					WAL-MART STORES, INC. STORE NO. 0500                                                       05/09/12
PROJECT: EL PASO, TX                                                                         ADD 3
PROJECT NO. 96540403


SPECIFICATIONS

SECTION 01640 - OWNER FURNISHED PRODUCTS
1. Revise Products Furnished By Other Schedule to Delete Gift Registry Kiosk.

SECTION 08710 - DOOR HARDWARE
1. Revise Paragraph 3.4, Hardware Schedule: Add Hardware Set No. 909A.

ARCHITECTURAL

SHEET D1 – DEMOLITION PLAN
DETAIL 1 – DEMOLITION PLAN
   1. Remove notes to relocate EAS pedestals at Garden Center (per LRM Guideline V3.01).
   2. Revise exterior door 117A to remain existing (per Internal QC).

SHEET NOTES
   1. Add note #6 to remove all ceiling fans (per LRM Guideline V3.01).

SHEET D1.1 FRONT GROCERY DEMOLITION
DETAIL 1 – FRONT GROCERY DEMOLITION PLAN
   1. Add box note to remove all ceiling fans (per Internal QC).

SHEET A1 – FLOOR PLAN
DETAIL 1 – FLOOR PLAN
   1. Add door tag 909A to plan (per Internal QC).

SHEET A1.2 – INTERIOR FINISH PLAN AND DETAILS
DETAIL 1 – INTERIOR FINISH PLAN
   1. Revise box note on plan to remove detail 2 reference (per Internal QC).
   2. Revise paint call out at compactor door openings (per Internal QC).
   3. Add 8’-0” dimension to compactor door openings (per Internal QC).

DETAIL 2 – EXISTING EXT CMU WALL SECTION
   1. Remove entire detail (per Internal QC).

DETAIL 3 – COLUMN COLORS
   1. Add box note to reference lay-in ceiling conditions (per Internal QC).

SHEET A1.3 – GROCERY INTERIOR FINISH PLAN AND DETAILS
DETAIL 1 – FRONT GROCERY WALL FINISH PLAN
   1. Revise finishes at door 909C (per Internal QC).
   2. Revise finishes at door 908A (per Internal QC).

DETAIL 2 – INTERIOR FINISH PLAN
   1. Revise finishes at door 128A (per Internal QC).
   2. Revise finishes at dairy cooler (per Internal QC).

SHEET A2 – EXTERIOR ELEVATIONS
DETAIL 4 – TLE FRONT ELEVATION
   1. Add arrow at second Tire sign (per Internal QC).

SHEET A3 – VESTIBULE PLANS AND ELEVATIONS
DETAIL 1 – GM VESTIBULE FLOOR PLAN
   1. Add room tag Return Storage 106 to plan (per Internal QC).


                                              Page 1 of 4
WAL-MART STORES, INC. STORE NO. 0500                                                     05/09/12
PROJECT: EL PASO, TX                                                                       ADD 3
PROJECT NO. 96540403


DETAIL 2 – GR VESTIBULE FLOOR PLAN
   1. Revise enlarged plan call out to 1/VCPFC (per Internal QC).

DETAIL 3 – COURTESY DESK ELEVATION
   1. Revise section call out to 10-A5 (per Internal QC).

DETAIL 5 – COURTESY DESK ELEVATION
   1. Add finish call outs PL4, P106 and DB5 to wing wall (per Internal QC).

DETAIL 6 – COURTESY DESK ELEVATION
   1. Add finish call outs PL4, P106 and DB5 to wing wall (per Internal QC).

SHEET A3.1 REAR OFFICE PLAN
DETAIL 1 – ENLARGED FLOOR PLAN
   1. Revise location of tactile signage (per Internal QC).

SHEET A3.2 – RECEIVING AND SITE TO STORE
DETAIL 4 – SITE TO STORE ELEVATION
   1. Revise material call out to PL4 at cabinets (per Internal QC).

SHEET A4 – ROOM AND DOOR SCHEDULES
DETAIL 3 – DOOR TYPES
   1. Revise door Y1 to be Y (per Internal QC).

DOOR SCHEDULE
  1. Revise notes at doors 906A, 909D, and 935A (per Internal QC).
  2. Add door 909A to the door schedule (per Internal QC).

ROOM FINISH SCHEDULE
  1. Revise base call outs at rooms 101 GM Vestibule, 103 Other Income, 115 Grocery Vestibule, and
      117 Other Income (per Internal QC).
  2. Add room 106 Return Storage to schedule (per Internal QC).
  3. Revise finishes to P105 at 104 Cart Storage and 118 Cart Storage (per Internal QC).
  4. Add note #32 to Restrooms 111, 112, 165, and 166 (per Internal QC).
  5. Revise finishes at 126 Seasonal Shop to Ref A1.2 (per Internal QC).
  6. Revise notes at 152 Breakroom, remove #18 and add #19 (per Internal QC).
  7. Revise finishes at 163 Site to Store to reference A3.2 (per Internal QC).
  8. Add room 601 Waiting to schedule (per Internal QC).
  9. Add wall “C” finishes at Room 604 (per Internal QC).
  10. Add wall “C” finishes at Room 900 (per Internal QC).
  11. Revise wall finishes at 901 Service Deli (per Internal QC).
  12. Revise notes at rooms 901, 909, and 935 (per Internal QC).

