					                                                    MARYLAND AVIATION ADMINISTRATION
                                                      PERMIT DRAWING CHECKLIST
                                                                      BWI AIRPORT
                                                              Project __________________




     General

                                                                                                                                YES     NO      N/A
     Is the task appropriate Code Analysis and the Life Safety- Egress Analysis plan included?
                                                                                                                                YES     NO      N/A
     Is queuing plan with directional arrows provided?


     Cover Sheet
                                                                                                                                YES     NO      N/A
     Is a cover sheet provided?
                                                                                                                                YES     NO      N/A
     Is a Key Plan (with north arrow and/or project north) shown and is it consistent with other plans?
                                                                                                                                YES     NO      N/A
     Is tenant's name, number and address information indicated?
                                                                                                                                YES     NO      N/A
     Is the square foot area of renovation given?
                                                                                                                                YES     NO      N/A
     Are applicable codes indicated on the cover sheet? [Refer to Tenant Directive 007.1]
                                                                                                                                YES     NO      N/A
     Is sheet index provided on the cover sheet?
     Is there a note that all loose debris/trash shall be deposited in covered trash receptacle or removed from the site? (No   YES     NO      N/A
     loose debris/trash shall be left on roofs, spaces open to the airport operations area (AOA), conveyance or open trash
     receptacle at any time).
     Is there a note that the unused/abandoned floor/wall openings shall be sealed or firestopped?                              YES     NO      N/A
     Are interior finishes classification indicated as per NFPA 101, 2006 edition, (Table A10.2.2) and IBC 2006 (Table          YES     NO      N/A
     803.5), whichever is more stringent ?




                                                                                                                                              9/7/2012
4366df1a-4ea9-4645-984d-21f4ce2e0a9f.xls                                                                                          General, Page 1 of 19
                                                     MARYLAND AVIATION ADMINISTRATION
                                                          PERMIT DRAWING CHECKLIST
                                                                         BWI AIRPORT
                                                                 Project __________________



     Architectural Demolition Plans

                                                                                                                              YES      NO      N/A
     Are plan(s) at 1/4" scale or larger?
                                                                                                                              YES      NO      N/A
     Is the lease line clearly indicated?
                                                                                                                              YES      NO      N/A
     Is ceiling demolition plan with a legend provided?
                                                                                                                              YES      NO      N/A
     Are all symbols and abbreviations used shown on the legend?
                                                                                                                              YES      NO      N/A
     Are walls/items to be demolished indicated by dashed lines?
                                                                                                                              YES      NO      N/A
     Are floor and roof penetrations indicated?
                                                                                                                              YES      NO      N/A
     Are existing finishes/items to remain indicated?
                                                                                                                              YES      NO      N/A
     Are cutting and patching notes provided?
                                                                                                                              YES      NO      N/A
     Is dust partition indicated with specified finish on the public side?
                                                                                                                              YES      NO      N/A
     Are dust partition details indicated?

     Architectural Floor Plans

                                                                                                                              YES      NO      N/A
     Are floor plan(s) at 1/4" scale or larger?
                                                                                                                              YES      NO      N/A
     Is the lease line clearly indicated?
     Are new partitions hatched or delineated with bolder lines?                                                              YES      NO      N/A

                                                                                                                              YES      NO      N/A
     Are new partition type symbols indicated?
                                                                                                                              YES      NO      N/A
     Is it clear what work is required for existing partitions with regard to cutting & patching/finishes?
                                                                                                                              YES      NO      N/A
     Are symbols for interior elevations/sections properly indicated/coordinated?
                                                                                                                              YES      NO      N/A
     Is the limit of new floor finish indicated?
                                                                                                                              YES      NO      N/A
     Are all necessary dimensions indicated?
                                                                                                                              YES      NO      N/A
     Has the designer verified that doors are minimum 3'-0" wide and have ADA-related clearances?
                                                                                                                              YES      NO      N/A
     Do the doors swing beyond the lease line? [Not supposed to].
                                                                                                                              YES      NO      N/A
     Are shelf standards within the first 10 feet of the premises fully recessed?
                                                                                                                              YES      NO      N/A
     Are all floor penetrations indicated?
                                                                                                                              YES      NO      N/A
     If space is on upper level and has plumbing, is waterproofing membrane indicated by a note?
     Are floor drains or floor sinks (if called for) indicated and coordinated with plumbing drawings? [See also Plumbing
                                                                                                                              YES      NO      N/A
     Section]
                                                                                                                              YES      NO      N/A
     Does the Storefront indicated in plan meet the requirements of the Tenant Design Criteria?

     Architectural Reflected Ceiling Plans

                                                                                                                              YES      NO      N/A
     Are Reflected Ceiling Plan(s) at the same scale as the floor plan(s)?
                                                                                                                              YES      NO      N/A
     Is Symbol Legend provided and coordinated with plan? Are all symbols and abbreviations used shown on the legend?

