					Annual Sustainability Progress Report: May
             2010 – May 2011




                  May 2011




         Scarborough Borough Council




                      0
                                Author: James Bridges, Sustainability Officer
Executive Summary
Sustainability/sustainable development is about ensuring the earth’s resources (e.g. metals,
minerals, coal, oil, and gas) are used wisely and our environment such as land, water and air (which
are also resources) on which we depend are looked after now so that our's and our children’s quality
of life are not compromised by our actions. As such, sustainability is about protecting and enhancing
the environment whilst promoting economic success by using resources wisely, and meeting the
social needs in the community. What changes can we all (council's, individuals, communities,
businesses) make to help ensure the future is a bright one for us as well as for future generations?

This annual report, aligned with the end of the financial year, documents progress with the delivery
of the sustainability work by the Council and in accordance with its partners as appropriate, over the
last 12 months (from May 2010 until May 2011).

The sustainability work is primarily addressed by Scarborough Borough Council’s (SBCs)
Sustainability Officer, but also the Energy Manager, and other Officers as appropriate, for example,
economic development, parks and countryside, housing, procurement, and planning. The work is
also being delivered in conjunction with partners, for example, the Emissions Working Group, a sub-
group of the Scarborough Local Strategic Partnership; and other local authorities in the sub-region.

The sustainability work of the Council is monitored and reviewed through the Sustainability Working
Group of elected Members and Officers that meets on a monthly basis. Progress is reported and
reviewed through the Council’s other governance structures, for example, Scrutiny Committees and
to the Full Council each year. There are five main sections to the report:
   First, is an introduction on how this annual report ties in with delivering on the Council’s
    Sustainable Development Strategy which was published in September 2010.
   Second, is a summary of the progress of the sustainability work delivered over the last 12
    months (May 2010 - May 2011), including key actions completed, actions in progress, actions
    that are significant but yet to be started, and actions unlikely to be started due to funding or time
    constraints.
   Third, material on some of the financial and carbon savings made through the Council delivering
    on sustainability is highlighted.
   Fourth, the way forward for delivering on sustainability over the next 12 months, until May 2012
    is discussed.
   Finally, key considerations and conclusions are provided.

Appendix 1 provides a comprehensive assessment on the delivery of sustainability over the last 12
months. Examples of completed actions highlighted there and in Section Two (below) include:
   Further to consultation with the public and partners, the Sustainable Development Strategy and
    an accompanying comprehensive delivery action plan were published in September 2010.
   A number of energy efficiency actions have been implemented to reduce energy usage, carbon
    emissions and the energy bill of the Council in its buildings. These include Passive Infra-red
    Lighting in 50% of Public Conveniences; modern controls for the boiler at Whitby swimming pool;
    and pool covers for Whitby and Scarborough swimming pools.
   The Council obtained £65,000 match funding through the Carbon Trust’s Salix Energy Efficiency
    Fund to take forward pro-active energy management measures in Council buildings.
   A comprehensive sustainability section of the Council website has been developed
    (www.scarborough.gov.uk/sustainability).

   Through regional funding, the Council has helped to establish 3 sustainability community
    projects, whereby community groups improve their energy efficiency and look to install
    renewable technologies: these greener communities’ related projects are in Fyling Dales,
    Hawsker and Whitby in co-operation with the Yorkshire Energy Partnership and the Stockholm
    Environmental Institute in York.
                                                    1
                                                                          Author: James Bridges, Sustainability Officer
                                           Contents Page

Contents                                                                                          Page No
Executive Summary                                                                                              1


Section One – Introduction                                                                                     3


Section Two - Summary of progress in delivering key sustainability actions                                     4


Section Three - Financial and carbon savings through delivery of the sustainability work                       9


Section Four – Looking forward: the next 12 months in delivering the sustainability work                     12


Section Five – Key summary points of this annual report                                                      14




Appendices

Appendix 1 - Summary of progress with actions                                                                15


Appendix 2 – Objectives’ of the Sustainable Development Strategy                                             40




Boxes and Tables

Box 1. The four priorities of the Sustainable Development Strategy                                             3

Table 1. Salix Energy efficiency fund: initiatives that have been implemented                                11
between September 2010 – April 201

Table 2. Salix Energy Initiatives Projects Pipeline                                                          13




                                                      2
                                                                       Author: James Bridges, Sustainability Officer
    Section One - Introduction

Sustainable development/sustainability is about meeting the needs of the present without comprising
the ability of future generations to meet their own needs. It’s about ensuring a better quality of life for
all, both for today and in the future.

Sustainability is about ensuring that the earth’s resources (e.g. metals, minerals, coal, oil, and gas)
are used wisely and our environment such as land, water and air (which are also resources) on
which we depend is looked after now so that our's and our children’s quality of life is not
compromised by our own actions. As such, sustainability is about protecting and enhancing the
environment whilst promoting economic success by using resources wisely so that they are of
benefit and enjoyment to present and future generations, and meeting the social needs in the
community.

