									Status of New Projects / MDO Blocks pending for ToR, PH, Environmental Clearances during 2011 - 12 (AS ON 31.01.2012)

                                                                 Date of EAC meeting   Date of submission of                                      Date of submission
Sl.                                Date of submission of
         Name of the Project                                      for ToR & Date of  Draft EIA / EMP for conduct            Date of PH             of Final EIA / EMP
No.                               Form - 1 to MoEF for ToR
                                                                     issue of ToR         of Public Hearing                                  for final EC & EAC meeting.

 I    NEW / EXPANSION PROJECTS
 1    Kunavaram OCP             Draft EIA / EMP was          ToR meeting was held       Draft EIA / EMP is ready for   Kept on HOLD
                                submitted to MoEF for ToR on 11.04.2007 and             submission for conduct of PH
                                on 20.02.2007.               ToR was issued on
                                                             26.04.07.
 2    KK OCP                    Applications in Form - 1 was ToR meeting was held       Fresh application in Form - I  --
      (Conversion of SMG & KK-2 submitted to MoEF on         on 24.02.09. ToR was       has to be submitted for ToR as
      Inclines)                 13.01.09.                    issued on 20.03.09         there is a change in the land
                                                                                        requirement.
 3    KK OCP (Revised)            Applications in Form - 1 was   ToR meeting was held
      (Conversion of SMG & KK-2   submitted to MoEF on           on 23.01.2012
      Inclines)                   02.12.11.
 4    Kondapuram Mine             Applications in Form - 1 was   ToR meeting was held Draft EIA / EMP was submitted PH was conducted     EC was issued on 05.03.2010.
                                  submitted to MoEF on           on 28.08.08 and ToR to APPCB on 31.12.08           on 18.05.09          Application for the approval of the
                                  30.07.08.                      was issued on                                                           Standing Committee on Wildlife was
                                                                 19.09.08.                                                               submitted to DFO, Paloncha on
                                                                                                                                         12.05.2010. Application is to be
                                                                                                                                         forwared by PCCF to GoAP. Meeting
                                                                                                                                         of Standing Committee on Wildlife was
                                                                                                                                         held on 14.10.2011and asked to
                                                                                                                                         submit a report on Impact of mine on
                                                                                                                                         the sanctuary.A report prepared by
                                                                                                                                         Corporate Environment Department
                                                                                                                                         has been submitted to Advisor
                                                                                                                                         (Forestry) for onward submission to
                                                                                                                                         the Standing Committee.
 5    Sand Mining (Gumpenapalli Applications in Form - 1 was ToR meeting was held Draft EMP has been submitted Date of PH is yet to
      & Ganapavarm),            submitted to MoEF on         on 26.05.2010 and    to APPCB                     be decided.
      Kothagudem                03.03.2010.                  ToR was issued on
                                                             22.06.2010.
                                                               Date of EAC meeting   Date of submission of                                   Date of submission
Sl.                                 Date of submission of
         Name of the Project                                    for ToR & Date of  Draft EIA / EMP for conduct          Date of PH            of Final EIA / EMP
No.                                Form - 1 to MoEF for ToR
                                                                   issue of ToR         of Public Hearing                               for final EC & EAC meeting.
 6    Sand Mining (Kudurpalli &   Applications in Form - 1 was ToR meeting was held Draft EMP has been submitted Date of PH is yet to
      Beerasagar),                submitted to MoEF on         on 26.05.2010 and    to APPCB                     be decided.
      Bhoopalpalli                03.03.2010.                  ToR was issued on
                                                               22.06.2010.
 7    Koyagudem - 1 Incline       Application in Form - 1 was ToR meeting was held Kept on HOLD
      Underground Mine            submitted to MoEF on        on 24.03.2009.and
                                  25.02.2009.                 ToR was issued on
                                                              15.04.09

