							                        OFFICE OF THE EXECUTIVE ENGINEER
                       NATIONAL HIGHWAY DIVISION, DHANBAD

                               NOTICE INVITING BID

 NOTICE INVITING BIDS FOR CONSULTANCY SERVICES FOR PREPARATION OF
        FEASIBILITY STUDY AND DETAILED PROJECT PREPARATION FOR
 CONSTRUCTION OF NEW BYE PASS IN BOKARO FROM KM. 52OF N.H 32 NEAR
  I.T.I.MORE & JOINS THE EXISTING N.H.23 AT KM. 9TH. NEAR UKRID MORE IN
                 BOKARO DISTRICT (LENGTH ABOUT 7.00KM.)

         Technical and financial bids for work of survey investigation and
preparation of technical Feasibility report and detail project report for engagement
of consultant for preparation of feasibility study and detailed project preparation
for New Bye Pass in Bokaro as detail below are invited in sealed double cover
system one containing technical bid and other financial bid from reputed
consultants who are empanelled with Minister of Road Transport in Highways
Govt. of India New Delhi in a appropriate category.
(a)     FEASIBILITY STUDY AND DETAILED PROJECT PREPARATION FOR
CONSTRUCTION OF NEW BYE PASS IN BOKARO FROM KM. 52 OF N.H 32 NEAR
I.T.I.MORE & JOINS THE EXISTING N.H.23 AT KM. 9TH. NEAR UKRID MORE IN
BOKARO DISTRICT (LENGTH ABOUT 7.00KM.)
2.      Qualifying requirements for consultancy firms -
    a) The firm should have carried out successfully as prime consultants for new
            bye pass/Green field alignment for 13 kms. Of 2 lane road and bridges
            having individual span of 15m. or more, (Attach proof) for Govt./Semi-
    Govt./
            Public sector under taking in last 3 years. (attach certificates of
    completion
            as proof)
       (b) The firm should have completed at least D.P.R. project (cost 100 crore)
    and
           above. (Attach proof)
       (c) The firm should empanelled with MORT&H, Govt. of India, New Delhi for
            above nature of work.



3.    The details of consultancy service broadly cover the following :
        (a)    Inception report
        (b)    Submission of technical feasibility report.
        (c)    Preparation of preliminary project report.
        (d)    Preparation detail project report including detail engineering
               design, working drawing, tender document for execution of civil
               work etc.
        (e)    Obtaining necessary approval for concerned authorities including
               approval of technical feasibility report. And detail project report by
               the Ministry of Road Transport & Highway Govt. of India New Delhi.
        (f)      Bill of quantity item rates note for efc. Economic.
4. The term of reference for consultancy services may be obtained from the
    office of the (1) Executive Engineer, N.H. Division, Dhanbad. (2)
    Superintending Engineer, N.H. Circle, Dhanbad (3) The Chief Engineer, N.H.
    Wing Jharkhand, Ranchi by the intending bidders upto 13.00 hours from 24—
    05-2010 to 28-05-2010 on payment of Rs. 5000/- in shape of bank draft in
    favour of Executive Engineer, N.H. Division, Dhanbad payable at S.B.I,
    Dhanbad. The firms that are in listed as an association/joint
    venture/consoritiums shall furnish MOU/joint venture agreement along with
    the proposal.
                             Alternatively, quotationers can download the terms of
                            reference ( T.O.R) from any the
         following website :
            (i)      www.jharkhand.gov.in
            (ii)     www.jharkhand.nic.in
                     However, the quotationers shall have to pay the above stated
                     cost of terms of reference( T.O.R) along with their quotations at
                     the time of submitting the quotation in the form of demand draft
                     as stated above.
5. The Bids accompanied by supporting the documents must reach the office
    of the Executive Engineer, N.H. Division, Dhanbad on or before 15.00 hours
    on 01-06-.2010 in double cover with technical proposal and financial
    proposal sealed in separate envelope which are clearly marked as technical
    proposal and financial proposal for proper identification by register post or
    by special messenger and and shall be opened 15.30 hour on the same day
    in the presence of bidder who wish to attend.
6. Financial bids will be inclusive of all taxes and duties. All statutory
    deduction will be made from the bill of consultants, the technical proposal
    shall be open first & financial proposals will be open for the those whose
    technical proposal are qualified. Only the firms whose technical proposal are
    accepted shall be informed the date of opening of the financial bids. The bids
    received letter than stipulated date and time will summarily be rejected.
7. The bidder should enclose duly pledged NSC/TDP/Bank guarantee of any
    Nationalized Bank in favour of undersigned amounting to 2% of quoted
    amount in financial bids. The Bank guarantee should be valid 180 days from
    date of opening of bids.
8. The successful bidder will have to submit performance security in the form
    of Bank guarantee/NSC/TDP @ of 3% of the contract sum valid for period of
    one year from the dt. Of commencement of the consultancy service.
9. The intending bidder are required to quote their PAN in the bid document.
10. All right are reserve to reject/postponed one or all proposal without
    assigning any reason thereof.


                                                        Executive Engineer
                                                       N.H.Division, Dhanbad

						
Related docs
Other docs by HC12091121856
No Slide Title
Views: 0  |  Downloads: 0
PowerPoint Presentation
Views: 0  |  Downloads: 0
EELL GestioniAss AllB
Views: 0  |  Downloads: 0
0C433491 5056 A318 A876AE12BDD8AE68
Views: 0  |  Downloads: 0
McLeodUSA Initial Post Hearing Brief
Views: 1  |  Downloads: 0
FERC�s Initiatives on Gas Infrastructure
Views: 0  |  Downloads: 0
PowerPoint Presentation
Views: 0  |  Downloads: 0
general assistance paralegal 3 1 12
Views: 7  |  Downloads: 0
Job Description template in house coordinator
Views: 5  |  Downloads: 0
NIPRNET LAN Application
Views: 9  |  Downloads: 0