     Is the ceiling lighting layout coordinated with electrical, mechanical and sprinkler drawings?                           YES      NO      N/A

     Is HVAC diffuser/return grille layout coordinated with mechanical drawings?                                              YES      NO      N/A

                                                                                                                              YES      NO      N/A
     Are ceiling heights (from finish floor) indicated?

     Are sprinkler heads located in the middle of ceiling tiles?                                                              YES      NO      N/A

                                                                                                                              YES      NO      N/A
     Are there sufficient notes to relocate existing sprinkler heads?




                                                                                                                                              9/7/2012
4366df1a-4ea9-4645-984d-21f4ce2e0a9f.xls                                                                                    Architectural, Page 2 of 19
                                                     MARYLAND AVIATION ADMINISTRATION
                                                        PERMIT DRAWING CHECKLIST
                                                                           BWI AIRPORT
                                                                   Project __________________


                                                                                                                              YES      NO      N/A
     Is the ceiling grid indicated 2'x2' in areas visible to the public? (2'x4' ceiling is NOT allowed).
                                                                                                                              YES      NO      N/A
     If gypsum wallboard (GWB) ceiling is indicated, are access panels shown or called for by a note?
                                                                                                                              YES      NO      N/A
     Are GWB ceiling/bulkhead supports properly detailed? [Must be fastened to the structure above].
                                                                                                                              YES      NO      N/A
     Are speakers for the public address (PA) system indicated? [See also Communications Section].
                                                                                                                              YES      NO      N/A
     Does the ceiling indicated meet Tenant Design Criteria?
     Have the sectional heights been coordinated to avoid conflicts between existing structure (i.e., beams), and all MEP     YES      NO      N/A
     items?

     Interior Elevations/Sections

                                                                                                                              YES      NO      N/A
     Are interior elevations shown at a minimum of 1/4"=1'0" scale?
                                                                                                                              YES      NO      N/A
     Are drawings properly referenced to the floor plans?

     Are counters, shelving, wall base and signage indicated?                                                                 YES      NO      N/A

                                                                                                                              YES      NO      N/A
     Are storefront elevations provided?
                                                                                                                              YES      NO      N/A
     Does the bulkhead meet the requirements of Tenant Design Criteria?
                                                                                                                              YES      NO      N/A
     Does the signage meet the requirements of Tenant Design Criteria?

     Partition/Wall Furring Details

                                                                                                                              YES      NO      N/A
     Are partition/wall furring details provided?
                                                                                                                              YES      NO      N/A
     Are partition/wall furring details legible and a minimum of 1"=1'-0" scale?
                                                                                                                              YES      NO      N/A
     Are steel studs/steel furring strips specified? [Wood studs are not permitted.]
                                                                                                                              YES      NO      N/A
     Are metal stud sizes, spacing and gauge indicated?
                                                                                                                              YES      NO      N/A
     Is gypsum wallboard (GWB) thickness and type indicated?
                                                                                                                              YES      NO      N/A
     If fire rated wall, is the Underwriters Laboratory (UL) design number indicated?
                                                                                                                              YES      NO      N/A
     Are blocking details provided for equipment and display support?
                                                                                                                              YES      NO      N/A
     Are kickers indicated for tall partitions?
                                                                                                                              YES      NO      N/A
     If rated walls terminate under metal roof deck, is "Fire Trak" or equal indicated?

     Column Cover Details

                                                                                                                              YES      NO      N/A
     Are column cover details provided and shown at a minimum of 1-1/2"=1'-0" scale?
                                                                                                                              YES      NO      N/A
     Are steel studs/furring strips specified?
                                                                                                                              YES      NO      N/A
     Are metal stud sizes, spacing and gauge indicated/specified?
                                                                                                                              YES      NO      N/A
     Is wood blocking (if required) indicated as fire retardant?
                                                                                                                              YES      NO      N/A
     Finish Schedules

                                                                                                                              YES      NO      N/A
     Is finish schedule provided?
                                                                                                                              YES      NO      N/A
     Are the room names and numbers the same as on floor plans?
                                                                                                                              YES      NO      N/A
     Are both the substrates and finishes indicated?
                                                                                                                              YES      NO      N/A
     For wet areas, does waterproofing terminate 4" above finish floor at all locations?
                                                                                                                              YES      NO      N/A
     Do finishes meet the requirements of Tenant Design Criteria?



                                                                                                                                              9/7/2012
4366df1a-4ea9-4645-984d-21f4ce2e0a9f.xls                                                                                    Architectural, Page 3 of 19
                                                        MARYLAND AVIATION ADMINISTRATION
                                                         PERMIT DRAWING CHECKLIST
                                                                        BWI AIRPORT
                                                                Project __________________



     Door Schedules and Details

                                                                                                                                 YES      NO      N/A
     Is door schedule provided?
                                                                                                                                 YES      NO      N/A
     Does the door schedule and plan references MAA facility door numbers in place?
     Are all personnel doors minimum 3'-0" wide? (2'-10" min. clearance for ADA)?                                                YES      NO      N/A

                                                                                                                                 YES      NO      N/A
     If fire rated assembly, is the rating specified?
                                                                                                                                 YES      NO      N/A
     Is the door hardware specified and/or a schedule provided?
                                                                                                                                 YES      NO      N/A
     Is the door and frame finish indicated?
                                                                                                                                 YES      NO      N/A
     Are the door head and jamb details provided?
                                                                                                                                 YES      NO      N/A
     If glass door is provided, is the glass indicated as tempered glass?
                                                                                                                                 YES      NO      N/A
     If a roll-up door/grille is indicated, are framing and bulkhead details provided?

