scope of work template
							FIELD APPRAISAL REPORT
  TMA TOBA TEK SINGH




               Prepared by;
Punjab Municipal Development Fund Company
                                             Table of Contents


1    INSTITUTIONAL DEVELOPMENT ...............................................................1
  1.1      BACKGROUND ...........................................................................................1
  1.2      METHODOLOGY ........................................................................................1
  1.3      DISTRICT PROFILE ....................................................................................1
     1.3.1     Location .................................................................................................1
     1.3.2     Area/Demography..................................................................................1
  1.4      TMA/TOWN PROFILE ................................................................................2
     1.4.1     History....................................................................................................2
     1.4.2     Location .................................................................................................2
     1.4.3     Area/Demography..................................................................................3
  1.5      TMA STAFF PROFILE ................................................................................3
  1.6      INSTITUTIONAL ASSESSMENT...............................................................3
     1.6.1     TMO Office ...........................................................................................4
  1.7      TOWN PLANNING ......................................................................................6
  1.8      INFRASTRUCTURE & SERVICES ............................................................9
  1.9      REGULATION............................................................................................10
     1.9.1     Civil Suits/Chalans...............................................................................11
     1.9.2     Encroachments.....................................................................................11
     1.9.3     Advertisement Tax...............................................................................11
  1.10 FINANCE ....................................................................................................13
2    FIELD APPRAISAL REPORT OF WATER SUPPLY SCHEME TOBA
TEK SINGH ...............................................................................................................15
  2.1      PREFACE ....................................................................................................15
  2.2      SUB SOIL WATER CONDITION .............................................................15
  2.3      RATIONALE OF THE SUB PROJECT .....................................................15
     2.3.1     Existing source of water supply...........................................................15
     2.3.2     Main components of existing system...................................................16
     2.3.3     Water service area................................................................................19
     2.3.4     Production capacity..............................................................................20
     2.3.5     Actual present production ....................................................................20
     2.3.6     Water shortage .....................................................................................21
     2.3.7     Chlorination .........................................................................................22
     2.3.8     Consumer’s data...................................................................................22
     2.3.9     Quality of water ...................................................................................22
     2.3.10    Operation & Maintenance....................................................................23
     2.3.11    O & M Financials.................................................................................23
  2.4      NEEDS.........................................................................................................23
2.5      PROBLEMS ................................................................................................24
   2.5.1    The source............................................................................................24
   2.5.2    Canal frequent closures........................................................................24
   2.5.3    Power shut downs ................................................................................24
   2.5.4    Transmission main ...............................................................................25
   2.5.5    Abandoned overhead reservoirs...........................................................25
   2.5.6    Low production....................................................................................25
   2.5.7    Deterioration of quality........................................................................25
2.6      IMPROVEMENT REQUIRED WITH JUSTIFICATION .........................25
2.7      THE SUB PROJECT ...................................................................................26
   2.7.1    Description...........................................................................................26
   2.7.2    Proposed design ...................................................................................27
   2.7.3    Site suitability ......................................................................................30
   2.7.4    Implementation period .........................................................................30
   2.7.5    Proposed detailed design & construction supervision .........................31
   2.7.6    Proposed plan for design & construction.............................................31
   2.7.7    Operation & maintenance implications ...............................................31
   2.7.8    Environmental & social issues.............................................................32
2.8      SUB PROJECT COST.................................................................................32
2.9      SERVICE DELIVERY & CAPACITY BUILDING INDICATORS .........34
   2.9.1    Service delivery indicators...................................................................34
   2.9.2    Capacity indicators...............................................................................34
2.10 RECOMMENDATIONS.............................................................................34
       ANNEXURES ……………………………………………………… ... 35
            Annexure A                                                                                               i
            Annexure B                                                                                              ii
            Annexure C                                                                                             iii
            Annexure D                                                                                             iv
            Annexure E                                                                                              v
            Annexure F                                                                                        vi-vii
            Annexure G                                                                                            viii
            Annexure H                                                                                             ix
            Annexure I                                                                                          x-xv
                                      FAR-Institutional Development Component TMA T.T. Singh
                                                                                Draft Version




                       1   INSTITUTIONAL DEVELOPMENT


1.1    BACKGROUND

TMA T.T. Singh has applied for funding from PMDFC for water supply and
sewerage schemes. After initial desk appraisal, PMDFC field team comprising the
members listed below visited the TMA for assessing its present institutional and
engineering capacity on 18-10-2005:

Mr. Mohammad Aashiq (Tech. Consultant)
Mr. Talal Ahmad (Manager-ID)
Mr. Ahsan Mehmood (Manager-ID)
Mr. Yousaf Solanki (Manager-Eng)
Mr. Saud Mukhtar (Dy. Manager-Fin)

1.2    METHODOLOGY

Appraisal is based on interviews, open-ended questionnaires and agency record
obtained from TMO and TMA staff. Debriefing sessions and discussions were held
with concerned individuals and groups.

1.3    DISTRICT PROFILE

Toba Tek Singh was notified as district with effect from 1st July, 1982 after slicing the
area comprising this district from Faisalabad as T.T. Singh was its sub-division. It
derives its name from the headquarters town named Toba Tek Singh.

      1.3.1 Location

The district T.T. Singh is situated in the centre of the Punjab. It is surrounded on he
north by district Jhang and Faisalabad, on the west by district Jhang and on the east by
Faisalabad district. On the south, river Ravi makes a natural boundary and separates it
from the district Sahiwal and district Khanewal.

      1.3.2 Area/Demography

The district consists of an area of 3252 square kilometres with a total population of
1,621,593 as per DCR 1998. It has three Tehsils/TMAs.

      1. Toba Tek Singh
      2. Gojra
      3. Kamalia.




                                                   Punjab Municipal Development Fund Company    1
                                                        FAR-Institutional Development Component TMA T.T. Singh
                                                                                                  Draft Version




            The demographic details of the district are as:

                                                                                                                    1981-98
                                                     Population 1998                                                 Avg.
                Area                                                                                   Population   annual
 Tehsil                                                           Population                  Avg.
              (sq.km.)      Both                           Sex                    Urban                  1981       growth
                                      Male     Female             density/sq.                 HH                      rate
                            sexes                         ratio                 proportion
                                                                     km.                      size                    (%)
T.T.Singh         1,000    617,035   314,658   302,377    104.1      617.0          9.7        7.1      435,280      2.07

Gojra             916      495,096   254,054   241,042    105.4      540.5         23.8        7.2      357,172      1.94

Kamalia           1,336    509,462   262,890   246,572    106.6      381.3         25.0        7.0      342,120      2.37
            Source: District Census Report 1998, Population Census Organization, Statistics Division
            Government of Pakistan, Islamabad


            1.4     TMA/TOWN PROFILE

                        1.4.1 History

            T.T. Singh Tehsil was formed in 1900 with Toba Tek Singh town as Tehsil
            Headquarter, under the administrative control of Jhang district. It was raised to the
            status of a sub-division in 1930 and district in 1982. After the implementation of the
            Punjab Local Government Ordinance 2001, the headquarter sub division was given
            the status of TMA.

            T.T. Singh is named after a Sikh saint Tek Singh who maintained a water pond and
            used to serve drinking water to the passers-by. He rendered a great humanitarian
            service to the community and gradually the pond came to be called as ‘Toba Tek
            Singh’ meaning the pond of Tek Singh. There was a small mandi (grain market) close
            to that pond which subsequently flourished and grew into a town that was named T.T.
            Singh after the name of the great benefactor of the area-Tek Singh.

            T.T. Singh is also a colony district. The British from the beginning of the 20th century
            constructed an extensive irrigation network to bring the agricultural lands under
            cultivation that were lying uncultivated since long because of the non-availability of
            irrigation water. For this purpose they also encouraged new settlements by attracting
            the people from other populous areas. These settlements are called colonies and such
            districts are called as colony districts.

                        1.4.2 Location

            T.T. Singh is the headquarter of the district. To its north is Jhang at a distance of 29
            km., to south Kamalia at a distance of 30 km., to east Gojra at 29 km. and to the west
            Shorkot at a distance of 29 km.

            T.T. Singh is situated to the west of Faisalabad and is connected with it both by road
            and railway. By rail, the distance from Faisalabad is 79 km. By road there are two
            routes, viz. Faisalabad-Samundari road and Faisalabad-Jhang road. The distance via
            both routes is almost equal (112 km).




                                                                     Punjab Municipal Development Fund Company         2
                                                      FAR-Institutional Development Component TMA T.T. Singh
                                                                                                Draft Version




                  1.4.3 Area/Demography

          T.T.Singh TMA is the oldest and most important Tehsil of the district. It spreads over
          an area of 1000 square kilometres with a population of 617,035 (as per DCR 1998).
          The TMA comprises of 32 Union Councils (29-Rural, 03-Urban) with only one CO
          unit namely T.T. Singh.

          The detail of CO Unit is as:
                                       Population 1998                                         1981-98
                                                                                             Avg. annual        Avg. HH
       CO Units                                                          Population 1981
                                                                                             growth rate          size
                          Both sexes         Male           Female                               (%)
T.T. Singh
                            59,938           30,534          29,404           37,844               2.74           7.5
(Headquarter
          Source: District Census Report(DCR) 1998, Population Census Organization, Statistics Division
          Government of Pakistan, Islamabad

          1.5     TMA STAFF PROFILE


 Sr.                                                     Date of         Service                          Experience
                Name            Designation                                            Qualification
  #                                                   Joining TMA         cadre                            (years)
         Mohammad                                                                      M.Sc.
 1                            TMO                     15.08.2001        LCS                               23
         Saleem Khan                                                                   (Physics)

 2       Abdul Rauf           TO (I&S)                04.12.04          LG&RD          *DAE(Civil)        26

         Mohammad                                                                      B.Sc. (Town
 3                            TO (P)                  19.11.04          LCS                               11
         Aslam                                                                         Planning)
                                                                                       B.Sc. (Hons.
 4       Afzal Pervaiz        TO (F)                  16.03.05          LCS                               31
                                                                                       Agriculture)

 5       Vacant               TO (R)                  Additional Charge with TO (P)

          *DAE = Diploma in Associate Engineering



          1.6     INSTITUTIONAL ASSESSMENT

          The ID team of PMDFC assessed the institutional and personal capacity of TMA T.T.
          Singh for accomplishment of mandatory functions as per PLGO 2001 in general and
          of (I&S) office for execution of proposed water supply and sewerage scheme in
          particular.
          The FAR includes the proposed performance improvement plan for each office based
          on the discussion with respective TMA staff. The details are as under.




                                                                   Punjab Municipal Development Fund Company            3
                                     FAR-Institutional Development Component TMA T.T. Singh
                                                                               Draft Version




        1.6.1 TMO Office

TMO is the focal person in TMA. He is also the Principal Accounting officer of
TMA. His responsibilities include coordination of activities of all Tehsil offices and
execution of sanctioned policies of TMA. During the field appraisal, ID team
discussed the following issues related to the office of TMO:


    A       Complaint Cell

Complaint cell has been established as per PLGO 2001. TMA has prepared a
complaint register to keep track of reported complaints. But most of the record is
about complaints received in writing. While TMA staff told that most of the
complaints are lodged orally and no is maintained. TMA has not developed any
reporting mechanism from concerned staff to TMO regarding disposal of complaints.


    B        Dissemination of Information
TMA has no institutional arrangements in place for dissemination of information to
the citizens. There is no website of TMA to display its achievements, goals,
infrastructure development and public response or feedback. There is no concept of
report cards. As in other TMAs, there is no reporting system between the TMA and
the Provincial Government. Annual budget is the only way of information forwarded
to Provincial Government. A proper monitoring system by Provincial Government
under PMSIP is definitely required.
    C        Community Driven Development

The concept of community driven development is not new for the people of T.T.
Singh Tehsil. The first NGO in the tehsil was registered in 1972. Details of registered
NGOs are:

•   Number of registered NGOs in district                      =        124
•   Number of registered NGOs of Tehsil T.T. Singh             =        62
•   Number of registered Urban NGOs of Tehsil                  =        20
•   Number of registered Rural NGOs of Tehsil                  =        42

As far as CCBs are concerned, this concept has been introduced through PLGO 2001.
But it could not be implemented due to the non-existence of rules for their operation.
CCB Rules were notified as late as 14.04.03, as a result of which CCBs were
registered at a belated stage. The TMA T.T. Singh did not reserve/allocate any funds
for CCBs in annual development programme of yea 2001-02 & 2002-03. Hence no
project was undertaken through CCB during this period.