Therefore, it is important that we all take account of the environmental impacts of our activities. For
example, to live sustainably we need to live within the limits of the Earth's environment and
resources. The Borough is one of the most beautiful parts of the world and it is important that we all
look after it for everyone to enjoy.

The sustainability work of the Council was re-energised two years ago in 2009 with the Cabinet
approval of a Sustainability Policy, the employment of a Sustainability Officer, and the setting-up of
the Sustainability Working Group of elected Members and Officers that continues to meet on a
monthly basis.

This document only assesses the delivery of the sustainability work by the Council and in
accordance with its partners as appropriate, over the last 12 months, from May 2010 until May 2011.
Whilst progress with delivering on sustainability actions over the last 12 months is reported in the
Table’s highlighted in Appendix 1, the majority of the material provides a detailed assessment of
progress since the publication of the Sustainable Development Strategy and the accompanying
delivery action plan in September 2010, and therefore the work that has been addressed over the
last 8 months1. For example, the relevant Table’s in Appendix 1 are structured around the order of
priorities, objectives and the comprehensive range of actions highlighted within the delivery plan.

The Sustainable Development Strategy highlights 4 priorities (see Box 1) to be addressed that will
help to make the Borough of Scarborough a more sustainable place to live and work - progress is
assessed against these four priorities throughout this annual report. In turn, within the delivery
action plan there are a total of 26 objectives with which the actions and priorities are aligned - see
Appendix 2.


Box 1. The four priorities of the Sustainable Development Strategy

    Priority 1 - Building capacity and local management towards sustainability (aligned with objectives 1-4).
    Priority 2 - Buildings and estates and activities within the council’s own operations: Making effective use
     of resources (aligned with objectives 5-12).
    Priority 3 - To address the challenges presented by climate change and combat these in a sustainable
     manner (aligned with objectives 13-20).
    Priority 4 - Reduce the Borough’s broader ecological footprint (aligned with objectives 21-26).
Source: SBC Sustainable Development Strategy 2010-2013



1
  The Sustainable Development Strategy (2010-2013) and the accompanying delivery action plan (as an Appendix to the
former) can be downloaded from the relevant links at www.scarborough.gov.uk/sustainability. The sustainability section
on the Council website provides further examples of sustainability work that has been delivered over the last two years.

                                                            3
                                                                                     Author: James Bridges, Sustainability Officer
This annual report is concerned with the progress of work primarily delivered by the Sustainability
Officer but also the Energy Manager (e.g. priority 2), and other Officers as appropriate, for example,
economic development, parks and countryside, housing, procurement, and planning. The work is
also being delivered in conjunction with partners, for example, the Emissions Working Group, a sub-
group of the Scarborough Local Strategic Partnership; and other local authorities in the sub-region.

The sustainability work of the Council is monitored and reviewed through the Sustainability Working
Group of elected Members and Officers that meets on a monthly basis and progress is reported and
reviewed through the Council’s other governance structures, for example, Scrutiny Committees and
to the Full Council each year.

The remainder of this report is structured as follows. Section Two is a summary of the progress of
the sustainability work delivered over the last 12 months (May 2010 - May 2011), including key
actions completed, actions in progress, actions that are significant but yet to be started, and actions
unlikely to be started due to funding or time constraints.

Section Three provides material on some of the financial and carbon savings made through the
Council delivering on sustainability. The material includes some of the energy efficiency measures
implemented by the Energy Manger and examples work by the Sustainability Officer that has
brought funding into the Council.

Section Four discusses the way forward for delivering on sustainability over the next 12 months, until
May 2012. Finally, Section Five provides key considerations and conclusions. Appendix 1 provides
a comprehensive progress report against actions over the last 12 months and highlights, for
example, key actions completed, actions in progress, actions that are significant but yet to be
started, and actions unlikely to be started due to funding or time constraints.



Section Two - Summary of progress in delivering key sustainability actions


To provide clarity in assessing progress with delivering on sustainability, this has been structured
into five classifications, ranging from those actions that have been completed through to those yet to
be started. The classification is as follows:

   Actions completed as a tangible outcome: for example, developed a climate change
    awareness screen saver, the setting up of an Energy Champions Group, or developed a
    Sustainability Impact Assessment template).
   Actions in progress but will be an on-going basis: for example, working with communities on
    sustainability and climate change initiatives or providing environmental business support in
    through advice and developing tools they can use including case studies, contacts, action
    planning etc.
   Actions in working progress but yet to be completed as a tangible outcome: for example,
    developing a bus map.
   Actions yet to be started (either as a tangible outcome or actions more aligned to be
    undertaken on an on-going basis)
   Actions unlikely to be started or taken forward (due to financial or time implications).

