                                  SHEET INDEX
                       ADDENDUM #1, DELTA 2, DATED 09.10.10
_____________________________________________________________________________________________
1200 N. Ashland Ave Chicago IL 60603 Ashland & Division CVS PHARMACY
STORE #05394
Electrical                   Description
    E1.1        Ground Floor Plan – Lighting
   Plan #1: Removed (2) exit signs on 2nd floor.
   Added General Notes 15 and 16
      E1.1A         Ground Floor Plan - Emergency Lighting
   Plan #1: Removed (2) exit signs on 2nd floor.
      E1.2          Ground Floor Plan – Power
   Plan #1: Added junction box at south side of west entrance for building signage.
   Added (2) OB-1 fixtures under awning at west side entrance.
   Plan #2: Added bailer circuiting.
      E1.3          Lighting Fixture Schedule and Notes
   Added fixture type OB-1 to Lighting Fixture Schedule
   Revised fixture type G4/24 removed wand
      E1.4       Enlarged Floor Plans - Power
      E1.5       Enlarged Floor Plan - Pharmacy Power
      E1.6       Ground Floor Plan – Mechanical Power
      E2.1       Electrical Riser Diagram and Notes
      E2.2       Panel Schedules and Mechanical Equipment Wiring
       Connection Schedule
   Added Bailer to MDP Panel Schedule. CKTS #25,27,29
   Added exterior lighting and signage at west entrance to D Panel Schedule CKTS #10, 12
   Added Bailer BA-1 to Mechanical Equipment Electrical Connection Schedule.
      E2.3          Electrical Details
      E2.4          Electrical Details
      E2.5          EMS Diagram And General Notes
   Added exterior lighting and signage at west entrance to EMS Panel
     E2.6           Electrical Details
    E2.7            EAS System Conduit Stub Up Detail and Symbol List
    E2.8            Building Exterior Signage Details
Fire Protection                   Description
    N/A

Mechanical                       Description
    M1.1            Partial Basement, Ground Floor and Mezzanine Plans -
      Mechanical
    M-1.2           Mechanical Roof Plan
    M2.1            Mechanical Notes and Schedules
     M2.2          Mechanical Notes and Schedules
  Reversed width and height dimensions of exterior louvers
    M3.1           Mechanical Details
Plumbing                       Description
    P1.1           Ground Floor Plan - Plumbing
  Removed air gap fitting and extended AC condensate lines to added hub drain in janitor’s
  closet.
     P1.2          Plumbing Risers
  Removed air gap fitting and extended AC condensate lines to added hub drain in janitor’s
  closet.
     P1.3          Plumbing Notes and Schedules

								
To top