The purpose is to present: -

   Plans/ Systems to deter fraud and corruption in all provincial
    departments.

   The report on the overall provincial expenditure for the 2011/12
    financial year that ended 31 March 2012.

   Indicate the 2012/13 year-to-date provincial expenditure for
    the first quarter ended 30 June 2012.



                                                                       2
finance
Department:
Department of Finance
North West Provincial Government
Republic of South Africa




                                   3
                                       3
   PT enforces compliance through regular audits and SCM compliance
    reviews, assess delegations and segregation of duties, etc
   All service providers are registered on a Central Supplier Database.
   Acquired an E-Procurement tool. The automated system ensures
    supplier rotation.
   Blacklisting of service providers, contractors, consultants, suppliers,
    due to poor performance, poor track records and/or unduly
    influencing the outcome of bidding in their favour, etc.
   Issue directives to departments to rotate the SCM Officials within
    their SCM units.
   Vetting of all SCM Officials
   Frequent training is offered to departments and Public Entities on
    SCM Policies and practices, DBAC, etc.
   Establishment of Risk Management Units in departments to increase
    awareness of fraud and corruption and to deter such activities.
   Intervention in Municipalities regarding the AFS, Capacity building,
    appointments and skilling of staff through financial training
                                                                              4
   Envisages the use of transversal and or general period contract in
    the province.
   The option of price-benchmarking (in particular for quotations) is
    being considered to prevent inflated prices through collusion of
    officials.
   Departments to inform the Provincial Treasury of all payments of
    R1million and above, where quotations are obtained. PT to verify the
    bank account of such service providers.
   Development of a contract inventory of all existing contracts for
    meticulous scrutiny and reviews with a link to the existing suppliers
    registered on the Central Supplier Database.
   Directives to departments to monthly report on all contracts
    awarded and concluded inclusive of payments made.
   Restricting government officials from doing business in their
    departments or other government departments linking and
    verification with PERSAL.


                                                                            5
   Daily scrutiny of exceptions generated by the PERSAL System to
    identify any irregular payments and take necessary actions to stop
    the payments
   Imposing thresholds of approval at stages of contracting or contract
    administration processes.
   Address the institutional weaknesses in the SCM processes through
    establishment of structured committees and the appointment of
    competent officials.
   Pre-employment screening is encouraged in departments to do
    thorough background checks, such as prior employment history,
    tertiary qualifications and memberships of professional associations
    of employees and contractors, service providers, etc.





                                                                           6
finance
Department:
Department of Finance
North West Provincial Government
Republic of South Africa




                                   7
                                       7
The provincial expenditure as at 31 March 2012 is 95.62% or R23.939 billion.

                                                                                           Pre Audited AFS     Percentage   Pre Audited AFS
                                        Programme                          Budgeted          Expenditure        of budget    (over)/under
                                                                            Amount               as at            spent       expenditure
                                                                                             31/03/2012          to date      for the year
                                                                            R' 000              R' 000              %            R' 000
  1     Office of the Premier                                                    225 882             201 627     89.26%               24 255
  2     Provincial Legislature                                                   166 341             163 954     98.56%                 2 387
  3     Health                                                                 6 413 542           6 380 255     99.48%               33 287
  4     Sport, Arts and Culture                                                  463 658             408 185     88.04%               55 473
  5     Human Settlements, Safety and Liaison (Public Safety Sector)             351 831             334 939     95.20%               16 892
  6     Economic Development, Environment, Conservation and Tourism              458 042             384 726     83.99%               73 316
  7     Department of Finance                                                    324 195             299 916     92.51%               24 279
  8     Education and Training                                               10 424 056          10 148 134      97.35%              275 922
  9     Local Government and Traditional Affairs                                 329 998             320 074     96.99%                 9 924
 11     Public Works, Roads and Transport                                      2 890 404           2 425 648     83.92%              464 756
 12     Social Development, Women, Children and Person with Disabilities         897 196             883 009     98.42%               14 187
 13     Agriculture and Rural Development                                        778 609             690 744     88.72%               87 865
 15     Human Settlements, Safety and Liaison (Human Settlement Sector)        1 312 564           1 298 402     98.92%               14 162
Total                                                                       25 036 318          23 939 613      95.62%           1 096 705


Low spending of 90% and below is registered for the Office of the Premier, departments of Sport, Arts &
Culture, Economic Development, Environment, Conservation & Tourism, Public Works, Roads &
Transport and Agriculture & Rural Development.