The remainder of this section provides a summary and examples of progress for key actions of the
sustainability work set-out to be delivered over the last 12 months in line with the classification
highlighted above. As applicable, the examples are aligned with 1 of the 4 priorities highlighted in
the Sustainable Development Strategy (SDS), as referred to in Box 1 (Section One) above. See
Appendix 1 for a comprehensive assessment of the sustainability actions the Council has been
working on over the last 12 months in accordance with the priorities.
                                                   4
                                                                         Author: James Bridges, Sustainability Officer
   Examples of actions completed (as a tangible outcome):

    » New sustainability section on the Council website. A comprehensive sustainability section
    of the Council website has been developed (www.scarborough.gov.uk/sustainability).

    » Energy management. The Council successfully obtained £65,000 match funding through the
    Carbon Trust’s Salix Energy Efficiency Fund to set-up a Council energy efficiency project fund.
    This is now up and running and as is highlighted in some of the actions discussed below in this
    section, the Energy Manager has pro-actively take forward energy efficiency projects within the
    Councils own operations.

    » 10:10 campaign. The Council has signed up to the national 10:10 Campaign to demonstrate
    it’s commitment to reducing its carbon emissions within its own operations by 10% over a 12
    month period starting in June 2010.

    » Sustainable Development Strategy (SDS). Further to consultation with the public and
    partners, the SDS and an accompanying comprehensive delivery action plan was published in
    September 2010 (see also Appendix 1).

    » Sustainability Impact Assessment (SIA) template. The SIA template has been developed
    and will help to ensure that sustainability is considered within proposals in Cabinet reports. It
    has been modified and completed with approval from the Sustainability Working Group and just
    needs to be passed by the Senior Manager Team for use with Cabinet reports (linked to priority 1
    of the Sustainable Development Strategy).

    » Sustainability Champion. Anchored sustainable development within the Council by
    nominating a Strategic Director as a Sustainability Champion – Hilary Jones (priority 1).

    » Recycling in Council buildings. The role out of recycling units (to separate paper, cans,
    plastic from landfill waste) to respective offices across the Council buildings (priority 2).

    » Energy efficiency projects in Council buildings. A range of energy efficiency projects
    within the council’s own buildings have been taken forward, including: Passive Infra-red Lighting
    in 50% of Public Conveniences; modern control boiler at Whitby swimming pool; pool covers for
    Whitby and Scarborough swimming pools; Quattro Seal draft exclusion installed at Whitby Spa;
    and retro-fit T5 light adaptors installed at Whitby and Scarborough swimming pools. See Table 1
    below and the actions under priority 2 in Appendix 1 for a more detailed analysis (priority 2).

    » Smart meters. All 10 buildings have electric smart meters with monthly readings taken. For
    gas meters, monthly meter readings are entered onto supplier’s website (priority 2).

    » Energy Champions Group. The Energy Manger has set-up an energy champions group
    (priority 2).

    » Energy action plans for council operations. Key Council building sites have energy action
    plans in place so that key energy efficiency actions have been identified and can be implemented
    to reduce energy usage, carbon emissions and the energy bill of the Council (priority 2).

    » Display Energy Certificates (DECs). Ensure that all public buildings that require a DEC
    (which assesses the energy efficiency of the building) have a proper formal assessment
    displayed (priority 2).

    » Video-conferencing. Encouraged video-conferencing as a means to move away from vehicle
    travel by having a climate week screen saver and setting up a half day workshop on using the
    video-conferencing equipment in March 2011 (priority 2).



                                                   5
                                                                        Author: James Bridges, Sustainability Officer
    » Community energy efficiency projects. Through regional funding, the Council has helped to
    establish 3 sustainability community projects, whereby community groups improve their energy
    efficiency and look to install renewable technologies: these greener communities’ related projects
    are in Fyling Dales, Hawsker and Whitby in co-operation with the Yorkshire Energy Partnership
    and the Stockholm Environmental Institute in York (priority 3).

    » Climate risk assessment work. Comprehensive risk assessment of the impact of a changing
    climate on local authority services and business continuity has now been completed for SBC by
    a part-time North Yorkshire Climate Change Adaptation Project Officer and the Sustainability
    Officer.

    » Sub-regional co-operation: carbon modelling funding bid. Through the Regional
    Efficiency and Improvement Programme (REIP) the York and North Yorkshire Sustainability
    Officers Group have successfully obtained money for carbon modelling work to help develop an
    evidence base for key carbon intervention measures in the respective districts. Carbon
    modelling work to progress through the summer of 2011 (priority 3).

    » Local Development Framework (LDF) and climate change. The emerging Core Strategy of
    the LDF has a specific proactive policy approach to development, adapting to the environmental
    risks at the local level that result from environmental processes and climate change. The climate
    change agenda is captured in the draft Core Strategy and generic Sustainability Appraisal
    (priority 3).


   Examples of actions in progress on an on-going basis:

    » Further energy efficiency projects in Council operations. Energy Manager is taking
    forward energy efficiency projects within the council’s own buildings with support from the
    Sustainability Working Group (see Table 2, Section Four, below) (priority 2).

    » Renewable technology feasibility studies. The Energy Manager is identifying potential
    renewable technologies, for example, wind turbines, photovoltaics and solar thermal heating
    within the council’s own buildings. - Filey Caravan Park identified as a potential site for wind
    turbines. The proposed new depot site awaiting surveys for solar thermal, biomass and PV solar
    panels (priority 2).

