Criteria For Validation: Part 3 - DOC by KOudP8X

VIEWS: 8 PAGES: 5

									Criteria For Validation:Part 3 Course Delivery                        Course Delivery                                                         Practical Training               Examined
                                                                                                                                              Experience                       (in one or more of the following
                                                                                                                                              (this column should be used to   documentation.
                                                                                                                                              record how your practical        In the event that it is not covered
                                                                                                                                              training/study has addressed     within the documentation it may
                                                                                                                                              the specific criteria)           be covered during the
                                                                                                                                                                               professional interview)
PC1 PROFESSIONALISM                  Residential Course               Monthly Study Notes/Reference Material
A successful candidate will          ARB – Elaine Stowell, ARB        Lecture Notes                                                                                            Case study – within the case
demonstrate overall competence       Qualifications Executive         RIBA Code of Conduct                                                                                     study the candidate has the
and the ability to behave with       (University Liaison )            ARB Architects Code: Standards of Conduct and Practice 2010 Version                                      opportunity to demonstrate
integrity, in the ethical and        The RIBA, Membership                                                                                                                      ‘best practice’.
professional manner appropriate      Obligations and Codes of                                                                                                                  Self Evaluation – within the
to the role of architect.            Conduct – Adrian Dobson,                                                                                                                  self evaluation, candidates can
                                     Director of Practice                                                                                                                      demonstrate their competence
                                                                                                                                                                               by evaluating both their
                                                                                                                                                                               conduct and that of the practice.
                                                                                                                                                                               Practice Problems – will be
                                                                                                                                                                               structured to incorporate two
                                                                                                                                                                               questions to cover each of the
                                                                                                                                                                               five criteria.
The candidate will have the skills   Communications, contract         Lecture Notes                                                                                            Case study – can be used as a
necessary to undertake effective     forms and letter writing –                                                                                                                vehicle to demonstrate their
communication and presentation,      Michael Dunn                                                                                                                              skills, where a candidate has
organisation, self-management        BSc (Hons) LLB LLM FRICS                                                                                                                  ‘shadowed’ the case study they
and autonomous working.              FCIArb                                                                                                                                    should refer to the PEDRs and
                                     Starting a Practice – Susan                                                                                                               Self Evaluation to demonstrate
                                     Ware, Director of Professional                                                                                                            these skills.
                                     Studies, The Bartlett
                                     CPD – Adrian Dobson
The candidate will have a clear      ARB – Elaine Stowell, ARB        Lecture Notes                                                                                            Case study – within the case
understanding of the architect's     Qualifications Executive         RIBA Code of Conduct                                                                                     study the candidate has the
obligation to society and the        (University Liason )             ARB Architects Code: Standards of Conduct and Practice 2010 Version                                      opportunity to demonstrate
profession, and a sufficient         The RIBA, Membership             http://www.architecture.com/EducationAndCareers/CPD/CPDAtTheRIBA.aspx                                    ‘best practice’.
awareness of the limits of their     Obligations and Codes of                                                                                                                  Self Evaluation – within the
competence and professional          Conduct – Adrian Dobson,                                                                                                                  self evaluation, candidates can
experience to ensure they are        Director of Practice             PC1 - Recommended Reading                                                                                demonstrate their competence
unlikely to bring the profession     Starting a Practice – Susan      The Architect’s Handbook of Practice Management                                                          by evaluating both their
into disrepute.                      Ware, Director of Professional   The Architect’s Guide to running a Practice                                                              conduct and that of the practice.
                                     Studies, The Bartlett            Good Practice Guide – Keeping out of Trouble                                                             Practice Problems – will be
                                     CPD – Adrian Dobson              Architect’s Legal Handbook                                                                               structured to incorporate two
                                     A Sustainable Future – Roger     The Architect in Practice                                                                                questions to cover each of the
                                     Burton                                                                                                                                    five criteria.
PC2 CLIENTS, USERS AND
DELIVERY OF SERVICES
A successful candidate will be       Marketing and Client             Lecture Notes                                                                                            Case study – the case study
able to demonstrate                  Relations – Claire Barton,       RIBA Outline Plan of Work                                                                                should cover the Architects
understanding of the range of        Partner of Haverstock            RIBA Marketing and PR                                                                                    Appointment, fees and
services offered by architects and    Associates                                                                                      resourcing and delivery of the
delivering those services in a        Architects Appointment and                                                                      project.
manner prioritising the interests     Services – Richard Brindley,                                                                    Practice Problems – will be
of the client and other               Director of Professional                                                                        structured to incorporate two
stakeholders.                         Services, RIBA                                                                                  questions to cover each of the
                                                                                                                                      five criteria.