     Architectural Details

                                                                                                                                 YES      NO      N/A
     Are enlarged details of storefront provided?
                                                                                                                                 YES      NO      N/A
     Are details of wall paneling (if included) provided?
                                                                                                                                 YES      NO      N/A
     Are signage details provided?
     Do the details show the tie-in of slab waterproofing into the drain? [See Plumbing Section]                                 YES      NO      N/A
     Are the roof penetration details, including structural support, curbs and flashings, indicated and coordinated with the     YES      NO      N/A
     mechanical drawings?

     Food Service Drawings

     Is Kitchen Equipment Plan (minimum scale of 1/4"-1'-0") provided? [The plan can be part of architectural floor plan]        YES      NO      N/A

     Has it been verified that floor penetrations are not located over sensitive airport operations, electrical, or              YES      NO      N/A
     communications equipment? (If so, moving the penetrations, reducing the number of penetrations, and/or providing
     secondary protection over the area below, is required).

     Are grease interceptors indicated?                                                                                          YES      NO      N/A

     Are back flow prevention devices indicated for all equipment receiving domestic potable water?                              YES      NO      N/A




                                                                                                                                                 9/7/2012
4366df1a-4ea9-4645-984d-21f4ce2e0a9f.xls                                                                                       Architectural, Page 4 of 19
                                                    MARYLAND AVIATION ADMINISTRATION
                                                       PERMIT DRAWING CHECKLIST
                                                                       BWI AIRPORT
                                                               Project __________________



     Mechanical Design Drawings and Specifications

     Mechanical (General)

                                                                                                                                 YES      NO     N/A
     Are mechanical plan(s) provided and shown at 1/4"=1'-0" scale or larger?
                                                                                                                                 YES      NO     N/A
     Is Mechanical Roof Plan (minimum scale of 1/8"=1'-0") provided?
                                                                                                                                 YES      NO     N/A
     Are supplemental HVAC units required? If so,
                                                                                                                                 YES      NO      N/A
            Are design conditions specified?
                                                                                                                                 YES      NO     N/A
            Are adequate structural details for its support included?
                                                                                                                                 YES      NO     N/A
            Is an evaporator condensate line needed and shown?
                                                                                                                                 YES      NO     N/A
            Are the controls and operating sequence provided?
                                                                                                                                 YES      NO     N/A
     Does tenant installed equipment have adequate access?
                                                                                                                                 YES      NO     N/A
     Is mechanical equipment properly supported?
                                                                                                                                 YES      NO     N/A
     Does mechanical equipment have vibration isolation?
                                                                                                                                 YES      NO     N/A
     Is HVAC equipment labeled as "[EQ TYPE]-[SPACE #]-1" ?
                                                                                                                                 YES      NO     N/A
     Are roof exhaust properly spaced from air intakes?
                                                                                                                                 YES      NO     N/A
     Are roof vents properly spaced from air intakes?
                                                                                                                                 YES      NO     N/A
     Does the roof equipment location meet FAA/MAA height and location requirements?
                                                                                                                                 YES      NO     N/A
     Is a Symbol Legend provided and coordinated with plan?
                                                                                                                                 YES      NO     N/A
     Are all symbols and abbreviations used shown on the legend?

     Mechanical Demolition Drawings

     Are demolition drawings provided and items that are "existing to remain" clearly indicated?                                 YES      NO     N/A

     Are there adequate notes that all equipment, piping, conduits, cable must be removed back to the source and                 YES      NO     N/A
     penetrations patched and finished with like materials? (No abandoned work is allowed to remain in place).

     Are notes provided to protect floor and roof penetrations during demolition/construction?                                   YES      NO     N/A

     Are notes provided to protect duct openings during demolition/construction?                                                 YES      NO     N/A

     If there are existing ducts and 'pass through' piping through tenant space that could be cut off by the renovation, is it   YES      NO     N/A
     shown to be reconnected?

     Heating System

                                                                                                                                 YES      NO     N/A
     Will make-up air heat be required?

     Are fire dampers properly identified?                                                                                       YES      NO     N/A

                                                                                                                                 YES      NO     N/A
     Are fire damper access panels identified?
                                                                                                                                 YES      NO     N/A
     Is access provided for valves and controls?
     Has it been checked if hydronic supply & return piping is nearby? (Otherwise, recommend Gas for Term. A/B and
                                                                                                                                 YES      NO     N/A
     electric for small loads elsewhere)
            If so, has it been considered for make-up heat?                                                                      YES      NO     N/A

                                                                                                                                 YES      NO     N/A
     Are the flow rates for coils and MAA pump capacity adequate for the additional load?