Total number of registered CCBs of TMA T.T. Singh is 161 out of which only 24
CCBs have taken up development projects (total 30 projects). Out of these 30 initiated
sub-projects, 16 have been physically completed and remaining are in progress.




                                                  Punjab Municipal Development Fund Company    4
                                               FAR-Institutional Development Component TMA T.T. Singh
                                                                                         Draft Version




      The details of year wise allocation of funds for CCBs in TMA T.T. Singh are as:


                                     Funds Allocated (Rs.)                   Funds
      Sr.                                                                                   Un-Spent
                Year                                                        Reserved
      No.                                                                                     (Rs.)
                                                                              (Rs.)
                              Actual        Liabilities       Total
              2001-02            -               -               -                -               -
              2002-03            -               -               -                -               -
              2003-04       9,000,000      -               9,000,000       3,469,125        5,530,875
              2004-05       9,631,000      5,530,875       15,161,875      6,214,680        8,947,195
      Total                 18,631,000                                     9,683,805


      Category-Wise Details of Sub-Projects Undertaken Through CCBs in TMA T.T.
      Singh.

       Sr.                                             No. of Projects            Total Estimated
                        Project Category
       No.                                              Undertaken                  Cost (Rs.)
        1      Cattle Pound                                    04                       1,935,980
               Jinaz Ghah (place for funeral
        2                                                      12                       3,296,100
               prayers)
        3      Water Supply Scheme                             08                       4,376,035
               Boundary Wall around Grave
        4                                                      02                       1,409,500
               Yard
        5      R.C.C. Sewer Pipe Line                          01                       150,000
               Drains, Oxidation Pond &
        6                                                      02                       950,000
               Sullage Carrier
        7      Re-Soling & Culverts                            01                        34,000
               Total                                           30                      12,151,615

      After in-depth discussion with TMA staff, the following Performance Improvement
      Plan is proposed for the office of TMO in TMA T.T. Singh.

            PIP Tasks                     PMDFC Interventions                 Performance Indicators
(i)    Citizens’ complaint cell •        Provide standard design of the       •       Number of complaints
       setup and computerized            Complaint center.                            computerized/tracked
       complaints tracking      •        Provide Standard Operating
       system started                    Procedures (SOPs) for the            •       Number of complaints
                                         Complaint center.                            disposed off as per
                                     •   Provide hands on training for                SOPs.
                                         the implementation of
                                         complaints center SOPs.




                                                            Punjab Municipal Development Fund Company        5
                                              FAR-Institutional Development Component TMA T.T. Singh
                                                                                        Draft Version




              PIP Tasks                   PMDFC Interventions                Performance Indicators
                                     •   Provide computerized system
                                         for complaints tracking and
                                         analysis.
(ii)     TMA website                 •    Provide template for website       •    Website contents are
        developed                         design.                                 updated regularly.
                                     •    Finance the cost of website
                                          development and initial            •    Number of citizens
                                          hosting.                                accessing the website
                                     •    Training of TMA staff for               (per month)
                                          regular update of websites.
(iii)     Initiation of              •    Community mobilization             •    Number of CCBs
         development schemes              through PMDFC social                    registered during the
         through CCBs.                    mobilization consultant.                financial year
                                                                             •    Number of CCBs
                                                                                  which initiated CCBs’
                                                                                  schemes during the
                                                                                  financial year
                                                                             •    Percent of CCB
                                                                                  allocation utilized
                                                                                  during the financial
                                                                                  year.
(iv)     Training needs              •   Formation of training               •    Number of TMA staff
         assessment of TMA               calendar                                 trained under each TO.
         staff by TMO                •   Make requisite arrangements
                                         for trainings.


        1.7    TOWN PLANNING

        PMDFC ID team met TO (P) and his staff and discussed planning processes and
        activities in the TMA.

        PMDFC team found the town clean. It looks somewhat a and planned town. Most of
        the streets are wide and TMA has done good work in maintaining the municipal
        infrastructure. City is not growing rapidly as it has little industry that is a pull factor
        for rural-urban migration.




                                                           Punjab Municipal Development Fund Company       6
                                     FAR-Institutional Development Component TMA T.T. Singh
                                                                               Draft Version




Following Table compares the available posts and filled posts.


Detail of Posts in Planning department (TMA-T. T. Singh)

s/no    Post                        Available Posts             Filled Posts
1       TO(P)                       1                           1
2       Sub.Engr.                   1                           1
3       Draftsman                   1                           1
4       Building inspector          2                           1
5       Tracer                      1                           no
6       Sr.clerk                    1                           1
7       Jr Clerk                    1                           1
8       Assistant                   1                           no
9       Naib Qasid                  2                           1

The office of TO (P) is very crucial office in TMA setup. It has been allocated the
following business:

   1. Prepare spatial plans for the tehsil/town in collaboration with Union
      Administrations including plans for land use, zoning and functions for which
      tehsil/town administration is responsible;
   2. Exercise control over land use, land sub-division, land development and
      zoning by public and private sectors for any purpose including agriculture,
      industry, commerce, markets, shopping and other employment centres,
      residential, recreation, parks, entertainment, passenger and transport freight
      and transit stations;
   3. Building control;
   4. Execute and manage development plans;
   5. Develop and manage schemes including site development in collaboration
      with District Governments and Union Administrations;
   6. Compile information provided by Union and Village Councils of prioritized
      projects in the tehsil/town; and
   7. Maintain municipal records and archives.

TO(P) Iftikhar Ali Chauhdry is a qualified town planner and is a Local Government
employee and has 11 years experience with Local Government system. Sub-engineer,
Saeed Akhtar is from PHED and has 19 years experience in planning colonies for his
parent department. Sr Clerk, Hamid Sarfraz is also from PHED and has experience in
data collection, surveying and report writing.

During the discussions it was revealed that the Planning office needed detailed
information on the characteristics and requirements of all land uses, physical, spatial
and economic activities that might guide the future shape of the city. But this requires
up to date maps. Maps like land use and services are not available with the TMA and
the one available is obsolete and out dated. Topographical maps that are essential for
efficient infrastructure and city management are non-existent.




                                                  Punjab Municipal Development Fund Company    7
                                           FAR-Institutional Development Component TMA T.T. Singh
                                                                                     Draft Version




Qualified TO Planning                                                            yes
Spatial Planning                                                                 no
Spatial plan                                                                     no
Land use map                                                                     yes
Zoning map                                                                       no
Base map                                                                         no
Annual Development Planning and Budgeting                                        yes
Annual Development Program and Budget                                            yes
Prepared with UC and TMC input                                                   no
Prepared with regard to data base                                                no
Presence of data base or data collection                                         no
Long term Annual Development Programming and Budgeting                           yes
Long term Dev. Program and Budget                                                no


  Plan Formulation: Because development plans are not based upon data and therefore
  made without knowing the actual needs. The absence of data means that prioritization
  of plans remain uninformed by the ground realities which results in piecemeal
  development.

  These are just preliminary observations about planning in TMA T. T. Singh. In depth
  study of the Planning process and problems shall be conducted by Urban Planning
  Consultants to be hired by PMDFC to assist TMA in determining the growth of city,
  location of new housing, commercial and industrial buildings, land use conversions,
  existing city zones. The consultants will also update base maps by mapping all the
  services like roads, water supply, sewerage and solid waste collection and disposal.
  All such maps and data will be a great help to TMA in adequately providing services,
  avoiding lop-sided development, exercising development control and in ascertaining
  the future requirements of the city.
  After detailed discussion with TO (P) and his staff, the following Performance
  Improvement Plan is proposed for the office of TO (P) in TMA T. T. Singh




                                                        Punjab Municipal Development Fund Company    8
                                                     FAR-Institutional Development Component TMA T.T. Singh
                                                                                               Draft Version




              PIP Tasks               PMDFC Interventions                      Performance Indicators


(v)             Setting up of     •   PMDFC will arrange for         •    Basic maps prepared
              GIS, mapping of         satellite images of the        •    Database of infrastructure developed
              services and            TMA.                                and thematic maps prepared.
              developing a        •   PMDFC will develop
              database of             standard formats for
              services.               services data collection.
                                  •   PMDFC will provide
                                      necessary training to
                                      TMA staff on mapping
                                      services on TMA maps.
                                  •   PMDFC will provide
                                      necessary training to
                                      TMAs for developing the
                                      services database.
(vi)           Preparation of     •   PMDFC will arrange for         • Number of development / capacity
              action plan             data collection, analysis         projects executed out of prioritised
                                      and prioritisation of             list.
                                      development and capacity
                                      projects.


               1.8   INFRASTRUCTURE & SERVICES

               Infrastructure & Services office is the back-bone of Tehsil Municipal Administration.
               It is responsible for provision, management, operation, maintenance and improvement
               of the municipal infrastructure.

               In TMA T.T. Singh, TO (I&S) is a diploma holder Civil Engineer from LG&RD
               department. The appraisal brought out that there was a shortage of technical
               equipments like surveying equipments, lab testing equipments, etc.

               During discussions, it was revealed that most of the I&S staff were willing to receive
               trainings on computer applications, use of modern technical equipments, preparation
               of project documents (designs & estimates).

               After detailed discussion with TO (I&S), the Following Performance Improvement
               Plan is proposed.

       P I P             T a s k s           PMDFC Interventions                    Performance Indicators
       (i)        Development of skills in   •   PMDFC to arrange training          •   Number of PC-I to PC-
                preparation of PC-I to PC-       sessions to train TMA staff for        V designed and got
                V.                               the preparation of PC-I to PC-         approved from the
                                                 V.                                     competent forum.
                                             •   PMDFC to review the PC-I to –
                                                 PC-V prepared by TMAs.
       (ii)       Water Supply               •   PMDFC will arrange hands-on        •   Number of Trainings /
                                                 trainings in:                          Workshops held




                                                                  Punjab Municipal Development Fund Company     9
                                                FAR-Institutional Development Component TMA T.T. Singh
                                                                                          Draft Version




Improvement in Operation,                   o     Operation of tube wells,      •   No. of relevant TMA
Maintenance and Management of                     reservoirs, Valves                staff trained in specified
Water Supply Systems                                                                areas.
                                            o     Preventive maintenance
                                            o     Removal of leakages
Enhancement of revenue
generation.                          •   PMDFC will help develop
                                         systems for:
                                            o Updating of consumer
                                               records and detection of         •   Increase in number of
                                               illegal connections                  consumers
                                                                                •   Number of illegal
                                                                                    connection
                                            o     Collection of arrears             detected/removed
                                                                                    during the financial
                                                                                    year.
                                            o     Proper maintenance of         •   Reduction in illegal
                                                  record of electricity bills       connections compared
                                                  and reconciliation of             with last FY.
                                                  WAPDA dues.                   •   %age increase in arrears
                                                                                    recovery compared with
                                            o     Separate accounting for           last FY.
                                                  water supply system.
                                                                                •   %age reduction in the
                                            o     Rationalized water                amount of over billing
                                                  distribution at                   by WAPDA..
                                                  consumer/household
                                                  level.
                                            o     Computerized consumer
                                                  billing system
                                            o     Maximization of
                                                  production capacity of
                                                  existing tube wells.
(iii)     Development of             •   PMDFC to help develop data             •   Number of municipal
         computerized database of        collection.                                services for which
         municipal services.         •   PMDFC to provide standard                  complete database is
                                         template in Excel spreadsheets             developed.
                                         for data analysis and periodic
                                         data updates.
                                     •   PMDFC to provide necessary
                                         training for data collection and
                                         periodic data update.


