Document Sample
scope of work template
							Accreditation of Thin-Layer
      Asphalt Mixes
W Steyn, A Visser, E Denneman




  2005
               Content
• Agrément SA
• Thin-Layer Asphalt mixes
• Cold mixes




      2005
                   Agrément SA
• Fit-for-purpose certification
   –   Need identified
   –   Develop guideline
   –   Approve guideline
   –   Invite applications
   –   Evaluate
   –   Certify
   –   Audit
• Agrément ≠ CSIR
   – Ministery of Public Works


           2005
 Current roads-related Agrément SA
             certificates
• Current guideline and certificates
  – Bridge deck joints
• Current guideline – awaiting applicants
  – Non-traditional road additives (chemical
    stabilisers)
• Almost guideline
  – Thin-layer asphalt
• Guideline to be developed
  – Cold mix


        2005
      What is a certificate / not
• Certificate – Agrément has evaluated a
  product and deemed it fit-for-purpose in
  accordance with a certain industry-
  approved guideline
• Certificate ≠ guarantee / warrantee!




       2005
     Thin-Layer Asphalt mixes
• Process followed
• Current status
• Main pointers




      2005
       T-LA: Process followed
• Industry Task Team established
  – Clients and industry
• Had meetings, decided on BBA guideline as
  model
• Technical team selected to update BBA
• Process followed with comments from core
  team and subsequent comments from ITT
• Agrément TECO reviewed document and
  approved subject to final comments

        2005
             T-LA: Current status
• Further comments from ITT received
   – Most comments addressed in documents
   – Some not addressed due to specific reasons – being
     communicated
• Agrément Board meeting now for approval subject to comments
• Further comments to be addressed during first evaluations –
  document is not ‘locked’, although final
• Recommendations for issues to be researched further made to
  Agrément
• Will be available on Agrément website
   – www.agrement.co.za
• Please send your applications




          2005
           T-LA: Main pointers
• BBA guideline used as model
• Update for SA conditions and test methods
  where possible
  – If no SA equivalent – use BBA developed test in
    the interim
• Mandatory and Optional tests
  – Mandatory – visual, texture, skid resistance, etc
  – Optional – noise, rut, etc
• Process to be followed
• Performance levels to be fine-tuned

        2005
                 TLA: General
• Evaluate existing data and sites
• Request / perform additional laboratory tests
  where required
• Evaluate field trial
• Performance values
  –   Acceptable
  –   Indicative
  –   Proposed
  –   No difference between minima – mostly safety
      related parameters


         2005
                              Request for certification



                         No         Agrément              Yes
                                                                   Establish assessment team
                                    approval?




T-LA: Process
                                                                 Assess applicant’s information



                                                           No                                  Yes
                                       Reject                             Satisfactory?                     Prepare contract



                                                                                                   Yes                               No
                                                                                                                 Accept?



                                                                                          Assess applicants
                                                                                          production control
                                                                                                                                Terminate


                                                                                No
                                        Reject                                              Satisfactory?

                                                                                                   Yes

                                                                                       Assess applicability of
                                                                                          existing test data



                                                                              No                                  Yes
                                                                                            Satisfactory?



                                                                   Inform applicant of                   Assess existing test data
                                                                additional test requirements



                                                           No            Accept?

                                                                               Yes
                                        Terminate
                                                                  Perform required test
                                                                    and assess results



                                                          No
                                        Reject                         Satisfactory?

                                                                               Yes


                                                                 Agrément SA procedure
                                                                     for certification


                Notify applicant                                         Monitor




    2005
                     TLA: Classification
Application Number of vehicles Certificate   Category A:
  category    per lane per day    class      - speed limit ≤ 60 km/h
                                             - gradients > 6 per cent
A           > 10000             1A
                                             - intersections.
B           > 10000             1B           Category B:
                                             - speed limit > 60 km/h
A           2000-10000          2A
                                             - gradients ≤ 6 per cent
B           2000-10000          2B

A           < 2000              3A

B           < 2000              3B


              2005
                 Cold Mix Asphalt
• Current situation
  – No guideline as yet
  – Possible to start with existing BBA guideline again
  – Need to establish ITT – RPF to nominate
• Process
  –   January / February 2006 first ITT meeting
  –   Decide on final process
  –   Develop guideline
  –   Comments and approval
  –   Implement


          2005
2005

						
Related docs
Other docs by HC120916001329
REMC Annual Time Sheet
Views: 2  |  Downloads: 0
District Evaluation Report Template
Views: 0  |  Downloads: 0
Queen�s Park Primary School
Views: 1  |  Downloads: 0
project report template
Views: 4  |  Downloads: 0
MECE E3018 LAB REPORT TEMPLATE
Views: 14  |  Downloads: 0
Syed Hasnain Ahmed
Views: 5  |  Downloads: 0
CAG Application 2006-07
Views: 0  |  Downloads: 0
Resume Rahul
Views: 3  |  Downloads: 0
Move Out Check List
Views: 18  |  Downloads: 0
Lecture 17 Managing IT Outsourcing
Views: 2  |  Downloads: 0