     Is fin tube radiation employed?                                                                                             YES      NO     N/A




                                                                                                                                                9/7/2012
4366df1a-4ea9-4645-984d-21f4ce2e0a9f.xls                                                                                         Mechanical, Page 5 of 19
                                                    MARYLAND AVIATION ADMINISTRATION
                                                         PERMIT DRAWING CHECKLIST
                                                                       BWI AIRPORT
                                                               Project __________________
                                                                                                                                 YES      NO     N/A


     Air Handling System

                                                                                                                                 YES      NO     N/A
     Are volume dampers provided?
                                                                                                                                 YES      NO     N/A
     Are transfer grilles indicated?
            Do transfer grilles require a fire damper?                                                                           YES      NO     N/A

     Is access provided for volume dampers?                                                                                      YES      NO     N/A

                                                                                                                                 YES      NO     N/A
     Is flexible duct kept to a minimum? (5 feet is maximum)
                                                                                                                                 YES      NO     N/A
     Is insulation specified on supply ducts?
                                                                                                                                 YES      NO     N/A
     Is a grille schedule provided?
                                                                                                                                 YES      NO     N/A
     If food service facility, is an exhaust hood provided?
                                                                                                                                 YES      NO     N/A
            Is make up air provided?
                                                                                                                                 YES      NO     N/A
            Are other exhaust fans provided?
                                                                                                                                 YES      NO     N/A
            If hood is included, is it steel construction and are grease cups provided on fans?
                                                                                                                                 YES      NO     N/A
            Are fans weatherproof?
                                                                                                                                 YES      NO     N/A
            Is a fire suppression system provided, if applicable, and gas shut off included in fire alarm system for hoods?
     Air Balancing

     Has an air balance been provided?                                                                                           YES      NO     N/A

                                                                                                                                 YES      NO     N/A
     Has the air balance taken into account the base building air from MAA system?
                                                                                                                                 YES      NO     N/A
     Has adequate fresh air been provided?
     Is the air balance consistent with the "Shell and Core" drawings?                                                           YES      NO     N/A

                                                                                                                                 YES      NO     N/A
     For food service facility is air balance negative with respect to adjacent terminal space?
                                                                                                                                 YES      NO     N/A
     Does SA/RA/EA/MA balance per ASHRAE standards?

     Mechanical Controls
     Has Johnson Controls Inc. been identified as point of contact for related work?                                             YES      NO     N/A

     Are local controls provided for tenant’s supplemental HVAC equipment?                                                       YES      NO     N/A

     Has it been noted that JCI is to be contacted prior to commencement of demolition in space to ensure that proper            YES      NO     N/A
     terminations of the local DDC/pneumatic controls for future use is done?
     Has it been noted that JCI shall be the proprietary controls contractor for all HVAC equipment that ties to base building   YES      NO     N/A
     systems (VAV boxes, reheat coils and control valves, etc.)? [JCI Contact is: Mr. Erik Badders (410-584-1160].

     Are economizer operation mode and night setback features included for energy savings?                                       YES      NO     N/A


     Do VAVs control valves or other appurtenances requiring airport-supplied HVAC tie-in into MAA's BMS?                        YES      NO     N/A


     Mechanical Specifications

     Are specifications adequate and reference SMACNA, ASHRAE, NFPA, local and airport codes or standards?                       YES      NO     N/A

                                                                                                                                 YES      NO     N/A
     Are water and air balancing by a certified contractor required?
                                                                                                                                 YES      NO     N/A
     Is written Balancing Report required? (It is required)




                                                                                                                                                9/7/2012
4366df1a-4ea9-4645-984d-21f4ce2e0a9f.xls                                                                                         Mechanical, Page 6 of 19
                                                  MARYLAND AVIATION ADMINISTRATION
                                                    PERMIT DRAWING CHECKLIST
                                                                     BWI AIRPORT
                                                             Project __________________
                                                                                                  YES      NO     N/A


     Mechanical Details

                                                                                                  YES      NO     N/A
     Are details provided to support mechanical equipment?
                                                                                                  YES      NO     N/A
     Are details provided to support roof mounted equipment?
                                                                                                  YES      NO     N/A
     Are details provided for equipment roof curbs and coordinated with architectural drawings?




