REMC Annual Time Sheet

W
Shared by: HC120916001329
Categories
Tags
-
Stats
views:
2
posted:
9/15/2012
language:
Unknown
pages:
28
Document Sample
scope of work template
							REMC - Time sheet - ESRI
Time sheet for work package contributions
                                                       Hours       Hours
 Work Package                  WP Title               Period 1    Period 2       Total hours       Periods
     WP1        Management                                                             0           Period 1   1-Jan-08 until   31-Dec-08
     WP2        Workshop 1 (OTHER)                                                     0           Period 2   1-Sep-06 until   31-Dec-09
     WP3        Review of Literature (RTD)                                             0
     WP4        Draft of Conceptual Framework (RTD)                                    0
     WP5        Typology of school systems (RTD)                                       0
     WP6        Workshop 2 (OTHER)                                                     0
     WP7        Study Design and Fieldwork                                             0
     WP8        Workshop 3 (OTHER)                                                     0
     WP9        Coding and Analysis of data (RTD)                                      0
    WP10        Workshop 4 (MGT)                                                       0
    WP11        Draft of Final Report (RTD)                                            0
    WP12        Workshop 5 (OTHER)                                                     0
    WP13        Revisions of Final Report (RTD)                                        0
    WP14        Dissemination (OTHER)                                                  0
                Total                                    0           0                 0


Time sheet for person hours in REMC

                                                       Hours       Hours
                                 Person               Period 1    Period 2       Total hours
                Emer Smyth                                                                     0
                Merike Darmody                                                                 0
                CC                                                                             0
                DD                                                                             0
                EE                                                                             0
                FF                                                                             0
                GG                                                                             0
                HH                                                                             0
                II                                                                             0
                Total                                    0           0                0



                                                       Hours       Hours
                Control                               Period 1    Period 2       Total hours
                Hours from the Work Packages                  0              0                 0
                Hours for the persons                         0              0                 0
Person months   0.00   0.00   0.00
REMC - Time sheet - UEDIN
Time sheet for work package contributions
                                                       Hours      Hours
 Work Package                 WP Title                Period 1   Period 2   Total hours       Periods
     WP1        Management                                                        0           Period 1   1-Jan-08
     WP2        Workshop 1 (OTHER)                                                0           Period 2   1-Sep-06
     WP3        Review of Literature (RTD)                                        0
     WP4        Draft of Conceptual Framework (RTD)                               0
     WP5        Typology of school systems (RTD)                                  0
     WP6        Workshop 2 (OTHER)                                                0
     WP7        Study Design and Fieldwork                                        0
     WP8        Workshop 3 (OTHER)                                                0
     WP9        Coding and Analysis of data (RTD)                                 0
    WP10        Workshop 4 (MGT)                                                  0
    WP11        Draft of Final Report (RTD)                                       0
    WP12        Workshop 5 (OTHER)                                                0
    WP13        Revisions of Final Report (RTD)                                   0
    WP14        Dissemination (OTHER)                                             0
                Total                                    0          0             0


Time sheet for person hours in REMC

                                                       Hours      Hours
                               Person                 Period 1   Period 2   Total hours
                Sheila Riddell                                                            0
                Elisabeth Weedon                                                          0
                CC                                                                        0
                DD                                                                        0
                EE                                                                        0
                FF                                                                        0
                GG                                                                        0
                HH                                                                        0
II                                                                       0
Total                             0             0               0



