Initial Prototype Demonstration

Shared by: HC120901022545
Categories
Tags
-
Stats
views:
0
posted:
8/31/2012
language:
Unknown
pages:
2
Document Sample
scope of work template
							Friday, August 31, 2012

Prototype Demonstration
     a) A 25-minute presentation, plus time for questions
     b) At least 6 students in the class should present.
     c) An evaluation criteria sheet will be used. (TBA)

Prototype Demonstration
  Mention which use cases have been implemented.
  Take your time to present them. Don't rush.
  Populate the prototype with meaningful data.
    Project Plan
     schedule
     people allocation
     management style – life cycle model; process model OO
            o reqts – use cases
            o specs – conceptual model
            o design – OO
            o implementation – C^
            o test & integrate
            o system test
            o deploy
            o acceptance test
            o maintain
                    enhance
                    fix defects
     deliverables
     standards
     milestones
     user’s guide
     Tell us what is left to be done.

Management
    Discuss your management approaches and problems you had.
    meetings
    reviews
    standards – Documentation, Coding


Testing
    Describe your testing approaches – black & white box; unit
    Documentation of testing
    Usability testing

Bug Reports
    Present Bugzilla bug reports and the way they are/can be used in the project.
              - Table reports
             - Graphical reports

Measurements
    Discuss CVS statistics produced by StatCVS. StatCVS generates statistical HTML
       reports from CVS repository logs.
    Post the generated HTML reports in your team Web site.
    Present O-O metrics and their implications: What can we interpret from these values?
    Look for some software in the Web and use it to obtain O-O metrics from your code.
      process, product, people and project metrics

GRASP Patterns
   Discuss at least 5 examples where you are using GRASP patterns. (guest, behappy)
   Demonstrate with diagrams


Conclusions
    What worked?
    What did not work?
    Why is your Software System of High Quality (SQA)?
    CMMi mapping – what level is your software process?
   

						
Related docs
Other docs by HC120901022545
Additional HW problems from CMOS
Views: 2  |  Downloads: 0
2001 Format for ITRS
Views: 3  |  Downloads: 0
??????? 7406 INVERTER open collector
Views: 12  |  Downloads: 0
User administration
Views: 2  |  Downloads: 0
SHREWSBURY TOWN COUNCIL
Views: 1  |  Downloads: 0
OFFICE OF THE EXECUTIVE SECRETARY
Views: 4  |  Downloads: 0
SHREWSBURY TOWN COUNCIL
Views: 6  |  Downloads: 0
SHREWSBURY TOWN COUNCIL
Views: 3  |  Downloads: 0