					                                                                         ILPM 1th Quarter Progress Report: July –Sept 2011
                                                                                            Monitoring and Evaluation Unit




                              QUARTERLY PROGRESS REPORT
                                   Reporting Period: July – September 2011

                 Improving Livestock Production & Marketing Project
                                       (Pilot)
                                                   Funded by
                                        Multi Donor Trust Fund (MDTF-N)
                                    And Government of National Unity (GoNU)




Left -Livestock on the loading ram corridor for loading on trucks – Elnhoud Livestock Market
Right – Women receiving her animal for restocking Program




                                          Submitted by: M&E Officer
                                      Submission Date: November 14th 2011




                                                        1
                                                                                                         ILPM 1th Quarter Progress Report: July –Sept 2011
                                                                                                                            Monitoring and Evaluation Unit


                                                                  Table of Contents


1.   Introduction ..................................................................................................................................................... 4
2.   Executive Summary ........................................................................................................................................ 5
3.   Project Components Performance .................................................................................................................. 7
4.   Next Quarter work plans ............................................................................................................................... 13
5.   Cross Cutting Issues ……………………………………………………….……………………………… …. 14
6.   Finance Performance Report ........................................................................................................................ 15
7.   Procurement Performance Report ................................................................................................................. 16
8.   Appendix 1: Other Activities ………………….…………………………….…,,,………………………………19
9.   Appendix 3. Compliance with the Grand Agreement…....………………… ……………………………………22




                                                                               2
                                                                 ILPM 1th Quarter Progress Report: July –Sept 2011
                                                                                    Monitoring and Evaluation Unit


 ABBREVIATIONS AND ACRONYMS

APC                      Assistant Project Coordinator
AG                        Advisory Group
BLS                      Baseline Survey
BNS                      Blue Nile State
CAHWs                     Veterinary Animal Health Workers
CDF                      Community Development Fund
CBO                       Community Based Organization
CPA                      Comprehensive Peace Agreement
DWC                      Drinking Water Corporation
EOI                      Expression of Interest
FPP                      Final Project Proposal
GA                       Grant Agreement
GNU                      Government of National Unity
FO                        Financial Officer
IC                       Individual Consultant
IDA                      International Development Bank
ILRI                     International Livestock Research Institution
ILPM                     Improving Livestock Production and Marketing
LCB                      Local Competitive Bidding
LDIF                     Livestock Development Investment Fund
LIU                      Locality Implementation Unit
LR                       Livestock Route
MARF                     Ministry of Animal Resources and Fisheries
MDTF                     Multi Donor Trust Fund
MoFNE                    Ministry of Finance and National Economy
NCB                      National Competitive Bidding
NGO                      Non Governmental Organization
PCU                      Project Coordination Unit
PIU                      Project Implementation Unit
PC                       Project Coordinator
QBS                      Quality Base Selection
RPF                      Resettlement Policy Framework
RWC                      Rural Water Corporation
SMAARI                   State Ministry of Agriculture, Animal Resources and Irrigation
SPC                      State (Sector) Project Coordinator
SSC                      State Steering Committee
TOR                      Terms of Reference
VDC                      Village Development Committee
VPAC                     Veterinary Privatization Advisory Committee
TTL                      Task Team Leader
WB                       World Bank
WNS                      White Nile State




                                               3
                                                                            ILPM 1th Quarter Progress Report: July –Sept 2011
                                                                                               Monitoring and Evaluation Unit


                                                 1.   INTRODUCTION:

Reporting Period      This report is the third quarterly progress report of YR 2011 covers the period from 1st July
                      2011 up to 30th September 2011. It presents the project progress in respect to the planned
                      activities performance and challenges compiled from the Eastern, Western Sectors and PCU
                      under the approved project components.
                           1. Livestock Development Investment Fund
                           2. Privatization of Animal Health Services and Markets.
                           3. Project Management and Studies
                           4. Livestock Route Development

Project Description   The Project supports the development of livestock production and marketing in two poor and
                      conflict ridden areas of central and eastern Sudan. Improving livelihoods dependant on
                      livestock is a means to ensure peace dividends, mitigate natural resource-based conflict and
                      improve food security.
PDO                   The project’s objective is to improve livestock production and marketing in selected rain-fed
                      areas of Central and Eastern Sudan.
Sector:               Livestock and Rural Development
Location:             Piloted states of Blue Nile (Damazin Locality), Sinnar (Abu Hugar Locality), White Nile (Al
                      Gabalain Locality) and North Kordofan (Gheibeish, En Nuhud and Abu Zabed localities).
Total Project Cost                                                                            Amount (US$ Million)
                                                        MDTF-N         GoNU                                            Total
                       Total project cost               $ 6.51 m      $ 3.70 m                                    $ 10.21 million




Implementing          Federal Ministry of Animal Resources and Fisheries (MARF) and relevant State Ministries of
Agency                Agriculture, Animal Resources and Irrigation (SMAARI)
Implementation        5 years, August 2007- June 2012 (Extended phase I)
Period:




                                                          4
                                                                               ILPM 1th Quarter Progress Report: July –Sept 2011
                                                                                                  Monitoring and Evaluation Unit


                                                 2. EXECUTIVE SUMMARY
     2.1 Main Achievement

    1. As livestock market operation and management during the previous quarter remain challenge. In this quarter the
       project achieved to:
          - To review the current status and identified the necessary gaps on market operations in coordination with
               related stakeholders.
          - A comprehensive work plan per market was drawn and discussed for action during the coming quarter
          -     The project encouraged MARF Minster to take the lead in resolving the ownership issues at the local level.

    2. In spite of the challenges facing the privatization of the animal health services, this quarter the project approved
       the success made by the contracted private vets who participated actively in the ILPM show at Elnhoud which
       attended by the first vice- president of Sudan,


    2.2 Challenges and constraints:

    1. The irregular flow of f the local funding has impacted negatively the implementation of the activities in particular
       the investment fund of the project.

3     In Regards to Markets operations stated work plans the project currently working closely with authorities to
      resolve these market operational related issues such as the ownership.