                                Hours         Hours
Control                        Period 1      Period 2      Total hours
Hours from the Work Packages             0             0               0
Hours for the persons                    0             0               0
Person months                         0.00          0.00            0.00 To calculte person months: (no. of average working days in a m
                                                                                                          Change figure 140 in cells B44
                                                                                                          Currently based on 7 hour wor
until   31-Dec-08
until   31-Dec-09
of average working days in a month) x (no. of working hours in a day)
 Change figure 140 in cells B44, B45 & B46 to your answer.
 Currently based on 7 hour working day, 20 working days per month.
REMC - Time sheet - UCD
Time sheet for work package contributions
                                                       Hours      Hours
 Work Package                 WP Title                Period 1   Period 2   Total hours       Periods
     WP1        Management                                                        0           Period 1   1-Jan-08
     WP2        Workshop 1 (OTHER)                                                0           Period 2   1-Sep-06
     WP3        Review of Literature (RTD)                                        0
     WP4        Draft of Conceptual Framework (RTD)                               0
     WP5        Typology of school systems (RTD)                                  0
     WP6        Workshop 2 (OTHER)                                                0
     WP7        Study Design and Fieldwork                                        0
     WP8        Workshop 3 (OTHER)                                                0
     WP9        Coding and Analysis of data (RTD)                                 0
    WP10        Workshop 4 (MGT)                                                  0
    WP11        Draft of Final Report (RTD)                                       0
    WP12        Workshop 5 (OTHER)                                                0
    WP13        Revisions of Final Report (RTD)                                   0
    WP14        Dissemination (OTHER)                                             0
                Total                                    0          0             0


Time sheet for person hours in REMC

                                                       Hours      Hours
                               Person                 Period 1   Period 2   Total hours
                AA                                                                        0
                BB                                                                        0
                CC                                                                        0
                DD                                                                        0
                EE                                                                        0
                FF                                                                        0
                GG                                                                        0
                HH                                                                        0
II                                                                       0
Total                             0             0               0



                                Hours         Hours
Control                        Period 1      Period 2      Total hours
Hours from the Work Packages             0             0               0
Hours for the persons                    0             0               0
Person months                         0.00          0.00            0.00 To calculte person months: (no. of average working days in a m
                                                                                                          Change figure 140 in cells B44
                                                                                                          Currently based on 7 hour wo
until   31-Dec-08
until   31-Dec-09
of average working days in a month) x (no. of working hours in a day)
 Change figure 140 in cells B44, B45 & B46 to your answer.
 Currently based on 7 hour working day, 20 working days per month.
REMC - Time sheet - EUI
Time sheet for work package contributions
                                                       Hours      Hours
 Work Package                 WP Title                Period 1   Period 2   Total hours       Periods
     WP1        Management                                                        0           Period 1   1-Jan-08
     WP2        Workshop 1 (OTHER)                                                0           Period 2   1-Sep-06
     WP3        Review of Literature (RTD)                                        0
     WP4        Draft of Conceptual Framework (RTD)                               0
     WP5        Typology of school systems (RTD)                                  0
     WP6        Workshop 2 (OTHER)                                                0
     WP7        Study Design and Fieldwork                                        0
     WP8        Workshop 3 (OTHER)                                                0
     WP9        Coding and Analysis of data (RTD)                                 0
    WP10        Workshop 4 (MGT)                                                  0
    WP11        Draft of Final Report (RTD)                                       0
    WP12        Workshop 5 (OTHER)                                                0
    WP13        Revisions of Final Report (RTD)                                   0
    WP14        Dissemination (OTHER)                                             0
                Total                                    0          0             0


Time sheet for person hours in REMC

                                                       Hours      Hours
                               Person                 Period 1   Period 2   Total hours
                AA                                                                        0
                BB                                                                        0
                CC                                                                        0
                DD                                                                        0
                EE                                                                        0
                FF                                                                        0
                GG                                                                        0
                HH                                                                        0
II                                                                       0
Total                             0             0               0



                                Hours         Hours
Control                        Period 1      Period 2      Total hours
Hours from the Work Packages             0             0               0
Hours for the persons                    0             0               0
Person months                         0.00          0.00            0.00 To calculte person months: (no. of average working days in a m
                                                                                                          Change figure 140 in cells B44
                                                                                                          Currently based on 7 hour wo
until   31-Dec-08
until   31-Dec-09
of average working days in a month) x (no. of working hours in a day)
 Change figure 140 in cells B44, B45 & B46 to your answer.
 Currently based on 7 hour working day, 20 working days per month.
REMC - Time sheet - KULeuven
Time sheet for work package contributions
                                                       Hours       Hours
 Work Package                  WP Title               Period 1    Period 2       Total hours       Periods
     WP1        Management                                                             0           Period 1   1-Jan-08 until   31-Dec-08
     WP2        Workshop 1 (OTHER)                                                     0           Period 2   1-Sep-06 until   31-Dec-09
     WP3        Review of Literature (RTD)                                             0
     WP4        Draft of Conceptual Framework (RTD)                                    0
     WP5        Typology of school systems (RTD)                                       0
     WP6        Workshop 2 (OTHER)                                                     0
     WP7        Study Design and Fieldwork                                             0
     WP8        Workshop 3 (OTHER)                                                     0
     WP9        Coding and Analysis of data (RTD)                                      0
    WP10        Workshop 4 (MGT)                                                       0
    WP11        Draft of Final Report (RTD)                                            0
    WP12        Workshop 5 (OTHER)                                                     0
    WP13        Revisions of Final Report (RTD)                                        0
    WP14        Dissemination (OTHER)                                                  0
                Total                                    0           0                 0


