Request For ACC Conditional Approval

W
Shared by: HC120916233032
Categories
Tags
-
Stats
views:
11
posted:
9/16/2012
language:
Latin
pages:
1
Document Sample
scope of work template
							Snee Farm Community Foundation                                  Request For ACC Approval
Post Office Box 751, Mt. Pleasant, SC 29465
Phone: (843) 884-5956 ~ Fax: (843) 884-9222

Prior to completing this Form, we ask that you review the 1999 Amended Declaration And Restrictions
(ADAR) - Page 13, B. Seeking Approval of Architectural Control Committee (ACC). In addition, there are
various ACC guidelines in other areas of the ADAR that may be helpful in planning this project(s) & request.
Comprehensive detail, supplements, and samples will help to expedite the ACC process.
APPROVAL IS REQUIRED PRIOR TO STARTING YOUR PROJECT(s) PLEASE PRINT:
HOMEOWNER ______________________________________________

PROPERTY ADDRESS ________________________________________

PHONE (PLEASE ADD AREA CODES IF OTHER THAN (843)          H) __________________________________

O) ________________________       C) ________________________        Fax) ___________________________


EMAIL _____________________________________________________

MAILING ADDRESS IF DIFFERENT:

______________________________________________________________________________________________________________ _
                                         Street Address            City & State                   Zip Code
Type of Request (Check One or More):
[   ] New Construction (Garage, Outbuilding, Etc.)              [ ] Fence                 [ ] Screening
[   ] Modification to Existing ____________________________     [ ] Swimming Pool
[   ] Repairs                                                   [ ] Patio                  [ ] Deck
[   ] Repaint (Applies to Same OR New Colors)                   [ ] Child Play Structure
[   ] Driveway                                                  [ ] Other _______________________________
[   ] Roofing                                                    [ ] Landscape
[   ] Tree & Stump Removal:
       Applies to ALL trees with a diameter in excess of 6 inches (measured 2 ft. above ground).
       Town approval is required for trees that come under their protective jurisdiction. Please
          contact them at 884-1229. If applicable, their written approval must accompany this ACC
          Request.
ANTICIPATED START ___________________                     ANTICIPATED COMPLETE ________________
Additional Information: ____________________________________________________________________
_________________________________________________________________________________________
_________________________________________________________________________________________
Attached or Included:
[ ] Plat or Survey [ ] Professional Plans & Specifications [ ] Personal Renderings & Specifications
[ ] Letter/Memo    [ ] Photos [ ] Town Approval [ ] Other__________________________________
[ ] Sample(s)
HOMEOWNER(S) SIGNATURE: _____________________________________________

         Please contact Jackie Walker, ACC Interim Chair, for further assistance:
              Telephone / Fax: 843 – 884 – 3617 // Email: jaclynjw@aol.com
Thank you for your cooperation with this process, and for making quality improvements to your property!
=================================================================================================
FOR ACC USE ONLY – Received By: _______________________________Date:___________________
NOTES: _______________________________________________________________________________________________________
_______________________________________________________________________________________________________________

Project(s) Completion                                     By:
Final Approval Date: _______________________              1. ________________________________________

2. ____________________________________________           3. _____________________________________________

						
Related docs
Other docs by HC120916233032
AFP FOUNDATION FOR PHILANTHROPY
Views: 0  |  Downloads: 0
General College Project March 2012
Views: 0  |  Downloads: 0
To Staff: Reminder Letter - DOC
Views: 34  |  Downloads: 0
70 leefindings
Views: 0  |  Downloads: 0
Four methods to combine simple sentences P
Views: 1  |  Downloads: 0
Ordre du jour sera le suivant :
Views: 6  |  Downloads: 0
Module 7B1
Views: 0  |  Downloads: 0
moving forward idyw
Views: 5  |  Downloads: 0
The Metaphor of the Elephant
Views: 9  |  Downloads: 0