A P P E N D I X A
REGIONAL PROJECT LIST
APPROX.
PROJECT COUNTY CORRIDOR LENGTH COST EST.
(MILES)
Iron Horse Trail (Project #35) Alameda Tri-Valley 15.0 $9,789,000
Davis - Estudillo - Crow Canyon Road Eastshore-
Alameda 16.6 $7,293,554
(Project #10) North
Southern Alameda County I-580 Eastshore-
Alameda 21.8 $7,048,378
Foothills (Project #13) South
Southern Alameda County I-880 Corridor Fremont-
Alameda 13.9 $6,610,743
(Project #9) South Bay
Emeryville Ped/Bike Overcrossing Eastshore-
Alameda 0.3 $6,500,780
(Project #46) North
Highway 24 Ped/Bike Overcrossing Eastshore-
Alameda 0.3 $6,500,780
(Project #47) North
Oakland-Alameda Connection (Project Eastshore-
Alameda 0.3 $6,500,650
#51) North
San Ramon - Foothill Rd. - I-680 Corridor
Alameda Tri-Valley 15.6 $5,735,928
(Project #28)
BART Trail / San Leandro St. (Project Eastshore-
Alameda 6.9 $5,307,770
#8) partial North
Iron Horse Trail (Project #34) Alameda Tri-Valley 8.0 $5,220,800
Alvarado - Niles - Niles Canyon (Project
Alameda Tri-Valley 22.1 $4,934,277
#36)
Northern Alameda County I-580 Eastshore-
Alameda 10.8 $4,626,152
Foothills (Project #11) North
Stoneridge Blvd. - Jack London Eastshore-
Alameda 6.8 $3,979,232
Connection (Project #24) North
Eastshore-
73rd Avenue - Hegenberger (Project #5) Alameda 5.2 $3,765,353
North
Eastshore-
Highway 13 Corridor (Project #22) Alameda 10.7 $3,543,072
North
Sunol
Vallecitos Rd. (Project #37) Alameda 14.1 $3,246,605
Gateway
Eastshore-
Alameda-Doolittle-Lewelling (Project #4) Alameda 9.5 $3,083,080
North
Eastshore-
Fruitvale - Broadway (Project #3) Alameda 2.9 $3,067,741
North
Dougherty - Hopyard Roads (Project
Alameda Tri-Valley 2.5 $3,006,838
#33)
Las Positas Creek Trail (Project #20) Alameda Tri-Valley 5.9 $2,952,326
E. Castro Valley-Dublin Canyon (Project Sunol
Alameda 6.5 $2,845,427
#15) Gateway
Bay Trail - Northern Alameda County Eastshore-
Alameda 29.1 $2,806,515
(Project #1) North
Regional Bicycle Plan A-1
A P P E N D I X A
APPROX.
PROJECT COUNTY CORRIDOR LENGTH COST EST.
(MILES)
Livermore Avenue Undercrossing
Alameda Tri-Valley 0.2 $2,600,520
(Project #50)
I-580 Undercrossing (Project #49) Alameda Tri-Valley 0.1 $2,600,260
Tassajara Rd. (Project #38) Alameda Tri-Valley 4.0 $2,440,201
Berkeley-Emeryville I-880 Corridor Eastshore-
Alameda 6.4 $2,332,721
(Project #6) North
Eastshore-
Oakland I-880 Corridor (Project #7) Alameda 3.1 $2,178,235
North
Oyster Bay – MLK Jr Connection (Bay Eastshore-
Alameda 1.4 $2,150,000
Trail) South
Fremont-
Highway 92 Corridor (Project #14) Alameda 4.1 $2,135,234
South Bay
MacArthur Blvd. I-580 - Foothills Eastshore-
Alameda 1 $2,005,464
(Project #12) North
Eastshore-
Union Point Park (Bay Trail) Alameda 0.1 $2,000,000
South
Stoneridge Blvd. (Project #23) Alameda Tri-Valley 2.4 $1,723,972
Vineyard - Concannon (Project #31)
Alameda Tri-Valley 3.1 $1,518,445
partial
Stanley-East Avenue (Project #27)
Alameda Tri-Valley 4.6 $1,506,167
partial
Eastshore-
Baumberg Tract (Bay Trail) Alameda 4. $1,500,000
South
Dublin Blvd. Extension (Project # 16) Alameda Tri-Valley 2.2 $1,435,720
Bridge over Altamont Creek (Project
Alameda Tri-Valley 0.1 $1,300,260
#48)
Eastshore-
42nd Avenue Bridge (Project #44) Alameda 0.1 $1,300,156
North
Eastshore-
Cerrito Creek Bridge (Project #43) Alameda 0.1 $1,300,156
North
Eastshore-
Damon Slough Bridge (Project #41) Alameda 0.1 $1,300,156
North
Hegenberger Undercrossing (Project Eastshore-
Alameda 0.1 $1,300,156
#45) North
San Leandro Slough Bridge (Project Eastshore-
Alameda 0.1 $1,300,156
#42) North
Eastshore-
Downtown Oakland Bay Trail Alameda 1.5 $1,280,000
North
Eastshore-
Auto Mall Connector Trail (Bay Trail) Alameda 5.2 $1,040,000
South
Vasco Road (Project #40) partial Alameda Tri-Valley 1.0 $961,056
A-2 Regional Bicycle Plan
A P P E N D I X A
APPROX.