4      The Insecurity Impacted the project activities in Blue Nile states, where the LIU Office closed, no looting
      reported. Staff relocated to PIU Office in Singa (Sinnar State) due to the inaccessibility to most of the working
      areas, LIU work plan will be discussed next quarter for future involvement




                                                             5
                                                                               ILPM 1th Quarter Progress Report: July –Sept 2011
                                                                                                  Monitoring and Evaluation Unit


    MATRIX OF AGREED ACTIONS:
                        Recommended action                                Responsible                Current status
1.  Sinnar state will take the responsibility of the remaining         Singa locality    Sinnar state letter was issued. The
    necessary needs of the market such as, electricity and market                        project is following on the process
    internal roads as per the state governor recommendation                              with stakeholders
2.  The market management should be the responsibility of the          PIU – Coordinator A primarily council were
    ministry of agriculture on the terms that a management council                       established, and process for
    will be formed involved the other stakeholder by 1st Sept 2011 ;                     finalization of the market ownership
3.  In regards to Elkhewie livestock market, it was agreed for the     PIU – Coordinator Done
    contractor to complete the fence and review the constructions to   and LIU
    match with set specifications                                      coordinator
4.  In regards to Elkhewie livestock market, the commissioner          Elkhewie          We received 18000 SDG ,the
    agreed to install water point in the market and pay a total of     commissioner and locality started bringing equipments
    18,000 SDG contributions for completion of basic need.             PIU coordinator & pipes for digging a water point in
                                                                                         the livestock market.
5. In regards to Elnhoud Livestock market agreed for the locality to : PIU-Coordinators Secured water via tanker
     Resolve the water problems as planned.                                             Secured cement block for
     Establish the Vet clinic according to specifications                               construction at site.
     Follow up with contractor to repair the damaged fence of                           Maintenance was done
         animals’ pens.
6. Review of MA agreed actions and follow up on the set action         PIU/LIUs          . Done & report was sent to PCU
    plans for further development within specific time frame.          Coordinators
WS Sector meeting main recommendations:                                PCU/PIU / LIUs’ Coming sector meeting will be
7. Importance of paying attention and focus on lessons learned and                       conducted at WS in Jan.2012.
    to be shared between the two sectors.                                                Done.
8. More effort should be paid towards communities contributions
    (cash & kind)
9. Agreed on arrange of a workshop to discuss the project exit
    strategy.
10. Exchange visits between the two sectors to address success                           Planned
    stories.
11. Unification of financial and procurement system at all project                       Waiting for action &coordination bet
    levels.                                                                              .PCU,PIUs
12. The future Sector meeting should be held in the presence of the
    two sectors (Joint meeting) for information sharing and learning.                    Agreed on Jan.2012
13. More effort must be exerted to discus the status and evaluate the
    vet. Privatization experiences to date for future vision.                            Clear action plan was established
14. The project has to allocate considerable fund for improvement
    and rehabilitation of land range improvements.
15. Implementation of environmental safeguard in all subprojects                         PCU concerns
    mainly livestock markets and water yards.
16. Documentation of success stories and all subprojects
    implemented and record of lessons learned.                                           Started\in all WS subprojects
17. Empowerment of the VPAC orientation and training on the water
    points operation and maintenance manuals;                                            Done




                                                              6
                                                                        ILPM 1th Quarter Progress Report: July –Sept 2011
                                                                                           Monitoring and Evaluation Unit




                                    2. PROJECT COMPONENTS PERFORMANCE

Component 1: Livestock Development Investment Fund:

1.1. Water Sub-projects:
During this period in both management working sectors seven water yards was successfully completed and primarily
handed over by contractors namely:
      Sieduk – Damazin locality
      Wad El fass – Damazin
      Mahboba - Damazin
      Agack - Elnhoud Locality
      Elhamaraya – Gebeish
      Rizig- Abu Zabad
      Ajab - Abuzabad

90% of the work was achieved and completed for Ahmer
Ain hafir in Jabalien Locality,
In Elterro and Jaba buna minor remaining activities per the
assigned contract as verified by the project team. (Agack
water point after rehabilitation)

The water yard achievements were followed by
implementation of technical & financial training for the
communities in hygiene promotion and trees plantation,
rural credit and management was delivered by the SMS for
pastoralist at the village level.

Other communities were participated in Black smith
workshop held in Elnhoud which organized by department
of extension and technology transfer aiming to disseminate
valuable intermediate technology at grass root level

During this quarter the project was achieved to ensure all 28 VDCs were well established for the management of
water facilities, more training on management capacity was
planned to be conducted during the next three months as
part of the project sustainability approaches.

 Particularly in the eastern sector VDCs auditing report was
received by the PIU from the State Auditing Chamber, An
audit was contracted to review the technical and financial
performances of all rehabilitated water points in Sinnar State
in order to identify pitfallsand weaknesses in both operation
and management, which subsequently will help in modifying
the signed MOU with WDC accordingly.




                                                          7
                                                                              ILPM 1th Quarter Progress Report: July –Sept 2011
                                                                                                 Monitoring and Evaluation Unit




1.2. Non Water subprojects:

The Six participated villages in the eastern sector
localities were repaid their restocking loans by
100%. So other 6 villages within the sector were
mobilized in three localities per loan agreement

In the western Sector selected communities were
mobilized, registered and paid their cash
contributions and they are ready to receive the
fund for implementing restocking.

The mobilization activities follows by routine
monitoring carried out by the sector staff specially
LIUs staff, looking for the general health of the
animals and extension messages delivery during
their field visits.

To date the table below shows the current status of the restocked at the project localities level.


                               Stock at       the New off spring
                                                                                       Died          Died      Total       Stock at the end
Locality          Animal       beginning       of                        Sub total
                                                  male female                          parent        kids      died        of month
                               month
                  sheep              1476              27       26          1520          11           2          13              1507
NHD               goat                170               2       3            175          3            -          3                172
                  total              1637              29       29          1695          14           2          16              1679
                  sheep               649              11       17           677           -           -           -               677
Gebeish           goat                539               4       8            551           -           -           -               551
                  total              1188              15       25          1228           -           -           -              1229
                  sheep              1582              20       29          1631          6            3          9               1622
Abuzabad          goat                98                0       3            101          1            -          1                100
                  total              1680              20       32          1732          7            3          10              1722
Abuhugar          Sheep               600               -        -            -            -           -           -                -
Jabalien          Sheep               452               -        -            -            -           -           -                -
Damazin           Sheep               520               -        -            -            -           -           -                -
    Total               -            6077              64       86         4655           21           5         26               4630




                                                            8
                                                                            ILPM 1th Quarter Progress Report: July –Sept 2011
                                                                                               Monitoring and Evaluation Unit


Component 2: Privatization of animal health services and
markets:

During this quarter the VPAC held two meetings discussing the
performance of the private vets in addition to review and approve
the new proposal raised by a 5 private vets to be selected.

The previously contracted private vets continue resuming their
works within their areas and they submitted their monthly report.

The private vets participated actively in the ILPM show at Elnhoud
animal pastoral campaign which attended by the first vice-
president of Sudan, , Federal ministers, Wali of North Kordofan
state, state Ministers and PSC chairman at the federal level (MARF
undersecretary) and many politicians and VPAC.

PIU PC conducted meeting with the private and public vets and
discussed roles and responsibilities of each sector, private vets'
performance and how to monitor the activities.

