					                                                    DE0201F
                                       General State Facilities
                        Board of Public Works/Department of General Services

Asbestos Abatement Program (Statewide)

GO Bonds                           $2,000,000       Recommendation: Approve


Bill Text: Provide funds to abate asbestos in various State facilities.


Program Description: This program provides funding for the abatement of asbestos which poses
imminent health hazards to State employees and the people they serve. Projects are identified
through asbestos surveys or routine inspections of facilities. Each year a prioritized list of facilities in
which asbestos poses a health hazard is submitted for funding. Funds requested will be used for
design, abatement, industrial monitoring, and waste removal of asbestos at various State facilities.


Program Performance Analysis: The effectiveness of the program is measured by the number of
asbestos projects completed. Since inception of the program in fiscal 1996, a total of 299 projects
have been funded at various State facilities.


Comments: The fiscal 2009 request is for $2.0 million to fund 15 asbestos abatement projects at
various State facilities. Building materials containing asbestos are present in State-owned buildings.
When disturbed by contact (such as during building maintenance), damage, or deterioration, the
materials are deemed to pose a health risk by releasing airborne asbestos fibers. Effective risk
management requires abatement, restriction of areas with imminent health hazard conditions, and
removal of asbestos. The Asbestos Management Oversight Committee (AMOC) updates the plan
annually with facility/department input to select projects with conditions which have the greatest
negative impact on facility function. Abatement costs associated with facilities being renovated/
demolished are included in the individual capital project budget; special maintenance costs are
covered by individual department operating budgets. The backlog of asbestos abatement projects
totals almost $4.7 million. Since AMOC annually reviews and updates the project list, yet to be
discovered, hazardous conditions could surface and be added to the backlog list.


Asbestos Abatement at Lowe House Office Building
        The proposed list of fiscal 2008 projects includes an $800,000 earmark for asbestos abatement
work in the Lowe House Office Building. This work has been anticipated to be necessary with any
future renovation of the older portions of the building that were not renovated during the most recent

For further information contact: Matthew D. Klein                                     Phone: (410) 946-5530

                       Analysis of the FY 2009 Maryland Executive Budget, 2008
                                                  1
                            DE0201F – BPW/DGS – General State Facilities

addition to the building. As introduced, the fiscal 2009 capital plan provides $700,000 for the design
of the Lowe House Building renovation project. The 2008 Capital Improvement Program earmarks
$8.2 million for construction in fiscal 2010. The estimated construction cost submitted by the
Department of General Services (DGS) includes $800,000 for asbestos remediation. Since the larger
project anticipates the need for asbestos abatement funding, it appears unnecessary to include the
$800,000 for asbestos abatement on the list of fiscal 2008 Asbestos Abatement Program projects.
One option would be to reduce the fiscal 2009 authorization to $1.2 million to reflect the additional
$800,000 that would be available from fiscal 2008 because the Lowe House Building asbestos
abatement is part of the larger renovation project. Alternatively, since there is currently a backlog of
asbestos abatement projects estimated at $4.7 million, the funds earmarked for the Lowe House
Building could be re-programmed to fund additional projects from the project backlog.


Re-opening of Victor Cullen Academy
         During summer of 2007, the Department of Juvenile Services re-opened the Victor Cullen
Academy on an emergency/expedited basis. As part of the estimated $20 million cost to renovate the
facility, which had been closed for several years, DGS contributed $138,000 from the Asbestos
Abatement Program for asbestos remediation work.




                     Analysis of the FY 2009 Maryland Executive Budget, 2008
                                                2
                                   DE0201F – BPW/DGS – General State Facilities

Fund Data
                                   Prior Program Activity – All Fund Sources
                                                ($ in Millions)

                             FY 2004                 FY 2005           FY 2006            FY 2007       FY 2008*

Encumbrances                      $1.645               $1.362           $1.187             $0.753          $0.738

Expenditures                      $1.237               $1.293           $1.103             $0.931          $2.955

*As of December 31, 2007.

