NOWG/NANPA Meeting Notes � October 21, 2004

W
Shared by: HC120915014446
Categories
Tags
-
Stats
views:
1
posted:
9/14/2012
language:
Latin
pages:
3
Document Sample
scope of work template
							NOWG/NANPA Meeting Notes – January 27, 2005

Participants:

Joe Cocke
Nancy Fears
Tom Foley
John Manning
Joe Rano
Beth Sprague

Bruce Bennett
Joanne Edelman
Rosemary Emmer
Paula Hustead
Mark Lancaster
Natalie McNamer
Julie Neumann
Beth O’Donnell
Julie Petersen
Karen Riepenkroger

After introductions, Rosemary handed the floor to John Manning to cover the standing
monthly agenda.

Process Improvement Plan (PIP) Review

Specific training for Code Administrators

Updated NANP member contact information in December

Starting to look further at adding rate centers to their website, some type of excel file.

NAS modification was done 12/04

Red light rule change orders 2 and 3 were approved by the FCC 1/6/05
(4 carriers have been denied under the red light rule)

NANPA continues to work with those carriers




NANPA Complaints
Reviewed the complaints that came in around last months meeting, on the last months
call. Another complaint came to NANPA in January regarding a concern around the
assignment of the 991 prefix and the confusion customers may have dialing 911 in error.
John explained the NXX had been assigned in many NPAs and had never presented a
problem that was brought to his attention. This was not considered a complaint against
NANPA performance.



CO Code Administration

Other resources – All measurements met. Nancy has been extremely busy reclaiming
CICs.

CO Administration. All measurements met.         One of the current code administrators is
going to work at the NPAC and looking for new code administrator. At this time her
responsibilities will be shared among the existing code administrators and everyone will
be notified.



NRUF

All measurements were met.

There is a new NRUF manager starting February 7, 2005. His name is Al Cipparone and
he is from quality assurance.

NPA Relief Planning

All measurements met.
Hyperlink is working well from email notification to NAS. When an NSS notification is
sent out to the Industry, there is now a link to NAS for that document.
Discussion of 909/951 25% utilization requirement ended.
Found homes for 99.97% of abandoned NXXs
Upcoming Illinois Commerce Commission status hearing on 217 and 618 NPAs



NANPA Administration Process/Procedures

NANPA brought in new issue to INC on jeopardy. It is now being worked at INC.

Department of Navy request still being worked.
The 2004 NANPA exhaust data is now posted on the website.
Number Conservation Activities/Special Projects

 There is a new Enterprise customized report service that is being worked on. That will
be on the website.

Audit of Data Entry services and AOCN being initiated (per contract). It is with Ernst
and Young and will report to the FCC during the 1st quarter.


The next meeting will be February 24, 2005 at 2 p.m. ET.

						
Related docs
Other docs by HC120915014446
Pierce County Continuum of Care
Views: 11  |  Downloads: 0
STATUTES AMENDMENT SURROGACY BILL 2008 UN
Views: 4  |  Downloads: 0
Catapult Analytics Reports
Views: 2  |  Downloads: 0
Sample Inventory Sheet for Schools
Views: 12  |  Downloads: 0
THIS PRESENTATION
Views: 1  |  Downloads: 0
Fasadnie paneli 1
Views: 0  |  Downloads: 0
147 01 IDIS 1 Day Workshop Agenda DC
Views: 1  |  Downloads: 0
Honorarberechnung gem. HOAI
Views: 16  |  Downloads: 0
VAT RET 201C Monthly
Views: 4  |  Downloads: 0
rizwan saqib
Views: 7  |  Downloads: 0