The table below shows the performance of the private vets during the quarter

Animal type              Vaccination No.                               Treatment No.                          Remarks
                 Planned      Achieved           %           Planned         Achieved           %
   Sheep         122000         94000            77          305000           274853           90
    Goat           9150          3200            35           22000            20419           92
   Cattle          8300          6200            74           18000            22062           122
   Camel          12100          6600            54           29000            33478           115

The trained CAWHs attached to the private vets and they are doing their work under the supervision of the private
and public vets. Preparation for conducting refreshment training for the most active Para—vets was planned to be
held in Dec. 2011

         1. Privatization of Markets

During this reporting period various coordination meetings and actions were made by the project in regards to the
management settings and ownership of rehabilitated livestock markets. As a result of an action work plan for each
Livestock market was drawn (Attached)

In spite of these efforts still no advances were made concerning the localities commitments particularly for Singa,
Tendelti and Damazin, where in the later market (Damazin) the locality was witnessed an armed conflict that
hindered the work in all development projects, but did not affect the projects interventions in the whole state.

    1. Tendelti Livestock Market: The technical report on analysis of the bore hole in the Livestock Market was
       received but unfortunately the report stated that the available water is unfit for human consumption. The
       project is consulting WNS DWC on alternatives ways, which was suggested to drain the water from the
       neighboring Sudd (Reservoir) to the market.
    2. Singa Livestock Market: on monitoring the signed MOU with locality on management/ operations guides, a
       support mission of WB, PCU and PIU, with Sinnar SMAARI Minister and Singa Commissioner had met The
       Sinnar Wali who directed the Minster to recruit a competent manager for the market and reformulate the
       market board of directors to be small but effective with qualified and active members, which the project still
       on process of putting this into place in regards to management and the market ownership.

                                                            9
                                                                                     ILPM 1th Quarter Progress Report: July –Sept 2011
                                                                                                        Monitoring and Evaluation Unit


    Table below showed average prices during the month of September: 2011:-
    Species                         Average Price Species                                                   Average Price
    Cattle females                      2500        Goat Male (more than 1year)                                   300
    Bull (semi-finished)                3500        Goat Female (less than 1year)                                 190
    Calf ( 2-3 years)                   1250        Goat Female (more than 1year)                                 250
    Sheep above 35 kg                    500        Camels Male                                                  3000
    Export Lamb less than 1 year         400        Camels Female                                                2000
    Goat Male (less than 1year)          190        Goat Male (more than 1year)                                   300
    Goat Male (more than 1year)          300        Goat Female (less than 1year)                                 190

The reduced number of animal presented and sold this quarter was influenced by rainy season as known animals are
comes from rural areas and the same time the sold numbers was influenced by courtesies and leniency in dealing
with custom collector (Buyers Fees Collector) and the buyers. The following table show the animal presented and
sold in Singa livestock Market.

   Month            Month                                                Total   Detailed Animal by type
                                                                                 Cattle    Sheep       Goat          Camels
   July      Total number of animal presented                            6985    308       4533        2141          3
             Total number of animal sold                                 1645    346       999                       3
   August    Total number of animal presented                            8302    376       5704        2222          0
             Total number of animal sold                                 1436    247       854         335           0
             Total number of animal presented                            7458    426       4772        2259          1
   September
             Total number of animal sold                                 1315    234       829         251           1
  Source: Singa Market Monthly Report

    3. Elkhewie Livestock Market: Extensive effort
       was made by PIU PC to enhance the locality to
       pay the committed contributions aiming to
       utilize it on filling the market gaps especially in
       provision of water, constructing cafeteria, vet
       unit. As the result the commissioner was paid
       sum of 18,000 SDG, and performing the
       following activities:
    - Starting to construct new water yard.
    - Furnished the market with excellent furniture.
    - Leveling the market yard.
    - Paid the cost of planting seedling around the
       market fence.
       (Picture on right: Elkhewie livestock market handed over by the
       contractor).
    4. Elnhoud Livestock Market: the following activities
          were achieved to enhance the market services capacity:
    -     They constructed four metal shed s (24000 SDG).
    -     Provision of electric generator (2000 SDG).
    -     Constructed of two offices at the entrance of the market.
    -     Additional furniture was purchased.
    -     Starting to build the vet. Unit by securing cement blocks.

                                                                         10
                                                                                                          ILPM 1th Quarter Progress Report: July –Sept 2011
                                                                                                                             Monitoring and Evaluation Unit


                    Table below show the functionality of NHD livestock market

  Month                         Sheep                                Goats                                  Cattle                                 Camel


            Sup.        Sold     Max    Min.    Av     Sup.   Sold   Max     Min.    Av     Sup.   Sold     Max      Min.    Av      Sup.   Sold   Max        Min.    AV

July.2011   12420       3169     369    152    260.5   654    271    210     136    173.0   1573   217      2125     0930   1527.5   651    125    3575    1587.5    2581.0

Aug.2011    25250       4712     420    270    345.0   1000   173    240     150    195.0   900    260      1925     0970   1447.5   622    113    4000    2435.0    3217.5

Sept.2011   26512       9773     520    370    445.0   1841   150    300     180    240.0   1156   266      1400     1050   1225.0   1262   089    5000    4100.0    4450.0

Total       64182       17654                          3495   350                           3629   742                               2535   327


             Source Elnhoud livestock market information system




             Component 3: Support for project implementation and studies.


                          TTL and PCU Support Mission:

             TTL accompanied by PCU mission composed of NPC Awatif Mohammed, M&E officer and M&E assistant, FO
             assistant visited the sector during August 2011 for reviewing performance, attending the sector meeting and
             discussed the MA report findings

             This mission was conducted during period 16 – 22 of August 2011 to achieve the listed objectives:

                    -      Resolve and support the eastern sector staff contracts issues and management of the rehabilitated markets.
                    -      Attend IFAD project start up workshop in lined with the project coordination with similar project in the area.
                    -      Attend the western sector meeting in Elobied.
                    -      Review of the MA resent report on the project management, finance and procurements activities in the
                           western sector.

                          Sate Steering Committee meetings:

             The project eastern sector managed to hold the regular meetings of the three states Steering Committees. The main
             agenda are to review the project performance, the exit strategy and the way forward, the challenges & constraints of
             water subprojects management and the required modifications of MOU between the communities and State DWC,
             and the digital maps of the livestock route produced by the project and the following steps.

             (i) Other missions:

             Upon the project implementation strategies review. Dr. Hassan Mohammed Nur was assigned on a short consultancy
             terms (1) Review and comment on the livestock market (2) to assess the current markets operation and management
             strategies in particularly the role of the localities commitments and market ownership (3) produce of comprehensive
             action plans and recommendations on the above mentioned issues..