Highest spending is registered in the Provincial Legislature, Departments of Health, Education &
Training, Social Development, Women, Children & Person with Disabilities and Human Settlements,
Safety and Liaison (Human Settlement Branch) all above 97%.

                                                                                                                                                8
   Education & Training
    • Underspending is mainly on Compensation of Employees due to the non expenditure
      on the lap top priority which was not cost benefit to the teachers and Grade R
      teachers not being appointed as excess educators were trained and placed in those
      posts.
    • The late submission of invoices from Suppliers for Learner Teacher Support material
      just after the closure of the year-end, the lower number of learners enrolment in
      school and Grade R resulted and the late commencement of infrastructure projects
      further resulted in underspending and committed funds in this regard were requested
      for rollover.
   Public Works, Roads and Transport
    • Underspending mainly relates to conditional grants of which the Provincial Roads and
      Maintenance Grant (R246m) based on the review of the committed IGP projects with
      the PRMG, which was only finalized in March 2012. A rollover of R107 million has
      been approved accordingly.
    • Furthermore R80 million which was allocated for the Koster/ Lichtenburg Road was
      not spent due to the contractual dispute between the department and the contractor.
    • Inaccurate tax invoices and delays by municipalities to invoice the department for
      Rates and Taxes contributed to underspending.
    • Payments could not be processed based on the late submission of invoices by
      transport operators or commuter and learner transport operations.

                                                                                             9
                                                                         Pre Audited AFS    Percentage    Pre Audited
                                Economic Classification   Budgeted         Expenditure       of budget   (over)/under
                                                           Amount              as at           spent      expenditure
                                                                           31/03/2012         to date     for the year
                                                           R' 000             R' 000             %           R' 000
Current Expenditure
 Compensation of employees                                  14 352 753        14 000 041      97.54%            352 712
 Transfer Payments                                           4 141 766         3 952 225      95.42%            189 541
 Goods and Service                                           4 588 292         4 358 034      94.98%            230 258
     Interest on Rent on Land                                      683             1 904      278.77%            (1 221)
     Financial Assets Current                                        5             6 783    135660.00%           (6 778)
Sub-total: Current                                          23 083 499        22 318 987      96.69%            764 512
Capital Expenditure                                                                              -
 Equipment                                                     268 632            207 845     77.37%             60 787
 Land and Buildings                                          1 680 907          1 409 911     83.88%            270 996
 Other Capital Expenditure                                       3 280              2 870     87.50%                410
Sub-total: Capital                                           1 952 819          1 620 626     82.99%            332 193
Total Expenditure                                          25 036 318        23 939 613      95.62%          1 096 705



Spending on Compensation of Employees, Transfer Payments and Goods & Services are the highest at
98%, 95% and 95% respectively with lowest spending registered on Equipment at 77% and Land and
Buildings at 84%.

Underspending is registered on all the economic classification areas; mainly on Compensation of
Employees with R352 million, Goods & Services with R230 million, Transfer Payments with R190 million
and Land & Buildings with R271 million.



                                                                                                                           10
       The average provincial spending on Compensation of Employees is 97.54% or R14 billion of the
        allocated budget of R14.4 billion.

                                                                       Available      Actual      % Spent of IYM Projected
                                                                       Personnel    Expenditure   Available (over)/under
                Compensation of Employees per Provincial Department
                                                                         Budget        as at        Budget    expenditure
                                                                        2011/12     31/03/2012     2011/12    31/03/2012

