Accident & Incident Deployment

Description

The template can use to make the accident and incident deployment and take actions.

Reviews
Shared by: Chan Dy Ot
Stats
views:
174
rating:
not rated
reviews:
0
posted:
10/11/2009
language:
English
pages:
0
Num 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 Date 12/01/07 13/01/07 13/01/07 18/01/07 24/01/07 24/01/07 27/01/07 07/02/07 15/02/07 28/02/07 01/03/07 02/03/07 03/03/07 21/03/07 26/03/07 29/03/07 04/04/07 13/04/07 13/04/07 23/04/07 14/05/07 25/05/07 28/05/07 01/06/07 09/06/07 19/06/07 20/06/07 23/06/07 28/06/07 09/07/07 10/07/07 17/07/07 18/07/07 25/07/07 11/08/07 17/08/07 07/09/07 24/09/07 28/09/07 03/10/07 17/10/07 20/10/07 12/11/07 14/11/07 25/11/07 Department Brewing Packaging Warehouse Packaging Packaging Warehouse Warehouse Warehouse Staff Packaging Packaging Packaging Packaging Utilities Packaging Warehouse Warehouse Packaging Packaging Packaging Packaging Engineering Packaging Warehouse Engineering Brewing Utilities Packaging Warehouse Packaging Packaging Packaging Technological Department Warehouse Utilities Packaging Packaging Packaging Packaging Engineering Packaging Staff Packaging Brewing Packaging Type of employment Fixed personnel Fixed personnel Agency personnel Contractor Fixed personnel Agency personnel Temporary personnel Fixed personnel Fixed personnel Temporary personnel Fixed personnel Contractor Fixed personnel Fixed personnel Fixed personnel Temporary personnel Contractor Contractor Agency personnel Contractor Temporary personnel Contractor Fixed personnel Fixed personnel Fixed personnel Contractor Fixed personnel Fixed personnel Contractor Fixed personnel Agency personnel Contractor Fixed personnel Contractor Fixed personnel Agency personnel Contractor Fixed personnel Contractor Fixed personnel Contractor Agency personnel Fixed personnel Contractor Fixed personnel Location Brewhouse Company premises Store/workshop Bottling hall Bottling hall Store/workshop Store/workshop Client/horeca Other Bottling hall Bottling hall Bottling hall Bottling hall Company premises Bottling hall Store/workshop Other Bottling hall Bottling hall Bottling hall Bottling hall Other Bottling hall Store/workshop Bottling hall Brewhouse Utilities Bottling hall Other Bottling hall Bottling hall Bottling hall Other Store/workshop Public road Bottling hall Bottling hall Bottling hall Bottling hall Other Bottling hall Other Bottling hall Brewhouse Bottling hall 46 47 48 49 50 28/11/07 01/12/07 17/12/07 17/12/07 25/12/07 Packaging Packaging Warehouse Brewing Packaging Contractor Temporary personnel Temporary personnel Fixed personnel Fixed personnel Bottling hall Bottling hall Other Fermentation & services Bottling hall Severity Incident Near miss Accident Incident Accident Incident Incident Incident Incident Incident Incident Incident Incident Incident Incident Incident Incident Incident Incident Incident Incident Incident Incident Permanent disability Incident Incident Incident Incident Incident Permanent disability Incident Incident Incident Incident Accident Incident Incident Incident Incident Permanent disability Accident Near miss Incident Incident Near miss Body part Leg Not applicable Arm Arm Arm Finger(s) Head Head Finger(s) Finger(s) Finger(s) Hand Finger(s) Trunk Head Hand Finger(s) Eye Head Head Foot Finger(s) Hand Arm Finger(s) Head Leg Eye Neck Finger(s) Knee Foot Leg Head Shoulder Hand Hand Finger(s) Finger(s) Foot Finger(s) Not applicable Back Arm Not applicable Failure type Poor personal protection Correct tools not available Other Other Technical failure Poor personal protection Technical failure Other Unsafe posture Other Technical failure Poor personal protection Poor personal protection Poor personal protection Poor personal protection Other Inadequate tools use Technical failure Poor/inadequate communication Unsafe posture Unsafe posture Other Poor personal protection Poor personal protection Other Unsafe posture Technical failure Poor personal protection Layout & design brewery Correct tools not available Correct tools not available Not entered Correct tools not available Poor personal protection Other Poor personal protection Poor personal protection Unsafe posture Correct tools not available Technical failure Inadequate tools use Other Technical failure Technical failure Poor personal protection Incident Accident Accident Incident Incident Hand Arm Leg Finger(s) Hand Other Technical failure Poor personal protection Other Inappropriate housekeeping Department Type of employment Location Brewing Engineering Packaging Staff Technological Department Utilities Warehouse Fixed personnel Temporary personnel Agency personnel Contractor Bottling hall Brewhouse Client/horeca Company premises Fermentation & services Other Public road Store/workshop Utilities Severity Body part affected Failure type Fatality Permanent disability Accident Incident Near miss Arm Back Eye Finger(s) Foot Hand Head Knee Leg Neck Not applicable Shoulder Trunk Correct tools not available Inadequate tools use Inappropriate housekeeping Layout & design brewery Not entered Other Poor personal protection Poor/inadequate communication Technical failure Unsafe posture Department Packaging Warehouse Brewing Engineering Utilities Staff Technological Department Type of employment Total Events 27 10 4 3 3 2 1 Total Events 23 15 6 6 30 20 10 0 25 20 15 10 5 0 Fixed personnel Contractor Fixed personnel Contractor Temporary personnel Agency personnel Location Bottling hall Other Store/workshop Brewhouse Company premises Client/horeca Fermentation & services Public road Utilities Total Events 27 8 6 3 2 1 1 1 1 30 25 20 15 10 5 0 Severity Incident Accident Permanent disability Near miss Fatality Total Events 38 6 3 3 0 40 30 20 10 0 Incident Accident Permanent disability Body part affected Finger(s) Hand Head Arm Leg Total Events 13 7 7 6 4 14 12 10 8 6 4 2 Foot Not applicable Eye Back Knee Neck Shoulder Trunk Failure type 3 3 2 1 1 1 1 1 Total Events 14 11 9 5 5 2 1 1 1 1 4 2 0 Poor personal protection Other Technical failure Correct tools not available Unsafe posture Inadequate tools use Inappropriate housekeeping Layout & design brewery Not entered Poor/inadequate communication 16 14 12 10 8 6 4 2 0 Packaging Fixed personnel 12 15 Contractor 9 10 Agency personnel 3 Temporary personnel 3 5 0 Fixed personnel 30 25 20 15 10 5 0 Bottling Hall 26 Company premise 1 Incident Accident NM Perm. Disability Contractor Agency personnel Temporary personnel Contractor Temporary personnel Agency personnel Bottling Hall 25 20 15 10 5 0 Incident Company premise Action # 2 & 4 # 6: near misses Accident NM Perm. Disability 8 6 4 2 0 Permanent disability Near miss Fatality #2: PM pillar to perform RCFA to get in deep causes 9 8 7 6 5 4 3 2 1 0 # 1: RBC team on bottling hall #3: Assess what tools need & raise request #3: Assess what tools need & raise request of purchase # 7: Improve the record system on "Contractors" & "tempo staffs" 21 3 2 1 Finger(s) Hand Head Arm Foot Not applicable Eye Back Neck Leg Knee Shoulder Trunk 7 6 5 3 2 2 2 1 1 0 0 0 0 Poor personal protection 8 Technical failure 5 Correct tools not available 4 Other 3 Unsafe posture 3 Inadequate tools use1 Inappropriate housekeeping 1 Not entered 1 Poor/inadequate communication 1 Layout & design brewery 0 # 6: Promotion of near misses campaing Action # 3 1: RBC team on hall #4: PM , SA, Pack Manager to review all tools use by both operators # 5: Ergonomic posters # 9: Establish a "Visitor Procedure" # 8: launch 5S team in bottling hall Safety Team KPIs SN KPIs 1 Accidents 2 Incidents 3 Near Misses Unit Num Num Num Target Actual YTD 0 0 25 0 200 0 J F M A M 201 2010 J J A S O N D Action Plan for Safety Team SN 1 2 3 4 5 6 7 8 9 Action List Restore Basic Condition on bottling hall PM Pillar to get into deep analaysis on root cause of technical failure Perform an assessment what correct tools need and raise request for purchase PM, SA Pillar and Pack Manager to review all tools use by operators and make enough available Promote campaign on Ergonomic Risk focus on "Posture" Promote the near misses campaign Improve the record system from "Contractors" and "Temporary Staffs" Launch 5S team in bottling hall to get a good housekeeping + regular audit interval Esblish a "Visitors Procedure" Who Sitorus Haris Chan Dy Dietmar Haris Haris Sitorus Chan Dy Dietmar Planned Effective Planned Effective Planned Effective Planned Effective Planned Effective Planned Effective Planned Effective Planned Effective Planned Effective W1 W2 W3 W4 W5 W6 W7 W8 W9

