					                    SPECIFIC PROCUREMENT NOTICE

                    Invitation for Prequalification Bids

                             REPUBLIC OF TURKEY


                     GAS SECTOR DEVELOPMENT PROJECT

                                   Procurement of
Supply and Installation of Erzincan Gas Compressor StationSupply and Installation of
   Surface and Sub-Surface Facilities and Cavern Leaching Operation of Tuz Gölü
                          Underground Gas Storage Project


                                  Loan No: 7342-TU


1. This invitation for bids follows the general procurement notice for this project that appeared
   in Development Business, issue no. 1140-653/05 of 07 April 2005This invitation for
   prequalification follows the general procurement notice for this project that appeared in
   Development Business No. 653 of 30 April 2005 on-line and in DG Market.                          Formatted: Highlight


2. The Petroleum Pipeline Corporation, BOTAŞ, has received a loan from the International
   Bank for Reconstruction and Development toward the cost of Gas Sector Development
   Project, and it intends to apply part of the proceeds of this loan to payments under the
   contract for the Supply and Installation of Erzincan Compressor Station.The Petroleum
   Pipeline Corporation, BOTAŞ, has received a loan from the International Bank for
   Reconstruction and Development related to the cost of Gas Sector Development Project,
   and it intends to apply part of the proceeds of this loan to payments under the contract for
   the Procurement of Supply and Installation of Surface and Sub-Surface Facilities and
   Cavern Leaching of the Tuz Gölü Underground Gas Storage Project. BOTAŞ intends to
   prequalify contractors and/or firms for the Supply and Installation of Surface and
   Subsurface Facilities and Cavern Leaching of the Underground Gas Storage Project and
   construction of a natural gas interconnection pipeline from the existing Eastern Anatolia
   Natural Gas Main Transmission Line to the Project Site. It is expected that invitations for
   bid will be made in February, 2008.
3. BOTAŞ now invites sealed bids from eligible bidders for the supply and installation of the       Formatted: Bullets and Numbering
   Erzincan Compressor Station which consists of four 4 turbine/compressor units with 3+1
   (three unit in operation and one unit spare) configuration and the other complemantary units
   and equipments and works complete in all aspects as defined in the Bidding Documents.
   The compressor station will be installed at Çayırlı town of Erzincan Province in Eastern
   Turkey and the site is approximately 115 km to the Erzincan City Center. The rate of flow
           to be pressurized on the pipeline varies between 1.613.000 to 2.040.000 Sm3/hour
           throughout the year.                                                                                         Formatted: Not Expanded by / Condensed by


           Eligible bidder should satisfy the postqualification criteria defined below:

    i)        As a contractor, management contractor, subcontractor or as a partner of a joint venture                 Formatted: Bullets and Numbering
              should have successfully completed and commissioned at least 2 (two) contracts for the
              supply and installation of natural gas compressor station or natural gas storage plant or
              natural gas fired energy power plant or natural gas pressure reduction and metering
              station project, each similar to the complexity described in Section VI, Technical
              Specifications, and each with a value of at least US$ 50 (fifty) million equivalent within
              last the last 10 (ten) years of which one of these contracts shall be centrifugal natural
              gas compressor station contract and should be in successful operation for at least one
              year as on the date of bid opening.

    ii)       The average annual construction turn over for the last 5 years should be USD 50 (fifty)                   Formatted: Bullets and Numbering
              Million equivalent.

    iii)      Liquid assets and/or evidence of access to or availability of credit facilities not less                  Formatted: Bullets and Numbering
              than USD 8 (eight) Million equivalent.

    iv)       The key personnel to be provided (the detailed resumes shall be provided):                                Formatted: Bullets and Numbering




                  Position                     Number         Total               Specific
                                                              Experience          Experience
                                                              (Years)             (Years)
                  Project      Manager              1                15                    5
                  (Mechanical or Civil
                  or Electrical and/or
                  Electronics Engineer)
                  Construction                      1                15                    5
                  Manager
                  (Mechanical or Civil
                  or Electrical and/or
                  Electronics Engineer)
                  Civil Engineer                    2                 5                    2

                  Mechanical Engineer               2                 5                    2

                  Electrical        and/or          2                 5                    2


 Management Contractor means a firm, acting in the role of ‘Contractor’ that does not usually perform contract
work directly, but manages the work of other (sub) contractors, while bearing full responsibility and risk for price,
quality, and timely performance of the contract.
         Electronics Engineer
         Heath and Safety             1               5                2
         Expert (with expert
         certificate)
         Procurement Expert           1               5                2