             The consultancy review to the established livestock markets visit was conducted per agreed schedule on the
             assistance of the filed staff, MARF representative and the project monitoring and evaluation officer. During the visit


                                                                                    11
                                                                           ILPM 1th Quarter Progress Report: July –Sept 2011
                                                                                              Monitoring and Evaluation Unit


the team was physically visited Singa, Tendelti, Elkhwei and Elnhoud markets were various conducted with the
stockholders and related authorities.
The main out come of this visit an agreed action plan was prepared per each market especially to the management
and infrastructure in boarder context. The detail of this action plan was share with the field staff for actions and
considerations upon the next quarter


(ii) The Mentoring and evaluation assessment and recommendation status:

The World Bank in Khartoum had contracted an IT specialist with the purpose of assessing the status of ILPM
livestock markets information with special focus on the Marketing Data base system applied by the project. THE
mission formed to conduct the assessment with the objective:
To assess the capacity of MARF to host, manage and supervise the ILPM Livestock Markets Data Base system.
To clearly identify the gaps with regard to the practical and technical aspect of the Data Base system to be perfectly
applied and to insure that the system within the markets is fully functioning.
To provide Technical Assistance needed by the project concerning dissemination of livestock markets information to
be available for the end producers.

The WB IT specialist paid a visit to MARF Marketing unit, Singa and Tendelti livestock markets and came up with
proposed following issue:

        The need for an overall ICT strategy for livestock sector.
        Facilities to be used in markets to enable the dissemination of Prices to the end producer (Solar Energy,
         Mobile Phones, radio, TV).
        Procurement of ICT through upcoming 5 years for improvement and efficiency
        For timely entry of Data the system should be a net connected Data Base ( Mobile phones could be used)
         Bulk SMSs should be applied according to the requirements of the end user (contents of the SMS)
        Knowledge of Information dissemination system (KIDS).
        Standardization of the operating system used (Vista – XP).
        The need for information system polices.
        The need for technical staff to back up and advice.
        Capacity building and training
        Data Analysis for decision making.
        Use of ICT for production.
        Coordination with SIFSIA (one sources of Livestock Information to avoid duplication and mistrust).
         By the end of his mission the IT specialist set some recommendation for the improvement of livestock data
         entering and dissemination to be at reach for the end producer.


Component 4: Livestock Route Demarcation
The fall of the rains had suspended all activities
along the livestock route but successive meeting
were held with the relevant stakeholders to
enhance the process of settling the problems the
affected farmers, preparing the required
legislations and announcing the livestock route for
all and particularly herders and farmers.

.

                                                         12
                                                                         ILPM 1th Quarter Progress Report: July –Sept 2011
                                                                                            Monitoring and Evaluation Unit


 3. NEXT QUARTER WORK PLAN

                                                      Eastern Sector

Agenda/Key Issues         Activities/Action Points                       Responsible              Timeframe             Resources
                                                                                                  2011
Component (1) Livestock Development Investment Fund
Specific Objective:      Activities:

Capacity building         TA for project design at community level       PIU, LIUs,               Nov                   Consultant
                          TA to train CAHWs                              PIU, LIUs                Dec                   Consultant
                          TA to train localities and DWC on              PIU                      Nov                   WES
                          supervision
                          Correct deficiencies of rehabilitated water    LIUs                     Dec - Jan             DWC
                          points
                                                                     SSC, PIU, DWC                 Nov - Dec            Signed
                           Review & modification of MOU with DWC                                                        MOUs
Revolving of repaid fund Livestock Restocking & Fattening            PIU, LIUs                    Oct - Nov             Repaid fund
                           Milk production & cheese making (Wanasab- LIUs                         Nov - Dec             Grants
                           Sinnar)
Component (2) Privatization of animal health services and markets

Market support towards Determining legal status& ownership of            Market board, PIU         Nov
sustainability            rehab. Markets
                          Market Management Modality (Clarifying         Market B., PCU,           Dec - Feb
                          stakeholders TORs)                             PIU
                          State Senior staff and officials orientation   SSC, PIU                  Dec
                          Provide weighs for rehabilitated markets (3)   PCU                       Dec
                          Grant to mobilize and train livestock          PIU, PCU                  Jan                  Comm.
                          producers                                                                                     Banks
                          Basic communication equipment for livestock    PCU, PIU                  Nov
                          groups
                          Installation WY in Tandalti Market
Component 4: Improving livestock routes

LR rehabilitation         Support for States in LR legalization           PCU, PIU                Nov - Feb
                          Livestock Route Re-vegetation (Seeding)         LIUs                    June
                          (300km)

                          Civil works on 3 Integrated Centers            PIU, LIUs, TA, Nov- Jan
                                                                         SMAARIs
Western Sector

Agenda/Key Issues         Activities/Action Points                       Responsible              Timeframe              Resources

Component (1)             Follow up of water yard construction at        LIU . PIU.PC and         Nov.-Dec               Locality,
Livestock Development     Elkhewie market                                PIU procurement                                 ILPM
Investment Fund                                                          officer
                          Delivery of the four new water yards to the    PIU,LIUs VDCs            Non.-Dec,              ILPM

                                                       13
                                                                           ILPM 1th Quarter Progress Report: July –Sept 2011
                                                                                              Monitoring and Evaluation Unit


                            targeted communities
                            Routine follow up of restocking &water yards   PIU,LIUs                 Oct. Nov, Dec          ILPM
                            subprojects
                            Water users training                           ,SWC,PIU,LIUs     Dec                           LPM
                                                                           VDCs
Livestock Markets                                                          LIUs        .&PIU Nov.-Dec.                     ILPM,
                            Formation of markets groups                    commissioner,                                   Locality
                                                                           market dealers
                            Electric generators, Geb. Furniture            PIU, Locality            Dec.                   ILPM,
                                                                                                                           Localities
Vet, services               Injection of three members to the VPAC         PIU PC                   Nov                    ILPM


                            Share the finding of Waste management to       PIU,LIUs
                            the stakeholders
                            CAWHs training                                 PIU,LIUs ,VDCs&           Dec                   ILPM

                            Contract 6 private Vets                        PCU,PIU,VPAC             Dec                    ILPM




  4. CROSS-CUTTING ISSUES:
     i.     Gender;
Women participation and involvement in the
project initiatives remains the core responsible
from herding, watering and milking of goats
and for caring for animals kept at home and
still sell processed dairy products.
This quarter the project achieved to provide 11
women headed household with 4 sheep per
each from the villages restocking payments as
grant. Also more women were received gas
cylinders as alternative source of energy order
to stop the use of fire wood or charcoal for
cooking

  ii.    Environment Safeguards:
Based on the WB recommendations the
project assigned one of the Subject Matter
Specialist (SMS) to shoulder the activities of
Environment Safeguard Officer in the Western
Sector.