                                                                        R' 000        R' 000         %           R' 000
1. Office of the Premier                                                  109 817       101 554    92.48%            8 263
2. Provincial Legislature                                                  54 086        53 645    99.18%              441
3. Health                                                               3 790 738     3 786 765    99.90%            3 973
4. Sport, Arts and Culture                                                161 620       141 809    87.74%           19 811
5. Human Settlements, Safety and Liaison (Public Safety Sector)           245 800       227 192    92.43%           18 608
6. Economic Development, Environment, Conservation and Tourism            115 107       105 249    91.44%            9 858
7. Department of Finance                                                  156 956       149 795    95.44%            7 161
8. Education and Training                                               7 989 372     7 781 175    97.39%         208 197
9. Local Government and Traditional Affairs                               193 979       182 172    93.91%           11 807
11. Public Works, Roads and Transport                                     658 381       609 671    92.60%           48 710
12. Social Development, Women, Children and Person with Disabilities      423 175       422 902    99.94%              273
13. Agriculture and Rural Development                                     362 121       347 046    95.84%           15 075
15. Human Settlements, Safety and Liaison (Human Settlement Sector)        91 601        91 066    99.42%              535
Total : Provincial Departments                                         14 352 753    14 000 041    97.54%         352 712

       The highest underspending is recorded in the Department of Education & Training and Public
        Works, Roads and Transport mainly due to the delay in filling vacant positions.

                                                                                                                       11
 The 2011/12 budget for conditional grants is R4.815 billion with expenditure at 91.01%
 or R4.382 billion and summarized per department as follows: -

                                                                                                              Actual                                               Pre Audited
                                                                                                                                       Pre Audited
                                                                                                          (Over)/Under                                                AFS
                                                                  Approved     Expenditure   % Spent of                   Approved         AFS       % Spent of
Conditional Grant Allocations within the North West                                                        expenditure                                            (Over)/Under
                                                                   Budget          as at      Budget                       Budget      Expenditure    Budget
Provincial Departments                                                                                     for the year                                         expenditure for
                                                                   2010/11      31/03/2011    2010/11                      2011/12         as at      2011/12
                                                                                                            ending 31                                           the year ending
                                                                                                                                        31/03/2012
                                                                                                           March 2011                                            31 March 2012

                                                                   R' 000        R' 000          %               R'000     R' 000        R' 000          %           R'000
Health                                                             1 161 702     1 161 586    99.99%               116     1 443 079     1 383 622    95.88%            59 457
Sport, Arts and Culture                                             110 301         71 655    64.96%            38 646      120 765         95 063    78.72%            25 702
Education and Training                                              782 644        716 609    91.56%            66 035     1 137 676     1 109 540    97.53%            28 136
Public Works, Roads and Transport                                   779 129        772 108    99.10%             7 021      754 391        463 257    61.41%           291 134
Social Development, Women Children and Person with Disabilities       1 427          1 427     0.00%                -        10 955         10 955    100.00%                -
Agriculture & Rural Development                                     141 107        140 070    99.27%             1 037      183 504        168 464    91.80%            15 040
Human Settlements, Public Safety and Liaison                       1 188 973     1 038 639    87.36%           150 334     1 164 550     1 151 077    98.84%            13 473
Total Conditional Grant Expenditure for 2010/11 & 2011/12          4 165 283     3 902 094    93.68%           263 189     4 814 920     4 381 978    91.01%           432 942


The provincial spending on conditional grants averages 91.01%, which is a decrease of
2.67% when compared to the same period last year where 6.85% expenditure was
registered.
National Treasury and National Departments approved the rollover of R266 million on
conditional grants based on funds committed to identifiable projects.
However an amount of R167 million are to be surrendered to the National Departments
due to non-commitment of funds to identifiable projects.
                                                                                                                                                                                 12
 The provincial infrastructure budget (excluding conditional grants) equals R936 million
 and preliminary spending is 78.05% or R730.8 million as at 31 March 2012.
                                                                                                                                                         Pre-Audited
                                                                                                          Audited              Pre-Audited
                                                                                 Audited                                                                     AFS
                                                                   Approved                 % Spent of (Over)/Under   Approved     AFS      % Spent of
 Total Infrastructure Allocations (excludes conditional grants)                Expenditure                                                              (Over)/Under
                                                                    Budget                 Budget as at expenditure    Budget  Expenditure Budget as at
         within the North West Provincial Departments                              as at                                                                 expenditure
                                                                    2010/11                 31/03/2011      as at      2011/12     as at    31/03/2012
                                                                                31/03/2011                                                                   as at
                                                                                                         31/03/2011             31/03/2012
                                                                                                                                                          31/03/2012

