Docstoc

LF_IM_TestCases_Q06-a

Document Sample
LF_IM_TestCases_Q06-a Powered By Docstoc
					Change Log

   No.   Version         Date     Author
    1              1   2-Aug-08    Ping
    2
    3
    4
    5
    6
    7
    8
    9
   10
                        Comments
Test cases and result
Test Cases Summary

       Story ID      Q06-a
                     Users who are knowledgeable in software architecture, but not in cost-benefit analysis method the tool
      Story Title    provides, can learn to use the tool for performing a general analysis run within 4 hours.

    Test Case No.                           Objective
                     To check if architects can understand CBAM within
          1
                     0.5 hour

          2          To check if architects can understand the basic idea
                     of the tool through user manual within 1 hour
                     To check if architects can use the tool to perform
          3
                     CBAM analysis within 1.5 hour
                     To check if architects can use the tool to perform
          4
                     Sensitivity analysis within 1 hour
           5
           6
           7
           8
           9
          10
 architecture, but not in cost-benefit analysis method the tool
forming a general analysis run within 4 hours.

                             Expected Response
            Architects can understand concept of CBAM within
            0.5 hour

            Architects understand the user interface of the tool
            within 1 hour

            Architects get familiar with the tool within 1.5 hours
            Architects are able to use the tool to perfrom
            sensitivity analysis within 1 hour
Test Case Detail

     Test Case No. 1
       Objective   To check if architects can understand CBAM within 0.5 hour



         Step                           Description                             Input

           1        Explain the meaning of QAS
                    Explain the meaning of AS and its relationship with
           2
                    QAS
           3        Explain the priority of QAS
                    Explain the 4 CBAM level and the meaning of
           4
                    benefit and cost of AS
           5        Explain the calculation
           6
           7
           8
           9
          10
                                Test Result 1 by Ping (Rev. 624 Date. 7/29/2008)
     Expected Results                          (P)ass /
                        Actual Results                           Discrepancies
                                                 (F)ail
5 minutes
                         Test 3 times
5 minutes
                         15 minutes
5 minutes                                         P
                         15 minutes
                         20 minutes
5 minutes
10 minutes
2008)                    Test Result 2 by <YourName> (Rev. XXX Date. 7/17/2008)
                                            (P)ass /
        Defect ID.   Actual Results                         Discrepancies       Defect ID.
                                              (F)ail
    Test Result 3 by <YourName> (Rev. XXX Date. 7/17/2008)
                       (P)ass /
Actual Results                         Discrepancies       Defect ID.
                         (F)ail
Test Case Detail

     Test Case No. 2
       Objective   To check if architects can understand the basic idea of the tool through user manual within 1 hour



         Step                            Description                               Input

           1        Understand the project explorer view
           2        Understand the QAS/AS editor
           3        Understand the table views

           4
                    Understand the analysis run and analysis steps
           5        Understand the sensitivity analysis run
           6
                    Unserstand the sensitivity analysis comparison
           7
           8
           9
          10
ugh user manual within 1 hour

                                            Test Result 1 by Ping (Rev. 624 Date. 7/29/2008)
                 Expected Results                          (P)ass /
                                    Actual Results                           Discrepancies
                                                             (F)ail
           5 minutes
           5 minutes
           10minutes                 Test 3 times
                                     15 minutes
                                                              P
           15 minutes                10 minutes
           15 minutes                25 minutes

           10 minutes
2008)                    Test Result 2 by <YourName> (Rev. XXX Date. 7/17/2008)
                                            (P)ass /
        Defect ID.   Actual Results                         Discrepancies       Defect ID.
                                              (F)ail
    Test Result 3 by <YourName> (Rev. XXX Date. 7/17/2008)
                       (P)ass /
Actual Results                         Discrepancies       Defect ID.
                         (F)ail
Test Case Detail

     Test Case No. 3
       Objective   To check if architects can use the tool to perform CBAM analysis within 1.5 hour



         Step                            Description                               Input

           1        Let architects do basic CBAM analysis using the tool
hin 1.5 hour

                                                    Test Result 1 by Ping (Rev. 624 Date. 7/29/2008)
                Expected Results                                   (P)ass /
                                            Actual Results                           Discrepancies
                                                                     (F)ail
           90 minutes              30, 35, and 40 minutes          P
2008)                    Test Result 2 by <YourName> (Rev. XXX Date. 7/17/2008)
                                            (P)ass /
        Defect ID.   Actual Results                         Discrepancies       Defect ID.
                                              (F)ail
    Test Result 3 by <YourName> (Rev. XXX Date. 7/17/2008)
                       (P)ass /
Actual Results                         Discrepancies       Defect ID.
                         (F)ail
Test Case Detail

     Test Case No. 4
       Objective   To check if architects can use the tool to perform Sensitivity analysis within 1 hour



         Step                              Description                               Input

                     Explain the meaning of sensitivity analysis and the
           1
                     features that the tool provides
           2
                     Let architects do sensitivity analysis using the tool.
s within 1 hour

                                                     Test Result 1 by Ping (Rev. 624 Date. 7/29/2008)
                  Expected Results                                  (P)ass /
                                             Actual Results                           Discrepancies
                                                                      (F)ail
                                     10 minutes                     P
            10 minutes
                                     (Due to the limited time, we
            50 minutes               can't finish this test)
2008)                    Test Result 2 by <YourName> (Rev. XXX Date. 7/17/2008)
                                            (P)ass /
        Defect ID.   Actual Results                         Discrepancies       Defect ID.
                                              (F)ail
    Test Result 3 by <YourName> (Rev. XXX Date. 7/17/2008)
                       (P)ass /
Actual Results                         Discrepancies       Defect ID.
                         (F)ail

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:7
posted:9/8/2012
language:Unknown
pages:20