                                                          14
                                                                             ILPM 1th Quarter Progress Report: July –Sept 2011
                                                                                                Monitoring and Evaluation Unit


 5. FINANCIAL REPORT:

Total funds received , from MDTF , in this quarter , is SDG 1,729,856.60 equals US$ 651,421.13 ; this amount
includes SDG 556,811.60 (US$ 207,388.49 ); paid on direct payment basis ; against the contract of Egis Bceom , as
last instalment for conflict study. Foreign Exchange gain in this quarter is SDG 4,536 and Exchange loss is SDG
1,752.98. Total payments of MDTF for the quarter, is SDG 2,141,073 equal to (US$ 807,180) – (Refer to Table-1).

On 25th of September; we received SDG 1,400,000 (US$ 524,305.30) from Counterpart Fund. Total, payments of
this quarter; is SDG 507,502 (US$ 191,510); plus SDG 3,503.45 as VAT on procured materials; during the period.
(Refer to Table-1).

The column which is designated as Other in Table-1; with amount of SDG 42,529.11 ; represents foreign exchange
incentive against amounts transferred from our designated account to our local account; based on the policy
announced by the Central Bank of Sudan.

In this quarter; MDTF paid 12% of its total payments, for Ghebaish and El-Khowei markets, 45 %; paid on water
projects; 26 % on Studies (Foreign consultants) while 14% paid for officers and 3% for operation cost. (Refer to
Category-6 breakdown – Table-1)

GoNU paid 33% of its total payments, in this quarter, on Ghebaish Livestock Market water-point, 4% paid for different
supervision and technical assistance and 63% for operation cost, (Refer to Category-6 breakdown Table-1).

From Table -2 , we can conclude that ; budgeted component – I , under MDTF, is utilized by 71 %, but under
GoNU ; it is utilized, only by 90%; budgeted component – II is utilized by 47 % under MDTF, because markets
rehabilitation is running to its end . Component –III; of MDTF is implemented by 91% while that of GoNU is done by
106%; due to the fact that most payments of GoNU are used to be made on operation cost. Total components of
MDTF; in this quarter; are implemented by 65%, while Total implementation, by components of GoNU, is 87%

Operation cost, under GoNU, represents 63% of its total payments, in this quarter, while it represents 3% of; MDTF
total payments for the same period.

Cumulative total; budgeted components; of MDTF, up to end of this quarter, is implemented by 89% . Cumulative
Components of GoNU, for the same period, implemented by 88%. Please note that, we compute , these percentage
figures , based on the total fund of MDTF as USD 6.51 million , and GoNU as USD 3.7 million ; also please note
that our reporting currency is Sudanese Gineih ( SDG) , therefore take the impact of galloping inflation, in Sudan, into
consideration while reading the comparisons between quarters.

During this quarter, ILPM submitted 7 withdrawal applications ( from number 33 up to 39); but we received the
value of 5 withdrawal applications , amounting to USD 651,421 , out of these 5 WAs , two of them are paid on
direct payment basis , WA – 39 is submitted as Documentation of Prior Advance to Designated Account . On
October 2011; we received the proceeds of WA-37 (refer to Table- 4 ).

Attached :-

1-   Table - 1- Receipts and Uses of funds 30/09/2011.
2-   Table - 2- Budget comparison, by components on 30/09/2011.
3-   Table - 3- Designated Account Reconciliation on. 30/09/ 2011.
4-   Table - 4- Statement of funds received on 3rd Quarter of 2011.

                                                          15
                                                                             ILPM 1th Quarter Progress Report: July –Sept 2011
                                                                                                Monitoring and Evaluation Unit


 6. PROCUREMENT REPORT:

The report covers the procurement activities at PCU, PIU eastern Sector & PIU western sector for quarter three July
– September 2011 includes the following:

1. Overall performance of the procurement functions in the project.
2. Various procurement activities undertaken and their status.
For the activities funded by MDTF it was carried out according to IDA applicable policy and procedures, GoNU
financed activities we used procurement policy & procedures as stipulated in financial act of 1995

Overall Performance of the procurement Function:
Overall performance of procurement improved across the two sectors after procurement staff attend the procurement
workshop which organized by World Bank during 2009 and staff full equipped to address procurement issue
effectively. Thus the quality of evaluation report for project executed & draft bid document & specification reflect the
gradually staff improvement so practical training is required for field staff to deal with wide procurement issues.

Various procurement issues undertaken & their status, in the project up to the end of June 2011
 Description                                  Procurement undertaken      Procurement undertaken status
 PCU Procurement Activities
 1    Mapping exercise in support of conflict Contract implementation & (Completed) the report was
      mitigation                              finalization                accepted by the project based on
                                                                          the final approval of the Advisory
                                                                          Group & the world bank, the last
                                                                          payment was processed to the
                                                                          consulting firm.
 2    2 additional Markets rehabilitation     Gheibaish and Elkhowy       Gabaish livestock market initial
                                                                          completion was on 20th of June
                                                                          2011, Elkhoway livestock market
                                                                          initial completion was on 11th of
                                                                          August 2011
 3    Market data base Equipment for 5 Invitation to quote,               Market data base office equipment
      markets ( Desktop, Telephone-fax, Screening and evaluation. was received & distributed to 4
      Printer and photocopiers)                                           markets (Damazine, Tendalti, Singa
                                                                          & Elnuhud).
 4    4*4 pickup vehicle for PCU and PIUs     The process of contract The vehicles arrived Khartoum,
                                              was done by UNOPS           project received vehicles through
                                                                          Toyota Distributor to ensure the
                                                                          warranty and after sale service from
                                                                          the agent.
 PIU Eastern Sector Procurement Activities
 1    Rehabilitation of Altrou hafir-Sennar Date of contract signed Not completed
      State                                 11/5/2011, location handed
                                            over 8/6/2011, completion
                                            date23/7/2011
 2    Rehabilitation of Ahmer ainak hafirs Date of contract signed Not completed
      hafir-Sennar State                    11/5/2011, location handed
                                            over 8/6/2011, completion
                                            date30/5/2011
 3    Rehabilitation of Jabel Buna hafir- Date of contract signed Not Completed
      Sennar State                          11/5/2011, location handed

                                                          16
                                                                      ILPM 1th Quarter Progress Report: July –Sept 2011
                                                                                         Monitoring and Evaluation Unit


Description                                  Procurement undertaken    Procurement undertaken status
                                             over 8/6/2011, completion
                                             date23/7/2011