                                                                    R' 000       R' 000         %         R' 000       R' 000      R' 000         %        R' 000
Health                                                               142 509      113 581    79.70%          28 928      44 904      40 312    89.77%          4 592
Sport, Arts and Culture                                               14 200         6 675   47.01%           7 525      35 259        6 981   19.80%         28 278
Economic Development, Environment, Conservation and Tourism           51 000       42 077    82.50%           8 923      31 710      27 710    87.39%          4 000
Education & Training                                                 112 250       68 380    60.92%          43 870      90 000      80 379    89.31%          9 621
Local Government and Traditional Affairs                              79 814       71 957    90.16%           7 857      84 737      80 033    94.45%          4 704
Public Works, Roads and Transport                                    432 000      340 660    78.86%          91 340     513 499     420 792    81.95%         92 707
Social Development, Women, Children and Person with Disabilities      50 390       26 697    52.98%          23 693      40 000      35 960    89.90%          4 040
Agriculture and Rural Development                                     35 000       31 399    89.71%           3 601      96 280      38 713    40.21%         57 567
     Total Infrastructure Expenditure for 2010/11 & 2011/12          917 163      701 426    76.48%         215 737     936 389     730 880    78.05%        205 509

 The current provincial infrastructure spending is a 1.57% increase when compared to the same period
 last year, where expenditure was 76.48%.

 The underspending of R206 million is mainly in the departments of Public Works, Roads and Transport
 with R92.7 million, Agriculture & Rural Development with R57.6 million, Sport, Arts & Culture with R28.2
 million.

 The departments of Local Government & Traditional Affairs spent the highest at 94% with lowest
 spending of 19,8% in Sport, Arts and Culture.
                                                                                                                                                                   13
   Some departments do not have key personnel, such as the HOD, CFO’s, Planning,
    Monitoring & Evaluation Officials, etc and these risks financial resource management
    being given insufficient professional leadership at the very top of departments;
   The lack of capacity to plan, skills and strategies to implement and deliver
    infrastructure and conditional grant projects.
   SCM deliverables in areas of advertisement of Tenders, adjudication and awarding;
    delegations, etc. require improvements and shorter turn-around time.
   Monitoring and obtaining invoices for payments from Service providers for services
    rendered and the effective delegations for approval of payments within 30 days of
    services rendered;
   The lack of financial skills and awareness on government policies & prescripts
    amongst many finance and non-finance staff remains a significant barrier to improving
    financial resource management across departments
   Poor cashflow/ expenditure forecasting led to departments exceeding their
    Departmental Expenditure Limits and conversely, where the unanticipated
    underspending was not identified sufficiently early, the opportunities for unspent funds
    to be reallocated to other key priorities were lost, hence the underspending of R1
    billion.


                                                                                               14
finance
Department:
Department of Finance
North West Provincial Government
Republic of South Africa




                                   15
                                        15
The provincial expenditure as at 30 June 2012 is 20.05 percent or R5.267 billion of the annual budget of
R26.272 billion.

The average spending of 20.05 percent is a 0.90 percent decrease when compared to the same last year
when the expenditure was 20.95 percent or R5.125 billion against the allocated budget of R24.464
billion.
                                                                                                     Percentage          IYM
                                                                                         Actual
                                                                                                       spent of       Projected
                                                                        Budgeted      Expenditure
                                                                                                      available     (over)/under
                                                                        Amount       incured as at
                           Provincial Departments                                                    budget as at    expenditure
                                                                                      30/06/2012
                                                                                                     30/06/2012      30/06/2012
                                                                         R' 000         R' 000             %            R' 000
 1. Office of the Premier                                                  236 006          44 872      19.01%               1 467
 2. Provincial Legislature                                                 165 310          41 055      24.84%                 -
 3. Health                                                               6 959 308      1 378 351       19.81%                 -
 4. Sport, Arts and Culture                                                447 106          77 457      17.32%                 -
 5. Human Settlements, Safety and Liaison (Public Safety Sector)           378 712          79 072      20.88%              (2 651)
 6. Economic Development, Environment, Conservation and Tourism            426 945          87 604      20.52%                 -
 7. Department of Finance                                                  371 924          70 202      18.88%                 -
 8. Education and Training                                              10 872 212      2 484 492       22.85%                 -
 9. Local Government and Traditional Affairs                               332 164          62 590      18.84%                 -
 11. Public Works, Roads and Transport                                   3 082 001        357 037       11.58%                 -
 12. Social Development, Women, Children and Person with Disabilities      949 701        166 351       17.52%             (26 925)
 13. Agriculture and Rural Development                                     850 993        121 152       14.24%              98 287
 15. Human Settlements, Safety and Liaison (Human Settlement Sector)     1 199 336        297 190       24.78%             (65 045)
 Total : Provincial Departments                                         26 271 718      5 267 425       20.05%               5 133