        1.9   REGULATION

        The office of TO (R) is extremely crucial in TMA setup. Its duties include to regulate
        market & services; issue licences, permits, grant permissions & impose penalties for
        violation thereof; management of municipal lands, estates, properties, facilities, assets
        & enterprises vested in TMA. It is also responsible for enforcement of municipal
        laws, rules and by-laws governing the functioning of TMA. Prevention of
        encroachments on public lands and places; prosecution and follow up of criminal,
        civil and recovery proceedings and regulation of affixing of signboards and




                                                             Punjab Municipal Development Fund Company           10
                                      FAR-Institutional Development Component TMA T.T. Singh
                                                                                Draft Version




advertisements are some other important functions of Tehsil office Municipal
Regulation.
The details of some of these functions as studied are:

       1.9.1 Civil Suits/Chalans
Details of Civil Suits
                Opening    Added new                             Cases
   Year                                          Total                           Balance
                 balance      cases                           disposed of
 2002-03            14           61                75               11              64

 2003-04            64           46               110               30              80

 2004-05            80           15                95               15              80


Details of Chalans

                                 Number of                                    Fine amount
    Nature of chalan                                     Receipts
                                  chalan                                          (Rs.)
                                   Year 2003-04
Sanitation                            34
Temporary Encroachments               102
                                                            64                  12,975
Water Rates                           283
Price Control                         55
        Sub-Total                     474
                                   Year 2004-05
Sanitation                          50
Temporary Encroachments               145
Water Rates                           380
Price Control                         144
        Sub-Total                     719

       1.9.2 Encroachments

Status of encroachment removal

    Year        Temporary Encroachments                  Permanent Encroachments
  2003-04                 375                                            40
  2004-05                 241                                            03

       1.9.3 Advertisement Tax
TMA has issued a notification on 20th June 2002 as per PLGO 2001 requirements,
specifying the revised rates of advertisement tax, which are:




                                                   Punjab Municipal Development Fund Company    11
                                         FAR-Institutional Development Component TMA T.T. Singh
                                                                                   Draft Version




    New sign board advertisement                  Rs. 10/sq.ft/annum
    Other advertisement boards                    Rs. 5/sq.ft/annum

    In notification, following terms and conditions are laid down:

       1. This tax would be collected from TMA revenue boundary
       2. Those sign/neon boards that are attached with TMA street lights, an extra
          electricity bill would be charged as identified by TMA
       3. The boards belonging to government departments and TMA would be
          exempted from this tax. Only those religious signboards are allowed that are
          not of sectarian nature. They are also exempted from advertisement tax.

    However this tax collection has been leased out by TMA. The amounts against which
    TMA has leased out this tax are as:

                             Year         Leased Amount (Rs.)
                            2002-03               150,000
                            2003-04               195,000
                            2004-05               225,000

    In consultation with TO (R) staff, the following Performance Improvement Plan is
    proposed for the office of TO (Regulation) in TMA T.T. Singh

            PIP Tasks                 PMDFC Interventions             Performance Indicators
Development     of    computerized PMDFC to provide               •    %age reduction in
data base of:                      software / hardware for             pendency in legal cases
                                   building up data base.              compared with last FY.
•   legal cases for proper
    monitoring                                                    •    %age increase in revenue
                                                                       compared with last FY.
•   advertisement and signboards
•   Licenses and permits
•   Municipal estates and
    properties




                                                      Punjab Municipal Development Fund Company    12
                                      FAR-Institutional Development Component TMA T.T. Singh
                                                                                Draft Version




1.10 FINANCE

TMA T.T. Singh is placed at seventh number in ranking of TMAs, when the criterion
used for selection of TMAs was applied on the data of FY 2003-04. TMA has a ratio
of own-source revenues to total revenues of 0.64 while ratio of utilization of
development funds to total available funds for development is 0.67.

TO (F) is a BPS 17 officer from Local Government service and does not have any
experience in Finance. He had received no training in Finance. The situation can be
improved by imparting relevant training to the TO (F) and his staff in accounts and
budget rules under the new law as well as use of computer software.

The TO (F) office maintains the books of accounts manually. All the books and
accounts are reconciled on monthly basis. However, no reports are produced for
management. There is scope for computerization of working of TO (F) office, which
will result in generating reports for management decision making.

The table shows revenue collected from water rates against budgetary targets:
                                                                  Rs. In million
                 2002-03                2003-04                2004-05
                            %                      %                       %
                 Rs.                    Rs.                    Rs.
                            Collection             Collection              Collection
Budget           3.10                   3.20                   3.2
Collection       1.91       61%         1.93       61%         1.73        54%

The figure shows that TMA collected around 60% of its budgeted water rates during
the first two years while the collection decreased in third year. TMA did not increase
the water rates during these years.

The table shows revenues of TMA during previous three years:
                                                                         Rs. In million
                   2001-02    2002-03      % Change          2003-04       % Change
Govt. Grants       10.84      41.76        285%              43.18         3%
Own      Source
                32.65         84.73        159%              75.78         -10.50%
Revenue

The table shows that during the second year TMA had a substantial increase in both
sources of revenue, while in third year there was a slight decline in own-source
revenue.
The following table shows utilization of funds for development and non-development
expenditure during year 2003-04:
                                                           Rs. In million
                                 2003-04                      %
           Total Revenue         146.21
           Non-Development
                                 37.55
           Expenditure                                 26%
           Development
                                 72.94                 50%
           Expenditure




                                                   Punjab Municipal Development Fund Company    13
                                             FAR-Institutional Development Component TMA T.T. Singh
                                                                                       Draft Version




         TMA spent 26 % of its funds on non-development activities, 50% of its funds were
         used for development works and 24% remained as closing balance.

         The Following Performance Improvement Plan is proposed for the office of TO
         (Finance) in TMA T.T. Singh

       PIP Tasks                  PMDFC Intervention                         Performance Indicators
•   Adoption/compliance •     PMDFC accounting software to be         •   Computerized annual budgets
    of budgetary and          designed based on PLGO                      and accounts prepared according
    accounting                requirements.                               to PLGO requirements.
    procedures as       •     PMDFC to hold workshops /               •   Service sector wise analytical
    prescribed under          training on budget preparation and          information available from TMA
    PLGO.                     accounting procedures using                 accounts.
                              accounting software.
                          •   TMAs where computerization is
                              not possible, PMDFC will hold
                              workshops on manual
                              bookkeeping and budget
                              preparation.
                          •   Training / workshops to be focused
                              on improving the quality budget
                              estimates.
•   Computerization of    •   PMDFC to assess the feasibility of      •   Number of officials using
    financial systems         implementing accounting software.           financial management system as
                          •   PMDFC to provide software for               a tool.
                              bookkeeping.                            •   Number of TMA staff
                          •   PMDFC to provide consulting                 undergone training in using
                              services for the implementation             some financial management
                              support and training of TMA staff           software
                              for the accounting software.
•   Analysis of user      •   PMDFC to organize workshops to          •   Cost of delivery of municipal
    charges and related       introduce and formalize                     services available separately.
    costs on periodic         procedures for analyzing the user
    basis                     charges for various services and
                              comparing with the cost of
                              delivery of services as well as cost
                              of collection of user charges.
•   Enhancement of        •   Updating of consumer records and        •   Percent increase in own source
    revenue generation        detection of illegal connections            revenues every year.
                          •   Collection of arrears                   •   Percent increase in TMAs own
                          •   Proper maintenance of records of            contribution to development
                              electricity bills and reconciliation        expenditure
                              of WAPDA dues                           •   %age increase in arrear recovery
                          •   Computerized consumer billing               compared with last FY
                              system                                  •   Reduction in illegal connections
                                                                          compared with last FY
                                                                      •   %age reduction in the amount of
                                                                          over billing by WAPDA




                                                          Punjab Municipal Development Fund Company    14
                                  FAR –Engineering Component (Water Supply) TMA Toba Tek Singh



      2    FIELD APPRAISAL REPORT OF WATER SUPPLY SCHEME TOBA
                                TEK SINGH

2.1 PREFACE
 This Sub project Field Appraisal Report (FAR) has been prepared by the Punjab
 Municipal Development Fund Company (PMDFC), for improvement and extension
 of water supply scheme, as proposed by Tehsil Municipal Administration Toba Tek
 Singh.
    This report provides an assessment of the present facilities of water supply
    system, problems and needs of the town, improvement required, site suitability,
    implementation period and its arrangements, preliminary design, environmental
    and social aspects, operation and maintenance aspects and sub project capital and
    maintenance cost.
    In order to collect primary data on project features and existing facilities, PMDFC
    team members visited the TMA Toba Tek Singh and had detailed discussions and
    site visits. It is concluded that the proposal of the sub project is justified. This will
    provide a basic urban service of water supply to the people of Toba Tek Singh at
    an affordable rate, reducing the water borne diseases and improving health
    standards.

2.2       SUB SOIL WATER CONDITION

      The under ground water is brackish and therefore not fit for human consumption.
      Quite a few dwellings in the vicinity of canal/water courses and irrigation minors,
      have installed hand pumps to draw water from shallow depths for domestic
      consumption. The main source of Municipal water supply is the canal water,
      which is supplied to the urban population after treatment by slow sand filtration.
      To cope with the closure of canal, raw water storage tanks have been provided.
      The surface water from canal is supplemented by shallow tube wells to draw sub
      soil water, which is mainly recharge from the Lower Gogera Branch Canal passing
      on South East of the town.

2.3       RATIONALE OF THE SUB PROJECT

      2.3.1 Existing source of water supply

      Existing water sources comprise of:
      • Water Works No.1, located near Tehsil office. It was constructed in mid
          thirties of 20th century.
      • Water Works No.2, located on Akalwala road in front of Jinnah Public School.
          It was completed during 1980.
      • Water Works No.3, located near government housing colony No.1.
      Raw canal water is treated in these water works and is pumped into the
      distribution system directly as well as through overhead reservoirs constructed at
      different places.
      • Nine shallow tube wells are located at the bank of Lower Gogera Branch
          Canal near Bhagat Canal rest house. The designed capacity of each tube well
          is 0.6 cusec. These tube wells were installed during late 80s.
                                                                                    - 15
                             FAR –Engineering Component (Water Supply) TMA Toba Tek Singh



    •  Shallow tube wells installed in the premises of water works-1, 2 & 3, which
       pump seepage water from raw water storage tanks.
    Layout plan of the said existing water sources is presented in plan attached.

    2.3.2 Main components of existing system
          • Water works
            (I) Water Works No.1

Sr.                                                        Capacity
          Description      Nos.           Size                                   Remarks
No.                                                        (Gallons)
        Sedimentation             265’ x 185’ x 12’      3,676,875        In good condition
                            1
        Tank                      370’ x 98’ x 11’       2,492,875
1                           1
                                  220’x 155’ x 10’       2,131,250
                            1
                                  Total                  8,301,000
                                  48’ x 25’ each
                                                                          Require change of
2       Filter Beds        10     @30                      360,000
                                                                          filter media
                                  gallon/sft/day            GPD
        Clear Water
3                           1     105’ x 17’ x 12’         133,875        Require de-silting
        Tank
                                                                          Abandoned due to
4       Shallow T/wells     4     0.3 cusec                1.2 cusec
                                                                          brackish water yield
        Clear water tank
5       for tube well       2     46’ dia 16’ deep          166100        In good condition
        water

                (II) Water Works No.2

Sr.                                                        Capacity
          Description      Nos.           Size                                   Remarks
No.                                                        (Gallons)
        Sedimentation
1                           2     500 x 230 x 12’         17,250,000      Good condition
        Tank
                               55 x 100’ each @
                                                          1,320,000
2       Filter Beds        4+4 30 gallon/sft/day                          Good condition
                                                             GPD
        Clear Water               57’ dia 10’
3                           1                              159,484        Require de-silting
        Tank                      working depth
                                                          0.60 cusec
                                  1 No. = 0.2 cusec                       Yielding still fresh
4       Shallow T/wells     2
                                  1 No. = 0.4 cusec                       water

                (III) Water Works No.3

Sr.                                                        Capacity
          Description      Nos.           Size                                   Remarks
No.                                                        (Gallons)
                                                                          One always empty
        Sedimentation
1                           2     300 x 88 x 12’          3,960,000       due to shortage of
        Tank
                                                                          raw water
                                  20 x 50’ each            120,000
2       Filter Beds         4                                             Working order
                                   @                        GPD




                                                    Punjab Municipal Development Fund Company    16
                               FAR –Engineering Component (Water Supply) TMA Toba Tek Singh



                                  30 gallons/sft/day
        Clear Water               27’ dia 10’
    3                       1                              40,000
        Tank                      working depth
    4   Shallow T/wells                  0.20               0.20         Yielding fresh water

               (IV) Water Works No. 4

It consists of Shallow tube wells installed along bank of lower Gogera Branch canal.
Total No of tube wells                               = 9 Nos
Designed capacity each                               = 0.60 cusec
Working hours/day                                    = 12
Total designed production capacity                   = 5.4 cusec
With 12 hours working /day capacity                  = 1.46 MGD
Depth of tube well                                   = 120’
Strainer 8” dia                                      = 40’
TDS value at the time of installation in year 1989 = 266-367 ppm