PROJECT COUNTY CORRIDOR LENGTH COST EST.
(MILES)
Eastshore-
Alameda Bay Trail Alameda 4.5 $900,000
North
Eastshore-
Garrin Park Connector Trail (Bay Trail) Alameda 4.5 $900,000
South
Eastshore-
Lake Merritt Connector Trail (Bay Trail) Alameda 0.8 $900,000
North
Eastshore-
Old Alameda Creek Spur Trail (Bay Trail) Alameda 4.4 $880,000
South
Middle Harbor Park Connections (Bay Eastshore-
Alameda 3.0 $600,000
Trail) North
Eastshore-
Southern Oakland Bay Trail Alameda 2.9 $580,000
South
Eastshore-
Jack London Blvd. - Portola (Project #25) Alameda 2.6 $410,852
North
Miscellaneous Bay Trail Alameda 28.9 TBD
TOTAL Alameda 321.4 $152,744,888
Contra Eastshore-
Carquinez Regional Shoreline Trail 10.0 $5,000,000
Costa North
Richmond Parkway to Wilson Point (Bay Contra Eastshore-
6.0 $4,000,000
Trail) Costa North
Contra Eastshore-
Pinole Bay Trail 0.4 $2,500,000
Costa North
Contra Eastshore-
Hercules Bay Trail 2.1 $2,000,000
Costa North
Iron Horse to Baypoint Delta de Anza Contra
Delta 4.7 $2,000,000
Trail Costa
Contra
Oakley to San Joaquin County Delta 7.5 $890,000
Costa
Contra Eastshore-
Point San Pablo Bay Trail Spur 4.2 $840,000
Costa North
Contra
Oakley to Brentwood (O'Hara, Fairview) Delta 6.6 $785,400
Costa
Contra Eastshore-
Crockett to Martinez 6.1 $725,900
Costa North
Contra
Highway 4 - Hwy 160 to Discovery Bay Delta 14.5 $684,500
Costa
Contra Eastshore-
West County Landfill Trail (Bay Trail) 2.9 $580,000
Costa North
Contra
Antioch Bridge to Knightsen Delta 5.6 $565,600
Costa
Contra
Iron Horse Trail Gap Closures Diablo 6.0 $536,000
Costa
Contra Eastshore-
San Pablo Avenue Bike Lane 2.4 $500,000
Costa North
Regional Bicycle Plan A-3
A P P E N D I X A
APPROX.
PROJECT COUNTY CORRIDOR LENGTH COST EST.