 8    2 X 135 MW Power Plant       Application in Form - 1 was ToR meeting was held     Awaiting for DPR for         Kept on HOLD
                                   submitted to State Level     on 29.05.2009 and       preparation of Draft EIA /
                                   EIAA on 17.04.09.            ToR was issued on       EMP.
                                                                17.06.09.
 9    RG OC - III Ph.- II          Applications in Form - 1 was ToR meeting was held    Draft EIA / EMP is under
      (GDK 8 & 8A)                 submitted to MoEF on         on 28.04.2010. ToR      preparation
                                   30.03.2010.                  was issued on 28th
                                                                May 2010.
10    MNG OC - IV Extension        Applications in Form - 1 was ToR meeting was held    Draft EIA / EMP is under
                                   submitted to MoEF on         on 28.09.2010. ToR      preparation
                                   11.08.2010                   was issued on
                                                                28.10.2010
11    RKP OC - II                  Application in Form - 1 was ToR meeting was held     Kept on HOLD
      (Conversion of RK - 5 & RK - submitted to MoEF on         on 24.06.09. EAC
      6 Inclines)                  11.06.2009                   sought some aditional
                                                                information and the
                                                                same was submitted
                                                                on 12.01.2010
12    Peddapur OC                  Application in Form - 1 was EAC meeting for ToR      Kept on HOLD
                                   submitted to MoEF on         was held on
                                   27.04.2009                   26.05.2009 and ToR
                                                                was issued on
                                                                09.06.09.
13    Kistaram OCP                Application in Form - 1 was EAC meeting for ToR       Draft EIA / EMP is under
                                  submitted to MoEF on        was held 29.10.2009.      preparation
                                  05.10.2009                  ToR was issued on
                                                              23.11.2009
                                                                 Date of EAC meeting   Date of submission of                         Date of submission
Sl.                                Date of submission of
         Name of the Project                                      for ToR & Date of  Draft EIA / EMP for conduct   Date of PH         of Final EIA / EMP
No.                               Form - 1 to MoEF for ToR
                                                                     issue of ToR         of Public Hearing                     for final EC & EAC meeting.
14    Khairagura UG Mine          Application in Form - 1 has    Kept on HOLD
                                  been prepared and ready
                                  for submission.
15    Kasipet - 1 Incline         Applications in Form - 1 was   ToR meeting was held
      (Exp. of Kasipet UG Mine)   submitted to MoEF on           on 23.01.2012
                                  02.12.11.
16    Kasipet 2 Incline           Applications in Form - 1 was   ToR meeting was held
                                  submitted to MoEF on           on 23.01.2012
                                  02.12.11.
17    GK OC Expansion Project     Form - 1 is under
                                  preparation

18    GDK 1&3, 2&2A & 5           Form - 1 is under
      Incline Mines               preparation


 II   MDO BLOCKS

A     GROUP - I
 1    Chennur - 5 Incline         Application in Form - 1 was ToR meeting was held Kept on HOLD
                                  submitted to MoEF on        on 24.06.09 and ToR
                                  18.05.2009                  was issued on
                                                              03.07.2009
 2    Chennur - 6 Incline         Application in Form - 1 was ToR meeting was held Kept on HOLD
                                  submitted to MoEF on        on 24.06.09 and ToR
                                  18.05.2009.                 was issued on
                                                              03.07.2009
 3    Chennur - 7 Incline         Application in Form - 1 was ToR meeting was held Kept on HOLD
                                  submitted to MoEF on        on 24.06.09 and ToR
                                  18.05.2009.                 was issued on
                                                              03.07.2009
 4    Sravanapalli - 1 Incline    Form - 1 is ready for          Kept on HOLD
                                  submission.
 5    Sravanapalli - 2 Incline                --do--             Kept on HOLD
                                                              Date of EAC meeting   Date of submission of                              Date of submission
Sl.                                Date of submission of
         Name of the Project                                   for ToR & Date of  Draft EIA / EMP for conduct        Date of PH         of Final EIA / EMP
No.                               Form - 1 to MoEF for ToR
                                                                  issue of ToR         of Public Hearing                          for final EC & EAC meeting.

B     GROUP - II
 6    Laxmidevpeta UG Mine        Application in Form - 1 was EAC meeting for ToR    Kept on HOLD
                                  submitted to MoEF on        was held on
                                  27.04.2009                  26.05.2009 and ToR
                                                              was issued on
                                                              09.06.09.
7     KTK - 9 Incline             Application in Form - 1 was EAC meeting for ToR    Kept on HOLD
                                  submitted to MoEF on        was held on
                                  27.04.2009                  26.05.2009 and ToR
                                                              was issued on
                                                              09.06.09.
 8    Rampuram Shaft Block        Application in Form - 1 was EAC meeting for ToR    Draft EIA / EMP was submitted Kept on HOLD
                                  submitted to MoEF on        was held on 13.06.07   by Anna University and it is
                                  07.04.2007                  and ToR was issued     under scrutiny.
                                                              on 29.06.07.

