TECHNICAL SPECIFICATIONS by 1xv74D

VIEWS: 30 PAGES: 11

									                         TECHNICAL SPECIFICATIONS

                                    SECTION-I

1.    General Information
1.1   The material covered in this specification shall be used in following 400 kV
      Double Circuit Transmission Lines associated with Karcham Wangtoo
      Transmission System of Jaypee POWERGRID Ltd.
                                                       Line length (Approx.)

      i.     400 kV D/C (Quad Moose) Karcham Wangtoo –              214 kms
             Abduallpur Transmission Line
      ii.    LILO of 400 kV D/C (Triple Snowbird) Baspa –             2 kms
             N.Jhakri Transmission Line at Karcham
             Wangtoo

2.    Scope
2.1   The material to be supplied on final destination at site basis as covered in this
      volume shall be designed, manufactured and tested as per the requirements
      specified.
      Final Destination shall mean the stores established by the Contractor of the Owner
      along the Transmission Lines.

2.2   The materials covered here under this specification shall be supplied complete in
      all respects, including all components, fittings and accessories which are necessary
      or are usual for their efficient performance and satisfactory maintenance under the
      various operating and atmospheric conditions. Such parts shall be deemed to be
      within the scope of the Contract, whether specifically included or not in the
      Specification or in the Contract Schedules. The Supplier shall not be eligible for any
      extra charges for such fittings, etc.

      The details of the materials required for the Conductor package under this
      Specification are mentioned in the bidding documents.

      (i)    ACSR 'MOOSE’ Conductor
      (ii)   ACSR ‘SNOWBIRD’ Conductor
3.    Weights and Measures
      All weights and measures shall be in System International (S.I.) units. All fasteners
      shall be of Metric size only.

4.    General Technical Conditions
4.1   The following provisions shall supplement all the detailed technical specifications
      and requirements brought out in the accompanying Technical Specifications. The
      Bidder’s proposal shall be based on the use of equipment and materials complying
      fully with the requirements, specified herein.



      SECTION-I (VOLUME-II)                                                             PAGE 1
        The Bidder shall furnish clause-by-clause commentary (with detailed technical data
        as required) on the Technical Specifications demonstrating the goods substantial
        responsiveness to the specifications or deviations and exceptions to the provisions
        of the Technical Specification.

4.2     Equipment Performance Guarantee
4.2.1   The performance requirements of the items are detailed separately in this
        Specification. These guarantees shall supplement the general performance
        guarantee provisions covered under General Terms and Conditions of Contract in
        clause entitled ‘Guarantee’.

4.2.2   Liquidated damages for not meeting specified performance shall be assessed and
        recovered from the Supplier. Such liquidated damages shall be without any
        limitation whatsoever and shall be in addition to damages, if any payable under
        any other clause of Conditions of Contract.

4.3     Engineering Data
4.3.1   The furnishing of engineering data by the Supplier shall be in accordance with the
        appropriate Schedule appended to this document. The review of these data by the
        Owner will cover only general conformance of the data to the specifications and
        drawings. This review by the Owner may not indicate a thorough review of all
        dimensions, quantities and details of the equipment, materials, any devices or
        items indicated or the accuracy of the information submitted. This review and/or
        approval by the Owner shall not be considered by the Supplier, as limiting any of
        his responsibilities and liabilities for mistakes and deviations from the
        requirements, specified under these Specifications and documents.

4.3.2   All engineering data submitted by the Supplier after final process including review
        and approval by the Owner shall form part of the Contract Document and the
        entire works performed under these Specifications shall be performed in strict
        conformity, unless otherwise expressly requested by the Owner in writing.

4.4     Drawings
4.4.1   All drawings submitted by the Supplier including those submitted at the time of
        bid shall be in sufficient detail to indicate the type, size, arrangement, dimensions,
        material description, Bill of Materials, weight of each component, break-up for
        packing and shipment, fixing arrangement required, the dimensions required for
        installation and any other information specifically requested in the Specifications.

