FIGURE 2 -ALDOT PROJECT SCHEDULE ELEVATED EXPRESSWAY US-280
ID 1 2 3 4 5 6 7 8 9 10 11 12 Task Name NHF-0038(526): Elevated US-280 PE Authorized ROW submittal Utilities submittal Environmental 30% PIH PS&E Final Back Check (Quality Control) Construction Bureau Review Final Plans to OE Letting 9/24/10 Duration 300 days 0 days 0 days 111 days 56 days 46 days Start Mon 8/3/09 Thu 10/1/09 Thu 4/1/10 Fri 10/9/09 Tue 9/1/09 Thu 10/8/09 4/08 7/08 10/08 1/09 4/09 7/09 10/09 1/10 4/10 7/10 10/10 1/11 4/11 7/11 Finish Fri 9/24/10 Thu 10/1/09 Thu 4/1/10 Fri 3/12/10 Tue 11/17/09 Thu 12/10/09 Thu 3/11/10 Thu 5/27/10 Tue 6/22/10 Thu 7/29/10 Fri 9/24/10 Fri 9/24/10 30% 10/29/09 PIH 8/10/09 PS&E 2/24/10 FBC 6/2/10 CN 6/22/10 OE 7/29/10 9/24 10/1 4/1
66 days Thu 12/10/09 56 days 19 days 28 days 42 days 0 days Thu 3/11/10 Thu 5/27/10 Tue 6/22/10 Thu 7/29/10 Fri 9/24/10