(MILES)
Contra
Richmond-San Rafael Bridge Access Transbay 2.9 $345,100
Costa
Contra Eastshore-
Point Richmond Bay Trail 1.7 $340,000
Costa North
Contra Eastshore-
Brickyard Cove Trail 1.6 $320,000
Costa North
Contra Eastshore-
Central Richmond Greenway 2.5 $298,000
Costa North
Contra
Pittsburg to Clayton Diablo 7.3 $250,000
Costa
West County Wastewater District (Bay Contra Eastshore-
1.0 $200,000
Trail) Costa North
Contra Eastshore-
Refugio Creek Connector Trail 0.9 $180,000
Costa North
Contra
Antioch Delta de Anza Trail Delta 1.5 $178,500
Costa
Contra
Pacheco to Concord Diablo 3.1 $174,000
Costa
Contra
Pittsburg to Oakley On-Street Route Delta 7.1 $148,500
Costa
Contra Eastshore-
Point Isabel Bay Trail 0.6 $120,000
Costa North
Contra
Crow Canyon Diablo 1.5 $84,000
Costa
Contra
Pleasant Hill Gap Closures Diablo 2.2 $59,600
Costa
Contra Eastshore-
San Pablo Dam Road 8.3 $25,000
Costa North
Contra
Pittsburg to Oakley Delta 7.3 $16,700
Costa
Contra
Camino Tassajara Road Diablo 4.6 $13,800
Costa
Contra
Concord Gap Closures Diablo 1.7 $5,100
Costa
Contra Eastshore-
Fish Ranch Road 0.8 $1,000
Costa North
Contra
Miscellaneous Bay Trail 45.5 TBD
Costa
Contra
TOTAL 181.1 $24,366,700
Costa
Golden
San Rafael – Larkspur Gap Closure Marin 1.0 $6,500,000
Gate
Mill Valley–Corte Madera (North South Golden
Marin 1.2 $5,250,000
Bikeway): Gate
North South Bikeway to Sonoma County Golden
Marin 16.5 $4,000,000
Study Gate
A-4 Regional Bicycle Plan
A P P E N D I X A
APPROX.
PROJECT COUNTY CORRIDOR LENGTH COST EST.
(MILES)
Golden
San Rafael Bay Trail Marin 16.3 $3,260,000
Gate
Golden
Central Marin Ferry Connection Project Marin 0.7 $2,250,000
Gate
Golden
Tiburon Bay Trail Marin 6.7 $1,340,000
Gate
Golden
Hamilton Bay Trail Marin 5.1 $1,020,000
Gate
North Bay
Highway 37 Bay Trail Marin 3.2 $640,000
East-West
Golden
Bridgeway Bike Lanes (Bay Trail) Marin 2.8 $560,000
Gate
Golden
Strawberry Bay Trail Marin 2.8 $560,000
Gate
North Bay
Highway 37 Access Improvements Study Marin 3.2 $500,000
East-West
Richmond Bridge Access Study Marin Transbay 3.2 $500,000
Golden
Corte Madera Bay Trail Marin 1.5 $300,000
Gate
Golden Gate Bridge Access Golden
Marin 0.2 $150,000
Improvements Study Gate
Shoreline Industrial Park Green (Bay Golden
Marin 0.3 $90,000
Trail) Gate
Golden
Magnolia Bikeway Project (partial) Marin 1.0 $80,000
Gate
Golden
Puerto Suello Gap Closure Project Marin 0.3 $80,000
Gate
Golden
Miscellaneous Bay Trail Marin 27.4 TBD
Gate
TOTAL Marin 93.4 $27,080,000
Silverado Trail/Highway 121 (City of Napa
Napa 3.7 $2,745,000
Napa) Valley
North Bay
American Canyon Bay Trail Napa 3.0 $2,700,000
East-West
Napa
Napa Vallejo Hwy Napa 5.2 $2,500,000
Valley
North Bay
Jameson Canyon Path Napa 5.6 $1,400,000
East-West
North Bay
Duhig/Las Amigas/Cuttings Wharf Napa 7.5 $1,340,000
East-West
North Bay
Old Sonoma Road Napa 3.5 $1,000,000
East-West
Napa
Napa River Connector Trail Napa 3.3 $660,000
Valley
Regional Bicycle Plan A-5
A P P E N D I X A
APPROX.
PROJECT COUNTY CORRIDOR LENGTH COST EST.