    » Community Energy Savings Programme (CESP). A project proposal for CESP has been
    completed by the Housing Manger and Sustainability Officer. However, financial match funding
    issues by SBC and the delay in the more comprehensive feasibility study by the partner
    organisations (Yorkshire Energy Partnership and EAGA) involved in the programme have
    hindered getting CESP off the ground, albeit the feasibility assessment work has now started
    (priority 3).

    » Low carbon economy – supporting business. The sustainability section of the SBC website
    has a section for businesses support and is regularly up-dated. Information is circulated to
    Scarborough business eco-blog, media etc about environmental support events taking place in
    the sub-region. The Sustainability Officer has attended and helped to organise venues for Green
    Business Club meetings in Scarborough and is looking to hold some in Whitby in the foreseeable
    future. Through the Emissions Working Group (sub-group of the Scarborough Local Strategic
    Partnership), the Sustainability Officer is working with the businesses to develop an
    environmental businesses support framework for action (for example, see the below heading
    ‘Environmental Strategy for businesses and partners’). The Sustainability Officer has attended
    regional low carbon exchange event workshops and presented on sustainability and funding
    opportunities for businesses (priority 3).




                                                   6
                                                                        Author: James Bridges, Sustainability Officer
    » Switch from polystyrene to cardboard packaging. The Sustainability Officer and the Waste
    Enforcement and Recycling Team are exploring the possibility of setting up a scheme where
    take-away outlets transfer to cardboard for take-away packaging rather than polystyrene. This
    will include working with businesses by using cardboard devising incentives (priority 4).

    » Sustainability web updates. The sustainability section of the SBC website which has been
    built is updated regularly with funding opportunities for the wider community, and highlights
    events and projects they can get involved in (priority 4).

    » Compost giveaways. Continuation with the successful compost giveaways twice a year
    (priority 4).

    » Community energy efficiency and broader sustainability projects. Examples of work the
    Sustainability Officer has been involved in include: sustainability presentations at two Area
    Forums; worked with the Scarborough and Whitby 10:10 campaign groups; worked with the
    Scarborough Climate Change Action Network; supported the Fyling Dales, Hawsker, and Whitby
    green communities projects; supported funding bids of the Esk Valley Community Energy Group;
    attended various events on local food production; attended various local events on energy
    efficiency in the Borough; involved in the Local Transport Group; participated in environmental
    workshops and a sustainability presentation at Graham School; involved in a teacher training
    climate change event; involved in the early phases of organising a series of workshops on
    climate change for the public in Whitby (priorities 3 and 4).

   Examples of actions started yet to be completed:
    » Sustainability Impact Assessment (SIA) for Cabinet reports. This has been completed in
    its draft form and approved by the Sustainability Working Group but still awaiting
    amendments/approval by Senior Managers (priority 1).

    » Aalborg Commitments. The Council is exploring signing-up to the Aalborg Commitments to
    formalise processes and knowledge exchange between towns and cities. The Sustainability
    Officer has produced a report on this for the Policy and Performance Manger and Leader of the
    Council. Need to confirm with Leader of the Council as to whether he can sign as soon as
    possible or whether Cabinet approval is required (priority 1).

    » Sustainability presentations for Officers and Members. Undertake a series of
    presentations and workshops with elected Member and Officers from respective units. The
    presentations and workshops will cover both sustainability and energy management.
    Presentations have been developed around the draft Sustainability Impact Assessment template
    for the business units of the Council. Previous presentation has been trialled with Sustainability
    Working Group and the Environmental Services Department. Members will be invited to Officer
    training sessions once dates are set. This will also tie in with an e-learning sustainability module
    on Learning Pool (priority 1).

    » Vehicle tracking for refuse vehicles. At the moment The Council are focussing on the in-cab
    system and associated vehicles tracking. This is currently out to tender and the Council are
    looking at an installation date of August/September 2011. SBC has also purchased some route
    optimisation software for refuse and recycling collection rounds. This, together with vehicle
    tracking and the in-cab system, should enable us to achieve a significant fuel saving (priority 2).

    » Travel Plan. On-going to be completed. Sustainability Officer to write the revised travel to
    work plan with targets (priority 2).

    » Council Energy Strategy. Energy Manager to up-date the Corporate Energy Strategy for the
    Council (priority 2)




                                                    7
                                                                         Author: James Bridges, Sustainability Officer
    » Scarborough Town Bus Map. Produce a bus map that draws together key bus routes to
    encourage alternative forms of transport. The Sustainable Development Officer is working with
    the Scarborough Renaissance Transport Group and Print Plus in taking forward the bus map.
    The bus map has been started and is likely to be completed end of July 2011 (priority 3).