4.4.2   Each drawing submitted by the Supplier shall be clearly marked with the name of
        the Owner, the unit designation, the Specification title, the Specification number
        and the name of the Project. All titles, noting, markings and in writings on the
        drawing shall be in English. All the dimensions should be to the scale and in metric
        units.

4.4.3   The drawings submitted by the Supplier shall be reviewed by the Owner as far as
        practicable within four (4) weeks and shall be modified by the Supplier if any


        SECTION-I (VOLUME-II)                                                             PAGE 2
        modifications and/or corrections are required by the Owner in compliance with
        Specifications. The Supplier shall incorporate such modifications and or corrections
        and submit the final drawings for approval. Any delays arising out of failure by the
        Supplier to rectify the drawings in good time shall not alter the Contract
        completion date.

4.4.4   The drawings submitted for approval to the Owner shall be in quadruplicate. One
        print of such drawings shall be returned to the Supplier by the Owner marked
        “approved/approved with corrections”. The Supplier shall there upon furnish the
        Owner additional print as stipulated in Technical Specification along with one
        reproducible in original of the drawings after incorporating all corrections.

4.4 5   Further work by the Supplier shall be strictly in accordance with these drawings
        and no deviation shall be permitted without the written approval of the Owner, if
        so required.

4.4.6   All manufacturing and fabrication work in connection with the equipment/
        material prior to the approval of the drawings shall be at the Supplier’s risk. The
        Supplier may make any changes in the design which are necessary to make the
        equipment conform to the provisions and intent of the Contract and such changes
        will again be subject to approval by the Owner. Approval of Supplier’s drawing or
        work by the Owner shall not relieve the Supplier of any of his responsibilities and
        liabilities under the Contract.

4.5     Manufacturing Schedule
        The Supplier shall submit to the Owner his manufacturing, testing and delivery
        schedules of various items within thirty (30) days from the date of the Letter of
        Award in accordance with the delivery requirements stipulated. Schedules shall
        also include the materials and items purchased from outside Suppliers, if any.

4.6     Reference Standards
4.6.1   The Codes and/or Standards referred to in Specifications shall govern, in all cases
        wherever such references are made. In case of a conflict between such Codes
        and/or Standards and the specifications, latter shall govern. Such Codes and/or
        Standards, referred to shall mean the latest revisions, amendments/changes
        adopted and published by the relevant agencies.

4.6.2   Other Internationally acceptable Standards which ensure equivalent or better
        performance than those specified shall also be accepted.

4.7     Design Improvements
4.7.1   The Owner or the Supplier may propose changes in the Specification of the
        equipment or quality thereof and if the parties agree upon any such changes, the
        Specification shall be modified accordingly.

4.7.2   If any such agreed upon change is such that it affects the price and schedule of
        completion, the parties shall agree in writing as to the extent of any change in the


        SECTION-I (VOLUME-II)                                                           PAGE 3
        price and/or schedule of completion before the Supplier proceeds with the change.
        Following such agreement, the provision thereof, shall be deemed to have been
        amended accordingly.

4.8     Quality Assurance
4.8.1   To ensure that the equipment under the scope of this Contract whether
        manufactured within the Supplier’s Works or at his Sub-Supplier’s premises is in
        accordance with the specifications, the Supplier shall adopt suitable Quality
        Assurance Programme to control such activities at all points necessary.

        Such programme shall be outlined by the Supplier and shall be finally accepted by
        the Owner after discussions before the award of Contract. A Quality Assurance
        Programme of the Supplier shall generally cover but not limited to the following :

        (a)    His organisation structure for the management and implementation of the
               proposed Quality Assurance Programme.
        (b)    Documentation control system.
        (c)    Qualification data for key personnel;
        (d)    The procedure for purchases of materials. Parts/components and selection
               of sub-Supplier’s services including vendor analysis, source inspection,
               incoming raw material inspection, verification of material purchases etc.
        (e)    System for shop manufacturing including process controls.
        (f)    Control of non-conforming items and system for corrective action.
        (g)    Control of calibration and testing of measuring and testing equipments.
        (h)    Inspection and test procedure for manufacture.
        (i)    System for indication and appraisal of inspection status.
        (j)    System for quality audits.
        (k)    System for authorising release of manufactured product to the Owner.
        (I)    System for maintenance of records.
        (m)    System for handling, storage and delivery and
        (n)    A Quality Plan detailing out the specific quality control procedure adopted
               for controlling the quality characteristics of the product.