                                               Authorization Summary*
                                                    ($ in Millions)

                                                            Funds                         Balances
                                                                                    To Be          To Be
Fiscal Year             Authorization          Encumbered           Expended      Encumbered      Expended


Prior Years                        $3.500               $3.500          $3.160             $0.000          $0.340

2004                                2.000                2.000           1.859              0.000           0.141
2005                                2.000                1.994           1.895              0.006           0.105

2006                                1.000                1.000           0.970              0.000           0.030
2007                                1.800                0.973           0.919              0.827           0.881

2008                                1.910                0.000           0.000              1.910           1.910

Total                             $12.210               $9.467          $8.803             $2.743          $3.407

*As of July 1, 2007.

                                                   Authorization Request
                                                      ($ in Millions)
                        2007          2008             2009       2010          2011         2012        2013
Description            Approp.       Approp.          Request    Estimate      Estimate     Estimate    Estimate

PAYGO GF                 $0.000        $1.910           $0.000       $0.000      $0.000        $0.000      $0.000

GO Bonds                  1.800            0.000         2.000        2.000       2.000         2.000       2.000

Total                    $1.800        $1.910           $2.000       $2.000      $2.000        $2.000      $2.000


                          Analysis of the FY 2009 Maryland Executive Budget, 2008
                                                     3
                            DE0201F – BPW/DGS – General State Facilities

Recommended Actions
      Approve.



Fiscal 2009 Proposed Projects
                                                                                             Total
                                                                    Estimated   FY 2009      State
  Subdivision                      Project Title                      Cost      Amount     Share (%)

Allegany          MSP – Cumberland Barrack and Garage – Vinyl         $37,700    $37,700    100.0%
                   Asbestos Tile (VAT), Thermal System
                   Insulation (TSI), and Fire Door
Baltimore City    DPSCS – Metropolitan Transition Center – First,     172,000    172,000    100.0%
                   Second, Third, And Fourth Floors – Ceiling
                   TSI
Baltimore         DHMH – Spring Grove Hospital – Dayhoff               51,400     51,400    100.0%
                   Building – Pipes, Tanks, and VAT
Baltimore         DHMH – Spring Grove Hospital – Red Brick             14,000     14,000    100.0%
                   Cottages #3 and #4 – VAT and Vinyl Sheet
                   Flooring
Baltimore         MSP – Pikesville Complex – Medical Building         225,000    225,000    100.0%
                   and Human Resources C – Ceiling Tiles, VAT,
                   and TSI
Baltimore         UMBC – Math/Psychology Building                      20,000     20,000    100.0%
                   Penthouse – TSI
Carroll           DHMH – Springfield Hospital Center – Medical,       385,000    385,000    100.0%
                   Metal, Muncie Buildings – Shingles, Panel
                   Boards and VAT
Prince George’s   UMCP – Benjamin Building – Ceiling Tile and         327,700    327,700    100.0%
                   Pipe
Prince George’s   UMCP – Cole Student Activities Building and         122,000    122,000    100.0%
                   Preinkert Building – Pipe, Tank, and Duct
                   Cover
Prince George’s   UMCP – Engineering Labs – Pipe                      200,400    200,400    100.0%
Prince George’s   UMCP – H.J. Patterson Hall – Ceiling Tile and        82,500     82,500    100.0%
                   Pipe


                    Analysis of the FY 2009 Maryland Executive Budget, 2008
                                               4
                               DE0201F – BPW/DGS – General State Facilities

                                                                                                     Total
                                                                     Estimated       FY 2009         State
    Subdivision                      Project Title                     Cost          Amount        Share (%)