C     GROUP - III
 9    Kalyani Khani - 7 Incline                               EAC meeting for ToR    Kept on HOLD
                                  Application in Form - 1 was
                                                              was held on
                                  submitted to MoEF on
                                                              29.10.2009. ToR was
                                  05.10.2009
                                                              issued on 23.11.2009
10    RKP Shaft Block - I         Form - 1 is ready for       Kept on HOLD
                                  submission.
11    RKP Shaft Block - II                    --do--          Kept on HOLD
12    Kalyani Khani - 6 Incline   Application in Form - 1 was EAC meeting for ToR    Kept on HOLD
                                  submitted to MoEF on        was held on
                                  05.10.2009                  29.10.2009. ToR was
                                                              issued on 23.11.2009
      SUMMARY OF PROJECT DESCRIPTION AND STATUS OF PH & EC OF THE NEW / EXPANSION PROJECTS & MDO BLOCKS DURING 2011 - 12 (AS ON 31.01.2012)

Sl.                                                                     Prod. Capacity                 Agency for BLD
            Name of the Project           Area   Type    Technology                       FR Status                   Status of BLD            Status of PH           Status of EC        Status of CFE
No.                                                                        (MTPA)                       / EMP Works


 I    NEW / EXPANSION PROJECTS
 1    Kunavaram OCP                      MNG      OC    Shovel Dumper        0.70        Approved on EPTRI               BLD available Draft EIA/EMP is        Kept on Hold
                                                                                         26-10-2005                      from Jan.- Dec. ready for submission.
                                                                                                                         2006
 2    JVR OCP - II                        KGM     OC    Shovel Dumper        4.00        Revised FR EPTRI                BLD available     PH was conducted on EC was issued on       Yet to be applied
                                                                                         was approved                    from Jan.-Dec.    21.05.2009.         28.03.2010
                                                                                         04.07.2011                      2006




 3    KK OCP                              MM      OC    Shovel Dumper        2.00        Mining plan   BLD - EPTRI,      BLD available     ToR meeting was
      (Conv. of SMG & KK-2 Inclines)                                                     approved.     EMP- Inhouse.     from Dec. 08 -    held on 23.01.2012
                                                                                                                         March 09.
 4    KK OCP (REVISED)                    MM      OC    Shovel Dumper        1.75        Mining plan                         To be
      (Conv. of SMG & KK-2 Inclines)                                                     approved.                         generated

 5    Sand Mining (Gumpenapalli &         KGM    Sand Manual / Semi     5.20 LM3/year                  Pragathi Labs for Data available Date of PH is yet to
      Ganapavarm), Kothagudem                    Mining mechanised                                     BLD               for Winter 2009 be decided.

 6    Sand Mining (Kudurpalli &          BHPL    Sand Manual / Semi     12.5 LM3/year    Mining plan  BLD-Pragathi       Data available Date of PH is yet to
      Beerasagar),                               Mining mechanised                       was approved Labs               for Winter 2009 be decided.
      Bhoopalpalli
 7    Koyagudem - 1 Incline               YLD     UG    Semi                 1.00           Kept on
      Underground Mine                                  mechanisation                        HOLD
 8    2 X 135 MW Power Plant              RG     Power Thermal             270 MW        FR is under   BLD & EMP by      BLD available        Kept on HOLD
                                                                                         preparation   Bagavathi Anna    form Dec. 08 to
                                                                                                       Labs, Hyd.        Feb. 09.
 9    RG OC - III Ph.- II (GDK 8 & 8A)   RG      OC     Shovel Dumper        7.00        Yet to be     EPTRI for BLD     BLD with PM2.5 Draft EIA / EMP is
                                                                                         approved                        is available for under preparation
                                                                                                                         Post monsoon
                                                                                                                         2010.

10 MNG OC - IV Extension                 MNG     OC     Shovel Dumper        3.0         Approved on EPTRI for BLD       BLD with PM2.5 Draft EIA / EMP is
                                                                                         29.03.2010                      is available for under preparation
                                                                                                                         Post monsoon
                                                                                                                         2010.

