					                                                                      BID SCHEDULE A
                                                                ITB-12-08 Proposal and Bid Form
                                                                     Raw Water Main - Callen to Eloisewood

CONSTRUCTION COMPANY NAME: ________________________________________________________________________


Bid Schedule
ITEM NO.                                            ITEM                              QUANTITY UNIT               UNIT PRICE           AMOUNT

     C.1         MOBILIZATION/DEMOBILIZATION                                                 1      LS
                                                                                                                                                    0

                 10" SDR-11 HDPE WM INSTALLED VIA
                 DIRECTIONAL DRILL (WITHOUT CASING). THE
                 10" SDR-11 HDPE PIPE WILL BE PROVIDED BY
   RW.2          THE CITY OF WINTER HAVEN. THIS PAY ITEM IS                              2,450      LF
                 FOR ALL WORK TO INSTALL / CONSTRUCT THE
                 PIPELINE IN ACCORDANCE WITH THE PLANS
                 AND SPECIFICAITONS.
                                                                                                                                                    0

  RW.2A          10" PVC C-900 WM                                                           100     LF
                                                                                                                                                    0

   RW.3          DI FITTINGS                                                             1,000     LBS
                                                                                                                                                    0

   RW.4          10" GATE VALVES WITH VALVE BOX                                              1      EA
                                                                                                                                                    0

   RW.5          AUTOMATIC AIR RELEASE VALVE ASSEMBLY                                        4      EA
                                                                                                                                                    0

   RW.6          SODDING                                                                 1,000      SY
                                                                                                                                                    0

   RW.7          MAINTENANCE OF TRAFFIC                                                      1      LS
                                                                                                                                                    0

   RW.8          MISCELLANEOUS RESTORATION                                                   1      LS
                                                                                                                                                    0

   RW.9          DRIVEWAY RESTORATION                                                       20      SY
                                                                                                                                                    0

  RW.10          CERTIFICATION ACTIVITIES                                                    1      LS
                                                                                                                                                    0

                                                                                                                   Bid Total =     $            -


"Bid Total" in words:


                                                                                                   dollars, and           cents.


Completion time: _______________________________________

                                                                                    PBF-3




  C:\Docstoc\Working\pdf\a4683989-7f38-4c7b-a250-1989a06c7bcc.xlsx
                              Bid Item                          Unit       M-15         M-16         M-17         M-18         Total
RW.1    6" RAW WATER MAIN                                        LF          215          460          100           60         835
RW.2    HDPE DIRECTIONAL DRILL                                   LF          450           80          685          460        1675
RW.3    DI FITTINGS                                             LBS          216           54          224           85         579
RW.4    6" GATE VALVES WITH VALVE BOX                           EA            2             1           2             0          5
RW.5    AIR RELEASE VALVES                                      LA            2             1           2             0          5
RW.6    CONNECT 6" WATER MAIN TO EXISTING 6" WATER MAIN         EA            1             0           0             1          2     0.000647
RW.7    SODDING*                                                SY           200          400          110           20         730
RW.8    CONCRETE CURB RESTORATION*                               LF           0             0           0             0          0
        REPLACE ASPHALTIC CONCRETE TOP, ROCK BASE &
                                                                 SY
RW.11   SUBGRADE*                                                            20            0            0            0          20
RW.12   CONCRETE DRIVEWAY RESTORATION*                           SY          45           110           0            0         155
RW.13   ASPHALT DRIVEWAY RESTORATION*                            SY           0            0            0            0           0




                               Fittings                     Weight (lbs)   M-15         M-16         M-17         M-18
                             6" 45 Bend                         37
                           8" x 6" Reducer                      54                  4            1            3            1

                            6" 11.25 Bend                        31                                           2            1
                             6" 90 Bend




                                                          total weight            216           54          224           85
                                      ENGINEER'S OPINION OF PROBABLE COS
                                        ELOISEWOOD AND CYPRESSWOOD W.T.P. IMPROVEMENTS
                                                   AECOM PROJECT # 06-0332 (32463)



