  • pg 1
									                                                               Is this facilitiy
                                                                  currently
            Name of                                          INCLUDED in or
             SSC                                                EXCLUDED
            member                Planning        Specific         from the
Challenge submitting             Region of name/description       Baseline
  No.      challenge   Sector      facility      of facility  Infrastructure?
          Andy Oliver NGOs       PJM        Unnamed 272 MW Currently
                                            coal plant in PA included -- I am
                                                             petitioning for it
                                                             to be excluded
        1




            Andy Oliver   NGOs   PJM        Unnamed 600 MW        Currently
                                            coal plant in Ohio    included -- I am
                                                                  petitioning for it
                                                                  to be excluded

        2




            Andy Oliver   NGOs   LGEE       120 MW Estill         Currently
                                            Energy coal plant     included -- I am
                                                                  petitioning for it
                                                                  to be excluded

        3




            Andy Oliver   NGOs   SOCO       Two 600 MW            Currently
                                            Longleaf coal units   included -- I am
                                                                  petitioning for it
                                                                  to be excluded
        4
    Andy Oliver   NGOs        MISO      3 coal units         Currently
                                        representing 750     included -- I am
                                        MW Mesaba plant      petitioning for it
                                        (aka. Excelsior)     to be excluded

5




    Andy Oliver   NGOs        MAPP      790 MW NextGen       Currently
                                        coal plant           included -- I am
6                                                            petitioning for it
                                                             to be excluded

    Andy Oliver   NGOs        Entergy   735 MW Plum Point Currently
                                        coal plant Unit 2 included -- I am
                                                          petitioning for it
                                                          to be excluded


7




    Andy Oliver   NGOs        PJM       Duplicate of 534     Currently
                                        MW Wise County       included -- I am
8                                       Energy Facility in   petitioning for it
                                        Virginia             to be excluded

    Herb Healy    Other       ISO-NE    Northeast Energy     Currently
                  Suppliers             Link                 excluded -- I am
                                                             petitioning for it
                                                             to be included




9
                                                                                Is the facility
                                                               Is the facility    needed to
                                                               an upgrade to serve a “load
 Summary of key arguments about why this facility is (or is     an existing pocket” within
              not) reasonably certain to be built                   line?        the region?
There were 3 waste coal-fired power plants of approximately   No               No
this size proposed for Pennsylvania at one point (River Hill,
Beech Hollow, Good Spring). River Hill and Beech Hollow are
no longer active in the permitting or development process.
Good Spring has not begun construction, faces additional
permit challenges, and has no off-taker for the power or
demonstrated financial ability to construct.



There have been 3 IGCC or coal to liquid power plants of      No               No
approximately this size proposed for Ohio at one point (Great
Bend, Conneaut, Lima). None of the facilities are actively in
the permitting process and 2 of the 3 have been dropped from
development by the companies involved.




No construction has occurred on this facility and there is no     No           No
evidence of sufficient power purchase agreements or financing
in order to move forward with construction. There is no final air
permit for the facility and the Kentucky Division of Air does not
expect a final permit to be issued soon.




Longleaf’s air permit remains under challenge, no power          No            No
purchase agreements have been identified, and one of the
project developers (Dynegy) has withdrawn from the facility.
No construction has begun, the Department of Energy (which No          No
had budgeted financial support for the plant) no longer lists the
project as a priority, the facility has no air permit and no off-
taker for the power from the facility. No evidence of the
financial wherewithal to begin construction exists.




Basin Electric has stopped development of this project. No       No    No
permits exist for the facility.



No construction has occurred on this facility, there is no    No       No
evidence of sufficient power purchase agreements or financing
in order to move forward with construction, and one of the
development partners for the facility - Dynegy - has backed
out. There is no final air permit for the facility and the
Arkansas DEQ has not heard from LS Power since January of
2010 despite requests for additional information.




We think this is just a clerical error in the spreadsheet. There No    No
are two 534 MW Wise Energy coal plants listed in Virginia.
One is listed as planned, the other under construction. Should
only be one project, which is under construction. The
"planned" facility should be excluded.
NEL received strong overall support of EISPC members with         No   No
69% voting for inclusion of the project. This indicates that a
strong majority of EISPC representatives agree that the project
meets the “reasonably certain” criteria. Despite strong regional
and overall support that the project is “reasonably certain”, the
vote when weighted, according to states electricity
consumption, resulted in NEL’s total vote falling below the 66%
threshold. Another transmission project in Illinois which
received 69% of the straight vote, was weighted at 74% and
included in the baseline case.
NEL is an ‘elective upgrade’ identified in the ISO-NE queue;
ISO-NE did not originally include elective upgrades in its
regional plan submission to the EIPC. However, development
of NEL is progressing and the project is expecting to submit a
filing to FERC in the first quarter of 2011 requesting a
declaratory order as a participant funded transmission line.
NEL has undertaken detailed routing analyses and has in final
draft form a filing addressing environmental permitting for the
bulk of the route. NEL is also in discussion with potential
providers for both REC qualified renewable and balancing
resources that are requesting transmission services across the
line. Given the progress to date and the work programmed in
                  Is the facility                           Is the facility
                    needed to                            needed to reduce
                     satisfy a                            congestion or to
                  contingency                                meet a local
                 or loss of local                        installed capacity
If yes, identify. generation?       If yes, identify.      requirement?       If yes, identify.
                 No                                     No