                                                                                                                 9/7/2012
4366df1a-4ea9-4645-984d-21f4ce2e0a9f.xls                                                          Mechanical, Page 7 of 19
                                           MARYLAND AVIATION ADMINISTRATION
                                            PERMIT DRAWING CHECKLIST
                                                         BWI AIRPORT
                                                 Project __________________




                                                                                             9/7/2012
4366df1a-4ea9-4645-984d-21f4ce2e0a9f.xls                                      Mechanical, Page 8 of 19
                                           MARYLAND AVIATION ADMINISTRATION
                                            PERMIT DRAWING CHECKLIST
                                                         BWI AIRPORT
                                                 Project __________________




                                                                                             9/7/2012
4366df1a-4ea9-4645-984d-21f4ce2e0a9f.xls                                      Mechanical, Page 9 of 19
                                           MARYLAND AVIATION ADMINISTRATION
                                            PERMIT DRAWING CHECKLIST
                                                         BWI AIRPORT
                                                 Project __________________




                                                                                              9/7/2012
4366df1a-4ea9-4645-984d-21f4ce2e0a9f.xls                                      Mechanical, Page 10 of 19
                                                    MARYLAND AVIATION ADMINISTRATION
                                                       PERMIT DRAWING CHECKLIST
                                                                        BWI AIRPORT
                                                                Project __________________



     Electrical Design Drawings and Specifications

     Electrical (General)

     Is a Symbol Legend provided and coordinated with the plans? Are all symbols and abbreviations used shown on the
                                                                                                                               YES      NO      N/A
     legend?
     Is there a note that electrical, communications, data, security, or fire safety wiring/systems shall not be interrupted   YES      NO      N/A
     without notification and coordination with the authority having jurisdiction and written approval from said authority.

     Electrical Demolition Drawings

                                                                                                                               YES      NO      N/A
     Are Electrical Demolition drawings (minimum scale of 1/4"=1'-0") provided?
                                                                                                                               YES      NO      N/A
     Are items that are "existing to remain" clearly indicated?
     Are there adequate notes that all equipment, piping, conduits, cable, etc must be removed back to the source and          YES      NO      N/A
     penetrations patched and finished with like materials? (No abandoned work is allowed to remain in place).

     Single Line Diagrams

                                                                                                                               YES      NO      N/A
     Is a single line or riser diagram included with panel boards and transformers identified?
                                                                                                                               YES      NO      N/A
     Are transformers provided with protection?
                                                                                                                               YES      NO      N/A
     Are transformers of adequate size for load?

     Electrical Lighting Plans

                                                                                                                               YES      NO      N/A
     Is a Lighting Plan (minimum scale of 1/4"-1'-0") provided?
                                                                                                                               YES      NO      N/A
     Is a luminaire fixture schedule provided?
                                                                                                                               YES      NO      N/A
     Is the lighting plan coordinated with fixture schedule?
                                                                                                                               YES      NO      N/A
     Is the lighting plan compatible with supply air diffusers and return grilles and sprinklers?
                                                                                                                               YES      NO      N/A
     Are lighting contactors, switches, etc. shown?
                                                                                                                               YES      NO      N/A
     Is the conduit size specified?
                                                                                                                               YES      NO      N/A
     Are the conductors shown adequate? Number of wires, size of wires, insulation?
                                                                                                                               YES      NO      N/A
     Has it been verified that Flexible Metal Conduit (FMC) does not exceed 6' in length.
                                                                                                                               YES      NO      N/A
     Is exit lighting shown?
                                                                                                                               YES      NO      N/A
     Is emergency lighting shown?
                                                                                                                               YES      NO      N/A
     Are the emergency and exit lighting battery backed-up for a minimum of 90 minutes?
                                                                                                                               YES      NO      N/A
     Are fixture cut sheets included?
                                                                                                                               YES      NO      N/A
     Is the wiring shown adequate? Number of wires, size of wires, insulation?
                                                                                                                               YES      NO      N/A
     Is the wire sized per the National Electric Code (NEC)?
                                                                                                                               YES      NO      N/A
     Is wire THHN or other approved insulated wire?
                                                                                                                               YES      NO      N/A
     Is all wiring plenum rated and in 3/4" conduit?




                                                                                                                                               9/7/2012
4366df1a-4ea9-4645-984d-21f4ce2e0a9f.xls                                                                                       Electrical, Page 11 of 19
                                                     MARYLAND AVIATION ADMINISTRATION
                                                      PERMIT DRAWING CHECKLIST
                                                                       BWI AIRPORT
                                                               Project __________________


     Electrical Power Plans

     Is a Power Plan (minimum scale of 1/4"-1'-0") provided?                                                                  YES      NO      N/A

                                                                                                                              YES      NO      N/A
     Does the electrical plan show the location of all panel boards, disconnects, transformers, equipment, and receptacles?
                                                                                                                              YES      NO      N/A
     Is panel location including distance and MAA supply breaker identified?