All the departments spent below the estimated 25 percent with the highest spending by the Provincial
Legislature with 24.84 percent and Human Settlements, Safety & Liaison (Human Settlement Branch)
with 24.78 percent.

Lowest spending is registered in the Departments of Public Works, Roads & Transport with 11.58 percent
and Agriculture & Rural Development spending 14.24 percent.
                                                                                                                                      16
                                                                                       Percentage
                                                                          Actual                      IYM Projected
                                                         Budgeted                        spent of
                                                                       Expenditure                    (Over)/Under
                         Economic Classification         Amount                         available
                                                                      incurred as at                   expenditure
                                                        2012/2013                      budget as at
                                                                       30/06/2012                      30/06/2012
                                                                                       30/06/2012
                                                          R' 000         R' 000             %            R' 000
 Current Expenditure
  Compensation of employees                              15 174 159       3 533 731      23.29%            (39 401)
  Transfer Payments                                       4 091 452         796 982      19.48%            108 339
  Goods and Services                                      4 851 475         669 675      13.80%            (63 821)
    Interest on Rent on Land                                  1 843              47       2.55%                -
 Sub-total: Current                                      24 118 929       5 000 435      20.73%              5 117
 Capital Expenditure
  Equipment                                                 254 866          10 291       4.04%                 16
  Land and Buildings                                      1 897 353         256 699      13.53%                -
  Other Capital Expenditure                                     570             -         0.00%                -
 Sub-total: Capital                                       2 152 789         266 990      12.40%                 16
 Total Expenditure                                       26 271 718       5 267 425      20.05%              5 133


Spending on all Economic Classification items are below the estimated 25 percent with the highest
spending of 23.29 percent on Compensation of Employees.

It is clear that emphasis is made on the payment for Compensation of Employees with a substantive
lack of planning, implementation and spending on core service delivery areas, such as Land & building
and Goods & Services which all registered spending below 14 percent.

The low spending trend by departments on these economic classification items, apart from
Compensation of Employees, may have a negative bearing on areas such as maintenance of schools,
clinics, hospitals, roads and government buildings as some of these assets are in a state of paralyses
and will result in under spending at the end of this financial year, in particular on infrastructure.

                                                                                                                      17
     The overall provincial spending on Compensation of Employees is 23.29 percent or R3.533 billion of the allocated
      budget of R15.174 billion.
     Highest spending is registered on Provincial Legislature with 26.56 percent with lowest spending of 17.11 percent by
      the Department of Finance.
     The departments of Social Development, Women, Children & Person with Disabilities and Human Settlements,
      Safety & Liaison (Human Settlements Branch) project to overspend on their Compensation of Employees by R26.9
      million and R20 million respectively, whilst the Department of Agriculture & Rural Development projects to
      underspend by R7.5 million.