Time sheet for person hours in REMC

                                                       Hours       Hours
                               Person                 Period 1    Period 2       Total hours
                AA                                                                             0
                BB                                                                             0
                CC                                                                             0
                DD                                                                             0
                EE                                                                             0
                FF                                                                             0
                GG                                                                             0
                HH                                                                             0
                II                                                                             0
                Total                                    0           0                0



                                                       Hours       Hours
                Control                               Period 1    Period 2       Total hours
                Hours from the Work Packages                  0              0                 0
                Hours for the persons                         0              0                 0
Person months   0.00   0.00   0.00 To calculte person months: (no. of average working days in a month) x (no. of working hours in a day)
                                                                    Change figure 140 in cells B44, B45 & B46 to your answer.
                                                                    Currently based on 7 hour working day, 20 working days per month.
month) x (no. of working hours in a day)
 4, B45 & B46 to your answer.
orking day, 20 working days per month.
REMC - Time sheet - DU
Time sheet for work package contributions
                                                       Hours      Hours
 Work Package                 WP Title                Period 1   Period 2   Total hours       Periods
     WP1        Management                                                        0           Period 1   1-Jan-08
     WP2        Workshop 1 (OTHER)                                                0           Period 2   1-Sep-06
     WP3        Review of Literature (RTD)                                        0
     WP4        Draft of Conceptual Framework (RTD)                               0
     WP5        Typology of school systems (RTD)                                  0
     WP6        Workshop 2 (OTHER)                                                0
     WP7        Study Design and Fieldwork                                        0
     WP8        Workshop 3 (OTHER)                                                0
     WP9        Coding and Analysis of data (RTD)                                 0
    WP10        Workshop 4 (MGT)                                                  0
    WP11        Draft of Final Report (RTD)                                       0
    WP12        Workshop 5 (OTHER)                                                0
    WP13        Revisions of Final Report (RTD)                                   0
    WP14        Dissemination (OTHER)                                             0
                Total                                    0          0             0


Time sheet for person hours in REMC

                                                       Hours      Hours
                               Person                 Period 1   Period 2   Total hours
                AA                                                                        0
                BB                                                                        0
                CC                                                                        0
                DD                                                                        0
                EE                                                                        0
                FF                                                                        0
                GG                                                                        0
                HH                                                                        0
II                                                                       0
Total                             0             0               0



                                Hours         Hours
Control                        Period 1      Period 2      Total hours
Hours from the Work Packages             0             0               0
Hours for the persons                    0             0               0
Person months                         0.00          0.00            0.00 To calculte person months: (no. of average working days in a m
                                                                                                          Change figure 140 in cells B44,
                                                                                                          Currently based on 7 hour wor
until   31-Dec-08
until   31-Dec-09
of average working days in a month) x (no. of working hours in a day)
 Change figure 140 in cells B44, B45 & B46 to your answer.
 Currently based on 7 hour working day, 20 working days per month.
REMC - Time sheet - UOM
Time sheet for work package contributions
                                                       Hours      Hours
 Work Package                 WP Title                Period 1   Period 2   Total hours       Periods
     WP1        Management                                                        0           Period 1   1-Jan-08
     WP2        Workshop 1 (OTHER)                                                0           Period 2   1-Sep-06
     WP3        Review of Literature (RTD)                                        0
     WP4        Draft of Conceptual Framework (RTD)                               0
     WP5        Typology of school systems (RTD)                                  0
     WP6        Workshop 2 (OTHER)                                                0
     WP7        Study Design and Fieldwork                                        0
     WP8        Workshop 3 (OTHER)                                                0
     WP9        Coding and Analysis of data (RTD)                                 0
    WP10        Workshop 4 (MGT)                                                  0
    WP11        Draft of Final Report (RTD)                                       0
    WP12        Workshop 5 (OTHER)                                                0
    WP13        Revisions of Final Report (RTD)                                   0
    WP14        Dissemination (OTHER)                                             0
                Total                                    0          0             0


