PowerPoint Presentation

W
Shared by: HC120911074256
Categories
Tags
-
Stats
views:
0
posted:
9/11/2012
language:
Unknown
pages:
14
Document Sample
scope of work template
							      ITER & Expectations for Fusion
    Research in the Next Quarter Century



                                 IAEA Scientific Forum 2007
                                           Vienna, September 18, 2007


                             Kaname Ikeda
            Nominee Director-General of the ITER Organization



                                                                        1
IAEA Scientific Forum 2007, Vienna 18 September 2007
                              Advantages of fusion
                             On Earth, fusion could provide:


              Essentially limitless fuel, available
              around the world

              No greenhouse gases

              Intrinsic safety

              No long-lived radioactive waste

              Suitable for large-scale energy
              production




                                                               2
IAEA Scientific Forum 2007, Vienna 18 September 2007
                      ITER: a necessary step towards fusion power

                                                       Satellite
                                                       Tokamak
                                                       (BA Project)


                                                                                       DEMO


                          JT-60                                       ITER




                    JET
                                                                       IFMIF
                                                                       IFMIF/EVEDA (BA Project)
                                                                                                  3
IAEA Scientific Forum 2007, Vienna 18 September 2007
                       ITER – Key facts

• Objective: to demonstrate the scientific
  and technological feasibility of fusion
  power

• Designed to produce 500 MW of fusion
  power (tenfold the energy input) for an
  extended period of time

• 10 years construction, 20 years
  operation

• Cost: 5 billion Euros for construction,
  and 5 billion for operation and
  decommissioning

• Parties represent half the world’s
  population


                                                        4
 IAEA Scientific Forum 2007, Vienna 18 September 2007
                          ITER – an International Cooperation…
Seven Parties, representing more than half of the world’s
population, are involved in the ITER construction




                                                                 5
IAEA Scientific Forum 2007, Vienna 18 September 2007
                      Location: Cadarache, France


                                                       = Itinerary ITER components




                                                                                     6
IAEA Scientific Forum 2007, Vienna 18 September 2007
                      ITER Agreement Signature, Elysée Palace, 21 November 2006




                      Representatives of the ITER Parties:
From left to right: Russian Federation, Japan, China, with the President of the
European Commission and the President of the French Republic, Korea, India,
                              U.S.A, and the EU
                                                                                  7
IAEA Scientific Forum 2007, Vienna 18 September 2007
                       Construction (2007-2016)
                       Sharing
Overall sharing:
EU 5/11, other six parties 1/11 each. Overall contingency of
10% of total. Total amount: 3578 kIUA (about 5,079 million
Euro in 2007)

                                   RF                     Total procurement value : 3021

                      CN                                                     Staff: 477
                                                                             R&D:    80
                 KO                            European
                                                Union
                                                                       Total kIUA: 3578
                    JP

                             IN
                                          US


                                                                                           8
IAEA Scientific Forum 2007, Vienna 18 September 2007
                        Contributions in kind

A unique feature of ITER is that almost all of the plant
components will be fabricated through in kind contributions
from the Members




                                                              9
 IAEA Scientific Forum 2007, Vienna 18 September 2007
                    Roles & Responsibilities for Construction

The ITER Organization, all the Parties, and the Fusion
Community work together on ITER.


            ITER Organization                              Seven Members

             • Planning/Design                         •   Detailing / Design
             • Integration / QA / Safety               •   Procurement/Fabrication
               / Licensing / Schedule                  •   Delivering
             • Installation                            •   Support installation
             • Testing + Commissioning
             • Operation


                                                                                     10
IAEA Scientific Forum 2007, Vienna 18 September 2007
                                Management Structure of
                                 the ITER Organization




                                                          11
IAEA Scientific Forum 2007, Vienna 18 September 2007
                                                                Project Schedule
               ITER IO                    LICENSE TO                    START TOKAMAK                                                 FIRST
            ESTABLISHED                   CONSTRUCT                       ASSEMBLY                                                   PLASMA

2005       2006          2007           2008             2009   2010        2011        2012           2013       2014     2015        2016
                                                                                OTHER BUILDINGS
                            EARTHWORKS


                   Contract                               TOKAMAK BUILDING

                                                                                     1st VV/TF/TS         Complete        Complete
                                                                                         Sector             VV             BLK/DIV
       Construction License Process
                                                                                             1st PFC     Install CS
                                                                              Install      TOKAMAK ASSEMBLY
                                                                             Cryostat

                                                                                                                         COMMISSIONING

                                                                                   1st PFC                 Last PFC
                              Procurement & Fabrication
  COILS
                                                                  1st TFC                  Last TFC Last CS

 VACUUM                       Procurement & Fabrication
 VESSEL
                                                                            First sector   Last sector




                                                                                                                                              12
  IAEA Scientific Forum 2007, Vienna 18 September 2007
                                    Conclusions

       • ITER is one of the most challenging and innovative
         scientific projects in the world today

       • Most of the ITER components will be procured and
         fabricated through in kind contributions, demanding a
         very high level of international cooperation

       • The ITER Organization is building up quickly at
         Cadarache, with strong support of the ITER Members




                                                                 13
IAEA Scientific Forum 2007, Vienna 18 September 2007
                                 Thank you for your attention!




                                                                 14
IAEA Scientific Forum 2007, Vienna 18 September 2007

						
Related docs
Other docs by HC120911074256
DE Leesburg Spring 2012 Checklist
Views: 1  |  Downloads: 0
Curriculum Map - DOC 20
Views: 6  |  Downloads: 0
0KK6TK 2GFHIA GS 10F 0299V GSAADVANTAGE052912
Views: 0  |  Downloads: 0
Plumbing Permits for Homeowners
Views: 0  |  Downloads: 0
PowerPoint Presentation
Views: 0  |  Downloads: 0
a planning template
Views: 7  |  Downloads: 0
Ashley Dies
Views: 0  |  Downloads: 0