               (V)    Water Works No.5

Previously water works No.1 was supplied raw canal water from Taiko minor,
through a watercourse of 4.0 Km length. This water was polluted by cattle, industries
and commercial concerns, by pouring in garbage, grease, oils and other solid and
liquid wastes. Efforts were made to protect this water, by laying pipeline with gravity
flow which was silted up. Then some portion of this watercourse was lined and
covered but people broke the top slabs and pollution of water started again.
There was no other alternative left except to filter the water near to its source and
pump it through a pipeline into the clear water tanks of w/w No.1. A scheme of water
treatment plant with slow sand filters is under execution by PHED, near to Taiko
minor and will be commissioned by Dec 2005. Water after treatment (filtration) will
be pumped through a 14” i/d AC “B” class transmission main 9,500 Rft long, into
clear water tanks of w/w No.1. The production capacity is 1.081 MGD. Filter units &
sedimentation tanks of w/w No.1 will be abandoned. Main features of this w/w are as
under:

    Description           Nos.                Size                      Capacity
Sedimentation tanks        2      500’ x 250’ x 5               78,12,500 Gallons
                                  100’x70’ @
Filter beds                4                                    1,120,000 GPD
                                  40 Gallons/Sft/Day
Clear water tanks          2      30 ft dia 8 ft depth          70,650 Gallons
                                  14” i/d AC “B” class
Transmission main          1                                    1.081 MGD at 16 hrs/day
                                  9500 Rft
                                  1.5 Cusec discharge 80 ft
Pumping machinery          3                                    1.081 MGD at 16 hrs/day
                                  head one stand by unit
•       Transmission main from tube wells to city
Water produced by tube wells (9 No) located on bank of lower Gogera Branch canal,
is pumped into a ground storage reservoir in the town, through 16” i/d A.C
transmission main with a length of 35,000 Rft.




                                                   Punjab Municipal Development Fund Company    17
                                FAR –Engineering Component (Water Supply) TMA Toba Tek Singh



Intermediate pumping station (IPS)
The capacity of ground storage tank at IPS is 1.66 lac gallons. The capacity and
number of pumping units installed at this IPS is as under:-

                      Type of     Designed      Actual        Working     Water Production
Sr. #   Pumping        Pump       Capacity     Discharge       Hours       for 16 hours/day
          Unit                     Cusec         GPH           Hour       designed Actual
                                                                            MGD       MGD
 1       No.1       CP*              1.5          1.22              16      0.54      0.44
 2       No. 2      CP               1.5          1.22              16      0.54      0.44
     Total                           3.0          2.44              16      1.08      0.88
* Centrifugal pumping unit
Ground storage
Ground storage is available at four places in the town as given below.

Location                        Capacity of Storage of clear water (MGD)
                                                                                      Total
                   For filtered water                   For tube well water          Ground
                                                                                     Capacity
                                  Total                               Total
             No. of     Capacity                 No. of     Capacity
                                 capacity                            capacity          MG
             tanks       (MG)                    tanks       (MG)
                                  (MG)                                (MG)
W.works
               1          0.134       0.134         2         0.166       0.332       0.466
No. 1
W.
works          1          0.159       0.159         -           -             -       0.159
No. 2
W.Works
               1          0.04          0.04        -           -             -        0.04
No. 3
IPS            -            -           -           1         0.166       0.166       0.166
Total          3                      0.333         3                     0.498       0.831
Overhead storage
The detail of overhead storage in the city is as under:-
 Sr #                   Location                     Capacity (gallons)           Height (ft)
  1      Near fire brigade station Jhang road.             30,000                    65
  2      Para colony Jhang road.                          20,000                     65
  3      Near Akbari Masjid                               50,000                     70
  4      Near Masjid Ehl-Hadith                            50,000                    70
  5      Waryam road near chungi                           30,000                    65
  6      Housing colony no.1                               20,000                    70
  7      Officers colony DCO road                          50,000                    70
  8      Water works no.1                                  50,000                    60
                     Total                                330,000
                                                      = 0.33 MG
Water distribution system




                                                    Punjab Municipal Development Fund Company   18
                              FAR –Engineering Component (Water Supply) TMA Toba Tek Singh



The water distribution network consists of pipe sizes ranging from 3 inches to 10
inches diameter. The pipe material used comprises; galvanized iron, cast iron,
asbestos cement, and uPVC pipes. Part of the distribution system, particularly in the
older part of the town, was laid during thirties of the 20th century and comprises cast
iron pipes. Most of these pipes have expired their life. These pipes are being replaced
now by TMA with galvanized iron pipes, uPVC and AC pipes.
The entire water network including transmission main and distribution system is
given as under:


             Rising Mains                Size (inch)               Length (ft)
     Tube well No.8 to 7                     8                        1,100
     Tube well No.7 to 6                     8                        1,100
     Tube well No.6 to 5                     10                       1,100
     Tube well No.5 to 4                     10                       1,100
     Tube well No.4 to 3                     10                       1,100
     Tube well No.3 to 2                     12                       1,100
     Tube well No.2 to 1                     12                       1,100
     Tube well No.1 to 9                     12                        400
     Tube well No.9 to T/M                    8                        800
     IPS-1 to O/H No.6                       10                       1,000
     WW-1 to O/H No.5                        8                        6,500
     WW-1 to O/H No.2                        8                        3,100
     Tube wells to WW-1                      16                      35,000
     Total-A                                                         53,300
     Water distribution Net Work (ft)
                       Previous.
          Size                        Recently Laid (ft)        Total Length (ft)
                       Length (ft)
          3            42,900           36,940                       79,840
          4             7,150            8,865                       16,015
          6             5,600           27,125                       32,725
          8            12,050            9,000                       21,050
          10            7,150               -                        7,150
          12           42,900               -                        42,900
       Total-B        117,750           81,930                      199,680
     Excluding replacement pipes                                    117,750
     Grand Total (transmission + distribution / A+B)                171,050

At certain locations, the pipes, particularly galvanized iron pipes have completed their
serviceable life, which are reported to be heavily corroded and rusted. Some of them
are incapacitated due to increase in water demands. The distribution of water in the
recently developed low-income areas, is either not available or their inadequacy is
reported.

   2.3.3 Water service area

Presently majority of area is served with water supply system. Recently developed
new settlements and some of the urban expansions are not served presently.




                                                   Punjab Municipal Development Fund Company   19
                            FAR –Engineering Component (Water Supply) TMA Toba Tek Singh



    2.3.4 Production capacity

The maximum production capacity of all sources has been worked out by taking
under mentioned factors into account.
• The filtration rate has been taken as 30 gallon/sft/day of the filter area.
• The working hours of the tube wells installed near sedimentation tanks have been
   taken as these are presently operating because the water quality is quite good
   (ranging from 350-400 p.p.m in w/works No. 2 and 500-600 p.p.m in water works
   No. 3 T/wells).
• The tube wells in water works No.1 have been abandoned because of deterioration
   of quality of water badly.
• The working hours of T/wells at Bhagat Rest House have been taken as 12
   hour/day as these cannot be increased because of brackish water intrusion. The
   quality of water has already deteriorated to 900-1000 p.p.m TDS value. The
   pumping for more than 8-12 hours/day is not recommended. Hence these T/wells
   will have to be staggered in operation.
• The maximum production capacity of the entire source has been given on
   Annexure-B, which works out to be 3.085 million gallons per day (MGD).

    2.3.5 Actual present production

The present actual production of water per day, in the entire system, has been worked
out by measuring the discharge of different pumping units and the working hours of
these units/day as intimated by TMA operation staff.
There are no bulk water meters available with pumping units. Hence the crude method
of measuring discharge by noting time of filling the overhead reservoirs/ground
storage tanks or emptying the clear water tanks, has been adopted. The total present
production has been estimated to be 1.806 MGD (excluding water works No. 1 which
is out of production and has been abandoned) in the periods when the canal/minors
are in operation and canal water is available to all water works (see Annexure-C).
This production capacity falls drastically when these canals are closed for prolonged
periods.
Canal closure periods
The main Lower Gogera Branch Canal is closed for one and a half (1-1/2) months in
winter season (Dec-Jan) where as the minors are closed for one week in every month
due to rotation because of shortage of water in addition to the 1-1/2 month period
mentioned above. There are number of other non-scheduled closures during the year
which are non predictable and depend upon availability of water in rivers and
distribution of water between the provinces. In this way the shortage of water is often
created due to canal closures.
Per capita present supply
•    With a total present production of 1.806 MGD and present population of 72,423
     persons, (year 2005) the per capita supply works out to be 25 GPCD. Apparently
     this seems to be fair for this city but the canal closures mentioned above have
     created serious problems of water shortage. Neither enough supplies to meet this
     shortage are available from Irrigation Department, nor enough storage capacity




                                                Punjab Municipal Development Fund Company   20
                             FAR –Engineering Component (Water Supply) TMA Toba Tek Singh



     of raw water is available in the water works to meet the gap of canal closures. As
     such there are some days in a month when no water is available to the people.
•    Another problem resulting in water shortage is the load shedding and frequent
     break down in rural 11-KV feeder of WAPDA, which supplies power to T/wells
     installed at Bhagat Rest House. At the time of visit, the water works No.1 was
     completely dry. Water works No.2 had a very small quantity of water left in
     sedimentation tank. In water works No.3 only one sedimentation tank was
     having a small quantity of water where as second was completely dry (in the
     past as well) due to short supplies. The tube wells had a power break down for
     the last 12 hours and most of the city was without water.
•    For adequate water supply to the people, we must have 40 GPCD criteria and the
     source should be designed at max. day demand.
Configuration
The whole of the town has been divided into two sectors i.e sector-I & sector II. The
railway track is the dividing line. Sector I falls on Northern side while sector II is on
the Southern side of the railway track. Sector-I comprises three Zones i.e zone 1, 2 &
3 and sector-II consists of only one zone.
Water from shallow tube wells in the vicinity of Lower Gogera Canal near Bhagat
Rest House is pumped through a rising main 16 inches diameter to intermediate
pumping station (IPS). The transmission main is extended to water works No.1 for
supply of water into ground storage tanks. Water from water works No.1 is further
pumped into distribution system through overhead reservoir or by direct pumping
through a by pass arrangements when need so arises. The IPS is located near DCO’s
office where a ground storage tank and pump house have been constructed. Water
from IPS is pumped either to distribution system through overhead reservoir or
directly fed to distribution system which is supplying water to sector-II.

    2.3.6 Water shortage

In spite of a production of 1.806 MGD against an available production capacity of
3.08 MGD, 0.831 MG ground storage and 0.33 MG over head reservoir storage, the
water shortage is experienced nearly in the entire town and specially in the under
mentioned parts of the city:
1. Jinnah colony
2. Disposal colony
3. Muhallah Eid gah
4. Sarhand colony
5. Shuja colony
6. Shareef colony
7. Bakhshi park
8. Madina colony
9. Zia colony
10. Gow shala
11. New Islam pura
12. Kachi abadi
13. Mehmood abad
14. Garden town
15. Abadi Pir Mansoor




                                                  Punjab Municipal Development Fund Company   21
                            FAR –Engineering Component (Water Supply) TMA Toba Tek Singh



16. Gulistan colony
Water shortage is intensified in the periods of canal closure when no surface water is
available and the stored raw water, in sedimentation tanks, is also consumed. The only
source available then, is ground water. At times when electric breakdown is
experienced at Bhagat area, there is no water at all in the city. Such instances have
been repeated many times and this was the situation during visit of PMDFC team to
this city.
Tehsil Administration has adopted the water rationing system and they continue to
supply water to different segments of city round the clock with a maximum of two
hours supply to each segment. Nearly all OHRs are closed due to less availability of
water as per explanation of TMA staff. Number of Abadies / Muhallas get water
during night. Number of reasons for this water shortage were observed which have
been explained in the caption of “Problems”.