    » Environmental Strategy for businesses and partners. Encourage partners and businesses
    to develop an Environmental Strategy/action plans and set targets and outcomes to deliver on,
    by providing them with a template of case studies, the types of actions they can undertake to be
    more resource efficient and reduce energy usage, contact/links for sustainability organisations
    that can provide them with advice etc. The Sustainability Officer has started work on an
    Environmental Strategy/Action Plan template that businesses can adapt. Work includes
    contacting businesses to find out about case studies of good energy management practice and
    their own top tips. To be completed end of summer 2011 (priority 4).


   Examples of actions yet to be started:

    » Green Fleet Environmental Management Plan. Ensure the Green Fleet Environmental
    Management Plan (draft Green Fleet Policy and draft Tyre Policy) for SBCs fleet is amended
    with appropriate quantitative targets; and approved by the Council. Because it is unclear as to
    the future of the Garage services, this action has been postponed with a view to amending the
    management plan as appropriate (priority 2).

    » Climate Change Action Plan. Sustainability Officer to develop a Climate Change Action Plan
    that will capture the risks from the risk assessment, adaptation actions and carbon emission
    reduction in the community. This will tie in with the carbon modelling assessment work due to
    take place in the summer 2011. Draft climate change plan due to be developed by end of
    October 2011 (priority 3).

    » Tree Strategy. With support from the Sustainability Working Group, the Tree Officer to
    complete the Woodland Management Strategy once the agency agreement with the County has
    been assessed. A draft version will be completed by end of October 2011 (priority 4).


   Examples of actions unlikely to be taken forward due to funding or time
    constraints:

    » Town twinning for sustainability. Increase the quality of city partnerships and twinning with
    regard to sustainability. Budget cuts have affected delivering on this action (priority 1).

    » Electric vehicles. Trialled electric vehicles’ for Council fleet (e.g. parks and countryside
    services and parking wardens) on three occasions, but as of yet this is not cost effective and the
    vehicles tested do not meet the requirements of the Council (priority 2).

    » Telematics chip for engines of vehicles to improve fuel efficiency. At the moment the
    Council does not have telematics on any vehicles. The main issue is that the majority of Council
    vehicles don’t have the links necessary to monitor driver/vehicle performance which means that it
    is difficult to measure any increase in efficiency. Some of the newer vehicles do have these links
    but the vehicle suppliers are not willing to provide vehicle warranty where engines were so
    modified. The current position is that the Council will look at this again when the warranty period
    ends for the vehicles which can be modified and run a trial (priority 2).

    » Carbon reduction sub-regional workshop report. Write-up the carbon reduction report as
    an outcome of the findings from the planning and low carbon sub-regional workshop organised
    and chaired by the SBC Sustainability Officer (November 2009). This has been started but will
    still need to be completed. However, it is unlikely to be completed due to time constraints and
    the detail that is still required to go into the report (priority 3).
                                                   8
                                                                        Author: James Bridges, Sustainability Officer
    Section Three – Financial and carbon savings through delivery of the
    sustainability work

The sustainability work delivered over the last 12 months has demonstrated significant carbon and
financial savings and has brought money into the local authority through regional funding climate
change programmes. Examples include:

    Salix Finance energy efficiency match fund. Through the Sustainability Working Group the
     Council successfully applied for Salix funding of £65,000 from the Carbon Trust, to match the
     Council’s own contribution for energy efficiency measures in Council operations (see the next
     bullet point below and Table 1). These monies went into a Council energy efficiency fund (total
     £130,000) that the Energy Manager has draw upon since he has come into post in February
     2010, although the fund was not up formally up and running until April 2010.

    Energy management in Council operations using the Salix/Council energy efficiency fund.
     Table 1, below, provides examples of financial and carbon savings through energy management
     by reducing energy usage in the Council’s operations using the Salix/Council energy efficiency
     fund. Table 1 highlights a range of energy efficiency measures that have been undertaken using
     the fund between September 2010 and April 2011 (e.g. its taken time for some of these projects
     to get through procurement and to be implemented and monitored for success), which include,
     modern boiler controls, swimming pool covers, and Passive Infra Red) motion sensors in Public
     Conveniences. Between September 2010 and April 2011 (these projects have amounted to
     £10,490 in financial savings and 70 tonnes of CO2.

    Regional Improvement and Efficiency Partnership (RIEP) funding programmes. SBC has
     been and is involved in a range of RIEP funding programmes2. However, the following examples
     clearly highlight the financial contribution of RIEP funding as money that has been brought into
     the Council over the last 12 months that has helped to take forwarded programmes that would
     otherwise not have been possible due to limited financial support:

        » Development of Local Climate Impacts Profiles for all North Yorkshire Authorities.
        AECOM consultants were employed to help all local authorities in North Yorkshire to
        progress from level 0 of National Indicator (NI) 188 (level of preparedness to adapt to
        climate change) to level 1. The project was undertaken between December 2009 and June
        2010. Funding for each local authority from RIEP to support this project = £2,000.