4    Rehabilitation of Seidak Hafir –First Date of contract signed         Completed
     Face                                    2/5/2011, location handed
                                             over 4/5/2011, completion
                                             date4/6/2011
5    Rehabilitation of Seidak Hafir –second Date of contract signed        Completed
     Face                                    2/5/2011, location handed
                                             over4/5/2011, completion
                                             date4/6/2011
6    Rehabilitation of mahbouba water yard Date of contract signed         Completed
                                             11/5/2011, location handed
                                             over 15/5/2011, completion
                                             date15/6/2011
7    Rehabilitation of Wadelfas water yard   Date of contract signed       Completed
                                             11/5/2011, location handed
                                             over 15/5/2011, completion
                                             date15/6/2011
PIU Western Sector Procurement Activities
1    Rehabilitation of Gabaish Livestock No objection, Contract            Completed & handed over.
     water point                             signature     ,    contract
                                             management             and
                                             implementation
2    Rehabilitation of Eritairit water point No objection, Contract        Completed & handed over.
                                             signature     ,    contract
                                             management             and
                                             implementation
3    Rehabilitation of Abu Melaise water No objection, Contract            Completed & handed over.
     point                                   signature     ,    contract
                                             management             and
                                             implementation
4    Rehabilitation of Um Gemaina water No objection, Contract             The contract was not signed due to
     point                                   signature     ,    contract   failure to secure community share.
                                             management             and
                                             implementation
5    Rehabilitation of Alawamra water point No objection, Contract         Completed & handed over.
                                             signature     ,    contract
                                             management             and
                                             implementation
6    Rehabilitation of AlHuwak water point   No objection, Contract        Completed & handed over.
                                             signature     ,    contract
                                             management             and
                                             implementation
7     Rehabilitation of Umdrouta Haffir      No objection, Contract        The process was revised & re-
                                             signature     ,    contract   advertised on 13th of April 2011.
                                             management             and    Due to delay on process it needs to
                                             implementation                re-advertise again .
8    Rehabilitation of Edaid Elhur Hafir / No objection, Contract          The process was revised & re-

                                                     17
                                                                            ILPM 1th Quarter Progress Report: July –Sept 2011
                                                                                               Monitoring and Evaluation Unit


 Description                                     Procurement undertaken         Procurement undertaken status
      Ehuhud Locality                            signature    ,   contract      advertised on 13th of April 2011.
                                                 management           and       Due to delay on process it needs to
                                                 implementation                 re-advertise again .
 9     Rehabilitation of livestock market        No objection, Contract         Initially handed over on20/6/2011.
       Gabaish market                            signature    ,   contract
                                                 management           and
                                                 implementation
 10    Elkhowie livestock market                 No objection, Contract         The initial completion was on 11th of
                                                 signature    ,   contract      August 2011.
                                                 management           and
                                                 implementation
 11    Elhamaraya water point                    Contract management and        Completed on27/9/2011.
                                                 implementation
       2011 – Sub projects
 12    Rehabilitation of Ajakk water point       Advertisement, invitation,     Invitation date 13/4/2011, contract
                                                 evaluation, report, contract   signing date 16/6/2011, contract
                                                 award, signing & contract      starting date 2/7/2011.
                                                 implementation.                Completion & initial receipt was
                                                                                on13/9/2011.
 13    Rehabilitation of Ajab water point        Advertisement, invitation,     Invitation date 13/4/2011, contract
                                                 evaluation, report, contract   signing date 16/6/2011, contract
                                                 award, signing & contract      starting date 2/7/2011.
                                                 implementation.                Completion & initial receipt was
                                                                                on3/8/2011.
 14    Rehabilitation of Rezig water point       Advertisement, invitation,     Invitation date 13/4/2011, contract
                                                 evaluation, report, contract   signing date 16/6/2011, contract
                                                 award, signing & contract      starting date 2/7/2011.
                                                 implementation.                Completion & initial receipt was
                                                                                on13/9/2011.
 15    Rehabilitation of Elmegaisim Haffir       Advertisement, invitation,     Invitation date 13/4/2011, no
                                                 evaluation, report, contract   objection not obtained.
                                                 award, signing & contract
                                                 implementation.

Next steps: (Procurement):
  iii.  The next step plan will focus on provision of technical assistant for PIUs & LIUs regarding preparation of bid
        document for procurement activities in pipeline project in addition to assist in contract management for
        under execution project.
  iv.   Follow up with procurement officer at all project level the status of execution of projects and quality.
   v.   Compilation of procurement activities from the sectors & the PCU to chick the procurement progress
        according to the procurement plan.
  vi.   Provide all required support in regards to specification, evaluation and reporting for post review
        procurement.
 vii.   Ensure of documentations, procurement checklist and execution of project as per requested. specification
        and approved bills of quantity.
 viii.  Exchange of information regarding procurement with staff at all level.
  ix.   Follow up procurement weakens indicators as per monitoring agent findings and report.
   x.   Address individual procurement review recommendations.



                                                         18
                                                                         ILPM 1th Quarter Progress Report: July –Sept 2011
                                                                                            Monitoring and Evaluation Unit




 7. Annex: (1) Other Activities:
         (i) Coordination meetings attended by the ILPM Staff;
         (ii) Meetings at MARF
         (iii) Meeting at World Bank;
         (iv) Other Management meetings activities

Visit/Meeting                 Date      Purpose                                            Remarks

                a. At the Project Coordination Unit ( PCU) Level

NPC ,APC visit to DG of 11/7            The purpose of the visit is to attend a one day    The study was prepared
Animal     Health     and               workshop (assessment of the livestock export       by Dr. Abubakr Ibrahim
Epidemics Control                       value chain in north Sudan.                        M. Hussein
Meeting with Dr. Hassan   13/7          The meeting took place in the PCU Premise          Market work plans was
Mohammed Nur (Animal                    chaired By APC attended by M&E officer and         prepared and shared with
Health expert)                          M&E Assistants, main issues discussed:             filed staff and the TTL
                                        Revision of the project materials enclosed in
                                        the project web site.

The project sent to World     14/7          1- Procurement issues.                         As at May 22nd revised
Bank Monitoring Agents                      2- Contract management issues.                 June 14th 2011.
comments on procurement                     3- Procurement and Contract
issues requiring attention                       management issues that progressed.
Meeting in the Agricultural   18/7      The meeting attended by HS Dr. M. A/Razig          MARF US want to share
Bank Headquarter in                     Undersecretary of MARF, Dr. Gazi , Deputy          the experience of the
Khartoum                                Director of the Agricultural Bank of Sudan ,       project while
                                        Mr. Saad Elomda Chairman of the                    implementing the
                                        Pastoralists Union, National Project               privatization of veterinary
                                        Coordinator and the Assistant Coordinator          services with the meeting
                                        .                                                  members

NPC Met with Singa            25/7      Main issues discussed :                            The locality commitment
livestock market Executive                  1. Locality commitment                         is still pending , and the
manager                                     2. Market Electricity                          management structure is
                                            3. Livestock Market Management                 one of the major
                                                 Structure                                 concerns
                                            4. Human resources management and
                                                 incentives needed to hire market
                                                 staff
                                            5. The Livestock market temporary
                                                 board of directors.