(MILES)
Napa
Yountville Crossroad Napa 2.6 $300,000
Valley
Napa
Pope Napa 0.8 $200,000
Valley
Eastshore-
I-80 Regional Connector Napa 1.2 $100,720
North
Napa
Frontage Road Napa 3.0 $36,000
Valley
Napa
Lincoln Street Napa 1.0 $20,000
Valley
Napa
1st/2nd Street Napa 2.4 TBD
Valley
North Bay
Hwy 12 (Duhig to Solano County) Napa 19.6 TBD
East-West
Miscellaneous Bay Trail Napa 21.3 TBD
TOTAL Napa 83.7 $13,001,720
San San
Mission Creek Bikeway and Greenbelt 2.6 $10,000,000
Francisco Francisco
Candlestick Point State Recreation Area San San
1.5 $1,400,000
(Bay Trail) Francisco Francisco
Lincoln Ave. West-Coastal Trail Multi-Use San San
1.5 $1,200,000
Path Francisco Francisco
San San
Cesar Chavez Street 1.6 $1,047,000
Francisco Francisco
India Basin/Hunters Point Naval San San
0.4 $500,000
Shipyard (Bay Trail) Francisco Francisco
San San
Presidio Promenade Improvements 2.5 $441,100
Francisco Francisco
San San
34th Avenue 2.1 $347,100
Francisco Francisco
San Golden
Battery East Road Multiuse Path 0.2 $260,000
Francisco Gate
San San
Fort Mason Tunnel 0.2 $250,000
Francisco Francisco
San San
Marina Blvd. Path Improvement 1.0 $220,000
Francisco Francisco
San San
Market Street Multimodal Study 3.1 $200,000
Francisco Francisco
San San
Washington Blvd. Improvements 1.5 $182,160
Francisco Francisco
San San
Broadway Tunnel 0.4 $179,100
Francisco Francisco
San San
3rd Street 4.3 $178,900
Francisco Francisco
A-6 Regional Bicycle Plan
A P P E N D I X A
APPROX.
PROJECT COUNTY CORRIDOR LENGTH COST EST.
(MILES)
San San
West Pacific 1.3 $173,580
Francisco Francisco
San San
2nd Street 0.9 $67,100
Francisco Francisco
San San
Polk Street 1.6 $60,000
Francisco Francisco
San San
The Embarcadero Path 2.3 $15,000
Francisco Francisco
San San
Portola Drive Class III 1.8 $3,900
Francisco Francisco
San San
Market/17th/Castro Intersection 0.1 TBD
Francisco Francisco
San San
Market/Hyde/Grove Intersection 0.1 TBD
Francisco Francisco
San San
Howard Street Bike Lanes 1.8 TBD
Francisco Francisco
San San
Sloat Blvd striping 2.0 TBD
Francisco Francisco
San San
The Embarcadero/Market connection 0.1 TBD
Francisco Francisco
San San
Miscellaneous Bay Trail 12.0 TBD
Francisco Francisco
US 101/Bayshore/3rd Intersection San
Peninsula 0.2 TBD
Improvements Francisco
San
TOTAL 47.1 $16,724,940
Francisco
SFIA East Side/Bay Trail Project (Project
San Mateo Peninsula 3.4 $9,493,000
#15)
San Francisco Airport Alignment San Mateo Peninsula 4.2 $8,000,000
East Bayshore Freeway (Bay Trail) San Mateo Peninsula 2.0 $5,000,000
Ralston Avenue Bikeway Interchange
San Mateo Peninsula 0.1 $3,140,000
Improvements (Project #3)
Crystal Springs-3rd/4th Avenue Bikeway
San Mateo Peninsula 4.8 $2,118,750
(Project #14)
San Mateo Bay Trail (Project #5) San Mateo Peninsula 5.0 $2,000,000
US 101/Willow Road Interchange
San Mateo Peninsula 0.1 $2,000,000
(Project #10)
BART/SFO Bikeway Project San Mateo Peninsula 8.3 $1,538,900
Burlingame Bayfront Trail (Bay Trail) San Mateo Peninsula 0.3 $1,500,000
Coastside Bikeway Projects (Project #9) San Mateo Peninsula 7.2 $1,412,500
Regional Bicycle Plan A-7
A P P E N D I X A
APPROX.
PROJECT COUNTY CORRIDOR LENGTH COST EST.