        The Quality Plan shall be mutually discussed and approved by the Owner after
        incorporating necessary corrections by the Supplier as may be required.

4.8.2   Quality Assurance Documents
        The Supplier shall be required to submit all the Quality Assurance Documents as
        stipulated in the Quality Plan at the time of Owner’s inspection of
        equipment/material.



        SECTION-I (VOLUME-II)                                                            PAGE 4
4.8.3    The Owner or his duly authorised representatives reserves the right to carry out
         Quality Audit and quality surveillance of the systems and procedures of the
         Supplier’s/his vendor’s Quality Management and Control Activities.

4.9      Owner’s Supervision
4.9.1    To eliminate delays and avoid disputes and litigation it is agreed between the
         parties to the Contract that all matters and questions shall be resolved in
         accordance with the provisions of this document.

4.9.2    The manufacturing of the product shall be carried out in accordance with the
         specifications. The scope of the duties of the Owner, pursuant to the contract, will
         include but not be limited to the following :

         (a)   Interpretation of all the terms and conditions of these Documents and
                Specifications.

         (b)   Review and interpretation of all the Supplier’s drawings, engineering data
               etc.

         (c)   Witness or authorise his representative to witness tests at the manufacturer’s
               works or at site, or at any place where work is performed under the Contract.

         (d)   Inspect, accept or reject any equipment, material and work under the
               Contract, in accordance with the Specifications.

         (e)   Issue certificate of acceptance and/or progressive payment and final payment
                certificate.

         (f)   Review and suggest modification and improvement in completion schedules
               from time to time, and

         (g)   Supervise the Quality Assurance Programme implementation at all stages of
               the works.

4.10     Inspection, Testing & Inspection Certificate
4.10.1   The Owner, his duly authorised representative and/or outside inspection agency
         acting on behalf of the Owner shall have at all reasonable times access to the
         Supplier’s premises and works and shall have the power at all reasonable times to
         inspect and examine the materials and workmanship of the product during its
         manufacture and if part of the product is being manufacture or assembled at other
         premises or works, the Supplier shall obtain from the Owner and /or his duly
         authorised representative permission to inspect as if the equipment/ materials were
         manufactured or assembled on the Supplier’s own premises or works.

4.10.2   The Supplier shall give the Owner Inspector fifteen (15) days written notice of any
         material being ready for testing. Such tests shall be to the Supplier’s account except
         for the expenses of the Inspector. The Owner/inspector, unless witnessing of the


         SECTION-I (VOLUME-II)                                                              PAGE 5
         tests is waived, will attend such tests within fifteen (15) days of the date of which
         the equipment is notified as being ready for test/inspection or on a mutually agreed
         date, failing which the Supplier may proceed with the test which shall be deemed
         to have been made in the Inspector’s presence and he shall forthwith forward to
         the Inspector duly certified copies of tests in triplicate.

4.10.3   The Owner/Inspector shall, within fifteen (15) days from the date of inspection as
         defined herein give notice in writing to the Supplier, of any objection to any
         drawings and all or any equipment and workmanship which in his opinion is not
         in accordance with the Contract. The Supplier shall give due consideration to such
         objections and shall make the modifications that may be necessary to meet the said
         objections.

4.10.4   When the factory tests have been completed at the Supplier’s or Sub-Supplier’s
         works, the Owner inspector shall issue a certificate to this effect within fifteen (15)
         days after completion of tests but if the tests are not witnessed by the
         Owner/inspector, the certificate shall be issued within fifteen (15) days of receipt of
         the Supplier’s Test Certificate by the Owner/ Inspector. The completion of these
         tests or the issue of the certificate shall not bind the Owner to accept the equipment
         should it, on further tests after erection, be found not to comply with the Contract.