     Are loads shown with homeruns identified by circuit?                                                                     YES      NO      N/A

                                                                                                                              YES      NO      N/A
     Is a note included or specified that minimum conduit size is ¾ Inch?
                                                                                                                              YES      NO      N/A
     Is adequate working space in front of electrical equipment provided for maintenance (per NEC Article 110.26)?
                                                                                                                              YES      NO      N/A
     Is all wiring in plenum rated and in conduit?
                                                                                                                              YES      NO      N/A
     Is grounding shown and sized per the NEC?
     Is rigid galvanized steel (RGS) conduit used in exposed installations subject to physical damage? Use RGS to a           YES      NO      N/A
     minimum of 10' above finished floor. All raceway fittings shall be steel.
                                                                                                                              YES      NO      N/A
     Is the conduit fill per the NEC?
                                                                                                                              YES      NO      N/A
     Are the conductors shown adequate? Number of wires, size of wires, insulation?
                                                                                                                              YES      NO      N/A
     Are conductors sized properly to limit voltage drop?
                                                                                                                              YES      NO      N/A
     Is wire THHN or other approved insulated wire?
                                                                                                                              YES      NO      N/A
     Has it been verified that flexible metal conduit (FMC) does not exceed 6' in length.
                                                                                                                              YES      NO      N/A
     Are Transient Voltage Surge Suppressors (TVSSs) provided for circuits that enter the building?

     Electrical Schedules

                                                                                                                              YES      NO      N/A
     Is there adequate electrical supply available for the loads? Voltage? Phases? Current? Spare breakers?
                                                                                                                              YES      NO      N/A
     Are all loads identified and connected?
                                                                                                                              YES      NO      N/A
     Are cable and conduit sizes included?
                                                                                                                              YES      NO      N/A
     Are loads balanced on phases?
     Are panel schedules included with circuits identified and marked? (A new schedule shall be placed in the panelboard      YES      NO      N/A
     showing the updated loads).
                                                                                                                              YES      NO      N/A
     Are panel voltages and interrupting capacities identified?
                                                                                                                              YES      NO      N/A
     Does panel number include tenant space number?
                                                                                                                              YES      NO      N/A
     Does spare capacity exist? Before and after new installation?
                                                                                                                              YES      NO      N/A
     Is new panelboard required?
                                                                                                                              YES      NO      N/A
     Is there a note that new panelboards shall be manufactured by Square D or equal?
                                                                                                                              YES      NO      N/A
     For new circuit breakers, is the Amps Interrupting Current (AIC) rating adequate for available fault current?




                                                                                                                                              9/7/2012
4366df1a-4ea9-4645-984d-21f4ce2e0a9f.xls                                                                                      Electrical, Page 12 of 19
                                                    MARYLAND AVIATION ADMINISTRATION
                                                       PERMIT DRAWING CHECKLIST
                                                                       BWI AIRPORT
                                                               Project __________________


     Electrical Details
                                                                                                                                 YES      NO      N/A
     Are sufficient detail drawings included to represent the work?
                                                                                                                                 YES      NO      N/A
     Are wall or ceiling mounting details adequate?
                                                                                                                                 YES      NO      N/A
     Is a transformer mounting detail included?
                                                                                                                                 YES      NO      N/A
     If transformer is mounted in the ceiling, is it less than 45 KVA?
                                                                                                                                 YES      NO      N/A
     If the transformer is floor-mounted, is a housekeeping pad provided?
                                                                                                                                 YES      NO      N/A
     Is there a note that all bonding and grounding to building steel shall be by exothermic welding.
     Is there a note that sleeves shall be installed for all cable and raceway penetrations of concrete slabs and walls unless
                                                                                                                                 YES      NO      N/A
     core drilled holes are used? (Penetrations through rated assemblies are to be firestopped).

     Electrical Specifications and Notes

                                                                                                                                 YES      NO      N/A
     Are electrical specifications included?
                                                                                                                                 YES      NO      N/A
     Do the specifications adequately address the work?
                                                                                                                                 YES      NO      N/A
     Is a note to firestop penetrations shown?
                                                                                                                                 YES      NO      N/A
     Are NEMA enclosures appropriate for the service?
                                                                                                                                 YES      NO      N/A
     Do enclosures meet specified type for required indoor or outdoor installation?

     Telephone and Data Outlet Requirements

                                                                                                                                 YES      NO      N/A
     Is the telephone (and data, if applicable) system connection and distribution included?
                                                                                                                                 YES      NO      N/A
     Is one duplex outlet (receptacle) connected to a UPS circuit and mounted adjacent to a data connection?




                                                                                                                                                 9/7/2012
4366df1a-4ea9-4645-984d-21f4ce2e0a9f.xls                                                                                         Electrical, Page 13 of 19
                                                  MARYLAND AVIATION ADMINISTRATION
                                                     PERMIT DRAWING CHECKLIST
                                                                     BWI AIRPORT
                                                             Project __________________