   2.3.7 Chlorination

No gas chlorination is being done at present except for the addition of bleaching
powder solution, which is used to disinfect water regularly. The solution is added in
clear water tanks.
   2.3.8 Consumer’s data

No. of domestic connections                 = 8,000
No. of commercial connections               = 66
Industrial connections                      = 01
Total                                       = 8,067 Nos.
Flat rate for:
Domestic connection                         = Rs. 30 / month
Commercial connection                       = Rs. 150 / month
Industrial connection                       = Rs. 13,200 / month

   2.3.9 Quality of water

Chemical
•      The chemical quality of water from treatment works is quite fair. The TDS
    value of filtered canal water is ranging from 180 to 225 ppm whereas the tube
    well installed in water works No. 2 & 3 are yielding water with TDS value of
    400 & 600 ppm respectively. When both waters are mixed, the quality is quite
    good for drinking purposes.
•      The chemical quality of water being produced from Bhagat tube wells,
    depend upon the periods of closure of canal and the working hours / day of each
    tube well. The quality deteriorates when excessive pumping (more than 12
    hours / day) is done and when canal is closed for longer periods say 1 or 1.5
    months. At the time of visit, the canal was closed and only five (5) tube wells
    were being run upto 16 hours / day. The TDS value of tube well No.1 measured
    at site was near to 1000 ppm, whereas at the time of installation of these tube
    wells in year 1989, water had TDS value of 270 ppm.
Bacteriological




                                                Punjab Municipal Development Fund Company   22
                            FAR –Engineering Component (Water Supply) TMA Toba Tek Singh



Very few complaints about contaminated water are registered in TMA. These
complaints are normally due to mixing of drain water with drinking water in
consumer connection due to substandard installations and materials. However, no
leakage was noticed during visit. The complaints are redressed by replacement of
pipes and materials of consumer connection by proper installation.

      2.3.10 Operation & Maintenance

The O & M of the present scheme is being done by TMA staff (26 Nos.). TMO told
that they are short staffed and need 27 additional staff, which could not be recruited
due to ban on recruitment. This staff is mostly busy with regulation of valves to have
rationing of water because of shortage. The management is very poor and no attention
is given to timely repair of the pumping machinery although TMA is giving due
attention to solid waste management and maintenance of parks as the city was found
quite clean and green. TMA staff requires proper capacity building and training for
proper O & M of this scheme with special reference to preventive maintenance rather
than perforce delayed maintenance being done at present.

      2.3.11 O & M Financials
O & M Annual Expenditure (2004-2005)
Establishment charges                =      Rs 953,056
Electrical charges
         =                          Rs 7,035,000
Repair & Misc. charges               =      Rs 117,551
                                        Total
                                          =                                Rs 8,105,607
Revenue Generation (2004-2005)
Budgeted Revenue                     =      Rs 3,222,720
Actual Revenue                       =      Rs 2,595,922
%age Revenue collection              =      80.5 %
Ratio of Revenue collection to
O & M charges                        =      32 %

2.4    NEEDS

Due to short production of water from various sources and frequent closure of canals,
major part of the city is subjected to water shortage. At some places TMA is
supplying water even after mid night.
People need potable water in adequate quantity to fulfil their daily needs, for which
they have demanded for an increase in supply hours. Sub soil water being brackish, no
other fresh water source is available and residents of the entire city have to depend
upon the public water supply system. Hence their immediate need is adequate
quantity of water with proper terminal pressure.




                                                Punjab Municipal Development Fund Company   23
                             FAR –Engineering Component (Water Supply) TMA Toba Tek Singh



2.5    PROBLEMS

      2.5.1 The source

Toba Tek Singh water supply system is facing number of problems resulting in
shortage of water. These are described as under:
• Water works No. 1. There is problem of pollution of raw canal water by public
   and industry during its flow through a 4 Km long watercourse. In spite of the best
   efforts of TMA, this problem could not be solved. Hence now a new treatment
   plant (slow sand filters) is under execution near to outlet by PHED to eliminate
   this problem. As narrated earlier the clear water will now be pumped from this
   w/works to w/works No.1. However this will increase the cost of O & M due to
   double pumping. The problem of canal closure will however persist and these
   water works will get water only three weeks a month.
• In water works No.2. The production can be increased by increasing No. of sets
   of pumping machinery and size of delivery/rising main because at present only
   one pump can be run at a time due to under sized delivery main (12” i/d).
• In water works No.3. Acute shortage of raw canal water is experienced.
   Production is half of full capacity because of raw water shortage. TMA needs to
   increase the discharge of the outlet.
• The shallow tube wells at Bhagat Rest House are yielding only 0.4 cusec (each)
   of water against their designed capacity of 0.6 cusec. Hence the total designed
   production is not possible. Further the quality of water is deteriorating due to over
   pumping (16 hrs/day). These tube wells cannot afford pumping more than 8-12
   hrs/day and hence additional tube wells are required for staggering the operation.

      2.5.2 Canal frequent closures

 There are three types of canal closures in this area.
• Scheduled closure in Dec-Jan of each year for 1-1/2 months for de-silting and
   maintenance. This affects the entire water works system.
• Rotation of water distribution amongst the distributaries and minors, which gives
   one-week compulsory closure of each minor in a month. Hence all water works,
   treating raw water in the city, do not get water for one week in each month.
• Unscheduled closures, which are unpredicted and are associated with shortage of
   water in the irrigation system, resulting from inter province distribution and
   shortage of water in rivers. These closures can extend to many weeks at a time and
   affect the public water supply seriously, both quantitatively and qualitatively.
   Some times there is no water in the city at all.

      2.5.3 Power shut downs

Shallow tube wells at Bhagat Rest House, being major source of water, are subjected
to power shut downs frequently. This power is drawn from a rural feeder, which does
not carry priority with power department. Hence a lot of shut downs/break downs are
experienced in this feeder. This affects the water supply system very seriously
resulting in water shortage.




                                                 Punjab Municipal Development Fund Company   24
                             FAR –Engineering Component (Water Supply) TMA Toba Tek Singh



      2.5.4 Transmission main
• 16” i/d AC “C” class transmission main with a length of 35,000 Rft (11 Km) is
   not being utilized for 24 hours / day. It is utilized for 12 hrs only and for rest of
   the time it is empty.
• The losses in the collector main of 8”, 10” and 12” i/d with a length of approx.
  8,000 Rft are excessive. With designed discharge of 0.6 cusecs, (each tube well)
  the head loss works out to be 71 ft and with present discharge of 0.4 cusec (each
  tube well) the loss still works out to be 34 ft. It is not only affecting the efficiency
  of pumping units but also resulting in bursting of pipeline between tube well Nos.
  1, 2 & 3. Whenever more than five tube wells are operated, this problem takes
  place and hence TMA staff does not operate all tube wells at a time due to this
  fear. Presently five to six tube wells are running for 16 hrs/day.
      2.5.5 Abandoned overhead reservoirs
Due to shortage of water, TMA staff is not filling up the overhead reservoirs, which
build up terminal pressure, when combined with water production from pumping
units. This is resulting in less water delivery during supply hours and hence the low
terminal pressure at remote end of distribution system.
      2.5.6 Low production
All the above factors are contributing to low production of water, especially during
canal closures and hence resulting in low terminal pressure at remote ends.
      2.5.7 Deterioration of quality
With excessive pumping of tube wells at Bhagat Rest House, the quality of water is
deteriorating. It becomes worst during prolonged closure of canal. The TDS value has
changed to approx. 1000 ppm from 225-250 ppm when tube wells were installed in
year 1989. Hence excessive pumping has to be stopped because recharge from this
canal of 572 cusec discharge, is not enough to support this pumping due to lesser
recharge and greater discharge from tube wells.

2.6     IMPROVEMENT REQUIRED WITH JUSTIFICATION

To eliminate the water shortage under mentioned improvements are suggested:
• Possibility of re-commissioning of water course of water works No. 1 be explored,
   by suggesting the ways and means of the protection of raw water flows from
   contamination /pollution enroute of the water course. The complete treatment
   plant is presently abandoned and if re-commissioned, this will add 0.36 MGD of
   water to the system. This may be done with lining of watercourse covering from
   top and strict daily patrolling.
• Additional pumping machinery should be provided at water works No. 2 for
   pumping available quantity of water because this water works produces major part
   of daily production (1.32 MGD).
• The delivery mains / rising mains, in the entire system be analyzed/ reviewed
   carefully to feed each OHR with adequate requirement from pumping stations.
• Additional tube wells may be installed at Bhagat Rest House site, on the opposite
   bank of canal, to increase production and stagger the operation of all tube wells in




                                                  Punjab Municipal Development Fund Company   25
                               FAR –Engineering Component (Water Supply) TMA Toba Tek Singh



      such a way that full capacity of transmission main (16”i/d) is utilized for 24 hours/
      day and that no tube well is pumped more than 12 hours / day.
•     Additional raw water should be arranged for water works No. 3 to utilize its full
      production capacity of 0.12 MGD.
•     The collector main size be changed in some sections by replacement of existing
      sizes with adequate sizes according to actual discharge of tube wells to eliminate
      excessive head loss for improvement of efficiency of pumping machinery and
      transmission main.
•     Additional ground storage be provided at water works No.1 for storage of clear
      water from 16” i/d transmission main to be utilized for 24 hours. The minimum
      storage to be provided including the existing one, should be equal to 12 hours
      production from tube wells.
      For this purpose, the existing filter beds, after cleaning and covering with R.C.C
      slab, can be utilized for clear water storage, if this water works is not to be
      commissioned otherwise new storage can be constructed.
•          Distribution system may be analyzed and improved to provide adequate
      quantity of water to remote corners.
•          For meeting the maximum day demand for next 20-30 years, alternate sources
      of fresh water have to be investigated because present sources of water i/c tube
      wells along Lower Gogera Branch Canal, will not be sufficient to meet the
      demand of the city beyond year 2008. Hence a very reliable and adequate source
      has to be investigated and exploited to meet future demand.
      For this purpose fresh water aquifer near Bhosi road, Pir Mahal or Kamalia is
      recommended for investigation as alternate.

2.7     THE SUB PROJECT

      2.7.1 Description

The water supply system of Toba Tek Singh will be improved by:
A.    Increase in production of water by:
      •      Installation of additional shallow tube wells along lower Gogera Branch
             Canal.
      •      Improvement of watercourse of water works No.1 and the water works
             itself if possible (study for elimination of pollution to be conducted).
      •      Installation of additional pumping machinery in water works No.1, 2 &
             IPS.
      •      Laying of additional delivery/rising mains for pumping additional
             quantity of water into the system/OHRs.
      •      Increase of raw water quantity for water works No.3.
B.    Construction of additional ground water storage or conversion of unutilized
      filter beds into clear water tanks at water works No.1.
C.    Replacement of some portion of collector main of existing tube wells to
      reduce head losses.
D.    Improvement of transmission main.
E.    Provision of stand by pumping machinery for tube wells and IPS.
F.    Search for more reliable source for future needs and if cost permits
      exploitation of that source for present needs of the city as well.




