Electrician Services Agreement
Agreement made on the (date), between (Name of Owner) of (street address, city,
state, zip code), referred to herein as Owner, and (Name of Contractor), of (street
address, city, state, zip code), referred to herein as Contractor.
For and in consideration of the mutual covenants contained in this Agreement, and
other good and valuable consideration, the parties agree as follows:
I. Description of Work.
A. Contractor will perform all wiring work (the Work) in the structure located
at (street address, city, state, zip code), as described in detail in Exhibit A
attached hereto and made a part hereof.
B. Wiring will be for overhead service unless otherwise stipulated, and
Contractor will not be required to install underground service even though
underground service may be necessary for the installation of a complete
electrical system, unless Contractor has included the same in this Agreement
and has so designated it in Exhibit A.
C. Feeder circuits to garage or outbuildings will be run overhead unless
otherwise stipulated in this Agreement.
II. Contract Time. The Work shall be completed on or before (date).
III. Contract Price. Owner will pay Contractor $__________for performance of the
wiring work described above as follows:
A. _____% when roughing-in is completed and has passed inspection, if
subject to inspection, and
B. The balance when the job is completed and has passed final inspection, if
subject to inspection.
IV. Fixtures. This Agreement is for wiring only and does not include fixtures, or an
allowance for fixtures or other equipment, unless so stipulated. Fixtures, as used in this
Section, means: (define). .
V. Overtime Work. Overtime work is not contemplated and shall not be required as
a part of this Agreement. If it is necessary for Contractor to work overtime, the expense
for such overtime work shall be paid to Contractor, plus overhead and profit, and shall
be agreed on before Contractor is required to proceed.
VI. Roughing-In. Contractor shall not be obliged under any circumstances to alter
the roughing-in after plastering has commenced. Owner agrees not to permit lathing
and plastering to be commenced until the roughing-in payment required by this
Agreement shall have been made to Contractor.
VII. Severability. The invalidity of any portion of this Agreement will not and shall not
be deemed to affect the validity of any other provision. If any provision of this
Agreement is held to be invalid, the parties agree that the remaining provisions shall be
deemed to be in full force and effect as if they had been executed by both parties
subsequent to the expungement of the invalid provision.
VIII. No Waiver. The fai