        » Comprehensive York and North Yorkshire climate change risk assessment project.
        This work has helped the local authorities in York and North Yorkshire to progress from Level
        1 to level 2 for NI188. Work started in October 2010 and is on-going until August 2010.
        SBCs Sustainability Officer is on the steering board for this project. Two part-time project
        officers were employed to work with Sustainability Officer’s to: (1) undertake a
        comprehensive risk assessment of the impact on local authority services for climate change
        adaptation work (this work is now completed for SBC); (2) disseminate the results of this
        work both within the Y&NY Authorities and their partners (on-going). This information can be
        used by organisations for their risk registers and adaptation action plans. Funding for each
        local authority from RIEP to support this project: £2,200

        » Greener neighbourhoods support officer for greener communities (through the
        Climate Change Skills Fund Programme). This is a 12 month programme that will run until
        October 2011 and involves the employment of a greener neighbourhood’s officer through the
        Yorkshire Energy Partnership to work with a community in York and the districts of North
        Yorkshire. SBCs Sustainability Officer is on the steering board and is working with the

2
 There have been a range of RIEP funding bids, for example, the employment of a North Yorkshire Climate Change
Schools Officer and series of climate change workshops for Chief Executive, senior mangers and leader’s of Council’s in
York and Humber.
                                                           9
                                                                                    Author: James Bridges, Sustainability Officer
        greener neighbourhoods officer and Whitby4Sustainability who have been selected as the
        Borough’s community group to work with, to deliver on sustainability and reduce energy
        usage in the community. Funding for each local authority from RIEP to support this project =
        £10,000.

        » Carbon Modelling Project. Successful carbon modelling bid by the local authorities of
        York and North Yorkshire to help develop an evidence base for key carbon intervention
        measures in the respective districts. SBC’s Sustainability Officer is the co-ordinator for the
        North Yorkshire sub-region. Carbon modelling work by Vantage Point using their Carbon
        Descent software is to progress through the summer of 2011. The data from the model will
        be used to take forward a climate change action plan for the Borough, including priority
        actions to reduce carbon emissions. Funding for each local authority from RIEP to
        support this project = £7,500

   Carbon Emissions Reduction Target (CERT) funding. The Housing Team have £25,000
    available through CERT funding that has been provided by energy suppliers to tackle fuel
    poverty in the Borough.

Totals
 Salix Finance Grant : £65,000
 Financial savings from energy efficiency measures (September 2010 – April 2011): £10,000
 Carbon savings from energy efficiency measures (September 2010 – April 2011): 70 tonnes3
 Funding for SBC programmes through RIEP financial support: £21, 700
 CERT funding: £25,000




3
  Other carbon emission saving projects, for example, though the RIEP funding initiatives are more difficult to quantify
because of the stages they are at. For example, the greener neighbourhoods programme is at the phase where the carbon
footprint for each of the community group members is being calculated, but the total amount of carbon savings will not
become clear until the footprint is recalculated in October 2011 once some of the energy efficiency measures have been
implemented (both in terms of change of behaviour and installation of insulation etc). See also Section 5 below for
information on carbon calculations and assessments.
                                                            10
                                                                                     Author: James Bridges, Sustainability Officer
Table 1. Salix Energy efficiency fund: Initiatives that have been implemented between September 2010 – April 2011
Project                Location           Description                                    Estimated     Assessment of installation of projects far                 CO2          £££ Saved
                                                                                         Annual                                                                   Saved        to date
                                                                                         Savings                                                                  to date      (projects
                                                                                                                                                                  (TNS)        started
Modern Boiler         Whitby          Prevents dry cycling of boilers, therefore    8%             Implemented in November 2010: Since
Controls (gas)        Leisure         boilers are only fired when there is a                       installation, site has recorded an average
                                                                                                                                                                    27.5       £3,500
                      Centre          genuine call for heat.                                       consumption saving of 25% each month these
                                                                                                   savings have been compounded by the installation
                                                                                                   of pool covers (see below).
Pool Covers           Whitby          A blanket that reduces heat loss from the     10%            Implemented in November 2010: (Savings from                      See        See above
(gas)                 Leisure         surface of the pools when they are not in                    this project incorporated into the above calculation).          above
                      Centre          use
Pool Covers           Scarborough     A blanket that reduces heat loss from the     10%            Implemented in December 2010: Since installation
(gas)                 Indoor Pool     surface of the pools when they are not in                    (DEC) site has recorded average monthly saving
                                                                                                                                                                    11.8       £1,500
                                      use                                                          between 6-8%
PIR’s in Public       Various         PIRs (Passive Infra Red) motion sensors       15%            Implemented in September 2010: Completed PCs
Conveniences          across the      activate lights in PCs only when in use.                     are demonstrating savings ranging between 40-60%
                                                                                                                                                                    18.8       £2,556
(PCs) (electric)      Borough         - 17 PCs completed
                                      - 15 PCs to be completed by end of June
                                      2011
T5 Lighting           Whitby          Adaptors enable lower wattage T5 bulbs        28%            Implemented in January 2011: Savings between
Adaptors              Leisure         retrofit to T8/T12 lamps                                     34-49% as wattage of all lamps at this site have
                                                                                                                                                                     0.7       £750
(electric)            Centre                                                                       been dropped considerably.
T5 Lighting           Scarborough     Adaptors enable lower wattage T5 bulbs        28%            Implemented in January 2011: Savings of 22%                       0.7       £833
Adaptors              Indoor Pool     retrofit to T8/T12 lamps                                     generated as only able to retro fit 2ft T8’s
(electric)
Quattro Seal          Whitby          Energy Savers specialise in draught           16%            Implemented in February 2011: Since installation
Draught Proofing      Pavilion        proofing windows and doors                                   the site is recording average monthly saving of 10%.
                                                                                                                                                                    10.4       £1,300
(gas)                                                                                              Encouragingly, whilst the site is also recording
                                                                                                   increased visitor numbers this is not considerably
                                                                                                   impacting upon energy consumption.
E-Box Voltage         Spa             E-Box optimises the incoming voltage,         30%            Implemented in April 2011: Following a 4 week
Optimisation          Footbridge      improves power factor correction and                         trial and installation (April 2011) the E-Box
                                                                                                                                                                    0.11       £51
(electric)            Lights          harmonic filtration                                          demonstrated a 37% savings.
Total savings:                                                                                                                                                     70.01       £10,490