     Fire Protection Drawings and Specifications

                                                                                                                  YES      NO      N/A
     Is an interface with MAA fire protection system provided?
                                                                                                                  YES      NO      N/A
           Does it include tenant Audio/Visuals and activating devices?
                                                                                                                  YES      NO      N/A
           Fire Alarm system connection?
                                                                                                                  YES      NO      N/A
     Are smoke detectors required in tenant HVAC system?
     Is a Symbol Legend provided and coordinated with plan? Are all symbols and abbreviations used shown on the
                                                                                                                  YES      NO      N/A
     legend?
                                                                                                                  YES      NO      N/A
     Does the specified Fire Protection System (drawings or submittal) have the following features:
                                                                                                                  YES      NO      N/A
           Zone information (to be coordinated with MAA Fire Department)?
                                                                                                                  YES      NO      N/A
           Fire Alarm system connection?
                                                                                                                  YES      NO      N/A
           Tenant Addressable System needs? (Schedule and details required)
                                                                                                                  YES      NO      N/A
            Compliance with MAA Design Standards for Descriptor Addresses?
     Are the Audibles [PA] and Visual Fire Alarm Notification placements adequate and per Code? {See also
                                                                                                                  YES      NO      N/A
     Communications Section]




                                                                                                                                  9/7/2012
4366df1a-4ea9-4645-984d-21f4ce2e0a9f.xls                                                                          Electrical, Page 14 of 19
                                           MARYLAND AVIATION ADMINISTRATION
                                            PERMIT DRAWING CHECKLIST
                                                         BWI AIRPORT
                                                 Project __________________




                                                                                              9/7/2012
4366df1a-4ea9-4645-984d-21f4ce2e0a9f.xls                                      Electrical, Page 15 of 19
                                                    MARYLAND AVIATION ADMINISTRATION
                                                         PERMIT DRAWING CHECKLIST
                                                                          BWI AIRPORT
                                                                  Project __________________



     Plumbing Design Drawings and Specifications
     Is a Symbol Legend provided and coordinated with plan? Are all symbols and abbreviations used shown on the
                                                                                                                  YES     NO      N/A
     legend?
                                                                                                                  YES     NO      N/A
     Is adequate access provided for isolation valves?
                                                                                                                  YES     NO      N/A
     Are all existing plumbing conditions shown?
                                                                                                                  YES     NO      N/A
     Are specifications included for plumbing system?
                                                                                                                  YES     NO      N/A
     Is PVC used? (PVC is not allowed).

     Domestic Water Plans

                                                                                                                  YES     NO      N/A
     Are domestic hot and cold-water plans shown (minimum scale of 1/4"=1'-0")?
                                                                                                                  YES     NO      N/A
     Are new water supply branch connections identified?
                                                                                                                  YES     NO      N/A
     Are isolation valves included (preferably in public area for MAA/BAA access)?
                                                                                                                  YES     NO      N/A
     Are backflow preventers (BFPs) used on supply water to the space?
                                                                                                                  YES     NO      N/A
     Are BFPs provided on all kitchen equipment?
                                                                                                                  YES     NO      N/A
     Is a booster hot water heater provided?
                                                                                                                  YES     NO      N/A
     Is a drain pan provided with the hot water heater?
                                                                                                                  YES     NO      N/A
     Is an expansion tank and a pressure relief device provided?
                                                                                                                  YES     NO      N/A
     Is the drain piped to the nearest sanitary drain?
                                                                                                                  YES     NO      N/A
     Is pressure relief piped to the nearest sanitary drain?

     Sanitary Waste Plans

     Is sanitary waste plan shown?                                                                                YES     NO      N/A
                                                                                                                  YES     NO      N/A
     Are floor cleanouts identified?
                                                                                                                  YES     NO      N/A
     Are clean outs turned up into space?

     Riser Diagrams

     Is riser diagram included, with pipe sizes?                                                                  YES     NO      N/A

                                                                                                                  YES     NO      N/A
     Are backflow preventers (BFPs) identified?
                                                                                                                  YES     NO      N/A
     Are valves, fixtures and installation methods shown?

     Gas Plans

                                                                                                                  YES     NO      N/A
     If gas is required, are plans and specifications included?
                                                                                                                  YES     NO      N/A
     Is the National Gas Code referenced?
                                                                                                                  YES     NO      N/A
     Is there an isolation point outside of tenant space? If so, please indicate.
                                                                                                                  YES     NO      N/A
     Are gas piping and appliances shown (if applicable)?
                                                                                                                  YES     NO      N/A
     Is the gas BTUH shown?
                                                                                                                  YES     NO      N/A
     Are gas regulators properly vented?
                                                                                                                  YES     NO      N/A
     Is the gas pressure data shown?




                                                                                                                                9/7/2012
4366df1a-4ea9-4645-984d-21f4ce2e0a9f.xls                                                                          Plumbing, Page 16 of 19
                                                   MARYLAND AVIATION ADMINISTRATION
                                                      PERMIT DRAWING CHECKLIST
                                                                      BWI AIRPORT
                                                              Project __________________



