2012 Block Gift Critical Dates

Shared by: HC120918023737
Categories
Tags
-
Stats
views:
0
posted:
9/17/2012
language:
English
pages:
1
Document Sample
scope of work template
							                          BLOCK-GIFT PROGRAM CRITICAL DATES
                            CYCLE YEAR: JULY 1 to JUNE 30, 2012

JULY 1ST
Initial Funding of one-half of the total Block-Gift. All documentation must be signed and returned
prior to this initial disbursement (funding).

NOVEMBER 1ST
Progress Report is due. This brief, student composed technical report should describe progress to date
and include: (EIGHT PAGE MAXIMUM)
    A summary at the beginning the report stating the project goal, important results achieved
       during the period and activity expected in the next period,
    A description of results, with illustrated discussion of any significant findings and/or theoretical
       finds,
    Key conclusions and their importance based on the findings,
    Future planned work, addressing technical challenges to be addressed.
    A list of articles published, presentations made, degrees granted and conferences attended.
Please see the Progress Report Instruction Sheet on the web site.

DECEMBER 30TH/ JANUARY 1ST
Second funding of the cycle, disbursing the second half of the Block-Gift.

FEBRUARY 15th
This is the APPLICATION date and RENEWAL APPLICATION date. Any institution seeking
follow-on funding for the next cycle must apply using the appropriate application form found at the
Foundation’s website (www.ii-vifoundation.com). This will act as a second update on the research
topic for renewal requests.

MARCH 15th to APRIL 15th
Those institutions who applied on February 15th will be informed of the Selection Committee’s
decision. Assuming a favorable decision a follow-on visit may be scheduled and new documentation
must be signed.

JULY 15th
This is the Final Progress Report for the cycle which ended June 30th. This should be prepared by the
student and be concise totaling only two pages with no figures. It should include:
     Key progress highlights,
     Brief description of any outstanding issues,
     A list of articles published, presentations made, degrees granted and conferences attended.
Please see the Progress Report Instruction Sheet on the web site.

AUGUST 31st
A Budget Reconciliation is due. This would compare the initial proposal budget against how the funds
were actually spent. It is required prior to the second disbursement for the next Block-Gift cycle.

						
Related docs
Other docs by HC120918023737
How to make a successful Flash Game
Views: 10  |  Downloads: 0
PowerPoint Presentation
Views: 1  |  Downloads: 0
boardad2010
Views: 0  |  Downloads: 0
PowerPoint Presentation
Views: 2  |  Downloads: 0
Stock Gift Notification 0511
Views: 5  |  Downloads: 0
pathology sop template mb91p202
Views: 15  |  Downloads: 0
Savannah Hall Room 223, 224 � Renovations
Views: 0  |  Downloads: 0