(MILES)
Millbrae Avenue Bridge (Bay Trail) San Mateo Peninsula 0.7 $1,300,000
Recreational Route Bikeway
San Mateo Peninsula 10.0 $750,000
Improvements (Project #6) partial
North Coast Bikeway (Project #7) San Mateo Peninsula 9.1 $748,750
Redwood City Bay Trail San Mateo Peninsula 3.0 $600,000
North-South Bikeway
San Mateo Peninsula 37.4 $560,700
(Signing/Detectors) (Project #1)
San Bruno Mountain Connector Trail
San Mateo Peninsula 1.8 $360,000
(Bay Trail)
North-South Bikeway (Old County Road
San Mateo Peninsula 5.7 $279,375
Section) (Project #8)
Brisbane Bay Trail San Mateo Peninsula 1.3 $260,000
Bair Island Trail (Bay Trail) San Mateo Peninsula 1.2 $240,000
North-South Bikeway (South Section)
San Mateo Peninsula 8.8 $220,750
(Project #4)
North-South Bikeway (Delaware-
San Mateo Peninsula 7.8 $193,750
California) (Project #13)
San Carlos Airport (Bay Trail) San Mateo Peninsula 0.8 $160,000
North-South Bikeway (Bayshore Section)
San Mateo Peninsula 5.7 $142,500
(Project #11)
East Palo Alto Northern Segment (Bay
San Mateo Peninsula 0.6 $120,000
Trail)
Colma Creek Connector Trail (Bay Trail) San Mateo Peninsula 0.5 $100,000
East Palo Alto Southern Segment (Bay
San Mateo Peninsula 0.5 $100,000
Trail)
South San Francisco Bayfront Trail (Bay
San Mateo Peninsula 1.2 $100,000
Trail)
Miscellaneous Bay Trail San Mateo Peninsula 7.8 TBD
TOTAL San Mateo 139.3 $42,438,975
Santa Clara County portions of Bay Trail Santa Silicon
25.0 $25,000,000
Coyote Creek Trail Clara Valley
North 101/Caltrain Corridor (Mountain Santa Silicon
13.0 $20,000,000
View - San Jose Airport) Clara Valley
San Tomas/Lawrence Expressway Santa Silicon
15.0 $20,000,000
Corridor Clara Valley
Los Gatos Creek Trail Corridor (San Santa Silicon
5.0 $15,000,000
Jose) Clara Valley
A-8 Regional Bicycle Plan
A P P E N D I X A
APPROX.
PROJECT COUNTY CORRIDOR LENGTH COST EST.
(MILES)
Los Gatos Creek Trail Existing
Santa Silicon
Access/Safety Improvements (Campbell 5.0 $5,000,000
Clara Valley
- Los Gatos)
Santa Silicon
Coyote Creek Trail (Coyote Hellyer Park) 16.0 $3,000,000
Clara Valley
Capitol Expressway at Monterey Rd. Santa Silicon
0.1 $1,000,000
Shoulder Improvements Clara Valley
Foothill Expressway at Loyola Corners Santa
Peninsula 0.1 $1,000,000
Shoulder Improvements Clara
Santa Silicon
Sunnyvale/Borragas Corridor 3.0 TBD
Clara Valley
Santa Silicon
Highway 9 to Santa Cruz 7.9 TBD
Clara Valley
Santa
Miscellaneous Bay Trail 33 TBD
Clara
Santa
TOTAL 123.1 $90,000,000
Clara
Eastshore-
Dixon to Vacaville Bike Route Solano 12.0 $9,760,000
North
Eastshore-
Jepson Parkway/Vacaville to Suisun City Solano 12.0 $4,320,000
North
Eastshore-
Fairfield to Vallejo (Solano Bikeway) Solano 10.0 $2,350,000
North
Eastshore-
Davis to Dixon Bikeway Solano 5.5 $1,480,000
North
Eastshore-
Benicia-Martinez Bridge Connection Solano 0.2 $1,140,000
North
North Bay
Cordelia to Napa County Solano 2.9 $1,050,000
East-West
North Bay
Vallejo to Benicia Solano 3.5 $930,000
East-West
North Bay
Suisun City to Rio Vista Solano 20.0 $900,000
East-West
Eastshore-
Central County Bikeway Solano 2.3 $850,000
North
Eastshore-
Carquinez Bridge Connection Solano 0.1 $760,000
North
North Bay
Vallejo to Sonoma County (SR 37) Solano 1.6 $600,000
East-West
Eastshore-
Benicia to Cordelia Solano 13.0 $250,000
North
Napa
Vallejo to Napa Solano 4.2 $190,000
Valley
Eastshore-
Benicia to Martinez Solano 2.2 $120,000
North
Regional Bicycle Plan A-9
A P P E N D I X A
APPROX.