Source: Energy Manager, SBC                                                           11
                                                                                                                                    Author: James Bridges, Sustainability Officer – May 2011
    Section Four – Looking forward: the next 12 months in delivering the
    sustainability work
The Sustainable Development Strategy and accompanying delivery action plan covers a 3 year
period from September 2010 until September 2013. Whilst there will be a number of smaller
actions taking place, key actions for the next 12 months until May 2012 includes much of the on-
going work as highlighted in Section Two (see also Appendix 1). More specifically, this work
includes:

    Sustainability Impact Assessment (SIA). Take forward the SIA for Cabinet reports: This has
     been completed in its draft form but awaiting amendments/approval by Senior Managers (work
     started, to be completed) (linked to priority 1 of the Sustainable Development Strategy).

    Aalborg Commitments. Further to the report that the Sustainability Officer has developed as
     to the advantages of SBC signing up to the Aalborg commitments, encourage the Council to
     sign-up to these to formalise processes and knowledge exchange between towns and cities
     (work started to be completed) (priority 1).

    Sustainability presentations for Officers and Members. Undertake a series of
     presentations and workshops with elected Members and Officers from respective units.
     Presentations have been developed around the draft Sustainability Impact Assessment
     template for the business units of the Council. Members will be invited to Officer training
     sessions once dates are set. This will also tie in with an e-learning sustainability module on
     Learning Pool (started to be completed) (priority 1).

    Energy efficiency in Council buildings. Energy Manager to take forward energy efficiency
     projects within the council’s own buildings (see Table 2 below) and other initiatives (an on-
     going basis) (priority 2).

    Energy Strategy. Energy Manger to up-date the Corporate Energy Strategy for the Council
     (yet to start to be completed) (priority 2).

    Travel Plan. Sustainability Officer to write the revised travel to work plan with targets (started
     to be completed) (priority 2)

    Community Energy Savings Programme (CESP). Completion of the comprehensive
     feasibility study for CESP by the partner organisations Yorkshire Energy Partnership and
     EAGA) with support from the Housing Manager and Sustainability Officer, with a few to taking
     forward a programme of action (started to be completed) (priority 3).

    Business support in the low carbon economy. Sustainability Officer to support local
     businesses to be involved in the low carbon economy by promoting renewable technologies,
     their viability and funding opportunities by attending business forums, undertake presentations,
     meetings, explore viability of taking forward a scheme for micro-technology renewable
     technologies at Scarborough business park (an on-going basis) (priority 3).

    Scarborough Town Bus Map. Sustainability Officer to continue to work with Scarborough
     Renaissance Transport Group and Print Plus to produce a bus map that draws together key
     bus routes to encourage alternative forms of transport. The bus map is likely to be completed
     end of July 2011 (work started to be completed) (priority 3). The possibility of developing bus
     maps for Filey and Whitby will be explored.

    Climate change action plan. Sustainability Officer to develop a climate change action plan
     that will capture the risks from the risk assessment, adaptation actions and carbon emission
     reduction in the community. This will tie in with the carbon modelling assessment work due to
     take place in the summer 2011. Draft climate change plan due to be developed by end of
     October 2011 (yet to be started) (priority 3).
                                                    12
                                                                Author: James Bridges, Sustainability Officer – May 2011
   Community sustainability/energy efficiency workshops, projects and meetings.
    Sustainability Officer to continue to raise awareness of sustainability and be involved in
    projects amongst the wider community of the Borough by attending Area Forum’s and
    community group meetings and events as appropriate. Proceed with the series of workshops
    on climate change for the public in Whitby and support other programmes, schemes and
    projects as appropriate. Continue to support the 3 greener neighbourhood schemes in the
    Borough and the Whitby Esk Energy project. Support climate change education in schools by
    supporting teachers and helping with materials storage of classroom activities (an on-going
    basis) (priorities 3 and 4).