CONSTRUCTION COMPANY NAME: ___________________________________________________________

Bid Schedule
ITEM NO.                                 ITEM                           QUANTITY
    C.1        MOBILIZATION/DEMOBILIZATION                                   1
   EW.1        SITE PAVING, GRADING AND SITEWORK                             1
   EW.2        YARD PIPING                                                   1
   EW.3        GROUND STORAGE TANK                                           1
               HIGH SERVICE PUMP BUILDING WITH ELECTRICAL/MCC
   EW.4                                                                      1
               BUILDING ADDITION
   EW.5        HIGH SERVICE PUMPS AND VFDS                                   1
   EW.6        RAW WATER WELL HEAD MODIFICATIONS                             1
   EW.7        FLOURIDE SYSTEM                                               1
   EW.8        SODIUM HYPOCHLORITE STORAGE                                   1
   EW.9        STANDBY GENERATOR                                             1
  EW.10        ELECTRICAL (10% of EW work)                                   1
   RW.1        8" RAW WATER MAIN                                            875
               10" SDR-11 HDPE WM INSTALLED VIA DIRECTIONAL DRILL
   RW.2                                                                    1,700
               (WITHOUT CASING)
   RW.3        DI FITTINGS                                                  600
   RW.4        8" GATE VALVES WITH VALVE BOX                                 5
   RW.5        AUTOMATIC AIR RELEASE VALVES                                  5
   RW.6        SODDING*                                                     750
   RW.7        TREE & SHRUBBERY RESTORATION*                                 1
   RW.8        MISCELLANEOUS RESTORATION*                                    1
               REPLACE ASPHALTIC CONCRETE TOP, ROCK BASE &
   RW.9                                                                     20
               SUBGRADE*
  RW.10        CONCRETE DRIVEWAY RESTORATION*                               150
  RW.11        ASPHALT DRIVEWAY RESTORATION*                                20
  RW.12        CERTIFICATION ACTIVITIES (MINIMUM 5% OF TOTAL BID)            1
   CP.1        SITE PAVING, GRADING AND SITEWORK                             1
   CP.2        YARD PIPING                                                   1
   CP.3        CONNECT 8" WATER MAIN TO EXISTING 6" WATER MAIN               1
   CP.4        RAW WATER WELL HEAD MODIFICATIONS                             1
    CP.5      ELECTRICAL (10% of CP work)                                   1

Bid Total =


Total Cost of this Bid Proposal in words:


                                                                        dollars, and       cen

*Total restoration costs shall be a minimum of seven percent (7%) of the Total Bid Cost.
ROBABLE COST
T.P. IMPROVEMENTS
2 (32463)




            UNIT       UNIT PRICE              AMOUNT
             LS    $         75,000.00     $       75,000.00 *Roughly 5%-10% of bid
             LS    $         30,000.00     $       30,000.00 *Lilac Street; 32171.06
             LS    $         50,000.00     $       50,000.00 *Lilac Street; 32171.06
             LS    $        450,000.00     $      450,000.00 *Lilac Street; 32171.06 (%75 of 1MG Estimate)
             LS
                   $        150,000.00     $      150,000.00   *City of Melbourne, DB Lee Bid Price (50%)
             LS    $        300,000.00     $      300,000.00   *City of Stuart, WTP 2 Improvements (Add 100k for V
             LS    $        100,000.00     $      100,000.00   *Richard Road WTP, 50k per well pump
             LS    $        100,000.00     $      100,000.00   *City of Stuart, WTP 2 Improvements
             LS    $         15,000.00     $       15,000.00 *City of Stuart, WTP 2 Improvements
             LS    $        250,000.00     $      250,000.00 *Carson Rd. WTP, Immokalee, 2004
             LS    $        152,000.00     $      152,000.00
             LF    $             45.00     $       39,375.00
             LF
                   $             55.00     $       93,500.00
            LBS    $              5.00     $        3,000.00
            EA     $          2,250.00     $       11,250.00 *Clewiston 200 Sewer
            EA     $          3,500.00     $       17,500.00 *20" Raw WM; 06-0106-03
            SY     $                3.00   $        2,250.00 *20" Raw WM; 06-0106-03
             LS    $         25,000.00     $       25,000.00 *20" Raw WM; 06-0106-03
             LS    $         25,000.00     $       25,000.00 *20" Raw WM; 06-0106-03
            SY
                   $             50.00     $        1,000.00 *20" Raw WM; 06-0106-03
            SY     $             60.00     $        9,000.00
            SY     $             50.00     $        1,000.00 *20" Raw WM; 06-0106-03
             LS    $         99,803.75     $       99,803.75
            LS     $         25,000.00     $       25,000.00
            LS     $         15,000.00     $       15,000.00
            EA     $          2,000.00     $        2,000.00
             LS    $         50,000.00     $       50,000.00 *Richard Road WTP
              LS   $           4,200.00   $            4,200.00

                                          $        2,095,878.75




ollars, and        cents. ($                  ).

Total Bid Cost.
%75 of 1MG Estimate)

 ee Bid Price (50%)
 provements (Add 100k for VFDs)
 per well pump
 provements
 provements

				