PROJECT COUNTY CORRIDOR LENGTH COST EST.
(MILES)
Eastshore-
Vallejo to Carquinez Bridge Solano 1.5 $90,000
North
Miscellaneous Bay Trail Solano 18.6 TBD
TOTAL Solano 109.6 $24,790,000
Golden
NWP Bicycle/Pedestrian Path Sonoma 30.0 $10,250,000
Gate
Golden
Sonoma County Bike Lanes (Bay Trail) Sonoma 43.0 $6,230,000
Gate
Joe Rodota Trail – Stony Point to Golden
Sonoma 1.3 $2,500,000
Downtown Santa Rosa Gate
Golden
Street Smart Sebastopol Improvements Sonoma 1.2 $1,000,000
Gate
Golden
Sonoma-Schellville Trail Sonoma 3.0 $637,500
Gate
Old Redwood Hwy/Mendocino Golden
Sonoma 5.3 $616,410
Ave./Santa Rosa Ave. Gate
Golden
Healdsburg Ave.-Lytton Springs Sonoma 3.0 $141,000
Gate
Petaluma Hill Rd. – Santa Rosa to Golden
Sonoma 6.4 $60,200
Roberts Gate
Golden
Old Redwood Hwy – Cotati to Petaluma Sonoma 3.1 $24,800
Gate
Golden
Arnold Dr. – Country Club to Madrone Sonoma 6.3 $18,000
Gate
Golden
Cloverdale to Healdsburg Sonoma 14.0 TBD
Gate
Healdsburg Route (Healdsburg/Piper/ Golden
Sonoma 2.4 TBD
1st) Gate
Golden
Sebastopol to Cotati Sonoma 7.5 TBD
Gate
North Bay
Hwy 37 Sonoma 6.2 TBD
East-West
Golden
Cotati to Rohnert Park Sonoma 2.5 TBD
Gate
Golden
Santa Rosa to Eldridge (Hwy 12, Arnold) Sonoma 12.0 TBD
Gate
North Bay
College / 4th (Santa Rosa) Sonoma 1.5 TBD
East-West
Petaluma to Sonoma (Lakeville, Hwy North Bay
Sonoma 15.0 TBD
116, Arnold, Leveroni, Napa) East-West
Golden
Mendocino to Cloverdale Sonoma 4.0 TBD
Gate
Napa County to Hwy 37 (Arnold, North Bay
Sonoma 13.0 TBD
Fremont, Ramal) East-West
A-10 Regional Bicycle Plan
A P P E N D I X A
APPROX.
PROJECT COUNTY CORRIDOR LENGTH COST EST.
(MILES)
Petaluma Blvd – Stony Point to southern Golden
Sonoma 4.5 TBD
City Limits Gate
TOTAL Sonoma 185.2 $21,477,910
Oakland-San Francisco Bay Bridge (East
Transbay 2.5 $50,000,000
Span)
Oakland-San Francisco Bay Bridge (West
Transbay 3.0 $65,000,000
Span)
San Mateo-Hayward Bridge Transbay 8.0 $84,000,000
Richmond-San Rafael Bridge Transbay 4.0 $93,400,000
TOTAL BRIDGES 17.5 $292,400,000
TOTAL 1,301.4 $705,025,133
* The project list and cost estimates will be modified following the completion of current planning efforts.
Regional Bicycle Plan A-11
A P P E N D I X A
A-12 Regional Bicycle Plan
Related docs
Other docs by HC1209130554
JNTUK DAP List of Affiliated Colleges with intake details for inclusion in the EAMCET 2012 List 1
Views: 79 | Downloads: 0
Get documents about "