kemper goodwin award - DOC

Document Sample
kemper goodwin award - DOC Powered By Docstoc
					                    THE AMERICAN INSTITUTE OF ARCHITECTS

                        A     I     A          A      R     I    Z     O      N     A

                         CELEBRATE ARCHITECTURE - 2008
                  T H E       KEMPER               GOODWIN                 A W A R D

                                              Call for Entries

Purpose:       To honor the collaborative efforts of the architect, contractor and owner of a project that
               embodies design excellence, exhibits outstanding craftsmanship, and exemplifies teamwork,
               resulting in a project that serves the owner’s mission functionally, financially and aesthetically.

Eligible:      Eligible entries include any work of architecture buildings or building complexes completed
               since January 1, 2000 and located within the state of Arizona. The project must be designed
               by an AIA Arizona member in good standing. The contractor shall be a licensed contractor in
               the state of Arizona.

Jury:          Submittals will be juried by a panel of AIA Arizona Fellows invited by the Arizona College of
               Fellows (no jury member shall cast a vote concerning any award for which the member
               participated in nominating).
Awards
Publicity:     The winning nominee will receive a Certificate of Excellence from AIA Arizona and be
               recognized at the 2008 Celebrate Architecture Presentation, September 27 at the Phoenix Art
               Museum. An effort will be made to include the winner in publicity resulting from the Design
               Awards program and in other AIA Arizona publications. The winner will be asked to provide
               one (1) digital image for publicity purposes.
Release
Waiver:        By submitting a nomination, entrants take full responsibility for the accuracy of all information
               submitted and warrant that all necessary permissions have been obtained from others who
               may have rights to the work. Entrants further acknowledge that no royalty or compensation is
               due anyone, hold AIA Arizona, its sponsors, staff, consultants, and members harmless from
               all liability and grant to AIA Arizona the non-exclusive right to publish, reproduce and
               distribute copies of the original entry.

Deadlines:     July 1             Entry Fees are due ($30 per entry) by 12:00 noon at the AIA Arizona office
               July 18            Submittal due by 12:00 noon at the AIA Arizona office
               end-July           Winners notified and publicity materials requested
               August 1           Digital images for presentation required at AIA Arizona office
               September 27       2008 Celebrate Architecture awards presentation at The Phoenix Art
                                      Museum

To Nominate: Complete the Nomination Form, attach optional support materials and deliver or send to AIA
             Arizona by the required deadline. Three (3) copies of the submittal are required.

Send to:       AIA Arizona
                         rd
               30 North 3 Avenue #200
               Phoenix, AZ 85003
               602-252-4200 or 800-367-2781
Past Winners: 2006 – ASU Polytechnic campus (submittal available to review)
              2006 – Phoenix Sky Harbor Center Fire Station No. 16 (submittal available to review)
              2005 – Desert Botanical Gardens (submittal available to review)
              2005 – Pima County Jail Expansion (submittal available to review)
              2004 – The Wrigley Mansion Club (submittal available to review)
              2004 – U of A Highland Commons (submittal available to review)
              2003 – Chandler Gilbert Community College Student Center (submittal available to review)
              2002 – Empire Southwest Administrative Offices (submittal available to review)
                     THE AMERICAN INSTITUTE OF ARCHITECTS

                         A     I    A          A     R     I   Z     O     N     A

                          CELEBRATE ARCHITECTURE - 2008

                   T H E       KEMPER              GOODWIN               A W A R D

                                            Nomination Form


To Nominate: Complete the information requested and respond to the Evaluative Criteria listed below
             (utilize the spaces provided or attach additional sheets, as necessary), describing how the
             work of the nominee exemplifies each criteria. In addition, the submission of applicable
             support material, such as drawings, photographs, or testimonial letters from others familiar
             with the nominee’s career and contributions, is encouraged, but not mandatory. If such
             material is submitted, it should be bound, in an 8-1/2" x 11" format, with this nomination form.
                       Three (3) copies of the submittal are required.


                                                                   _______________________________
Kemper Goodwin Award Nominee                                       Nominated by an AIA Member


                                                                   _______________________________
contact                                                            contact

                                                                   _______________________________
                                                                   _______________________________
                                                                   _______________________________
                                                                   _______________________________
address /telephone/fax/email                                       address/phone/fax/email




WAS THE PROJECT BUILT WITHIN ESTABLISHED BUDGET PARAMETERS AND DID ALL PARTIES
CONTRIBUTE TO THIS ACHIEVEMENT?




WAS THE PROJECT COMPLETED ON TIME AND HOW DID THE PROJECT TEAM CONTRIBUTE TO
THIS GOAL?



                                      1 of 3
DOES THE PROJECT (OR DESIGN?) CONTRIBUTE TO THE BOTTOM LINE OF THE ORGANIZATION IN
TERMS OF INCREASING WORKER PRODUCTIVITY, ENHANCING COMPANY IMAGE OR CORPORATE
IDENTITY?




IS THERE VALUE IN THE DESIGN?




WAS THE RELATIONSHIP SUCCESSFUL FOR ALL PARTIES; I.E. WAS IT A “WIN-WIN” SITUATION?




                                       2 of 3
WAS THE ARCHITECT RESPONSIVE TO CONTRACTOR’S NEEDS IN CREATING WORKING
DRAWINGS, SPECIFICATIONS, ETC. THAT WOULD ALLOW THE WORK TO BE EASILY COMPLETED
IN THE ALLOTTED TIME FRAME RESULTING IN A SAVINGS OF TIME, MONEY OR EFFORT FOR ALL
PARTIES INVOLVED IN THE PROJECT?
DID THE PROJECT ENHANCE THE BUILT AND/OR NATURAL ENVIRONMENT THROUGH PRUDENT
USE MATERIALS OR BUILDING TECHNIQUES?




DID THE PROJECT CONTRIBUTE IN A SIGNIFICANT WAY TO THE BUILDING INDUSTRY?




                                      3 of 3

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:5
posted:9/18/2012
language:Unknown
pages:5