Lean Six Sigma Studies Surveys

W
Shared by: HC12091104816
Categories
Tags
-
Stats
views:
3
posted:
9/10/2012
language:
English
pages:
2
Document Sample
scope of work template
							4. Lean Six Sigma / Studies / Surveys

    T4a. Work Measurement Techniques (e.g., Engineered Time Studies, Work Sampling,
Operational Audit, Functional Models) --Knowledge of work measurement techniques such as
engineered time studies, work sampling, operational audits, and functional models for evaluating
workload and output, forecasting and conducting analyses, and ensuring program or organizational
goals and objectives are met.

    T4b. Manpower Studies Program --Knowledge of manpower study program to include policies,
procedures, and forms necessary for planning and conducting manpower studies, utilizing
acceptable/approved study techniques, validating mission and function tasks, workload and staffing
needs, identifying manpower and organizational problems, recommending solutions, and providing
technical assistance and follow-up.

    T4c. Statistical and Quantitative Analysis, Operations Research, and Management/Industrial
Engineering Techniques -- Knowledge of statistical and quantitative analyses, operations research
and management and industrial engineering techniques for developing analytical tools to support
manpower requirements resourcing decisions. Can include the use of Regression Analysis, Time
Studies, Work Sampling, Operational Audits, the 5 Step Method of validating mission and functional
tasks, and the application of Functional Models. The knowledge of evaluative techniques for
determining whether or not organizational goals and objectives are being met.

     T4d. Manpower Requirements Determinations Programs --Knowledge of techniques and
procedures such as manpower staffing guides, Five Phased methodology, manpower requirements
criteria, etc., for evaluating work and determining manpower requirements necessary for mission
accomplishment in TDA and TOE/MTOE organizations.

    T4e. Standards Application, Maintenance, and Documentation Procedures --Knowledge of the
processes for determining manpower requirements and the application of the products
(standards/criteria) to organizational entities. Includes the update of the standards/criteria and their
documentation in the standards database or the Force Management Bulletin Board. (AR 71-32, AR
570-4)

    T4f. Work Center Description Preparation and Validation; and Selection/Definition of
Workload Factors and Work Units --Knowledge of procedures for preparing and validating work
center descriptions, defining organizational work units, developing and defining workload
measurement factors, and establishing methods of accounting for output.

    T4g. Requirements Determination Process -- Knowledge of the HQDA process by which concept
plans (requirements for new materiel or organizations) are developed and analyzed and from which
doctrinal, training, organizational, and materiel needs of the Army evolve. Review and analyze
requests for additional manpower, materiel requirement documents, and organizational design and
re-design.

    T4h. Manpower Requirements Determination for TOEs --Knowledge of pertinent doctrine and
regulations, policies and precedents, and related support resources affecting the combat
development process in order to analyze, evaluate, and advise on requirements necessary to
perform stated mission. (AR 71-32)

    T4i. Requirements System (TOE, BOIP) --Knowledge of Army's automated system FMS and
regulations for documenting organizational structure, personnel, and equipment requirements at all
echelons, maintaining and submitting changes to requirements documents, and ensuring
conformance with manpower principles, policies, and directives. (AR 71-32)

    T4j. Manpower Requirements Criteria Program --Knowledge and understanding of the
Manpower Requirements Criteria Program policy and procedures necessary to perform studies to
establish criteria for determining manpower requirements for combat support and combat service
support functions in Army TOE tactical organizations and to interpret, analyze, modify, and effect
change to annual maintenance man-hours for determining manpower requirements for
maintenance functions. (AR 71-32)

    T4k. Equipment Survey Policies and Procedures --Knowledge of DA policies and procedures for
equipment surveys to include conducting and analyzing surveys and current trends in equipment,
providing technical guidance and assistance, and developing published regulations and operating
procedures on equipment surveying. (AR 570-7)

    T4l. Equipment and Material Handling Knowledge of Army's system for assigning Federal Item
Identification and National Stock Numbers (NSN) necessary to describe an item-of-supply and
establish the unique identity of the item. (AR 708-1). Familiarity with Common Table of
Authorizations and how to use them (CTAs) as found in the FMSWEB site. Knowledge of DA type
classification system (AR 70-1) and procedures for analyzing and approving requests for exemption
from type classification. CP26 personnel must have knowledge of procedures for reviewing,
analyzing, and approving requirements and authorizations for numbers and types of equipment
according to specific Line Item Numbers. Knowledge of equipment authorization and utilization
policies and procedures including approval levels required for specific equipment, equipment
authorization levels, and the DA Manpower Management and Equipment Authorization System
necessary to recommend alternative equipment usage, and ensure equipment requirements are in
accordance with approved doctrine and organizational concepts. (AR 71-32)

   T4m. Efficiency Review and Productivity Programs -- Knowledge of established organizational
operational improvement and productivity techniques and procedures (i.e. Lean Six Sigma (LSS)) for
conducting studies necessary for assessing the productivity, effectiveness, and efficiency of
program operations, work processes, and work methods.

						
Related docs
Other docs by HC12091104816
network science
Views: 0  |  Downloads: 0
Exhibit Tally Sheet
Views: 4  |  Downloads: 0
STATE OF MONTANA
Views: 0  |  Downloads: 0
Howtocompact Co MIS
Views: 0  |  Downloads: 0
Hire Checklist - DOC
Views: 0  |  Downloads: 0
PowerPoint Presentation
Views: 0  |  Downloads: 0
Print Name: _____
Views: 0  |  Downloads: 0