							                                      Wal-Mart Stores, Inc.
                                Design & Construction Department
                                       2001 S.E. 10th Street
                                  Bentonville, AR 72716-0550

                           WAL-MART DIRECTIVE #07-067
To:         Construction Managers; General Contractors           cc:   Construction Directors
                                                                       Design Directors
From:       Karen Ritchey                                              Design Managers
                                                                       Construction Managers
Date:       July 6, 2007                                               Bryan Novak


SCOPE: The Scope of Work as defined within this CONSTRUCTION BULLETIN is to modify the
originally issued Contract Documents and all subsequent contract modifications to reflect the following:

Subject: PCOB Tool Introduction – New Store Program

Wal-Mart Stores Inc. has requested that Evoco Inc. provide an online, web-based application
to allow you, the General Contractor, the ability to submit a preliminary change order budget
(PCOB) online regarding your construction project. The PCOB Tool will appear as an add-on
to the existing RFI Tool in your selection listing when you log into the Building Portal. For
now, this new application will be used for New Store projects only. Store Planning projects will
continue with their current process for the time being.

All New Store projects with the construction contract awarded after July 11, 2007 will address
PCOBs through the online PCOB Tool. This new application will replace the current system of
PCOBs being submitted via fax and/or email except for those projects currently under
construction.

When you first log in to the PCOB Tool you will be directed to a quick 5-10 minute tutorial
before reaching the application itself. This tutorial can also be printed if desired and will be
available for future reference online as well as in a downloadable PDF format.


Please note that all email correspondence will be sent from notifications@evoco.com. It is
important to let your email administrators know that emails coming from evoco.com are valid
notifications, in case SPAM filters need to be altered.

If you have any questions regarding this new process, please do not hesitate to contact Evoco
Client Services at 1.800.274.5250 or via email at support@evoco.com.

If you have any general questions about the PCOB Tool, please contact your Contracts
Administrator.

Thank you for your attention to this matter.

Karen Ritchey
Director of Construction Administration
Wal-Mart Stores Inc.

						
Related docs
Other docs by HC120911184048
McDonnell TC Elec Egrg Data.ppt
Views: 0  |  Downloads: 0
AutomotiveMobile Equipment Capstone
Views: 1  |  Downloads: 0
Carattere Swis 721 Cn Bt corpo 10
Views: 9  |  Downloads: 0
GENERAL INFORMATION
Views: 3  |  Downloads: 0
2009 01 16EMSHIELD DFR2 GuideSpec
Views: 0  |  Downloads: 0
clare elliott
Views: 0  |  Downloads: 0
continental pr fixedcaliper 20110815 en
Views: 3  |  Downloads: 0
decertified firms for august 2011
Views: 4  |  Downloads: 0