                                                    Punjab Municipal Development Fund Company   26
                               FAR –Engineering Component (Water Supply) TMA Toba Tek Singh



     2.7.2 Proposed design

•    Population and water demand

                                  Water          Av. Day       Max. Day
                  Population
      Year                     Consumption       Demand        Demand                 Remarks
                   Persons       GPCD             MGD           MGD
                                                                             Census 1998 with growth
     1998           59,938           -              -               -
                                                                             rate of 2.74% per annum
     2005           72,423           40            2.90           4.35
     2010           82,900           40            3.32           4.98
     2015           94,900           40            3.80           5.70
     2025          124,355           50            6.21           9.31
     •     Present possible production
           Total capacity of production (Annexure-B) = 3.085 MGD
           Water works No.1 is unproductive
           Net capacity                              = 3.085-0.360 = 2.725 MGD
           PHED is executing the new water works No.5 that will produce 1.081 MGD
           by December 2005.
           Total possible production in Dec 2005     = 2.725 + 1.081 = 3.81 MGD




     •     Shortage of water

                  Max. Day Demand         Capacity of present source             Shortage
      Year
                       MGD                          MGD                           MGD
     2005               4.35                        3.81                           0.54
     2010               4.98                        3.81                           1.17
     2015               5.70                        3.81                           1.89
     2025               9.31                        3.81                            5.5

     •     No. of tube wells (Working Hours/ day = 12)

                                           Tube well                               No. of tube
             Shortage/ requirement                          Discharge/hour
    Year                                    capacity                                 wells
                     MGD                     Cusec                GPH                Nos.
    2005             0.54                     0.50               45,000                 4
    2010             1.17                     0.50               97,500                 9
    2015             1.89                     0.50              157,500                14
    2025             5.50                     0.50              458,333                40

           The aquifer along the bank of Lower Gogera Brach can yield very limited
           quantity of fresh water due to small discharge of the canal (572 cusecs) and




                                                       Punjab Municipal Development Fund Company   27
                          FAR –Engineering Component (Water Supply) TMA Toba Tek Singh



    hence it is evident that this source cannot be recommended for installation of
    tube wells beyond year 2008.
    Some other source has to be investigated for future use. Presently we can
    install seven more tube wells at the opposite bank of Gogera Branch Canal that
    will hardly suffice up to year 2008. Additional tube wells cannot be installed at
    this source and hence beyond this year, we will have to go for some more
    reliable source that may be far away but there seems to be no other alternative.
    For this purpose Bhoosi road, Pir Mahal or Kamalia area may be investigated,
    as it is fresh water zone and we may get an aquifer, which can support greater
    capacity tube wells.
•   Transmission main
    The transmission main has been designed to take 5.4 cusec of water. The
    calculated head loss at this discharge with 0.6 cusec capacity tube well is over
    225 ft (Annexure-D). Whereas at 0.40 cusec discharge it is 106 ft. It is due to
    undersized collector main in certain reaches. It is presently under utilized by
    pumping 5-6 tube wells for 16 hours / day. This main will be utilized for 24
    hours per day. Hence the operation of the tube wells will be staggered in such
    a way that all tube wells run 8-12 hours / day. The quality of water can be
    monitored regularly and the operation of all these tube wells can be adjusted
    so as the TDS value of all the tube wells does not exceed the safe limit. Hence
    existing transmission main of 16” i/d “B” & “C” class will be quite adequate
    to take the additional water from 7 Nos. tube wells proposed now.
•   Collector main
    As shown in Annexure-D, the head loss in the collector main is quite high.
    Hence it is proposed that collector main may be replaced in sections where the
    head loss is high. For this purpose the existing collector main will be analyzed
    by operation of all tube wells at a time and observing the pressure in different
    sections of the main by installation of pressure gauges. The sections giving
    high head loss should be replaced.

•   Ground storage
    Sufficient ground storage for operation of filter beds, is available, in all water
    works. However additional storage will be required for water pumped from
    tube wells at night hours. Hence 12 hours storage for this water is proposed.
    Production from existing wells                               = 0.972 MGD
    Production proposed from new tube wells (9 Nos.)
    For year 2010                                                = 1.22 MGD
    Total production from tube wells in year 2010                = 2.192 MGD
    Production from new water works No.5 (remote source)         = 1.081 MGD
    Total production for which storage is required               = 3.273 MGD
    Half-day storage (12 hrs.)                                   = 1.64 MG
•   Available storage
    At water works No.1                                            = 0.466 MG
    At IPS                                                         = 0.166 MG
    Total                                                          = 0.632 MG
    Balance required                                               = 1.008 MG
                                                                   say 1.0 MG




                                              Punjab Municipal Development Fund Company   28
                              FAR –Engineering Component (Water Supply) TMA Toba Tek Singh



        The present filter beds of size 48’x25’ will be converted into clear water
        storage tanks
        Total capacity of ten filter beds with 12 ft depth             = 0.90 MG
        This will be done by removing all materials from filter beds, covering them
        with R.C.C slab & providing granite/mosaic finish on walls and bed.
        Additional Storage required                                    = 0.1 MG
        This can be constructed at IPS site, as land is available. However actual
        storage required at IPS site will be calculated in detail designs by consultants.
   •    Pumping machinery at IPS & water works No.1
        As shown in the plan, the water shortage area is observed in coverage area of
        water works No.1 and remote coverage area of W/W No.2. A small area in
        coverage of W/W No.3 is also observed to have shortage. Hence pumping
        machinery at the under mentioned places will be augmented to pump
        additional water to these areas to eliminate shortage.

Water      No. of    Discharge   Head    Motor    Type of
                                                                        Remarks
works       sets      (cusec)     (ft)   (BHP)     pump
                                                            2 Nos. existing sets to be
  1          4          3.0       150      60     V.T.P*
                                                            replaced
                                                            1 No. existing set to be
  2          2          3.0       150      60     V.T.P
                                                            replaced
 IPS         2          3.0       150     60      V.T.P     Additional sets
Total        8          3.0       150     60      V.T.P
* Vertical Turbine Pump

        The exact requirement will be calculated by consultants in detailed design
        after proper network analysis and calculation of water demand in various
        sectors.

   •    Overhead storage
        Total average day demand in year 2010               = 3.32 MGD
                   th
        Taking 1/6 storage                                  = 0.553 MG
        Available over head storage                         = 0.33 MG
        Balance required                                    = 0.223 MG
        Presently 0.1 MG capacity storage will be built up in Muhallah Islam Pura
        where water shortage is acute. Further storage can be added subsequently.
   •    Rising main
        The capacity of rising main for each OHR as per demand of the area, will be
        analyzed and calculated in detail by consultants. Evidently 12” i/d rising mains
        are required for additional pumping machinery of W/W No. 1, 2 & IPS. A
        tentative quantity of 16,500 ft has been assumed for this purpose. Exact length
        will be determined by consultants in detailed design.
   •    Distribution system
        Complete network analysis is needed to explore the replacements required and
        the new pipelines in unserved area. Evidently bigger sized feeders will be




                                                  Punjab Municipal Development Fund Company   29
                            FAR –Engineering Component (Water Supply) TMA Toba Tek Singh



       required to improve the terminal pressure for equalizing the pressure in all
       parts of the city. A tentative quantity of these pipelines will be assumed for
       approximate estimation for replacement and provision in uncovered areas.
       TMA has already replaced sufficient length of rusted pipes and provided new
       pipe lines in the city.
   •   Power connections
       Power connections for 8 Nos. tube wells and 8 Nos. pumping sets, will be
       required according to BHP of motors in particular premises.
   •   Pump houses
       For tube well         = 7 Nos. of 10’ x 10’ size
       For IPS               = 1 No. of 12’ x 16’ size
       For W/W No.1          = 2 Nos. of 12’ x 16’ size
       For W/W No.2          = 1 No. of 12’ x 16’ size
   •   Staff quarters at Gogera Branch Canal
       For watch and ward of tube wells, two Nos. staff quarters, one on each bank of
       canal, is proposed.

   2.7.3 Site suitability

   •   For tube wells
       This site is available readily. Two marlas of land for each tube well is
       required. It will be purchased by TMA easily and no problem will be
       encountered.

   •   Collector main
       It can be laid in ROW of Irrigation Deptt. They have normally no objection to
       such public installations. However coordination with this Deptt. will be made
       by TMA for this purpose.

   •   For town pumping station
       Sufficient land is available in all city water works for construction of new
       pump houses.
   •   For over head storage
       Sufficient land is available with TMA for its construction.
   •   For ground storage
       Adequate land is available in W/W No.1 & IPS premises with TMA.
   2.7.4 Implementation period
The project will be executed with in 18 months, after the work has been awarded to
the contractor as it involves lot of works of different nature in town and away from
town. The activities have been shown in Annexure-E.




                                                Punjab Municipal Development Fund Company   30
                             FAR –Engineering Component (Water Supply) TMA Toba Tek Singh



   2.7.5 Proposed detailed design & construction supervision
The feasibility studies and detailed design i/c preparation of contract/ bid documents
will be entrusted to Consultants. The construction will be carried out by TMA Toba
Tek Singh through TO (I & S) through National Bidding with post qualification. The
Resident Supervision will be carried out by the consultants.
   2.7.6 Proposed plan for design & construction
The activities from FAR approval to completion of the project, have been shown in
bar chart at Annexure-E
   2.7.7 Operation & maintenance implications
The present system is being maintained by TMA with 26 persons and they feel quite
short staffed, having additional requirement of 27 persons. The system presently
adopted is very poor and it seems as if the political Nazims have not been paying due
heed to this issue. TMO & TO (I &S) were very confident that they have placed the
O & M of this system on first priority of TMA as per instruction of new Nazim,
recently sworn in, and things will work much better as compared with the past.
Having numerous sources of water and pumping through long distance including
double pumping in the town, makes O & M costly. But there is no other alternative
because of non-availability of fresh water from any other source.
 Consumers are ready to pay the water charges if adequate & regular water supply is
available to them. Present recovery rate is over 80% but water rate is very low and
will have to be increased for better O & M system.
The O & M cost after completion of the scheme has been worked out (Annexure-F)
and for generation of revenue (Annexure-G) to meet O & M cost, under mentioned
flat water rates will be required.




                   Proposed rate / month         Expected
                                        Target                               Deficit
                                                  O&M
   Year Domestic Commercial Industrial Revenue                              /Surplus
                                                   cost
         (Rs.)     (Rs.)      (Rs.)    (million)                            (million)
                                                 (million)
                                                                            (-) 4.998
   2005       30           150         13,200      3.107        8.105
                                                                             Actual
   2010       80           250         15,000       9.92        13.233      (-) 3.313
   2015      120           400         20,000      18.758       17.97       (+) 0.788


The present rate of Rs. 30 / month for domestic and Rs. 150 / month for commercial is
too low and need immediate increase which can only be done once the adequate
supply of water is given to the consumers. The rates will have gradually to be
increased to reduce the deficit and bring it to zero in year 2015. All proposed rates are
affordable by consumers.




                                                  Punjab Municipal Development Fund Company   31
                                FAR –Engineering Component (Water Supply) TMA Toba Tek Singh



      2.7.8 Environmental & social issues
No environmental or social issue will crop up in execution of this scheme. The people
will get adequate potable water for domestic and commercial use, thus reducing water
borne diseases and improving health standards with improvement in National
Economy. No person will be displaced and no compensation is required to be paid.
However with increase in quantity of water supplied, the wastewater quantity will
increase sufficiently. A sewerage scheme already exists and no severe problem of
O & M has been observed in the city. Further a sewerage scheme for extension of the
existing sewers and shifting of existing disposal works away from the populated area,
is also under preparation to be included in PMSIP. With the completion of this
scheme, no problem of wastewater will be encountered. The proforma for social &
environmental issue has been attached as Annexure-H

2.8    SUB PROJECT COST

The scope of work involved is reproduced as under:
1.     Tube well 120 ft depth along Lower Gogera Branch Canal = 7 Nos.
2.     Pump house for tube wells (10’ x 10’)                       = 7 Nos.
                 For water works (12’x16’)                         = 4 Nos.
3.   Vertical turbine pumps of 0.5 cusecs against 250 ft head with
      30 BHP AC motor & 50 ft Column pipe                          = 7 Sets
4.      Collector main
       A.     New main
              8” i/d      = 1,100 Rft
              10” i/d     = 2,200 Rft
              12” i/d     = 2,200 Rft
              16” i/d     = 3,200 Rft

       B.     Improvement of existing collector main
       Replacement of existing pipes is given as under:-

                        Size (Inch Dia.)
                                                                       Length (Rft)
            From                             To

              8”                             10”                            1,100

             10”                             12”                            2,200

             12”                             16”                            2,600

5.        Improvement of existing transmission main
      It includes replacement and new installation of air valve and non return valves to
      eliminate bursting of pipes due to air pockets and water hammer.
6.        Ground storage tanks




                                                    Punjab Municipal Development Fund Company   32
                                   FAR –Engineering Component (Water Supply) TMA Toba Tek Singh



          A.      Conversion of existing filter beds (10 Nos.) at W/W No.1 to clear water
                  tanks.
          B.      Additional storage of 0.1 MG at IPS
7.             Pumping machinery in town
      Vertical turbine pumping unit of 3 cusec discharge 150 ft head
      60 BHP motor and 10 ft column pipe = 8 Nos.
8.             Over head storage
      In muhallah Islam Pura 0.1 MG = 1 No.
9.             Rising main 12” i/d (tentative quantity)

      •          Water works No.1 to OHR Waryam Road                  = 5,000 Rft.
      •          Water works No.2 to Jhang Road OHR                   = 2,500 Rft.
      •          IPS to housing colony                                = 3,000 Rft.
                 Total                                                = 10,500 Rft
10.            Distribution system (tentative quantity)
                12” i/d      = 5,000 Rft
                10” i/d      = 3,000 Rft
                8” i/d       = 1,000 Rft
                6” i/d       = 3,000 Rft
                4” i/d       = 4,500 Rft
                3” i/d       = 17,000 Rft



11.            Power connection
          For tube wells                                              = 7 Nos.
          For IPS and town W/W                                        = 8 Nos.
12.            Bulk water meters
          For tube wells 6” i/d                                       = 16 Nos.
          For T/Main 16” i/d                                          = 2 Nos.
          For T/main 14” i/d of W/W No.5                              = 2 Nos.
          Total                                                       = 20 Nos.
13. Generating sets
          250 KVA diesel generating sets                              = 2 Nos.
          LT electric line                                            = 10,000 Rft
          Generator room (16’x20’)                                    = 2 Nos.
14.         Repair of civil structures in W/W No.2, 3 & IPS           = 1 Job
15.         Staff quarters                                            = 2 Nos.