The candidate will have the skills    Architects Appointment and     Lecture Notes                                                    Case study - the case study
necessary to provide a competent      Services – Richard Brindley,                                                                    should cover the Architects
service, both singly and as part of   Director of Professional                                                                        Appointment, fees and
a team, including understanding       Services, RIBA                                                                                  resourcing and delivery of the
of client needs, appropriate          Communications, contract       PC2 – Recommended Reading                                        project. Where the case study
communication, programming,           forms and letter writing –     The Architect’s Handbook of Practice Management                  does not cover all aspects
coordination and competent            Michael Dunn                   The Architect’s Guide to running a Practice                      within the criteria the PEDR
delivery. This will be supported      BSc (Hons) LLB LLM FRICS       Good Practice Guide – Keeping out of Trouble                     sheets should provide evidence
by knowledge of the briefing          FCIArb                         Architect’s Legal Handbook                                       on other projects.
process, forms and terms of           Fees, Fee bids and Fee         The Architect in Practice                                        Practice Problems – will be
appointment, the means of             Management – Peter Farrell,    Good Practice Guide – Painless Financial Management              structured to incorporate two
professional remuneration,            Design Group Chester.          Good Practice Guide – Starting a Practice                        questions to cover each of the
relevant legislation, and the         Value Management/Cost          Good Practice Guide – Marketing your Practice                    five criteria.
execution of appropriate              Control – Mark Boorman,        Good Practice Guide – Fee Management
programmed and coordinated            Faithful and Gould.            Guide to the RIBA Agreements 2010
project tasks.                                                       Plan of Work – Multi Disciplinary Services
PC3 LEGAL FRAMEWORK
AND PROCESSES
A successful candidate will be        The Construction Industry     Lecture Notes                                                     The legal context of practice
able to demonstrate                   and the role of Architectural                                                                   may be demonstrated with
understanding of the legal context    Practice – Roger Burton                                                                         reference to the specific Case
within which an architect must        RIBA                                                                                            study, with reference to
operate, and the processes            The JCT Forms of Contract –                                                                     projects documented within the
undertaken to ensure compliance       Michael Dunn, BSc (Hons)                                                                        PEDR sheets and by reference
with legal requirements or            LLB LLM FRICS FCIArb                                                                            to specific practice within the
standards.                                                                                                                            Self Evaluation.
                                                                                                                                      Practice Problems – will be
                                                                                                                                      structured to incorporate two
                                                                                                                                      questions to cover each of the
                                                                                                                                      five criteria.
The candidate will have the skills    Planning and Development –     Lecture Notes                                                    Case study – evidence of the
necessary to positively interact      Roger Shrimplin, MA(Cantab)    Localism – The Essentials                                        candidates involvement of the
with statutory and private bodies     DipArch RIBA FRTPI FCIArb      A Plain English Guide to the Localism Bill                       legal frameworks should be
or individuals, and competently       MIL ArqCol                     Design and Access Statements – How to write, read and use them   clearly documented within the
deliver projects within diverse       Building Regulations – Andy    CDM – http://www.hse.gov.uk/construction/cdm.htm                 case study.
legislative frameworks.               Thomas MRICS MBEng MBA                                                                          Practice Problems – will be
                                      Health and Safety – Danny                                                                       structured to incorporate two
                                      Coomer                                                                                          questions to cover each of the
                                      MCIOB,RMaPS                                                                                     five criteria.
This will be supported by             Planning and Development –     Lecture Notes                                                    Practice Problems – will be
knowledge of the relevant law,        Roger Shrimplin, MA(Cantab)    Localism – The Essentials                                        structured to incorporate two
legislation, guidance and controls   DipArch RIBA FRTPI FCIArb        A Plain English Guide to the Localism Bill                                   questions to cover each of the
relevant to architectural design     MIL ArqCol                       Design and Access Statements – How to write, read and use them.              five criteria.
and construction.                    Building Regulations – Andy      Technical Task Force Information Sheets
                                     Thomas MRICS MBEng MBA           The Party Wall Act -
                                     Land and Property Law –          http://www.communities.gov.uk/documents/planningandbuilding/pdf/133214.pdf
                                     Sarah Thomas
                                                                      PC3 – Recommended Reading
                                                                      The Architect’s Guide to Running a Job
                                                                      The Architect’s Job Book
                                                                      Architect’s Legal Handbook
                                                                      Good Practice Guide – Negotiating the Planning Maze
                                                                      Managing Health and Safety in Construction
                                                                      Regulations 2007 (CDM)
                                                                      Guide to the Building Regulations
PC4 PRACTICE AND
MANAGEMENT
A successful candidate will be       The Construction Industry        Lecture Notes                                                                Self Evaluation – within the
able to demonstrate                  and the role of Architectural    http://www.constructingexcellence.org.uk/                                    self evaluation there is the
understanding of the business        Practice – Roger Burton                                                                                       opportunity for candidates to
priorities, required management      RIBA                                                                                                          analyse the practice/s of which
processes and risks of running an    Starting a Practice – Susan                                                                                   they have experience.
architectural practice, and the      Ware, Director of Professional                                                                                Case study – there is the
relationship between the practice    Studies, The Bartlett                                                                                         opportunity to describe the
of architecture and the UK           PII – speaker tbc                                                                                             operations of the practice in
construction industry.                                                                                                                             relation to the specific case
                                                                                                                                                   study and the construction
                                                                                                                                                   industry as a whole.