11 RKP OC - II                           MM      OC     Shovel Dumper        2.00        Yet to be     Simhadri Labs for Kept on HOLD      Kept on HOLD         Tor pending at MoEF
   (Conversion of RK - 5 & RK - 6                                                        approved      BLD
   Inclines)
Sl.                                                              Prod. Capacity                 Agency for BLD
            Name of the Project    Area   Type    Technology                       FR Status                   Status of BLD            Status of PH            Status of EC       Status of CFE
No.                                                                 (MTPA)                       / EMP Works

12 Peddapur OC                    BHPL    OC     Shovel Dumper        2.00                      Kept on HOLD



13 Kistaram OCP                   KGM     OC     Shovel Dumper        2.00        Approved on Pragathi Labs for         To be       Draft EIA / EMP is
                                                                                  01.11.2010   BLD                   generated      under preparation
14 Khairagura UG Mine             BPA     UG                                                   Pragathi Labs for   Kept on HOLD
                                                                                               BLD
15 Kasipet UG Extension           BPA     UG                          0.54        Under        Pragathi Labs for         To be      ToR meeting was
                                                                                  preparation  BLD                     generated    held on 23.01.2012
16 Kasipet 2 Incline                                                  0.47        Approved on                            To be      ToR meeting was
                                                                                  04.07.2011                           generated    held on 23.01.2012
17 JK - 5 OCP                      YD      OC    Shovel Dumper        2.00        Revised FR EPTRI                 BLD available    Completed in Dec. '07 EC was issued on     Applied for CFE on
                                                                                  was approved                     for the year                           18.05.2009           07.01.2011. TC
                                                                                  12.01.2011                       2006                                                        meeting was held on
                                                                                                                                                                               12.05.2011. CFE was
                                                                                                                                                                               issued 25.06.2011
II    MDO BLOCKS
A     GROUP - I
1     Chennur - 5 Incline         SRP     UG     LONGWALL             1.50         Conceptual   EPTRI for BLD        Final report      Kept on HOLD
                                                                                     Report                           received
                                                                                   Completed
 2    Chennur - 6 Incline         SRP     UG     LONGWALL             1.50            -do-      EPTRI for BLD        Final report      Kept on HOLD
                                                                                                                      received
 3    Chennur - 7 Incline         SRP     UG     LONGWALL             1.50            -do-      EPTRI for BLD        Final report      Kept on HOLD
                                                                                                                      received
 4    Sravanapalli - 1Incline     MM      UG     LONGWALL             1.50            -do-      To be awarded                          Kept on HOLD

 5    Sravanapalli - 2 Incline    MM      UG     LONGWALL             1.50            -do-      To be awarded                          Kept on HOLD
Sl.                                                             Prod. Capacity                Agency for BLD
            Name of the Project    Area   Type    Technology                     FR Status                   Status of BLD      Status of PH   Status of EC   Status of CFE
No.                                                                (MTPA)                      / EMP Works

B     GROUP - II
6     Laxmidevpeta UG Mine        BHPL    UG     LONGWALL            1.50        Conceptual   EPTRI for BLD     Final report    Kept on HOLD
                                                                                   Report                       received
                                                                                 Completed
7     KTK - 9 Incline             BHPL    UG     LONGWALL            1.50           -do-      EPTRI for BLD     Final report    Kept on HOLD
                                                                                                                received
 8    Rampuram Shaft Block        KGM     UG     CM With LHDs        1.57           -do-      BLD & EMP for     Draft EMP is    Kept on HOLD
                                                                                              Anna University   ready
C     GROUP - III
9     Kalyani Khani - 7 Incline   MM      UG     CM                  1.50        Conceptual   EPTRI for BLD     Final report    Kept on HOLD
                                                                                   Report                       received
                                                                                 Completed
10 RKP Shaft Block - I            MM      UG     LONGWALL            1.50           -do-      BLD & EMP for     Kept on HOLD
                                                                                              CIMFR
11 RKP Shaft Block - II           MM      UG     LONGWALL            1.50           -do-                         Kept on HOLD
12 Kalyani Khani - 6 Incline      MM      UG     CM                  1.00        Conceptual   EPTRI for BLD     Final report    Kept on HOLD
                                                                                   Report                       received
                                                                                 Completed

								