                                                                                                           Percentage
                                                                                              Actual                      IYM Projected
                                                                            Budgeted                         spent of
                                                                                           Expenditure                    (Over)/Under
                Compensation of Employees per Provincial Departments        Amount                          available
                                                                                          incurred as at                   expenditure
                                                                           2012/2013                       budget as at
                                                                                           30/06/2012                      30/06/2012
                                                                                                           30/06/2012
                                                                             R' 000          R' 000             %            R' 000
    1. Office of the Premier                                                   117 060           27 001      23.07%                -
    2. Provincial Legislature                                                    81 335          21 606      26.56%                -
    3. Health                                                                3 988 666         943 493       23.65%                -
    4. Sport, Arts and Culture                                                 165 256           36 659      22.18%                -
    5. Human Settlements, Safety and Liaison (Public Safety Sector)            283 105           58 024      20.50%                -
    6. Economic Development, Environment, Conservation and Tourism             122 032           27 161      22.26%                -
    7. Department of Finance                                                   217 830           37 281      17.11%                -
    8. Education and Training                                                8 348 820       1 961 247       23.49%                -
    9. Local Government and Traditional Affairs                                213 664           49 238      23.04%                -
    11. Public Works, Roads and Transport                                      726 328         148 721       20.48%                -
    12. Social Development, Women, Children and Person with Disabilities       449 943         111 559       24.79%            (26 925)
    13. Agriculture and Rural Development                                      363 738           87 679      24.10%              7 524
    15. Human Settlements, Safety and Liaison (Human Settlement Sector)          96 382          24 062      24.97%            (20 000)
    Total : Provincial Departments                                          15 174 159       3 533 731       23.29%            (39 401)

                                                                                                                                          18
The 2012/13 budget for conditional grants is R4.939 billion with the expenditure at 16.33 percent or
R806.8 million and summarized per department as follows: -



                                                                  Approved      Expenditure   % Spent of   Approved                      % Spent of
    Conditional Grant Allocations within the North West                                                                 Expenditure as
                                                                   Budget           as at      Budget       Budget                        Budget
                  Provincial Departments                                                                                 at 30/06/2012
                                                                   2011/12       30/06/2011    2011/12      2012/13                       2012/13


                                                                   R' 000         R' 000          %         R' 000          R' 000           %
Health                                                              1 442 973       284 778    19.74%       1 563 592         252 871     16.17%
Sport, Arts and Culture                                               97 956         11 503    11.74%         102 373          14 387     14.05%
Education and Training                                              1 065 108       208 750    19.60%       1 137 785         239 889     21.08%
Public Works, Roads and Transport                                    744 987         61 508     8.26%         860 104          40 079      4.66%
Social Development, Women Children and Person with Disabilities       10 955          3 876     0.00%          11 657                -     0.00%
Agriculture & Rural Development                                      180 744         13 247     7.33%         212 834           3 575      1.68%
Human Settlements, Public Safety and Liaison                         998 376        182 461    18.28%       1 050 933         255 950     24.35%
Total Conditional Grant Expenditure for 2011/12 & 2012/13           4 541 099       766 123    16.87%       4 939 278         806 751     16.33%



The provincial spending on conditional grants averages 16.33 percent, a decrease of 0.54 percent
when compared to last year where expenditure was registered at 16.87 percent.

Departments of Human Settlements, Public Safety & Liaison spent the highest with 24.35 percent,
followed by Education & Training with 21.08 percent. Spending of less than 5 percent is registered by
the department of Public Works, Roads & Transport and Agriculture & Rural Development with Social
Development, Women, Children & Person with Disabilities having zero spending.


                                                                                                                                                      19
The provincial infrastructure budget (excluding conditional grants) equals R961 million with
expenditure of R40.1 million or 4.18 percent spending as at 30 June 2012.


                                                                                      Actual                                  Actual
                                                                       Approved                  % Spent of   Approved                  % Spent of
 Infrastructure Allocations (excludes conditional grants) within the               Expenditure                            Expenditure
                                                                        Budget                    Budget       Budget                    Budget
                 North West Provincial Departments                                     as at                                  as at
                                                                        2011/12                   2011/12      2012/13                   2012/13
                                                                                    30/06/2011                             30/06/2012

                                                                        R' 000       R' 000          %         R' 000       R' 000          %
 Health                                                                   76 553         7 854    10.26%         60 730         3 619     5.96%
 Sport, Arts and Culture                                                  33 000           -       0.00%         19 472         1 807     9.28%
 Economic Development, Environment, Conservation and Tourism              31 710           -       0.00%         10 510            -      0.00%
 Education & Training                                                     90 000        10 885    12.09%         80 000         2 680     3.35%
 Local Government and Traditional Affairs                                 78 000         7 174     9.20%         69 000            -      0.00%
 Public Works, Roads and Transport                                       555 499        86 219    15.52%        550 422        23 432     4.26%
 Social Development, Women, Children and Person with Disabilities         40 044         4 306    10.75%         30 501         6 033    19.78%
 Agriculture and Rural Development                                       108 280         1 217     1.12%        140 015         2 564     1.83%
        Total Infrastructure Expenditure for 2011/12 & 2012/13         1 013 086      117 655     11.61%        960 650        40 135     4.18%



The provincial spending on infrastructure averages 4.18 percent, which is a decrease of 7.43 percent
when compared to the same period last year where expenditure was registered at 11.61 percent.

