Sample Template by 8nmAPV3

VIEWS: 0 PAGES: 3

									                            Annual Value Engineering Utilization Report
                                            for FY11
                                           Agency VE Data Form
Agency Number:
Agency Name:           University of Virginia
Form Submitted By:     C. A. Johannesmeyer                    Phone #: 434-982-4371
Date:

Instructions   (1) Please enter the data requested above.
               (2) For each project with a construction budget in excess of $5,000,000 and where
                   it's preliminary design documents were completed at any point between
                   July 1, 2010 and June 30, 2011, please complete a brief Project Data Sheet.
                   The Project Data Sheets may be accessed by clicking on the "PDS" tabs at the
                   bottom of this sheet. ( Complete a new Project Data Sheet for each project that
                   meets the two criteria noted above. )
               (3) Submit this completed Excel form to Michael.Gray@dgs.virginia.gov
                   no later than July 21, 2011. (Please return the Excel file, rather than a pdf image.)
               (4) If your agency had no projects meeting both criteria listed in (2) above, then just
                   check the box below and return this Excel form to the above noted e-mail address.

                                      "There were no projects subject to the statutory requirements for a
                                       Value Engineering Study for my agency during the July 1, 2010 to
                                       June 30, 2011 timeframe."
                         Annual Value Engineering Utilization Report
                                         for FY11
                                          Project Data Sheet
Agency Number:           0
Agency Name:             University of Virginia
Project Number:          B1157          (include subproject number, if applicable)
Project Title:           East Chiller Plant & Lee Street Realignment (Schematic or Preliminary)
Preliminary Construction Budget:                   $      22,000,000

If a VE Study was prepared for this project, provide the following:
                 Value Engineering Study Cost:                          $        13,229
                 Estimated Value Engineering Savings:                   $     4,300,305
                  (for items accepted by Agency)

If a VE Study was not prepared for this project, provide the following:

                 Date waiver was granted by Director of DEB:
                 Reason for not preparing VE Study:




                 If the project was procured using either the Construction Management or
                 Design-Build delivery methods, provide an estimate of the value saving
                 recommendations accepted by the owner for this project:



Provide any additional remarks here:
                         Annual Value Engineering Utilization Report
                                         for FY11
                                          Project Data Sheet
Agency Number:           0
Agency Name:             University of Virginia
Project Number:                         (include subproject number, if applicable)
Project Title:
Preliminary Construction Budget:

If a VE Study was prepared for this project, provide the following:
                 Value Engineering Study Cost:
                 Estimated Value Engineering Savings:
                  (for items accepted by Agency)

If a VE Study was not prepared for this project, provide the following:

                 Date waiver was granted by Director of DEB:
                 Reason for not preparing VE Study:




                 If the project was procured using either the Construction Management or
                 Design-Build delivery methods, provide an estimate of the value saving
                 recommendations accepted by the owner for this project:



Provide any additional remarks here:

								
To top