PCU Mission to project        16/8      Travel to Singa \Sinnar State.                     The mission composed
Sectors                                 With the East Sector Coordinator the Mission       of NPC,M&E officer ,
                                        team members discussed the preparations            M&E Ass, Financial Ass .
                                        made to present and attend of the IFAD
                                        project start up workshop per their official
                                        invitations
Mission team met with         18/8      The attendees agreed on specific                   HE Sinnar State Wali

                                                      19
                                                                     ILPM 1th Quarter Progress Report: July –Sept 2011
                                                                                        Monitoring and Evaluation Unit


Sinnar state Wali on the             recommendations in regards to the operation issued an administrative
presence of state minister           of Singa livestock market .and locality orders with regard to
of agriculture and locality          contribution                                   Singa Livestock Market
commissioner                                                                        (Completion of the
                                                                                    markets essential needs
                                                                                    ( water and electricity)
                                                                                    and market management
                                                                                    .
NPC met with Shertie          28/8   Main issues discussed :
A\Bagi Mohammed                      The possibility of rehabilitation of Khammas
Shertiie of Khamass Halab            halab Primary Market
( One of project targeted            Approval of locality commissioner and state
villages                             authority and MARF regarding the
                                     rehabilitation for the market
                                     Any TA required for rehabilitation
Meeting with HE Minister      4/9    Main issues discussed:                         The meeting attended by
of MARF                              The current security status of Blue Nile state NPC and DGs of MARF
                                     A clear vision for TA and possible assistance technical Departments.
                                     needed and necessary arrangements to be
                                     undertaken.
NPC and M&E officer met       5/9    Main issues discussed :
with Project TTL in WB               Project implementation status.
premise                              The status in Eldamzine LIU \ Blue Nile State
                                     ILPM Impact Assessment.
                                     Exchange visits for staff from project sector.
                                     Study tours timing.
                                     Coordination with IFAD, to check
                                     opportunities for scaling up or new fund
                                     raising opportunities.
PIU COs and WS LIUs 20/9             Main issues Discussed :                        The Meeting chaired by
Meeting in PCU                       Guidelines for Fund Raising Proposals Mr.TTL , Attended by
                                     presented by Project TTL.                      NPC ,APC ,M&E Officer ,
                                     Guidelines to be adopted and applied and PIU Coordinators ,West
                                     submitted to PCU by Project Coordinators.      Sector LIUs Coordinators
                                                                                    and M&E Assistants ,
WB IT Specialist Visit to 26/9       Main Issues Discussed :                        The meeting is a part of
PCU ( the IT Specialist              Review of the consultant visit schedule.       the      task      to be
assigned by WB to assess             Review of ILPM Project Implementation          undertaken by the IT
ILPM Livestock Marketing             Status.                                        specialist    to      ILPM
Data Base ).                         Marketing Data Base overview and               Project, attended by NPC
                                     implementation status , challenges and         ,APC and M&E Assistant
                                     constrains                                     The mission Purpose is
                                                                                    to             assess the
                                                                                    Information        System
                                                                                    adopted by ILPM Project.

WB IT specialist meeting      27/9   Main Issues Discussed: Current Status of the
with DG of Planning and              Marketing Data Base System and Information
livestock Economics of               flow.
MARF


                                                   20
                                                                             ILPM 1th Quarter Progress Report: July –Sept 2011
                                                                                                Monitoring and Evaluation Unit


                b. At the Eastern Sector Level

PIU & LIUs regular              Weekly      Follow up and Supervision                       Attended by PIU & LIUs
meetings                                                                                    staff
Supervision & Support           4 -6 / 7    Revision of Project performance                 PCU M&E officer, M&E
mission                                                                                     Assistants
ES Regular meeting in           7 – 9 /7    Review sector performance and challenges,       Attended by ES
Singa                                       WPs                                             consultants and some
                                                                                            SMSs
Sinnar State Steering Co.        18/7       to review the project performance, exit         Attended by the state
                                            strategy, the challenges & constraints of water members, the project PIU
                                            subprojects, and the digital maps of the        and LIUs coordinators
                                            livestock route
WN State Steering Comm           25/7       to review the project performance, exit          Attended by the state
                                            strategy, the challenges & constraints of water members, the project PIU
                                            subprojects, and the digital maps of the        and LIUs coordinators
                                            livestock route.

BN State Steering Comm           31/7     to review the project performance, exit              Attended by the state
                                         strategy, the challenges & constraints of water       members, the project PIU
                                         subprojects, and the digital maps of the              and LIUs coordinators
                                         livestock route
Mission to PCU                 18/9/2011 To attend fund raising session and discuss            ES PIU PC
                                         staff contracts
                                            At the Western Sector Level

NHD 11 visits           Jul6,10,12,14,18    - Monitoring of subprojects                        NHD 11 visits
6meetings               ,19,20              - restocking and vaccination extension             6meetings
                        Aug.2,9,12          message delivery
                        Sept.7,8,9,13,19,   - Routine staff meeting
                        22,27               - Mission meeting
                                            Mobilization &supervision.
Gebeish . 19 visits     Jul.16,17,18,19,    -community mobilization                            Gebeish . 19 visits
                        21,22,23,26,28,2    - follow up of subprojects
                        9,30
                        Aug.3,9,10,25       - commissioner meeting
                        Sept.8,13,20,29     -.
 Abuzabad               3,4,5,11,13 Jul.    -community training                                 Abuzabad
12 visits               11,14,15,16,20,2    - vaccination of herds                             12 visits
                        2,23,24 Augst.      Planting of seedlings
                                            Discuss market board formation
                                            Attend sector meeting




                                                          21
                                                                                 ILPM 1th Quarter Progress Report: July –Sept 2011
                                                                                                    Monitoring and Evaluation Unit