SHEET A5 – CASEWORK
DETAIL 9 – COUNTER SECTION
   1. Add call out PL4 to detail (per Internal QC).

DETAIL 10 – BASE CABINET SECTION
   1. Revise call out PL4 to be PL6 (per Internal QC).

SHEET AC1 – AUTO CENTER PLANS
DETAIL 2 – TLE PLAN
   1. Add room name 601 Waiting to the plans (Internal QC).




                                              Page 2 of 4
WAL-MART STORES, INC. STORE NO. 0500                                                     05/09/12
PROJECT: EL PASO, TX                                                                       ADD 3
PROJECT NO. 96540403

DETAIL 3 – ENVIRONMENTAL CAGE
   1. Revise detail call out to 6-AC1 (per Internal QC).

DETAIL 6 – BOLLARD DETAIL
   1. Add entire detail (per Internal QC).

KEYNOTES
   1. Add keynote 10.44 to legend (per Internal QC).

EQUIPMENT SCHEDULE
   1. Revise quantities at TB461, TB462, TB475, TB476, TB525, TB812, and TB816 (per revised
      scope of work).
   2. Add TB626 to schedule (per revised scope of work).

SHEET RXPFC – PHARMACY
DETAIL 2 – COUNTER SECTION
   1. Revise note regarding to laminate PL20 (per Internal QC).

DETAIL 4 – PHARMACY EXTERIOR ELEVATION
   1. Revise elevation to show 2’-10” counter at Pharmacy Check-out (per Internal QC).

SHEET GA1 – FRONT GROCERY FLOOR PLAN
DETAIL 1 – FRONT GROCERY FLOOR PLAN
   1. Revise enlarged plan call out to 5-GA1 (per Internal QC).
   2. Revise location of tactile signage (per Internal QC).
   3. Delete box note (per Internal QC).

DETAIL 2 – EXHAUST FAN DETAIL
   1. Remove entire detail (per revised scope of work).

DETAIL 5 – PARTIAL FLOOR PLAN
   1. Add entire detail (per Internal QC).

SHEET GA2 – REAR GROCERY FLOOR PLAN AND DETAILS
DETAIL 1 – REAR GROCERY FLOOR PLAN
   1. Add tactile exit signage call out (per Internal QC).
   2. Add tactile exit signage and call out (per Internal QC).

MECHANICAL

SHEET MP1 – MECHANICAL AND PLUMBING PLAN
GENERAL NOTES
1. Add note 41 per peer review comments.

SHEET MAC2 – AUTO CENTER MECHANICAL DETAILS
DETAIL 1 – DIY TANK DETAIL
1. Revise detail for clarification.

DETAIL 8 – WASTE OIL PUMP ASSEMBLY
1. Revise detail to Graco manufacturer per peer review comments.

SHEET MAC2.1 – AUTO CENTER MECHANICAL DETAILS
PLUMBING KEYNOTES
1. Add keynote 15.473 to sheet per peer review comments.




                                              Page 3 of 4
WAL-MART STORES, INC. STORE NO. 0500                                                         05/09/12
PROJECT: EL PASO, TX                                                                           ADD 3
PROJECT NO. 96540403

SHEET P2 – PLUMBING DETAILS AND SCHEDULES
DETAIL 9 – WALL CLEANOUT
1. Remove detail from sheet and rename to “NOT USED” for clarification.

SHEET GP1 – FRONT GROCERY PLUMBING PLAN
DETAIL 1 – FRONT GROCERY PLUMBING PLAN
1. Remove detail callout 7/P2 per peer review comment.
2. Remove plumbing design for oven per peer review comment.

DRAIN / CLEANOUT / HOSE BIBB / HYDRANT SCHEDULE
1. Remove schedule from sheet per peer review comment.

FLOOR / ROOF DRAIN SCHEDULE
1. Add schedule to sheet per peer review comment.

ELECTRICAL

SHEET E1.1 – ENLARGED LIGHTING PLANS DETAILS AND SCHEDULE
DETAIL 2 – REAR AREA LIGHTING PLAN
   1. Remove wiring for the existing 3-way switches in breakroom per peer review comments.

SHEET E2 – POWER PLAN
DETAIL 1 – POWER PLAN
1. Remove power drop 05B and 07H per FPD.
2. Add power drop 19A per FPD.
3. Add keynote for the self checkouts and attendant stations.

ELECTRICAL KEYNOTES
1. Add keynote 16.489 and 16.W14. (CI 2472)

SHEET E2.1 – ENLARGED POWER PLANS
DETAIL 1 – VISION CENTER POWER PLAN
1. Remove (3) data outlets from Record Retention room per peer review comments.

SHEET E4.1 – PANELBOARD SCHEDULES
PANELBOARD SCHEDULE L1D1
1. Circuit (42) – update load and description.

PANELBOARD NOTES
1. Remove general note 4 and renumber 5 to 4.

SHEET E5 – TLE ELECTRICAL PLANS
DETAIL 1 – TLE ELECTRICAL PLAN
1. Remove “CLEAN LIGHT FIXTURES” from note per peer review comments.

DETAIL 2 – TLE PIT ELECTRICAL PLAN
1. Remove “CLEAN AND RELAMP FIXTURE AS REQUIRED” from note per peer review comments.