Two departments, Economic Development, Environment, Conservation & Tourism and Local Government
& Traditional Affairs, reflect no spending on infrastructure for the quarter ending 30 June 2012, which is
unacceptable based on existing infrastructure projects that were carried over to this financial year for
which services were rendered and awaiting payment.


                                                                                                                                                     20
   The provincial expenditure as at 30 June 2012 is at 20.05 percent or R5.267 billion and the expenditure trends for the
    first quarter of the financial year reflect that the province recorded a consolidated expenditure, which is 4.95 percent
    below the expected target of 25 percent.


   Underspending of R98.287 million is registered by the Department of Agriculture & Rural Development and mainly
    relates to Transfer Payments to the tune of R108 million and Compensation of Employees with R7.5 million, whilst
    overspending is projected on Goods & Services with R16.8 million.


   Overspending of R65 million and R26.9 million is projected by the departments of Human Settlement, Safety & Liaison
    (Human Settlement Branch) on Compensation of Employees (R20m) and Goods & Services (R45m) as well as Social
    Development, Women, Children & Person with Disabilities with R26.9 million on Compensation of Employees.


   The conditional grant expenditure of 16.33 percent or R806.7 million as at 30 June 2012 is not acceptable given; the
    purpose and importance of these funding allocations as highlighted in the Division of Revenue Act and the Conditional
    Grant Framework.


   The low spending of 4.18 percent and non-spending on infrastructure funds are unacceptable given the poverty and
    unemployment levels in the province as well as the need for upgrading and maintenance at schools, clinics, hospitals,
    roads and government buildings.




                                                                                                                               21
   Departments that under spent on conditional grant allocations must provide explanations for the under spending in
    terms of section (11) and (12) of the Division of Revenue Act, Act No. 5 of 2012.


   Given the underspending in these areas; departments responsible for infrastructure and conditional grant funds were
    urged to put remedial actions in place to improve planning and implementation of projects given the essential service
    delivery initiatives, poverty and unemployment levels in the province.


   Departments that materially underspent should submit plans that address their underspending and motivate why their
    current baseline allocations should not be reduced accordingly to free the funds for other departments that have
    capacity and plans to spend during this financial year.


   Departments must monthly and quarterly link their financial and operational performance information to know exactly
    what has been spent on what programmes and to what effect as well as to assess whether they are achieving value for
    money and engage on areas of underperformance more rigorously.


   Departments must improve their capacity to comprehensively monitor and assess financial and non-financial
    performance through the appointment of skilled staff, filling the key vacant positions and to enhance skills and
    awareness amongst the staff through training on financial resource management.


   Departments must evaluate their capacity to determine whether they are able to administer and spent their allocated
    funds this year or consider the surrender of funds, during the coming 2012/13 Adjustment Estimate, to other Provincial
    Departments that have the capacity to absorb and spent the funds on key services.


                                                                                                                             22
23
     23

						
Related docs
Other docs by HC12091115850
DrPH � Social and Behavioral Sciences
Views: 5  |  Downloads: 0
WEST AFRICAN JOURNAL OF NURSING REAL
Views: 50  |  Downloads: 0
LT203 Module Description 2011 12
Views: 0  |  Downloads: 0
Playing the Small Screen Booking Form
Views: 0  |  Downloads: 0
CURRICULUM UPDATE SUMMARY REVIEW SHEET
Views: 0  |  Downloads: 0
article carbs
Views: 3  |  Downloads: 0
FOR IDHS USE ONLY
Views: 1  |  Downloads: 0
Digital Storytelling:
Views: 11  |  Downloads: 0
Did You Know?
Views: 2  |  Downloads: 0