                                                          Punjab Municipal Development Fund Company   33
                                FAR –Engineering Component (Water Supply) TMA Toba Tek Singh



16.     Replacement of sub standard consumer connections         = Job

The approximate cost of the sub project has been worked out to be Rs. 60.54
million and summary of cost is given at Annexure-I

2.9     SERVICE DELIVERY & CAPACITY BUILDING INDICATORS

      2.9.1 Service delivery indicators
      • Average liter per capita of safe drinking water supplied per day
      • Average No. of hours/day water supplied to house holds.
      • Number of valid complaints registered.
      • Estimated No. of new house holds that will receive drinking water through the
          connections from the improved/extended water supply system.

      2.9.2 Capacity indicators
      • Decrease in No. of water supply interruptions per month.
      • No of tube wells operated at certain time.

2.10 RECOMMENDATIONS

•           Toba Tek Singh city is in dire need of potable fresh water. Project is
          technically feasible and financially viable at affordable consumer’s charges.
•           Present sources of water are not adequate and reliable and will hardly be
          enough to supply water up to year 2010, after that, water shortage will again be
          experienced. Some other reliable source of fresh ground water has to be
          searched which will certainly be at a remote distance.
•           It is better to search and investigate the more reliable source now if possible.
          This may involve larger expenditure to base the scheme on a remote source but
          it will become unavoidable beyond year 2010.
•           The capacity of TMA has to be built up in under mentioned sectors: -
        i.       O & M of water supply scheme.
       ii.       Detection & registration of illegal connections if any.
      iii.       Billing and revenue collection system.
      iv.        Replacement of sub standard consumer connections.
•           The top ranking officers of TMA & Nazim has to realize that the water supply
          to the residents, carries top priority and they should pay special attention to its
          O & M activity.
•           Diesel based electric generating sets are need of the day at Bhagat water works
          due to frequent power failure. These can be included if we feel sure that these
          will be maintained properly by TMA. (Under taking given by TMA attached at
          Annex. J).
•           Consumer connections directly from transmission main must be disconnected
          and linked to distribution system.
•           Watch and ward at tube well site should be regulated to eliminate thefts.
•           Raw water quantity at water works No.3 should be got doubled by
          improvement of existing out let from distributary.




                                                     Punjab Municipal Development Fund Company   34
   FAR –Engineering Component (Annexes) TMA Toba Tek Singh




ANNEXURE




                                                 - 35
FAR –Engineering Component (Annexes) TMA Toba Tek Singh



Location Map



                        Taxila




       Toba Tek Sing

              Shorkot




                                              Selected




                                                TMAs




                                                -i
                                                                                                                         Annexure-B


                                        PRESENT WATER PRODUCTION CAPACITY

                                                      W/S Scheme Toba Tek Singh

           Surface                    Ground Water                   Total
Water
            water      Tube      Discharge Working   Production   production                       Remarks
Works      (MGD)      well No.    (Cusec)    Hours     (MGD)        (MGD)
                                                                               All tube wells installed in this water works have
   1        0.360        -          -         -          -          0.360
                                                                               gone brackish
            1.32         1         0.2       18        0.081                   Both tube wells are yielding fresh water of 350-
                                                                               400 ppm TDS value even with 18 hrs /day
   2                     1         0.4       18        0.162        1.563      working. One tube well is 10 years old whereas
                                                                               other is 3 years old.
           S. Total      2         0.6       18        0.243
                                                                               Water quality from tube well is not bad. It has
   3        0.12         1         0.20      16         0.07        0.19
                                                                               got TDS value of 500 ppm with 4 years life
 Tube                                                                          Present average discharge of each tube well is
wells at                                                                       measured to be 0.40 cusec against 0.60 cusecs
Lower                                                                          designed capacity.
              -          9         0.40      12        0.972        0.972
Gogera
Branch
 Canal

                                                                                                                                      - ii
           1.80       12                                   1.285       3.085


                                                                                                                                  Annexure-C
                                            PRESENT ACTUAL PRODUCTION
                                               W/S Scheme Toba Tek Singh

                         Surface water                             Ground Water
                                                                                                 Total
Water                          Working                Tube   Discharge Working
            Pump   Discharge             Production                               Production   Production                  Remarks
Works                           Hours                 well    (Cusec)    Hours
             No.    (GPH)                 (MGD)                                    (MGD)        (MGD)
                                (Hrs.)                 No.               (Hrs.)
                                                                                                            This water works has been abandoned
              1     20000        7          0.14       -           -      -           -
                                                                                                            and a new water works at Trandi is
    1                                                                                            0.360
                                                                                                            under construction with a capacity of
              2     32500        7          0.22       -           -      -           -
                                                                                                            1.08 MGD
                                                                                                            Water from 2 Nos. tube wells is also
              1     63000        14        0.882       -           -      -           -
    2                                                                                            0.882      thrown into clear water tanks
              1     63000     Stand by       -         -           -      -           -
                                                                                                            Water from shallow tube well is also
    3         1     20000        3          0.06       -           -      -           -           0.06
                                                                                                            pumped into clear water tank
              1      2000     Stand by       -         -           -      -           -            -
Shallow                                                                                                     The quality of water is deteriorating. It
Tube                                                                                                        has changed from 225 ppm to 1000 ppm
wells at                                                                                                    from 1989 to 2005. Maximum period of
Lower         -       -          -           -         6       0.40       16        0.864        0.864      pumping affordable is 8-12 hrs/day to
Gogera                                                                                                      keep the quality good.
Branch
Canal
                                                                                                            Present discharge (Actual) as water
                                           0.942                                    0.864        1.806
                                                                                                            works No.1 is non productive.
                                                                                      iii
                                                                         Annexure-D

            HEAD LOSS IN TRANSMISSION MAIN
                W/S Scheme Toba Tek Singh
                                                             Head Loss
                    Discharge    Length     Size     Per
    Pipe Line                                              Total
                     (Cusec)      (Rft.)   (inch)   1000            Cumulative
                                                           Loss
                                                     Rft
A. Discharge of tube well = 0.6 cusec
T/W 8-7                0.60        1100      8      1.97     2.38      2.38
T/W 7-6                1.20        1100      8       7.1   8.59       10.97
T/W 6-5                1.80        1100     10       5.1     6.90     17.87
T/W 5-4                2.40        1100     10       8.7    10.52     28.39
T/W 4-3                3.00        1100     10      13.1    15.85     44.24
T/W 3-2                3.60        1100     12       7.4     8.95     53.19
T/W 2-1                4.20        1100     12      10.1    12.22     65.41
1 to junction TW-9     4.80         400     12      12.2     5.36     70.77
 Junction TW-9 to      5.40        35000    16      3.97     153      223.79
        IPS
B. Discharge of tube well = 0.40 cusec
T/W 8-7                0.40        1100      8      0.89    1.07       1.07
T/W 7-6                0.80        1100      8      3.55    4.29       5.36
T/W 6-5                1.20        1100     10      2.41    2.91       8.27
T/W 5-4                1.60        1100     10      4.32    5.22      13.49
T/W 4-3                2.00        1100     10       5.9    7.14      20.63
T/W 3-2                2.40        1100     12      3.58    4.33      24.96
T/W 2-1                2.80        1100     12      4.92    5.95      30.91
1 to junction TW-9     3.20         400     12      6.30    2.77      33.68
 Junction TW-9 to      3.60        35000    16      1.87    72.0      105.68
        IPS




                                                                               - iv
                                                                                                                                 Annexure-E

                                                     SUB PROJECT IMPLENENTATION PERIOD

NAME OF THE SUB PROJECT                    Water Supply Scheme Toba Tek Singh
                                        Year 2005                      Year 2006                                       Year 2007
S#               Activity
                                        Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun July Aug Sep Oct Nov Dec
      Preparation of Detailed design,
 1    cost estimates & Contract
      Documents
      Invitation & receipt of bids,
 2
      evaluation and award of work
 3    Mobilization of contractor
      Installation of tube wells
 4
      Construction of pump houses
 5    & installation of pumping
      machinery
      Construction of ground atorage
 6
      tanks
      Installation of pumping
 7
      machinery and yard piping
      Laying of collector main &
 8
      improvement of T/main
 9    Construction of OHRs
      Replacement and laying of
 10
      rising main for OHRs
 11   Power connections installation

 12   Laying of distribution system



                                                                                                                                        -v
                                                                                            Annexure-F

                   ANNUAL OPERATION & MAINTENANCE COST
                     AFTER COMPLETION OF SUB PROJECT
                                             W/S scheme Toba Tek Singh
A.       Electrical charges

     •    No. of units consumed

                                        No.             Total
           Sr.                                                   Units
                  W/works BHP            of    W/hours working                            Remarks
           No.                                                 consumed
                                        sets            days
                                                                                   Water to be pumped at
                                                                                   250 ft head after
             1    Bhagat        30      16        12        300         1289088    infiltration of
                                                                                   additional 7 Nos. tube
                                                                                   wells.
             2    W/W-5         25       2        16        300         179040     New W/Works
                                                                                   Water from W/W-5
             3    W/W-1         -        -          -        -          179040     will be re-pumped at
                                                                                   W/W-1 .
                                                                                   Water from Bhagat
                  IPS &
             4                  -        -          -        -          774000     will be re-pumped at
                  W/W-1
                                                                                   150 ft head.
                                                                                   After installation of
             5    W/W- 2        60       2        12        300         322272     additional pumping
                                                                                   set.
                                                                                   After increase of raw
             6    W/W- 3        20       2          6       300          53712
                                                                                   water availability
                  Total                                                2,797,152

     •    Cost of electricity
                   Year                  No.of units             Cost / unit        Total cost (million)
                   2005                   1487300                  4.73               7.035 (actual)
                   2010                   2142200                  4.73                   10.133
                   2015                   2797152                  4.73                   13.230

B.       Establishment charges (annually)

                 Year               No.of persons       Av. Salary / month         Total salary (million)
                 2005                    26                    3055                        0.953
                 2010                    35                    5000                         2.10
                 2015                    45                    6000                         3.24




                                                                                                            - vi
                                                                                Annexure-F
                                          C.     Repair charges

                  Year             Expected repairs                      Remarks
                  2005                  0.117              Actual too low for good O & M
                  2010                   1.0
                  2015                  1.50

Total expected Annual O & M cost

                                                                 All figures in million
                                               Establishment
              Year       Electrical charges                     Repair charges             Total
                                                  charges
                                                                                           8.105
              2005             7.035               0.953              0.117
                                                                                          (actual)
              2010            10.133               2.10               1.00                13.233
              2015            13.230               3.24               1.50                 17.97




                                                                                                     vii
                                                                                      Annexure-G
                             PROPOSED TARRIF TO MEET O & M COST

                                      W/S Scheme Toba Tek Singh
                          A. Domestic   (Average persons per house hold = 7.5)
                            No. of
             Projected                Percentage  No. of    Proposed             Domestic
                            house                                                                 Remarks
    Year     population               connected connections   Rate               Revenue
                            holds
              Persons        Nos.        %             Nos.           Rs.        Rs. million
    2005       72423        9656         83           8000            30            2.88           Actual
    2010       82900        11053        88           9726            80            9.34          Proposed
    2015       94900        12653        95           12020           120          17.31          Proposed


                                         B. Commercial & Industrial

                                                                                                Total
                          Commercial                              Industrial                   revenue
                                                                                                target
      Year
                                          Revenue
                No. of       Proposed                   No. of         Propose     Revenue
                                           target                                              (million)
              connections      rate                   Connections       d rate     (million)
                                          (million)
      2005        66            150        0.119          1             13200        0.158        0.227
      2010        75            250        0.225          2             15000        0.360        0.585
      2015        110           400        0.528          4             2000         0.960        1.488

Total proposed revenue

                                                                                    Total revenue
              Year        Domestic (million)       Commercial & Industrial
                                                                                   target (million)
              2005                2.88                        0.227                     3.107
              2010                9.34                        0.585                      9.92
              2015               17.31                        1.488                    18.758

   O & M COST VRS REVENUE (All figures in million of Rs.)