         Planning Expert              1               5                2

         Topographer                  1               5                2




v)    Proposals for the timely acquisition (own, hire, lease, etc) of the following essential     Formatted: Bullets and Numbering
      Contractor’s Equipment:

      Equipment Type and                   Minimum
      Characteristics                      Number
                                           Required
      Dozer- minimum 280 HP                      1
      Backhoe- minimum 280 HP                    2
      Loader- minimum 280 HP                     1

      Crane- minimum 60 tons                      2

      Hi-Up                                       3
      Welding machine                            20
      Generator-minimum 150kVA                    1
      Trucks                                      2
      Air compressor- minimum 280                 2
      cfm

vi)   Litigation history: The Bidder should provide accurate information on any litigation or     Formatted: Bullets and Numbering
      arbitration resulting from contracts completed or under execution by him over the last
      two years. Non-performance of a contract did not occur within the last two (2) years
      prior to the deadline for bid submission based on fully settled disputes or litigation. A
      fully settled dispute or resolution is one that has been resolved in accordance with
      Dispute Resolution Mechanism under the respective contract and where all appeal
      instances available to the applicant have been exhausted.
vii)    Availability of ISO 9001 and 14001 quality certificates.                                       Formatted: Bullets and Numbering


viii)   The Joint Ventures must comply with the following requirements:                                Formatted: Bullets and Numbering
         The figures for each of the partners of a joint venture shall be added together to
           determine the Joint Venture’s overall compliance with the minimum qualifying
           criteria set out in Sub-paragraph 3 of this Invitation For Bids (IFB); however, in
           order for a joint venture to be qualified, the lead partner should demonstrate at
           least one of the contracts specified under paragraph IFB Sub-paragraph 3 (i) and
           also demonstrate average annual contruction turnover of US$ 25 (twenty five)
           million equivalent for the last 5 (five) years, and also demonstrate at least 50%
           (fifty percent) of the amounts specified under IFB Sub-paragraph 3 (iii);
         All partners should jointly meet the requirement specified under IFB Sub-
           paragraph 3 (iv) and (v);
         All partners should satisfy the requirement specified under IFB Sub-paragraph 3
           (vi) and (vii);

ix)     The bidder shall propose the appropriate turbine-compressor model used for Erzincan            Formatted: Bullets and Numbering
        Compressor Station with its bid. Proposed turbine-compresssor model shall not be
        changed in any stage.

x)      The minimum qualification criteria for the turbine/compressor manufacturer is given            Formatted: Bullets and Numbering
        below:

        a. Availability of ISO 9001 quality certificate.                                               Formatted: Bullets and Numbering
        b. Availability of at least 5 facilities in operation in countries other than manufacturer’s
           country for at least 3 years that consist of the same model gas turbine and the same
           model centrifugal gas compressor units as proposed for Erzincan Compressor
           Station.
        c. The manufacturer shall produce both turbine and compressor. (Under no
           circumstances, the turbines and compressors come from different manufacturers
           shall not be accepted)
        d. A product information file about proposed turbine-compressor package shall be
           submitted.                                                                                  Formatted: Indent: Left: 0.25"
                                                                                                       Formatted: Outline numbered + Level: 1 +
The construction period is envisaged to be 510 calendar days.                                          Numbering Style: 1, 2, 3, … + Start at: 1 +
                                                                                                       Alignment: Left + Aligned at: 0.25" + Tab
                                                                                                       after: 0.5" + Indent at: 0.5"
4. Bidding will be conducted through the international competitive bidding procedures                  Formatted: Bullets and Numbering
   specified in the World Bank’s Guidelines: Procurement under IBRD Loans and IDA                      Formatted: Indent: Left: 0.25"
   Credits, and is open to all bidders from eligible source countries as defined in the
                                                                                                       Formatted: Outline numbered + Level: 1 +
   guidelines.                                                                                         Numbering Style: 1, 2, 3, … + Start at: 1 +
                                                                                                       Alignment: Left + Aligned at: 0.25" + Tab
                                                                                                       after: 0.5" + Indent at: 0.5"
5. Interested eligible bidders may obtain further information from BOTAŞ and inspect the
   bidding documents at the address (1) given below between 09.00-17.00. hrs (local time).             Formatted: Bullets and Numbering
                                                                                                       Formatted: Outline numbered + Level: 1 +
                                                                                                       Numbering Style: 1, 2, 3, … + Start at: 1 +
6. A complete set of bidding documents in English may be purchased by interested bidders on            Alignment: Left + Aligned at: 0.25" + Tab
   the submission of a written application to the address (2) below and upon payment of a              after: 0.5" + Indent at: 0.5"
                                                                                                       Formatted: Bullets and Numbering
   nonrefundable fee USD 400 including Value Added Tax, VAT. The method of payment
   will be direct deposit aforementioned nonrefundable fee to the BOTAŞ’s account at
   Vakıfbank AŞ BOTAŞ OfficeBilkent Branch- Ankara- Republic of Turkey, account No:
   2005690 for payment in TL or account no 4004715 for payment in USD. The document
   will be sent by airmail for overseas delivery and surface mail for local delivery.