Related docs
THE ACCIDENT INCIDENT
Views: 210  |  Downloads: 10
ACCIDENT INCIDENT
Views: 126  |  Downloads: 7
ACCIDENT, INCIDENT
Views: 122  |  Downloads: 3
Accident Incident Reporting
Views: 24  |  Downloads: 1
Accident Incident Reporting
Views: 61  |  Downloads: 0
Accident Incident Form
Views: 65  |  Downloads: 1
ACCIDENT INCIDENT REPORT
Views: 152  |  Downloads: 4
Accident Incident Report
Views: 72  |  Downloads: 0
Incident Accident Form
Views: 81  |  Downloads: 2
premium docs
Other docs by Chan Dy Ot
Lean Diagnostic Checklist
Views: 385  |  Downloads: 58
Basic Inventory Management
Views: 1212  |  Downloads: 125
Illustraion of Toyota Production System
Views: 477  |  Downloads: 31
JIT Kanban Concept in TPS
Views: 431  |  Downloads: 35
Safetly Handling of NH3
Views: 270  |  Downloads: 7
Manufacturing & Service Delivery Process
Views: 909  |  Downloads: 37
Deming's Principles
Views: 767  |  Downloads: 29
Failure Mode and Effect Analysis
Views: 605  |  Downloads: 74
KPIs Benchmarking
Views: 522  |  Downloads: 38
5S Kick Off Communication Newsletter
Views: 739  |  Downloads: 91
Chapter 2 Operation Strategy
Views: 1735  |  Downloads: 71
A3 Status Report
Views: 544  |  Downloads: 17
A3 Problem Statement
Views: 487  |  Downloads: 23
Trainer Effectiveness Index
Views: 524  |  Downloads: 28
Project selection matrix
Views: 536  |  Downloads: 30