Time sheet for person hours in REMC

                                                       Hours      Hours
                               Person                 Period 1   Period 2   Total hours
                AA                                                                        0
                BB                                                                        0
                CC                                                                        0
                DD                                                                        0
                EE                                                                        0
                FF                                                                        0
                GG                                                                        0
                HH                                                                        0
II                                                                       0
Total                             0             0               0



                                Hours         Hours
Control                        Period 1      Period 2      Total hours
Hours from the Work Packages             0             0               0
Hours for the persons                    0             0               0
Person months                         0.00          0.00            0.00 To calculte person months: (no. of average working days in a m
                                                                                                          Change figure 140 in cells B44
                                                                                                          Currently based on 7 hour wor
until   31-Dec-08
until   31-Dec-09
of average working days in a month) x (no. of working hours in a day)
 Change figure 140 in cells B44, B45 & B46 to your answer.
 Currently based on 7 hour working day, 20 working days per month.
REMC - Time sheet - Whole of Consortium
Time sheet for work package contributions
                                                       Hours      Hours
 Work Package                  WP Title               Period 1   Period 2   Total hours
     WP1        Management                               0          0             0
     WP2        Workshop 1 (OTHER)                       0          0             0
     WP3        Review of Literature (RTD)               0          0             0
     WP4        Draft of Conceptual Framework (RTD)      0          0             0
     WP5        Typology of school systems (RTD)         0          0             0
      70        Workshop 2 (OTHER)                       0          0             0
     WP7        Study Design and Fieldwork               0          0             0
     WP8        Workshop 3 (OTHER)                       0          0             0
     WP9        Coding and Analysis of data (RTD)        0          0             0
    WP10        Workshop 4 (MGT)                         0          0             0
    WP11        Draft of Final Report (RTD)              0          0             0
    WP12        Workshop 5 (OTHER)                       0          0             0
    WP13        Revisions of Final Report (RTD)          0          0             0
    WP14        Dissemination (OTHER)                    0          0             0
                Total                                    0          0             0


Time sheet for person hours in REMC Project

                                                       Hours      Hours
                               Partner                Period 1   Period 2   Total hours
                ESRI                                     0          0             0
                UEDIN                                    0          0             0
                UCD                                      0          0             0
                EUI                                      0          0             0
                KULeuven                                 0          0             0
                DU                                       0          0             0
                UOM                                      0          0             0
                Total                                    0          0             0



                                                       Hours      Hours
                Control                               Period 1   Period 2   Total hours
                Hours from the Work Packages             0           0            0
                Hours for the persons                    0           0            0
                Person months                           0.00       0.00         0.00
Periods
Period 1   1-Jan-08 until   31-Dec-08
Period 2   1-Sep-06 until   31-Dec-09

						
Related docs
Other docs by HC120916001329
REMC Annual Time Sheet
Views: 2  |  Downloads: 0
District Evaluation Report Template
Views: 0  |  Downloads: 0
Queen�s Park Primary School
Views: 1  |  Downloads: 0
project report template
Views: 4  |  Downloads: 0
MECE E3018 LAB REPORT TEMPLATE
Views: 14  |  Downloads: 0
Syed Hasnain Ahmed
Views: 5  |  Downloads: 0
CAG Application 2006-07
Views: 0  |  Downloads: 0
Resume Rahul
Views: 3  |  Downloads: 0
Move Out Check List
Views: 16  |  Downloads: 0
Lecture 17 Managing IT Outsourcing
Views: 0  |  Downloads: 0