7. Bids must be delivered to the address (2) below at or before 14.00 hours (local time) on        Formatted: Outline numbered + Level: 1 +
                                                                                                   Numbering Style: 1, 2, 3, … + Start at: 1 +
   01.09.2009. All bids must be accompanied by a bid security of minimum USD 1 000 000             Alignment: Left + Aligned at: 0.25" + Tab
   (one million) or an equivalent amount in a freely convertible currency. Late bids will be       after: 0.5" + Indent at: 0.5"
   rejected. Bids will be opened in the presence of the bidders’ representatives who choose to     Formatted: Bullets and Numbering
   attend at the address (3) below at 14.00 hours (local time) on 01.09. 2009.                     Formatted: Font: Not Italic
3.Turkish Petroleum Pipeline Corporation, BOTAŞ, proposes to construct underground                 Formatted: Bullets and Numbering
   natural gas storage (UGS) facility approximately 200 km south of Ankara in the central
   part of Turkey, approximately 40 km south of Tuz Gölü (or "Salt Lake").

   Tuz Gölü UGS Project will create a series of underground gas storage caverns by
   controlled fresh water solution mining of portions of the extensive underground natural
   salt formations. Each cavern will be developed at the depths of 1100-1400 m, have a
   physical volume of approximately 630.000 m3 and the total working gas volume will be
   nearly 1 billion m3 in twelve caverns.



   The storage project consists of subsurface facilities, surface facilities and operations. The
   subsurface facilities / works relevant for this prevailing prequalification consist of:

                                                                                                   Formatted: Bullets and Numbering
              Detailengineering study of Supply and Installation of Subsurface facilities of
                Tuz Gölü UGS Project
              Two   already existing wells UGS-1 and UGS-2, which have to be installed by
                the final casing column,
              Drilling   of additional 10 new cavern wells with adequate subsurface
                installation,
              Leaching process of 12 salt caverns for gas storage purpose (each cavern with
                a geometrical volume of approximately 630.000 m³ )
              First   gas fill,
              Snubbing     operation,
              Commissioning       of each cavern.
   The surface facilities / works relevant for this prevailing prequalification consist of:
                                                                                                   Formatted: Bullets and Numbering
              Detailengineering study of Supply and Installation of Surface facilities of Tuz
                Gölü UGS Project
              Technological  units such as; compressors, drivers, gas measuring equipment,
                filters and separators, heaters, coolers, drying plants, de-hydration units,
                   leaching pumps, cavern heads, dilution pumps, decanters, blanket units, fuel
                   gas supply system, transport pipelines, storage tanks, flare system, vent
                   systems, pressure control, power supply, power generator, instrumentation,
                   cables, units- and plant controlling system, automation components, SCADA,
                   auxiliary and supporting equipment, connecting piping, connecting piping
                   with armatures, field piping system and connecting manifold, etc.
                 Steel constructions,   supporting constructions
                 Civil   works, base plates, basement, ground works
                 Technological      buildings, factory buildings, stores, social and sanitary
                   buildings
                 Streets   and outside facilities
                 Safety  systems (gas-warning system, fire alarm system, fire fighting system,
                   fail-safe- supervising systems)
                 Tank farm


In respect to the 2 leaching/construction phases of the 12 caverns, the Leaching Plant will be
designed for the simultaneous leaching process of 6 caverns. The main design data of the entire
leaching system are given below.