                No                                      No




                No                                      No




                No                                      No
No   No




No   No




No   No




No   No




No   Yes   NEL establishes a
           critical transmission
           pathway facilitating
           the delivery of
           renewable
           generation sources
           to New England
           markets
                                                                            Will inclusion of this
    Reasons why party                                                    facility or project in any
  believes facility has a       Other reasons why sponsor believes               way bias the
  high/low probability of      project construction is or is not highly Interconnection wide
    being constructed                           probable.                    planning exercise?
Permitting actively            There is no financial justification for   Yes, including a
underway or completed          merchant coal-fired power plants in this generation facility that is
(e.g., EIS, EIR, state siting) market. Facilities not already under      not reasonably certain
                               construction or without 100% of the       may lock that facility in for
                               power fully committed cannot be           all future scenarios.
                               considered “reasonably certain”,
                               particularly per the early release of the
                               2011 Annual Energy Outlook (no new
                               coal plants without government subsidies
                               projected to 2035).
Permitting actively            There is no financial justification for   Yes, including a
underway or completed          merchant coal-fired power plants in this generation facility that is
(e.g., EIS, EIR, state siting) market and these facilities do not have   not reasonably certain
                               air permits. Facilities not already under may lock that facility in for
                               construction or without 100% of the       all future scenarios
                               power fully committed cannot be
                               considered “reasonably certain”,
                               particularly per the early release of the
                               2011 Annual Energy Outlook (no new
                               coal plants without government subsidies
                               projected to 2035).
Permitting actively            There is no financial justification for   Yes, including a
underway or completed          merchant coal-fired power plants in this generation facility that is
(e.g., EIS, EIR, state siting) market and these facilities do not have   not reasonably certain
                               air permits. Facilities not already under may lock that facility in for
                               construction or without 100% of the       all future scenarios
                               power fully committed cannot be
                               considered “reasonably certain”,
                               particularly per the early release of the
                               2011 Annual Energy Outlook (no new
                               coal plants without government subsidies
                               projected to 2035).
Permitting actively            There is no financial justification for   Yes, including a
underway or completed          merchant coal-fired power plants in this generation facility that is
(e.g., EIS, EIR, state siting) market. Facilities not already under      not reasonably certain
                               construction or without 100% of the       may lock that facility in for
                               power fully committed cannot be           all future scenarios
                               considered “reasonably certain”,
                               particularly per the early release of the
                               2011 Annual Energy Outlook (no new
                               coal plants without government subsidies
                               projected to 2035).
Permitting actively            There is no financial justification for      Yes, including a
underway or completed          merchant coal-fired power plants in this     generation facility that is
(e.g., EIS, EIR, state siting) market and these facilities do not have      not reasonably certain
                               air permits. Facilities not already under    may lock that facility in for
                               construction or without 100% of the          all future scenarios
                               power fully committed cannot be
                               considered “reasonably certain”,
                               particularly per the early release of the
                               2011 Annual Energy Outlook (no new
                               coal plants without government subsidies
                               projected to 2035).
Permitting actively            MAPP submitted comments to EISPC          Yes, including a
underway or completed          also identifying this project as no longergeneration facility that is
(e.g., EIS, EIR, state siting) in development.                           not reasonably certain
                                                                         may lock that facility in for
                                                                         all future scenarios
Permitting actively            There is no financial justification for   Yes, including a
underway or completed          merchant coal-fired power plants in this generation facility that is
(e.g., EIS, EIR, state siting) market and this facility does not have an not reasonably certain
                               air permit. Facilities not already under  may lock that facility in for
                               construction or without 100% of the       all future scenarios
                               power fully committed cannot be
                               considered “reasonably certain”,
                               particularly per the early release of the
                               2011 Annual Energy Outlook (no new
                               coal plants without government subsidies
                               projected to 2035).

Permitting actively            There is no second 534 MW coal unit        Yes, including a
underway or completed          planned for the Wise Energy location.      generation facility that is
(e.g., EIS, EIR, state siting)                                            not reasonably certain
                                                                          may lock that facility in for
                                                                          all future scenarios
Project is included in a       The Right of Way Study is near              The Canadian Maritimes
regional plan or equivalent completion in Maine ( Main Interagency is not currently modeled
process approved by            Review Panel). Economic studies have as a NEEM region in the
applicable ISO or public       been completed to demonstrate the          EIPC /CRA model;
entity, Participation          merits of the project. Preliminary Project therefore the impacts
contracts executed,            engineering and detailed cost estimate     would be limited to the
Permitting actively            study have been completed.                 New England NEEM
underway or competed                                                      region.
(e.g., EIS, EIR, state siting)
   Is this a     Was this
generation or    challenge
transmission   presented to
   facility?  EISPC on 1/11?
Generation    No




Generation   No




Generation   No




Generation   No
Generation     No




Generation     No




Generation     No




Generation     No




Transmission   Yes

								
To top