					Wink Worksheet                            Delta Stage Lighting   August 23, 2007
Dalton, GA                                 Project Worksheet                 Pg.1

 Qty                 Item / Description       Price
Specified Upgrades
     8 ETC Source IV 26˚ Ellipsoidal      $   2,742.24
     3 36ft x 24ckt Raceways              $   2,960.10

Upstage /Downstage Trusses                $ 14,590.95
   16 12" x 12" x 8ft. Truss
   16 Powder Coat Black
    8 Truss Pick Points
    8 6ftSpanset w/ Steel Sling
    8 4ftSpanset w/ Steel Sling
    8 3ftSpanset w/ Steel Sling
   16 5/8" Shackles

     4 Custom Wall Brackets
     8 1/2 Couplers (Black)
    50 Masonry Anchors

    20 Double Cheeseborough

Onstage Pipe Adds                         $     571.60
    6 1 1/2" x 21ft Schedule 40
    3 Pipe Sleeves
    2 Pipe Paint & Prep (Labor)
    2 Pipe Paint & Prep (Supplies)
Wink Worksheet                                           Delta Stage Lighting   August 23, 2007
Dalton, GA                                                Project Worksheet                 Pg.2

 Qty                  Item / Description                        Price

FOH Pipe 1                                                $     1,679.69
    2 1 1/2" x 21ft Schedule 40
    1 Pipe Sleeves
   12 1/4" Shackles
    1 1/4" Proof Coil Chain (By Bucket)
    2 Pipe Paint & Prep (Labor)
    2 Pipe Paint & Prep (Supplies)

       1 Data Cable Package (Cat 5 to Each Position)
         (No OptoSplit… Just Dry Runs… Includes Installation)




         Product Shipping                                 $     1,127.23

    Required Rental Equipment (Provided by Church)
     1 36ft AWP w/ Straddle Kit
     1 36ft AWP

 Qty                     Installation                   $ 11,970.00
     1            Chain Motors Package for Installation
     1           Removal of Existing Lighting Positions
   0.5        Removal of Existing Unused Pipes Upstage
   0.5            Removal of Existing Drapery Upstage
   0.5         Custom Field Modification of Red Valance
   0.5        Custom Field Modification of Gold Valance
   1.5              Install Upstage / Downstage Truss
     1                     Install Custom Wall Brackets
     2               Install Cross-Stage Pipes on Truss
                 Lighting / Rigging Improvement Labor
Wink Worksheet                                            Delta Stage Lighting   August 23, 2007
Dalton, GA                                                 Project Worksheet                 Pg.3

 Qty                   Item / Description                     Price

                     Drapery Modification                 $   2,920.00
       1 Upstage Traveller Drapery Cut & Hem (Off Site)
       1 Upstage Border (Off Site)
       1 Drapery Shipping Allowance
         Estimate (Will Bill At Cost)


                             Travel                       $   3,702.00
   14    Hotel (2rooms 7 Days)
   21    Per Diem (3 PD x 7 Days)
   50    Fuel
  500    Mileage


                                        Base Budget       $ 42,263.81




Adder #1                                                  $   6,454.61
FOH Pipes (x2) - Existing Structural Member
     1 1 1/2" x 21ft Schedule 40
     2 4 Circuit Pipe Boxes
   12 1/4" Shackles
     1 1/4" Proof Coil Chain (By Bucket)
     2 Pipe Paint & Prep (Labor)
     2 Pipe Paint & Prep (Supplies)
     1 Installation Day
     2 Hotel (2rooms 1 Days)
     3 Per Diem (3 PD x 1 Days)


       8 Circuit Add
Wink Worksheet                        Delta Stage Lighting   August 23, 2007
Dalton, GA                             Project Worksheet                 Pg.4

 Qty             Item / Description       Price
Wink Worksheet                                               Delta Stage Lighting   August 23, 2007
Dalton, GA                                                    Project Worksheet                 Pg.5

 Qty                   Item / Description                        Price

Adder #2
                   Updated Electrical Required               $ 17,798.40
    12   Circuits FOH
    12   1st Electric Circuits
    12   2nd Electric Circuits
    36   Edison Whips (Patch to Dimmers)
                              Existing Circuit Replacement

Adder #3
                     Updated Electrical Adder                $ 17,798.40
    12   Circuits FOH Add
    12   1st Electric Circuits Add
    12   2nd Electric Circuits Add
    36   Edison Whips (Patch to Dimmers)
                           Expanded Circuit Replacement
                     Travel (Electrical Adder)               $   2,244.00
    8    Hotel (2rooms 4 Days)
   12    Per Diem (3 PD x 4 Days)
   50    Fuel
  500    Mileage




                                           Total Adders      $ 44,295.41

                                      Total of all Work      $ 86,559.22
Wink Worksheet                                                Delta Stage Lighting   August 23, 2007
Dalton, GA                                                     Project Worksheet                 Pg.6

                                   Notes

Fixtures for Praise tem under screens to help control spill
Electrical distribution (plug strips) for lighting pipes

Truss grid work to properly support the overstage lighting pipes




Additional pipe and supplies that Rock Bridge does not currently own
For overstage area
Wink Worksheet                                              Delta Stage Lighting   August 23, 2007
Dalton, GA                                                   Project Worksheet                 Pg.7

                                    Notes

New pipe supplies for position over the audience




Shipping costs

Church is to provide two lifts for duration of the install (7 days)




Installation equipment and labor
Wink Worksheet                                          Delta Stage Lighting   August 23, 2007
Dalton, GA                                               Project Worksheet                 Pg.8

                                  Notes

estimated cost to send the upstage traveller drape out to be re-hemmed
by a professional drape company. Will bill at cost.




Crew travel expenses




Total for base work




The current pipe over the audience will get moved back 15' to provide
a better lighting position for video. This would add two short pipes
where the current over audience pipe is hanging. This position makes
a nice location to hang lights that would focus on the midstage area
of the stage. This is an option.
Wink Worksheet           Delta Stage Lighting   August 23, 2007
Dalton, GA                Project Worksheet                 Pg.9

                 Notes
Wink Worksheet                                             Delta Stage Lighting   August 23, 2007
Dalton, GA                                                  Project Worksheet               Pg.10

                                   Notes


Currently the electrical work to the existing lighting positions does not
meet electrical codes. The cable they used between the dimmers and the
hang positions is really not rated to handle the load you are putting on it.
This would be the minimum amount of electrical work required to bring the
system up to code with same number of circuits as everything currently
exists. (12 circuits minimum)


This additional electrical work would bring the circuit count up to the
maximum you could have on each pipe. (24 circuits maximum)
The reasoning behind this is if you ever plan to expand in the
future it would be better to add the electrical work now while the rest
of the work is being done. We estimate about an $8000 savings to do
the work now instead of later. Once the electrical work is done all you
would have to do is add additional dimming.

The travel adder is the additional day it would take to finish the
electrical work.

Note:We can give your electrician the plan of what needs to be done
if you would rather have the electrical work done by a local company.
This would probably save you some money.

				