 Prince George’s    UMCP – H.J. Patterson Hall – Pipe, Tank, and        41,000          41,000       100.0%
                     Plaster
 Prince George’s    UMCP – Physics Building – TSI Pipe and Duct         35,000          35,000       100.0%
 Prince George’s    UMCP – Physics Building – Duct Cover and           286,300         286,300       100.0%
                     Insulation Pipe, and Plaster Vibration Damper

 Total                                                               $2,000,000     $2,000,000


DHMH: Department of Health and Mental Hygiene
DPSCS: Department of Public Safety and Correctional Services
MSP: Maryland State Police
UMBC: University of Maryland Baltimore County
UMCP: University of Maryland, College Park




Fiscal 2008 Project Status
                                                       Estimated     Current
 Subdivision               Project Title                 Cost        Amount              Project Status

 Anne          DGS – Lowe House of Delegates            $800,000     $800,000     Awaiting HOD Reno
 Arundel        (HOD) Building – Ceiling Tiles                                     Project
                VAT
 Anne          DGS – Income Tax Building – Floor         160,000      160,000     100% design awaiting bids
 Arundel        Tiles – Abatement
 Anne          DGS – Treasury Building –                 300,000      300,000     100% design awaiting bids
 Arundel        Abatement
 Baltimore     Coppin State University – Parlett         175,000      175,000     Funds to be transferred to
 City           Moore Library – Abatement                                          the University System of
                                                                                   Maryland (USM)
 Baltimore     Coppin State University – JWJ              75,000       75,000     Funds to be transferred to
 City           Auditorium – Abatement                                             USM
 Baltimore     DLLR – 1100 Eutaw Street – Outer           60,000       60,000     In design/ bid in May
 City           Wall Areas of Floors 1-3




                       Analysis of the FY 2009 Maryland Executive Budget, 2008
                                                  5
                              DE0201F – BPW/DGS – General State Facilities

                                                       Estimated    Current
 Subdivision              Project Title                  Cost       Amount              Project Status

 Baltimore     Education – Workforce and                 316,000      316,000    In design/ bid in May
 City           Technology Center – Thermal
                Insulation
 Baltimore     University of Baltimore – Academic         21,000       21,000    Funds to be transferred to
 City           Center – TSI                                                      USM
 Baltimore     University of Baltimore – Academic         75,000       75,000    Funds to be transferred to
 City           Center – VAT                                                      USM
 Baltimore     DHMH – Rosewood Hospital Center           500,000      500,000    Ready for bidding
                – Administration Building
 Baltimore     UMBC – Administration Building –           25,000       25,000    Funds to be transferred to
                Sub Basement Hot Water Tank                                       USM
                Thermal Insulation
 Calvert       Jefferson Patterson Park – Gardiners       54,898       54,898    In design/ bid in March
                Cottage – TSI Abatement
 Carroll       DHMH – Springfield Hospital                94,000       94,000    In design/ bid in April
                Center – Men’s Home, Power
                House @ Patterson House – VAT
                and TSI
 Carroll       DHMH – Springfield Hospital                10,000       10,000    In design/ bid in April
                Center – VAT and TSI
 Prince        Maryland State Police – Forestville        28,000       28,000    In design/ bid in March
 George’s       Complex – VAT and Mastic
 Prince        UMCP – Computer and Space                  31,000       31,000    Funds to be transferred to
 George’s       Sciences Building – Ceiling Tiles,                                USM
                TSI Pipes
 Prince        UMCP – Administration Building –           15,145       15,145    Funds to be transferred to
 George’s       Abatement                                                         USM
 Total                                                 $2,740,043   $2,740,043

DGS: Department of General Services
DLLR: Department of Labor, Licensing, and Regulation
DHMH: Department of Health and Mental Hygiene
JWJ: James Wilson Johnson
MSP: Maryland State Police
TSI: Thermal System Insulation
UMBC: University of Maryland Baltimore County
UMCP: University of Maryland, College Park
VAT: vinyl asbestos tile


                      Analysis of the FY 2009 Maryland Executive Budget, 2008
                                                 6

				