                                                                                                                                                   Practice Problems – will be
                                                                                                                                                   structured to incorporate two
                                                                                                                                                   questions to cover each of the
                                                                                                                                                   five criteria.
The candidate will have the skills Starting a Practice – Susan        Lecture Notes                                                                PEDR Sheets should
necessary to engage in business    Ware, Director of Professional     RIBA Fees Calculator                                                         demonstrate the skills required
administration and ability to      Studies, The Bartlett              RIBA QA Toolkit                                                              to undertake the tasks specified
resource, plan, implement and      Human Resource                     RIBA Project Quality Plan for small projects                                 on the sheets in relation to this
record project tasks to achieve    Management – Maureen                                                                                            criteria.
stated goals, either individually  Royce, Liverpool Business                                                                                       Practice Problems – will be
or within a team.                  School                                                                                                          structured to incorporate two
                                   Fees, Fee bids and Fee                                                                                          questions to cover each of the
                                   Management – Peter Farrell,                                                                                     five criteria.
                                   Design Group Chester.
This will be supported by          Starting a Practice – Susan        Lecture Notes                                                                Case Study – within the
knowledge of the nature of legal   Ware, Director of Professional                                                                                  context of the case study
business entities, office systems, Studies, The Bartlett                                                                                           candidates have the opportunity
administration procedures and the Employment Legislation –            PC4 Recommended Reading List                                                 to demonstrate their
relevant legislation.              Helen Owen, Hill Dickinson.        The Architect in Practice                                                    understanding of the office
                                                                      The Architect’s Guide to Running a Practice                                  procedures etc.
                                                                    The Architect’s Handbook of Practice Management   Practice Problems – will be
                                                                    Good Practice Guide – Employment                  structured to incorporate two
                                                                    Good Practice Guide – Starting a Practice         questions to cover each of the
                                                                                                                      five criteria.
PC5 BUILDING
PROCUREMENT
A successful candidate will be       The Construction Industry     Lecture Notes                                      PEDR Sheets – these should
able to demonstrate                  and the role of Architectural                                                    record the candidates’
understanding of UK                  Practice – Roger Burton                                                          experience throughout the
construction and contract law,       RIBA                                                                             procurement of the project.
construction procurement             The JCT Forms of Contract –                                                      Case Study – this presents an
processes and the roles of built     Michael Dunn, BSc (Hons)                                                         opportunity for candidates to
environment professionals.           LLB LLM FRICS FCIArb                                                             demonstrate their
                                     Construction Procurement –                                                       understanding both by
                                     Nigel Curry                                                                      implementing and
                                                                                                                      analysing/reflecting on the
                                                                                                                      processes
                                                                                                                      Practice Problems – will be
                                                                                                                      structured to incorporate two
                                                                                                                      questions to cover each of the
                                                                                                                      five criteria.
The candidate will have the skills   Communications, contract       Lecture Notes                                     PEDR Sheets – these should
necessary to plan project-related    forms and letter writing –     User’s Guide to Adjudication.                     record the candidates’
tasks, coordinate and engage in      Michael Dunn                                                                     experience throughout the
design team interaction, execute     BSc (Hons) LLB LLM FRICS                                                         procurement of the project.
effective contract communication     FCIArb                                                                           Case Study – this presents an
and resolve construction-related     Dispute Resolution - Michael                                                     opportunity for candidates to
challenges and disputes.             Dunn                                                                             demonstrate their
                                     BSc (Hons) LLB LLM FRICS                                                         understanding both by
                                     FCIArb                                                                           implementing and
                                                                                                                      analysing/reflecting on the
                                                                                                                      processes
                                                                                                                      Practice Problems – will be
                                                                                                                      structured to incorporate two
                                                                                                                      questions to cover each of the
                                                                                                                      five criteria.
This will be supported by an         SBC 11 – Michael Dunn, BSc     Lecture Notes                                     PEDR Sheets – these should
understanding of contractual         (Hons) LLB LLM FRICS           Contracts – Rights of Third Parties               record the candidates’
relationships, the obligations       FCIArb                                                                           experience throughout the
upon an architect acting as          The NEC Form of Contract -     PC5 – Recommended Reading List                    procurement of the project.
contract administrator, job-         Michael Dunn, BSc (Hons)       Architect’s Guide to Running a Job                Case Study – this presents an
related administrative systems       LLB LLM FRICS FCIArb           The Architect’s Job Book                          opportunity for candidates to
and the management of projects                                      Architect’s Legal Handbook                        demonstrate their
in the context of the candidate's                                   Construction Contracts – Questions and Answers    understanding both by
professional experience.                                            Good Practice Guide – Extension of Time           implementing and
                                                                    Good Practice Guide – Keeping out of Trouble      analysing/reflecting on the
                                                                    Good Practice Guide – Mediation                   processes
Good Practice Guide – Inspecting Works          Practice Problems – will be
Guide to SBC 05                                 structured to incorporate two
Managing Health and Safety in Construction      questions to cover each of the
Regulations 2007 (CDM)                          five criteria.
Understanding Standard JCT Building Contracts
Which Contract ?

								
To top