ENGINEERING SERVICES AGREEMENT - DOC by fLr2wX

VIEWS: 15 PAGES: 2

									                                                                                  • Material Testing Services • < project >

 1                                     APPENDIX A • ARTICLE AI • INTRODUCTION

 2   A. PROJECT DESCRIPTION

 3       Perform all material testing and soils engineering services necessary for completion of the construction of

 4       improvements (the "Improvements") identified as [              ?             ] in accordance with COUNTY Ordinance

 5       461 and Caltrans’ Standard Specifications , where the COUNTY has administrative control of contracts.

 6       Improvements include [           ?        ].

 7   B. LOCATION

 8       [       ?       ]

 9   C. COORDINATION

10       ENGINEER shall coordinate with other involved agencies for material testing and soil engineering services.

11       Coordination may include, but will not necessarily be limited to the following:

12           •   Riverside County Transportation Department                 •    Flood Control

13           •   CALTRANS                                                   •    Department of Fish and Game

14           •   Federal Highway Administration                             •    Bureau of Land Management

15           •   Department of Parks and Recreation                         •    EMWD

16           •   Design Engineer                                            •    Utility Companies

17           •   Railroad Companies                                         •    Construction Manager

18           •    [      ?      ]                                           •     [       ?       ]

19   D. KEY PERSONNEL

20       The ENGINEER has represented to the COUNTY that certain key personnel will perform the services and if

21       one or more of such personnel should become unavailable, ENGINEER may substitute other personnel of at

22       least equal competence only after prior written approval by the COUNTY PROJECT MANAGER has been

23       secured. The key personnel for performance of this PROJECT is:

24           Project Manager                                                [         ?       ]

25                                                      Article AII • Duties

26   Material testing and soil engineering services [           ?           ].   ENGINEER shall provide and/or perform, but

27   not limited to, the following basic services (Tasks)

28

29

     Engineering Services Agreement • Scope of Services                                                               A-1
                                                                           • Material Testing Services • < project >

 1   A. MATERIALS TESTING

 2      ENGINEER shall procure, coordinate and schedule all field and laboratory testing services necessary for the

 3      construction process. Material testing services to be provided include the following:

 4          1. Full-time compaction observation/testing of fill placement during rough grading.

 5          2. Compaction testing of utility trench backfills, street subgrade and street base materials on an as-

 6              needed bases.

 7          3. Observation of utility trench backfills, street subgrade and street base materials placement.

 8          4. Laboratory testing including: maximum dry density, R-value, sand equivalency, and sieve analysis.

 9          5. Prepare a final rough grading geotechnical report with density test information, test location map, and

10              conclusions/recommendations (6 copies).

11          6. Prepare a pavement design report with R-value test results and calculated structural pavement

12              section thicknesses for aggregate base and asphalt concrete, based upon traffic index information to

13              be provided by others (6 copies).

14          7. Cast, deliver, cure and test concrete cylinders for compressive strength on an as-needed basis.

15          8. Prepare a final post-grading compaction report with density test information and test location map (6

16              copies).

17          9. Submit daily field reports, including field hours of geotechnical personnel.

18

19

20

21

22

23

24

25

26

27

28

29

     Engineering Services Agreement • Scope of Services                                                          A-2

								