                Year                  O & M cost       Proposed Revenue            Surplus/ Deficit
                                       proposed
                 2005                    8.105                 3.107                  (-) 4.998
                 2010                   13.233                  9.92                  (-) 3.313
                 2015                   17.970                18.758                  (+) 0.788




                                                                                                             - viii
                                                                                                                Annexure-H
                    ENVIRONMENTAL MANAGEMENT PLAN FOR E-2 CATEGORY PROJECTS

                                                                                                                Environmental
                  Environmental Assessment                          Yes   No   If Yes, Specify Details           Management
                                                                                                                  Measures

1.   Will the project involve any of the following changes in
     land use classification?
     i.   Conversion       of    recognised      environmentally/         √
          historically/culturally sensitive land to any other
     ii. Conversion    of     open/recreation        areas     to         √                                 .
         commercial/industrial residential use?
     iii. Conversion of agricultural land to any other use?         √          15 marla land required for   It is easily available. No
                                                                               tube wells                   measures are required
     iv. Conversion of residential/industrial         areas    to         √
         industrial/commercial use?
     v.   Any other? (please specify)                                     √
2.   Will the project create risk of contamination of
     ground/surface or drinking water, due to:
     i)   Effluents or leachates                                          √
     ii) Due to leakages                                                  √
     iii) Any other? (please specify)                                     √
3.   Will the project increase or decrease?
     i)   Depth of GW table                                         √          Tube well operation will     It will be recouped by
                                                                               lower water table            seepage from canal
     ii) Flow/quantity in water bodies                                    √
4.   Will the project have any possibility of water-logging?              √
5.   Will the project cause any air pollution?                            √
6.   Will the project cause noise pollution?                              √
7.   Will the project generate solid waste?                               √
8.   Will the project result in cutting of trees?                         √
9.   Will the project damage or disturb other service lines?
     i)   Water supply lines
                                                                    √
                                                                               The laying of distribution   Coordination will be
     ii) Electric cables
                                                                    √          lines and rising mains       done with other Deptt.
                                                                               may disturb these            To have minimum
     iii) Roads
                                                                    √          services.                    effects.
     iv) Telephone cables
                                                                    √
     v) Any other (please specify)
10. Will the project cause any health hazard?
                                                                          √
11. Will the project create smell and/or smoke?
                                                                          √
12. Project causes any effect on flora and fauna?
                                                                          √




                                                                                                                 ix
                                                                                 Annexure-I
                                        TOBA TEK SINGH


                              Improvement of Water Supply Scheme

                                        SUMMERY OF COST




Sr.#                              Description                       Amount      Remarks

   1 Tubewells                                                      1,783,000

   2 Pump House                                                     1,175,000

   3 Pumping Machinery                                             10,160,000

   4 Collector Mains                                                7,373,000

   5 Improvement of T/Mains                                          100,000

   6 Ground Storage Tanks                                           6,200,000

   7 Over Head Reservoir                                            4,000,000

   8 Rising Mains                                                   4,534,000

   9 Distribution System                                            4,822,000

  10 Power Connections                                              2,250,000

  11 Bulk Water Meters                                               800,000

  12 Repair of Civil Structures                                      800,000

  13 Staff Quarters                                                 1,280,000

  14 Replacement of sub standard consumer connections              13,500,000

       TOTAL                                                       58,777,000

       Add 3 % Contegencies                                         1,763,310

       GRAND TOTAL                                                 60,540,310

                                                          Say          60.54    Million




                                                                                          -x
                                            TOBA TEK SINGH
                                Improvement of Water Supply Scheme
(1) Tube Wells
S.No. Description                    Unit    Length Width    Depth Quantit Rate       Amount
                                                                   y
  1   Hand drilling of 6" I/d bore   Rft        120                    120     275.65   33078.00
      for tube well in all types of
      soil except shingle gravel
      and rock. From ground level
      to 120 ft. below ground level.

  2   Direct rotary/reverse rotary Rft          120                    120    502.05    60246.00
      drilling of 22"-26"dia bore for
      tube well in all types of soil
      except shingle gravel and
      rock. From ground level to
      120 ft. below ground level.

  3   Furnishing samples of water Each                                   2    156.00         312.00
      from bore hole (per set of
      two bottles)
  4   Providing and installing 12" Rft           56                     56   1465.45    82065.20
      dia 1/4" thick brass strainer
      in tube well bore holes
      including sockits, special
      sockets, special socket
      studs etc complete.

  5   Providing and installing 12"   Each                                1   7022.80     7022.80
      dia 1/4" thick 6 ft long M S
      bail plug in tube well bore
      holes complete.
  6   Providing and installing 12" Rft           61                     61    752.05    45875.05
      dia 1/4" thick M S blind pipe,
      socket/ welded joints, M.S.
      reducers(where necessary)
      in tube well bore holes
      including jointing/welding
      with strainer etc. complete.



  7   Shrouding with graded pea Cft             120   2.85             342     26.40     9028.80
      gravel 3/8" to 1/8"dia around
      tube well in bore hole. Area
      of shrouding = pi/4(D2 - d2)
      = 0.7854(2.172 - 1.042)
      = 2.85 Sft




                                                                                        xi
S.No. Description                    Unit   Length Width   Depth Quantit Rate      Amount
                                                                 y
  8    Testing and developing for  Job                                  1 10000.00   10000.00
       tube well 12" dia upto the
       designed discharge pumping
       upto 72 hours with
       contractor own machinery
       and staff I/c preserving of
       water samples ater every 24
       hours running etc.complete
       in all respects.



  9    Testing of strata and water  No.                                2     2000.00      4000.00
       samples from PHE
       department laboratory
       complete with all charges (2
       samples per set)
 10    Providing and fixing MS well No.                                1     1000.00      1000.00
       cap on tube well
 11    Providing and fixing MS        No.                              1     2000.00      2000.00
       suspension clamp in PCC
       1:4 for 12" dia pipe including
       all cost of labour and
       material complete in all
       respects.
       Sub Total                                                                        254627.85
       No. of tube wells     7 No.   No.                               7 254627.85     1782394.95
       TOTAL (T/Wells)                                                                 1782394.95
                                                                           Say         1783000.00

(2) Pump House
  1    Construction of pump house per                                700         800    560000.00
       for T/wells 10' x 10' (7No.) sft.

      2 Construction of pump house per                               768         800    614400.00
        for W/Works 12' x 16' (4No) sft.

       TOTAL                                                                           1174400.00
                                                                           Say         1175000.00




                                                                                         xii
(3) Pumping Machinery For Tube Wells and W/Works
S.No.             Description                                Unit      Quantit Rate             Amount
                                                                       y
  1
        P/Installing and testing of vertical turbine pumping units KSB/PECO/Grandfos
        made for given discharge against given head with column pipe coupled with AC
        electric motor with switch starter mounted on M.S. Board 3' x 2.5' made of angle
        iron frame 1½” x 1½” x 1/4” and M.S. sheet 1/8” thick i/c painting, embedded in/
        mounted on walls of Pump House. It also includes electrification of motor from
        WAPDA meter to main switch starter and motor with appropriate size cable
        encased in PVC/ G.I. pipe/flexible pipe as per specification The rate also i/c the
        cost of P/F pressure gauge C.I. specials such as sluice value, reflux valve air valve
        tail pieces, reducer increaser of B. Class and G.I. pipe of required size for delivery
        up to 10’beyond pump house i/c testing of machinery for 72 hour to the entire
        satisfaction of engineer in charge. The rate also include all Amp meter volt meter
        phase indicators earthing and P.C.C foundation. (3 Nos. to be replaced) 7+3 = 10


           Q = 0.5 cusecs, H = 250', Col. = 50' & BHP = 30   per set        10     520000        5200000.00
           Q = 3.0 cusecs, H = 150', Col. = 10' & BHP = 60   per set         8     620000        4960000.00
        TOTAL                                                                                   10160000.00


(4) Collector Mains
S.No. Description                   Unit   Length Width      Depth Quantit Rate                 Amount
                                                                   y
  1
        Providing, laying, cutting, jointing, testing and disinfecting A C pipe lines of BSS
        with B class working pressure pipes,in trenches complete in all respects I/c
        specials and Excavation & Backfilling.

i) New Mains
        16" i/d                     Rft        3200                       3200         727.75    2328800.00
        12" i/d                     Rft        2200                       2200         431.75     949850.00
        10" i/d                     Rft        2200                       2200          313.4     689480.00
        8" i/d                      Rft        1100                       1100           198      217800.00
ii) Replacement of Existing Pipes
        12" to 16" i/d              Rft        2600                       2600         727.75    1892150.00
        10" to 12" i/d              Rft        2200                       2200         431.75     949850.00
        8" to 10" i/d               Rft        1100                       1100          313.4     344740.00
        TOTAL                                                                                    7372670.00
                                                                                 Say             7373000.00




                                                                                                  xiii
S.No. Description                     Unit   Length Width    Depth Quantit Rate             Amount
                                                                   y
(5) Improvement of T/Mains
      Replacement and                Job                                 1 LS                 100000.00
      installation of new air valves
      and non return valves to
      eliminate water hammer


(6) Ground Storage Tanks
  1   Conversion of existing filter   Sft          48   25           12000           350     4200000.00
      beds at W/Works No. 1 to
      clear water tanks including
      Granite/mosaic finish on
      walls and beds (10 No)
  2   Construction of ground        per gallon                      100000            20     2000000.00
      storage tank of 100000
      gallons capacity at W/Works
      No.1 including cost of all
      specials, valves,piping, vent
      and carriage of materials
      and labour etc. complete in
      all respects.


      TOTAL                                                                                  6200000.00

(7) Over Head Reservoir
  1   Construction of over head       per gallon                    100000            40     4000000.00
      reservoir of 100000 gallon
      capacity



(8) Rising Mains
      Providing, laying, cutting,   Rft        10500                 10500         431.75    4533375.00
      jointing, testing and
      disinfecting 12" i/d A C pipe
      lines of BSS with B class
      working pressure pipes,in
      trenches complete in all
      respects I/c specials and
      Excavation & Backfilling.


                                                                             Say             4534000.00




                                                                                               xiv
S.No. Description                        Unit    Length Width   Depth Quantit Rate               Amount
                                                                      y
(9) Distribution System
  2   Providing new pipe lines "B" class, laying, jointing, excavation, backfilling, testing and
      disinfecting i/c cost of specials, sluice valves, construction of chambers, connections with
      existing lines complete in all respects.


  i)     12" i/d                           Rft     5000                    5000         431.75    2158750.00
  ii)    10" i/d                           Rft     3000                    3000          313.4     940200.00
  iii)   8" i/d                            Rft     1000                    1000            198     198000.00
  iv)    6" i/d                            Rft     3000                    3000         125.65     376950.00
  v)     4" i/d                            Rft     4500                    4500           72.1     324450.00
  vi)    3" i/d                            Rft    17000                   17000          48.45     823650.00
         TOTAL                                                                                    4822000.00



(10) Power Connections
  1      Providing and installing power connections including the cost of 25 KVA substation, 11 KV power
         line and electric energy meters complete in all respects


  i)     For T/wells                     No.                                   7        150000    1050000.00
         For IPS & town W/Works          No.                                   8        150000    1200000.00
         TOTAL                                                                                    2250000.00

(11) Bulk water meters
  1                                      No.         20                       20        40000      800000.00



(12) Repare of civil
structures
         Repare of civil structures in   Job                                       LS              800000.00
         W/Works no. 2, 3 & IPS

(13) Staff Quarters
         Construction of staff           Sft                               1600           800     1280000.00
         quarters (2No)

         (14) Replacement of Consumer
                  Connections
         Replacement of sub              No.                               9000          1500 13500000.00
         standard consumer
         connections




                                                                                                    xv

						
Related docs
Other docs by cuiliqing
Heat Case Asm - Jordans Manuals
Views: 5  |  Downloads: 0
B747-400 Teardown - Turbo Resources
Views: 3  |  Downloads: 0
Lee Sherman
Views: 5  |  Downloads: 0
RPM for AIRTRONIC 2-4_6-2012.doc - Espar
Views: 5  |  Downloads: 0
HEC-HMS
Views: 5  |  Downloads: 0
View File
Views: 5  |  Downloads: 0