4.10.5   In all cases where the Contract provides for test whether at the premises or works
         of, the Supplier or of any Sub-Supplier, the Supplier except where otherwise
         specified shall provide free of charge such item as labour , materials, electricity,
         fuel, water, stores, apparatus and instruments as may be reasonably demanded by
         the Owner inspector or his authorised representative to carry out effectively such
         tests of the equipment in accordance with the Contract and shall give facilities to
         the Owner/Inspector or to his authorised representative to accomplish testing.

4.10.6   The inspection by Owner and issue of Inspection Certificate thereon shall in no
         way limit the liabilities and responsibilities of the Supplier in respect of the agreed
         Quality Assurance Programme forming a part of the Contract.

5.       Technical Description
5.1      The technical description of ACSR 'MOOSE' Conductor shall be as specified in
         Section-II of this Technical Specifications. The technical description of ACSR
         'SNOWBIRD' Conductor shall be as specified in Section-III of this Technical
         Specifications.

6.       Tests and Standards
6.1      Tests
         The following type, acceptance and routine tests and tests during manufacture
         shall be carried-out on the material. For the purpose of this clause:

6.1.1    Type Tests shall mean those tests which are to be carried out to prove the process
         of manufacture and general conformity of the material to this Specification. These
         tests shall be carried out on samples prior to commencement of commercial


         SECTION-I (VOLUME-II)                                                              PAGE 6
             production against the order. The Bidder shall indicate his schedule for carrying
             out these tests.

6.1.2        Acceptance Tests shall mean those tests which are to be carried out on samples
             taken from each lot offered for pre-dispatch inspection, for the purposes of
             acceptance of that lot.

6.1.3        Routine Tests shall mean those tests, which are to be carried out on the material to
             check requirements which are likely to vary during production.

6.1.4        Tests During Manufacture shall mean those tests, which are to be
             carried out during the process of manufacture and end inspection by the Supplier
             to ensure the desired quality of the end product to be supplied by him.

6.1.5        The norms and procedure of sampling for these tests will be as per the Quality
             Assurance Programme to be mutually agreed to by the Supplier and the Owner.

6.1.6        The standards and norms to which these tests will be carried out are listed against
             them. Where a particular test is a specific requirement of this Specification, the
             norms and procedure of the test shall be as specified in Annexure-A or as mutually
             agreed to between the Supplier and the Owner in the Quality Assurance
             Programme.

6.1.7        For all type and acceptance tests, the acceptance values shall be the values specified
             in this Specification or guaranteed by the Bidder, as applicable.

7.           Guaranteed Technical Particulars
7.1          The Standard Technical Particulars of the conductor are given in the relevant
             sections of the technical specifications and the bidder is required to comply with
             the same. The Bidder shall also furnish any other schedule information as in their
             opinion is needed to give full description and details to judge the item(s) offered by
             them

8.0     Technical Information

8.1     A. Electrical System Data for 400 kV Lines

        Electrical System Data
        a.    Nominal Voltage                                      kV                   400

        b.   Maximum system voltage                                kV                   420

        c.   BIL (Impulse)                                         kV (Peak)
                                                                   *For 400 kV D/C 1800
                                                                   TL in snow zone
                                                                   #For 400 kV D/C 1550
                                                                   TL in non-snow
                                                                   zone

             SECTION-I (VOLUME-II)                                                             PAGE 7
        d.   Power frequency withstand voltage (Wet)            kV (rms)             680

        e.   Switching surge withstand voltage (Wet)            kV(peak)
                                                                *For 400 kV D/C 1175
                                                                TL in snow zone
                                                                #For 400 kV D/C 1050
                                                                TL in non-snow
                                                                zone

        f.   Minimum Corona extinction voltage at 50 Hz AC      KV(rms)              320 (Min)
             system under dry condition                         Phase to earth.

        g.   Radio interference voltage at one MHz for phase    Micro volts          1000
             to earth voltage of 305 KV under dry condition.                         (max)