       - Brine discharge;                                    into salt lake Tuz Gölü
       - Max. Leaching water flow;                           6 x 300 m3/h = 1800 m3/h
       - Max. Total fresh water volume per year;             15.000.000 m3
       - Leaching well head pressure;                        90 bar ± 5 bars
       - Max. Pressure in the cavern;                        220 bars
       - Brine volume flow total;                            680 ... 3120 m3/h
       - Blanket medium;                                     Nitrogen
       - Power supply;                                       31, 5 kV

Prequalification will be conducted through prequalification procedures specified in the World
Bank’s Guidelines: Procurement under IBRD Loans and IDA Credits, May 2004 and is open
to all bidders from eligible source countries, as defined in the guidelines.
Interested eligible applicants may obtain further information and inspect the prequalification
document at BOTAŞ (address below) from 09.00-12.00 (local time). A complete set of the
prequalification document in English may be purchased by interested applicants on the
submission of a written application to the address below and upon payment of a nonrefundable
fee of 65 YTL or in 50 US$ including Value Added Tax, VAT. The method of payment will be
direct deposit aforementioned nonrefundable fee to the BOTAŞ’s account at Vakıfbank AŞ
BOTAŞ Office- Ankara- Republic of Turkey, account No: 2005690 for payment in YTL or
account no 4004715 for payment in USD. The document will be sent by airmail for overseas
delivery and surface mail for local delivery.
Applications for prequalification should be submitted in sealed envelopes, delivered to the
address below by October 19, 2007 and be clearly marked “Application to Prequalify for Gas
Sector Development Project, Procurement of Supply and Installation of Surface and Sub-
Surface Facilities and Cavern Leaching of the Tuz Gölü Underground Gas Storage Project,
The Contract No: WB-G-2-11 b-1. ”
        Address (1):

        BOTAS
        Petroleum Pipeline Corporation
        Contracts & Engineering Department
        Attn. Mr. Abdulvahit FİDAN
        Bilkent Plaza 4. Cadde
        A-1 Blok, Kat 6, 06800
        Bilkent, Ankara
        Republic of Turkey

        E-mail: abdulvahit.fidan@botas.gov.tr                                                       Formatted: German (Germany)
        Phone No: +90 312 297 25 14
        Fax No: +90 312 297 32 44

        Address (2):

        BOTAS
        Petroleum Pipeline Corporation
        Haberleşme Müdürlüğü
        Bilkent Plaza 4. Cadde
        A-2 Blok, Zemin Kat, 06800
        Bilkent, Ankara,
        Republic of Turkey

        Address (3):

        BOTAS                                                                                       Formatted: French (France)
        Petroleum Pipeline Corporation
        Konferans Salonu
        Bilkent Plaza 4. Cadde                                                                      Formatted: Underline
        A-2 Blok, Zemin Kat, 06800                                                                  Formatted: Indent: Left: 0.5"
        Bilkent, Ankara,                                                                            Formatted: Underline
        Republic of Turkey                                                                          Formatted: Indent: Left: 0.5"
                                                                                                    Formatted Table
                                                                                                    Formatted: Font: 11 pt, English (United
                                                                                                    States)
        RELATED PERSONNEL FOR TECHNICAL INFORMATION                                                 Formatted: Font: Not Bold
        BOTAS
                                                                                                    Formatted: Not Highlight
                                                                                                    Formatted: Not Highlight
No    NAME-SURNAME               PHONE            FACSIMILE                     E-mail
1                                                                                                   Formatted: Font: Not Bold, Not Highlight
     Abdulvahit FİDAN       +90 312 297 25 14   +90 312 297 32 44   abdulvahit.fidan@botas.gov.tr
                                                                                                    Formatted: Font: Not Bold
2    Zülfü YILDIRIM         +90 312 297 27 34   +90 312 297 32 44   zulfu.yildirim@botas.gov.tr     Formatted: Not Highlight
                                                                                                    Formatted: Not Highlight
3    Ümit Can BAŞARAN       +90 312 297 25 75   +90 312 297 32 44   ucan.basaran@botas.gov.tr
                                                                                                    Formatted: Font: Not Bold, Not Highlight
                                                                                                    Formatted: Font: Not Bold
Petroleum Pipeline Corporation
Contracts & Engineering Department

Attn. Mr. Musa Cihan
Project Manager
Bilkent Plaza 4. Cadde
A-1 Blok, Kat 6, 06530
Bilkent, Ankara
Republic of Turkey

E-mail: musa.cihan@botas.gov.tr
Phone No: +90 312 297 26 08
Fax No: +90 312 266 06 19

				