         Appendix 2. Compliance with the Grant Agreement

Project name: Improving Livestock Production and                Grant No.:   Compliance status as of 30 September, 2011
Marketing Project (ILPM) – A Pilot                              TF090693
                                                                dated 29 Aug
                                                                2007
Ref         Compliance requirement by the recipient1                Y/N/P    Current status
            Withdrawal conditions
3.02        No withdrawals shall be made:
             a) For payments made for expenditures                    Y      No expenditures related to the grant were
                 prior to 29 August 2007.                                    incurred prior to 29 August 2007
             b) for any payment for any taxes levied by               Y
                 or in Sudan on goods or services
             c) Under Category (4) for Sub grants until               Y      Operation Manual has been adopted. The
                 the Operational Manual has been                             project finalized translating the same into
                 adopted, in form and substance                              Arabic.
                 satisfactory to the World Bank.
            Reporting requirements
2.04        Prepare a project report in form and                      Y      Project submitted 1 progress report for the 1st
(a)         substance acceptable to IDA, each covering                       Q of this year 2011 in the required format.
            one calendar quarter, and submit to IDA
            within 45 days after the end of the calendar
            quarter covered
2.04        Prepare a Completion Report (ICR) in form                 N/A    Closing date is 30 June 2012. Therefore due
(b)         and substance acceptable to IDA and submit                       date is 31 December 2012.
            to the IDA not later than six months after the
            closing date.
2.05        Maintain a financial management system                    Y      A financial management manual was prepared
(a)         satisfactory to IDA                                              and endorsed by World Bank.
2.05        Prepare interim un-audited financial reports              Y      Project submitted quarterly un-audited
(b)         covering a calendar quarter as part of the                       financial reports as a part of the project
            project report, in form and substance                            quarterly progress reports.
            acceptable to IDA, and submit to IDA within
            45 days after calendar quarter covered
2.05        Have the financial statements (FS), each                  Y      First audited FS were completed by 30 June
(c)         covering a fiscal year, and submit audited FS                    2009; the 2nd audited report was completed by
            not later than six months after the end of each                  30 June 2010, the project received the
            fiscal year                                                      audited report for the financial year 2010, on
                                                                             30 /6 /2011 , we took all audit comments and
                                                                             adjustments into consideration ; meanwhile we
                                                                             delivered a copy to World Bank – Khartoum
                                                                             Office on the same day.
1.02(j) Procurement plan (PP) – initial PP covering                   Y      On November 14th 2010 the WB approved
        18 months from 1 September 2007 to 31                                ILPM PP including additional financing.
        November 2008 dated 2 July 2007 approved.
        Institutional and other requirements
2.03    Adopt an Operational Manual in form and                       Y      A revised operational manual was adopted

 1
     The project became effective on countersignature on 29 August 2007.

                                                                 22
                                                                            ILPM 1th Quarter Progress Report: July –Sept 2011
                                                                                               Monitoring and Evaluation Unit




Project name: Improving Livestock Production and           Grant No.:   Compliance status as of 30 September, 2011
Marketing Project (ILPM) – A Pilot                         TF090693
                                                           dated 29 Aug
                                                           2007
Ref     Compliance requirement by the recipient1               Y/N/P    Current status
        Withdrawal conditions
(a)     substance acceptable to the World Bank
2.03    (i) Prepare Environmental Social                         Y      Accomplished. May 2009, a translated version
(b)     Management Framework (ESMF) and                                 was shared with the PIUs and LIUs.
        Medical and Veterinary Waste Management
        Plan (MVWMP) both in form and substance                         Accomplished, November 2009
        satisfactory to IDA within six months after
        effectiveness.
        As for Veterinary Chemicals Waste
        Management Plan (VCWMP)
        ii) Ensure that activities are implemented in            Y      See 2.03(b)(i) above
        accordance with guidelines, procedures,
        timetable and specifications set forth in the
        ESMF and VCWMP.
        iii) Do not amend or waive any provision of              Y      See 2.03(b)(i) above
        the aforementioned frameworks,
        assessments and plans without IDA’s
        approval if doing so may, in IDA’s opinion,
        materially or adversely affect implementation
        of activities
2.03    (i) Prepare Land Acquisition and                         Y      Land Acquisition and Resettlement policy
(c)     Resettlement Policy Framework (RPF), both                       framework accomplished in Feb. 2009, a
        in form and substance satisfactory to IDA                       translated version was shared with the PIUs
        within six months after effectiveness                           and LIUs.
        ii) Ensure that the Project Coordination Unit            Y      See 2.03(f)(i) above
        (PCU) and Locality Implementation Units
        (LIUs) carry out activities in accordance with
        guidelines, procedures, timetable and
        specifications set forth in the Land Acquisition
        and RFP
        iii) Carry out Resettlement Action Plan as so            NA     The implemented sub-project needed no
        approved and if so indicated, prior to the                      Resettlement Policy Framework (RPF) as it
        commencement of any works under relevant                        was a water yard
        Sub-project                                                     Rehabilitation

        iii) Do not amend or waive any provision of              Y      See 2.03(c)(i) above
        the aforementioned frameworks,
        assessments and plans without IDA’s
        approval if doing so may, in IDA’s opinion,
        materially or adversely affect implementation
        of activities
2.03    (i) Open and thereafter maintain a project               Y      Opened in Bank of Sudan
(d)     account on terms and conditions satisfactory
        to IDA

                                                            23
                                                                            ILPM 1th Quarter Progress Report: July –Sept 2011
                                                                                               Monitoring and Evaluation Unit




Project name: Improving Livestock Production and           Grant No.:   Compliance status as of 30 September, 2011
Marketing Project (ILPM) – A Pilot                         TF090693
                                                           dated 29 Aug
                                                           2007
Ref       Compliance requirement by the recipient1             Y/N/P    Current status
          Withdrawal conditions
          iii) Replenish the account at timely intervals         Y      During this quarter, ILPM submitted 7
                                                                        withdrawal applications ( from number 33 up to
                                                                        39); but we received the value of 5 withdrawal
                                                                        applications, amounting to USD 651,421, out
                                                                        of these 5 WAs, two of them are paid on direct
                                                                        payment basis, WA – 39 is submitted as
                                                                        Documentation of Prior Advance to Designated
                                                                        Account. On October 2011; we received the
                                                                        proceeds of WA-37 (refer to Table- 4 ).

         iv) Use the funds in the LA exclusively for the         Y
         purpose of the project to meet reasonable
         cost of goods, works and services
2.03 (f) Make appropriate amounts of proceeds of the             Y      Transfer was made to communities served by
         grant available to Beneficiaries under Sub-                    project through PIUs under sub grant
         Grant Agreements                                               agreement to rehabilitate water yards, livestock
                                                                        markets and non water sob-projects.
2.03    No later than six months after effectiveness of          Y      A Privatization Act was issued by North
(g)     the Agreement, the Recipient shall issue                        Kordofan State in April 2009.
        requisite regulations that will allow selected
        aspects of provision of veterinary services to
        be privatized.
2.06(a) All goods, works and services are procured in            Y      All the consultant services goods and works
        accordance with World Bank guidelines                           were procured in accordance with WB
                                                                        guidelines processes.
          Additional conditions from Disbursement
          Letter
I(ii)     Disbursement deadline – 4 months after                 N/A    Closing Date is 30 June 2012
          Closing Date
II(iii)   Minimum value for applications – US$ 50,000            Y      No exceptions.
II(iv)    Currency of Designated Account (DA) – Euro             Y      Euro DA opened in October 2007.
II(iv)    Financial Institution at which DA will be              Y      DA No. 69213119 002 opened at CBOS in
          opened – Central Bank of Sudan (BOS)                          October 2007.
II(iv)    Type of DA – segregated; ceiling – Euro                Y      Following the MTR mission and the project
          300,000                                                       restructure, the project support mission in May
                                                                        2010, the ILPM project requested a ceiling
                                                                        Increase to Euro 500,000
III(ii)   Frequency of reporting eligible expenditure            Y
          from DA – monthly




                                                            24

				