             * - Approx. 153 kms of 400 kV D/C (Quad) line
             and approx. 2 kms of 400 kV D/C (Triple) LILO is
             passing thru’ snow zone/area
             # - Approx. 61 kms of 400 kV D/C (Quad) line is
             thru’ non-snow zone/area


8.2     Details of Line Materials for 400 kV Line
8.2.1   a.   Conductor and earthwire for Quad Bundle Line
        S    Description                      Unit   Conductor                Earthwire
        No
        1.   Name/Type                               ACSR MOOSE          Galvanised
                                                                         steel
        2.   Size                            Mm         54/3.53 Aluminum 7/3.66
                                                        +7/3.53 Steel


        3.   Conductor per phase                        4                     N.A.

        4.   Spacing between conductor of    Mm         457                   N.A.
             same phase (sub conductor
             spacing)


        5.   Configuration                              Vertical (for D/C     Two
                                                        with 8000 mm min.     continuously to
                                                        inter phase           run
                                                        spacing).             horizontally       on top of the
        6.   Overall diameter                mm         31.77                 10.98
        7.   Unit mass                       Kg/KM      2004                  583



             SECTION-I (VOLUME-II)                                                           PAGE 8
        8.    Minimum UTS                                  KN           161.2               68.4

        9.    Ruling Design Span                           Meter        400                 400


8.2.1   b.    Conductor and earthwire for Triple Bundle Line
        S     Description                    Unit      Conductor                            Earthwire
        No
        1.    Name/Type                                                 ACSR SNOWBIRD    Galvanised
                                                                                         steel
        2.    Size                                         Mm           42/3.99 Aluminum 7/3.66
                                                                        +7/2.21 Steel


        3.    Conductor per phase                                       3                   N.A.

        4.    Spacing between conductor of                 Mm           457                 N.A.
              same phase (sub conductor
              spacing)


        5.    Configuration                                             Vertical (for D/C   Two
                                                                        with 8000 mm min.   continuously to
                                                                        inter phase         run
                                                                        spacing).           horizontally      on top of the
        6.    Overall diameter                             mm           30.56               10.98

        7.    Unit mass                                    Kg/KM        1657                583

        8.    Minimum UTS                                  KN           118                 68.4

        9.    Ruling Design Span                           Meter        400                 400


8.2.2.1 (a)          Detail of Insulator String with Disc Insulators for 400 kV D/C (Quad Bundle) TL
                     in Snow zone
              SL.    Particulars                     Single            Single ‘I’      Quad Tension
              NO.                                    Tension           suspension      String
                                                     String            Pilot String


              1.     Type of Disc                           Standard            Standard     Standard

              2.     E& M strength of each insulator in     120                 120          160
                     the string in KN
              3.     No. of disc insulators per string      25                  25           4 x 25

              4.     Size of disc in mm                     280 x 145           280 x 145     280 x 170
                                                            Or                  or
                                                            255 x 145           255 x 145
              5.     Size and designation of pin ball in    20                  20           20
                     mm
              6.     Minimum creepage distance of           315                 315          330
                     each disc in mm




              SECTION-I (VOLUME-II)                                                                       PAGE 9
8.2.2.1 (b)         Detail of Insulator String with Disc Insulators for 400 kV D/C (Quad               Bundle) TL
                    in Non-Snow zone
              SL.   Particulars                     Double       Single ‘I’ Single                     Quad
              NO.                                   Suspensio    suspensi Tension                      Tension
                                                    n string     on Pilot    String                    String
                                                                 String
              1.    Type of Disc                          Standard    Standard      Standard           Standard

              2.    E& M strength of each insulator in    120         120           120                160
                    the string in KN
              3.    No. of disc insulators per string     2 x 23      23            24                 4 x 23

              4.    Size of disc in mm                    280 x 145   280 x 145     280 x 145           280 x 170
                                                          or          or            Or
                                                          255 x 145   255 x 145     255 x 145
              5.    Size and designation of pin ball in   20          20            20                 20
                    mm
              6.    Minimum creepage distance of          315         315           315                330
                    each disc in mm