     Plumbing Design Drawings and Specifications


     Plumbing Details

                                                                                                                            YES     NO      N/A
     Are details shown for floor drains as per MAA Standard details or have the following features:
           Are floor drains provided with clamping collar and specified seepage holes? [J.R. Smith's #2005-A, or equalent
                                                                                                                            YES     NO      N/A
           by Josam or Zurn]
                                                                                                                            YES     NO      N/A
           If membrane waterproofing is used, is it shown to be clamped into the clamping ring?
                                                                                                                            YES     NO      N/A
           If liquid applied waterproofing is indicated, is membrane flashing shown to be clamped into the clamping ring?
                                                                                                                            YES     NO      N/A
           If for food service, is epoxy coating specified?
                                                                                                                            YES     NO      N/A
     Are details shown for floor sinks as per MAA Standards or have the following features:
           Are floor sinks provided with clamping collar and specified seepage holes? [J.R. Smith's "Sani-Ceptor" #3100,
                                                                                                                            YES     NO      N/A
           or equalent by Josam or Zurn]
                                                                                                                            YES     NO      N/A
           If membrane waterproofing is used, is it shown to be clamped into the clamping ring?
                                                                                                                            YES     NO      N/A
           If liquid applied waterproofing is indicated, is membrane flashing shown to be clamped into the clamping ring?
                                                                                                                            YES     NO      N/A
           If used for food service, is epoxy coating specified?
                                                                                                                            YES     NO      N/A
     Are floor penetration details indicated as per MAA Standard Details or have the following features:
                                                                                                                            YES     NO      N/A
           Is metal sleeve indicated?
                                                                                                                            YES     NO      N/A
           Is membrane flashing indicated and extends minimum of 2 inches above floor level?
                                                                                                                            YES     NO      N/A
           Is the gap between the penetrant and sleeve provided with UL-approved fire stopping system ?
                                                                                                                            YES     NO      N/A
     Is a potable water connection detail shown?
                                                                                                                            YES     NO      N/A
     Is a sewage connection detail shown?
                                                                                                                            YES     NO      N/A
     Is the Thermaco (or equal) automatic grease interceptor specified for kitchen sinks?
                                                                                                                            YES     NO      N/A
     Is access provided to service grease traps?
                                                                                                                            YES     NO      N/A
     Are adequate mounting details shown?




                                                                                                                                          9/7/2012
4366df1a-4ea9-4645-984d-21f4ce2e0a9f.xls                                                                                    Plumbing, Page 17 of 19
                                                     MARYLAND AVIATION ADMINISTRATION
                                                       PERMIT DRAWING CHECKLIST
                                                                        BWI AIRPORT
                                                                Project __________________



     Communication Design Drawings and Specifications

     Is a Symbol Legend provided and coordinated with plan? Are all symbols and abbreviations used shown on the
                                                                                                                                  YES      NO     N/A
     legend?

     Has a note been added that all activity in MAA IDF's be coordinated with MAA OAT? (Any communication cabling that
     is not part of the base permit will require a separate permit prior to installation. This includes cables installed by
                                                                                                                                  YES      NO     N/A
     Verizon or others.).

     Emergency Evacuation Paging System

                                                                                                                                  YES      NO     N/A
     Is system scematic for installation provided?
                                                                                                                                  YES      NO     N/A
     Is speaker location shown in the tenant space and called out as "EES"?
     Is conduit routing detail, showing connection to MAA's IDF (communication closet) provided? (If cable pull is joint with
                                                                                                                                  YES      NO     N/A
     communication cables, indicate details on drawings).
                                                                                                                                  YES      NO     N/A
     If tenant audio system is installed in space, is audio shunt provided? (Indicate details on drawings).
                                                                                                                                  YES      NO     N/A
     Is list of hardware materials provided? (Should be acceptable to or approved by MAA IT)

     Communication Cable (Voice & Data)

                                                                                                                                  YES      NO     N/A
     Is conduit to MAA IDF (communication closet) detail provided?
                                                                                                                                  YES      NO     N/A
     Is detail of conduit, cabling, terminations etc (within suite) provided?
                                                                                                                                  YES      NO     N/A
     Is detail of conduit entry and facility routing/termination in the MAA IDF provided? (Include labeling detail).
                                                                                                                                  YES      NO     N/A
     Has it been verified that all cable is plenum rated AND installed in conduit?

     Commercial Cable TV

                                                                                                                                  YES      NO     N/A
     Is conduit routing detail to Cable TV connection point indicated?
                                                                                                                                  YES      NO     N/A
     Is detail of conduit and cable routing within suite indicated?
                                                                                                                                  YES      NO     N/A
     Is detail of conduit entry and facility routing/termination in the MAA IDF provided? (Include labeling detail).
                                                                                                                                  YES      NO     N/A
     Has it been verified that all cable is plenum rated AND installed in conduit?




                                                                                                                                                9/7/2012
4366df1a-4ea9-4645-984d-21f4ce2e0a9f.xls                                                                                    Communications, Page 18 of 19
                                           MARYLAND AVIATION ADMINISTRATION
                                            PERMIT DRAWING CHECKLIST
                                                         BWI AIRPORT
                                                 Project __________________




                                                                                                  9/7/2012
4366df1a-4ea9-4645-984d-21f4ce2e0a9f.xls                                      Communications, Page 19 of 19

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:190
posted:9/7/2012
language:Unknown
pages:19