8.2.2.1 (c)         Detail of Insulator String with Disc Insulators for 400 kV D/C (Triple bundle) TL
                    in Snow zone
              SL.   Particulars                                  Single ‘I’                Double
              NO.                                                suspensi                  Tension
                                                                 on Pilot                  String
                                                                 String
              1.    Type of Disc                                      Standard                         Standard

              2.    E& M strength of each insulator in                120                              210
                    the string in KN
              3.    No. of disc insulators per string                 23                               2 x 25

              4.    Size of disc in mm                                280 x 145                         280 x 170
                                                                      or
                                                                      255 x 145
              5.    Size and designation of pin ball in               20                               24
                    mm
              6.    Minimum creepage distance of                      315                              370
                    each disc in mm


8.2.2.2 (a)         Detail of Insulator String with Long Rod           Insulators for 400 kV D/C (Quad
                    Bundle) TL in Snow Zone
              SL.   Particulars                   Single                    Single ‘I’          Quad Tension
              NO.                                 Tension                   suspension          String
                                                  String                    Pilot String
              1.    Size of long Rod insulator            60-85             60-85               75-85

              2.    E& M strength of each insulator       120               120                 160
                    unit in the string in KN
              3.    No. of Long rod insulators per        1x3               1x3                 4x3
                    string
              4.    Length of long Rod insulator in       1209              1209                1417
                    mm
              5.    Minimum creepage distance of          2625              2625                2750
                    each unit in mm


8.2.2.2 (b)         Detail of Insulator String with Long Rod           Insulators for 400 kV D/C (Quad
                    Bundle) TL in Non-Snow Zone


              SECTION-I (VOLUME-II)                                                                             PAGE 10
              SL.    Particulars                       Double      Single ‘I’          Single             Quad
              NO.                                      Suspensi    suspension          Tension            Tension
                                                       on string   Pilot               string             String
                                                                   String
              1.     Size of long Rod insulator        60-85       60-85               60-85              75-85

              2.     E& M strength of each insulator   120         120                 120                160
                     unit in the string in KN
              3.     No. of Long rod insulators per    2x3         1x3                 1x3                4x3
                     string
              4.     Length of long Rod insulator in   1112        1112                1112               1304
                     mm
              5.     Minimum creepage distance of      2415        2415                2415               2530
                     each unit in mm


8.2.2.2 (c)          Detail of Insulator String with Long Rod            Insulators for 400 kV D/C (Triple
                     Bundle) TL in Snow Zone
              SL.    Particulars                                           Single ‘I’              Double
              NO.                                                          suspension              Tension String
                                                                           Pilot String
              1.     Size of long Rod insulator                            60-85                   85-90

              2.     E& M strength of each insulator                       120                     210
                     unit in the string in KN
              3.     No. of Long rod insulators per                        1x3                     4x3
                     string
              4.     Length of long Rod insulator in                       1209                    1417
                     mm
              5.     Minimum creepage distance of                          2625                    3084
                     each unit in mm




      9.0           Service Condition.
                    Equipment/material to be supplied against this specification shall be suitable
                    for satisfactory continuous operation under conditions as specified below:
                    Maximum ambient temperature (Degree Celcius)         :     50
                    Minimum ambient temperature (Degree Celsius)                   :           (-)15** / (-)5##
                    Relative humidity (% range)                                    :           10-100
                    Maximum annual rainfall & snowfall (Cm)                        :           As per published
                                                                                               Meteorological/
                                                                                               Climatological data
                    Wind zone (as per IS: 875)                                     :           2** / 4##
                    Maximum wind velocity (m/sec.)                                 :           39** / 47## m/sec. (as
                                                                                               per IS : 875)
                    Maximum altitude above mean sea level (Metres)                 :           2500** / 1000## m
                                                                                               (approx)
                    Isoceraunic level (days/years)                                 :           60
                    Climate varies from moderately hot and humid tropical climate to cold snowfall
                    prone climate.

              ** - For 400 kV D/C TL in snow zone/area
              ## - For 400 kV D/C TL in Non-snow zone/area