   Tree Strategy. Tree Officer to complete the Woodland Management Strategy in its revised
    format once the agency agreement with the County has been assessed. Draft version will be
    completed by end of October 201 (yet to be started) (priority 4).

   Environmental Strategy for businesses and partners. Encourage partners and businesses
    to develop an Environmental Strategy/action plans and set targets and outcomes to deliver on,
    by providing them with a template of case studies, the types of actions they can undertake to
    be more resource efficient and reduce energy usage, contact of sustainability organisations
    that can provide them with advice etc. Sustainability Officer has started work on an
    Environmental Strategy/Action Plan template that businesses can adapt. Work includes
    contacting businesses to find out about case studies of good energy management practice and
    top tips etc. To be completed end of summer 2011 (on-going yet to be completed) (priority 4).


Table 2. Salix Energy Initiatives Projects Pipeline

Project                Location               Description                                   Estimated Annual
                                                                                            Savings
Modern Boiler          Scarborough            Prevents dry cycling of boilers,              12%
Controls               Indoor Pool            therefore boilers are only fired when
(gas)                                         there is a genuine call for heat.
Quattro Seal           Evron Centre           Reduces heat loss from the fabric of          15%
Draught Proofing                              the building
(gas)
E-Box Voltage          Numerous               E-Box optimises the incoming voltage,         30%
Optimisation           pathway Light          improves power factor correction and
(Electric)             locations              harmonic filtration
PIR’s Public Cons      Remaining 12           PIR, Passive Infa Red motion sensors          25%
(electric)             public cons            activate lights in Pub Cons only when
                                              they are in use
Voltage Optimiser      Filey Caravan          Optimiser reduces the incoming                8-15%
(electric)             Site                   voltage
PIR’s                  Filey Caravan          PIR, Passive Infa Red motion sensors          25%
(electric)             Site Changing          activate lights in changing areas only
                       facilities             when they are in use
IWEMS                  Whitby Leisure         IWEMS optimises speed of pumps                25%
Integrated Water       Centre Pool            according to bather load and required
Energy                 Filtration             chlorination levels. Typically a 10%
Management                                    reduction in pump speed equates to a
System                                        25% reduction in energy.
(electric)
28w D Lamp LED         tbc                    Switching a 28w D-lamp to a 6w LED            70%
replacements                                  reduces the energy of the lamp
(electric)                                    significantly. The council has
                                              thousands of these lamps across its
                                              portfolio
Source: Energy Manager, SBC




                                                          13
                                                                       Author: James Bridges, Sustainability Officer – May 2011
Section Five - Key summary points of this annual report


Further to the above sections that have highlighted the sustainability work delivered by the Council
and its partner organisations over the last 12 months (May 2010-May 2011), and where delivery of
work is to be concentrated in the future (May 2011-May 2012), key considerations include:
      Many actions that are associated with priority 1 ‘mainstreaming sustainability at the
       strategic level in our own operations’ have had the preparation work completed. These
       actions now just need to be taken forward at the strategic level, (e.g. Sustainability Impact
       Assessment, officer training, signing up to the Aalborg commitments) and then these
       actions will be completed. As such many of these actions are associated with
       policy/training measures.
      Those actions associated with priority 2 ‘sustainability and energy management within the
       Council’s own operations’ have clear outcomes and are more associated with practical
       measures, for example, installation of boiler controls or swimming pool covers. A number
       of these more practical actions have been progressed and completed.
      Much of the work to be delivered in the community around climate change and broader
       sustainability (priorities 3 and 4 respectively) have been started (e.g. projects and
       programmes that engage the community) and are actions to be undertaken on an on-going
       basis, rather than actions to be completed with any specific end point highlighted at this
       juncture. However, many of these actions will require deadlines to be set against them in
       due course, rather than being classified simply as an ‘on-going basis’.
      Some of the actions around supporting businesses still need to be taken forward, for
       example, environmental audits and environmental action plans, but once an environmental
       support action plan template has been developed in co-operation with local businesses,
       and CO2 sense, this work will progress quite swiftly.

      Members, Officer’s and the local community should recognise that investing in sustainability
       is not just about financial savings, for example, reduced energy bills by installing energy
       efficiency measures, but also about the carbon savings that can be incurred. This is
       because there are financial costs associated with emitting each ton of carbon. For
       example, for larger organisations there is a range of mandatory carbon trading schemes in
       place that put a price on each ton of carbon that they emit, but current consultation
       processes by the Department for Energy and Climate Change (DECC) suggest that the
       threshold of such schemes might be lowered to capture smaller organisations.

       To illustrate, the Carbon Reduction Commitment Energy Efficiency Scheme is compulsory
       for private and public organisations that consumed over 6,000 MWh (6,000,000 kWh) of
       half-hourly metered electricity during the period from January 2008 to December 2008
       (therefore, SBC is not fully involved in the is scheme, it only has to report on its energy
       usage). At today's prices, this is roughly equivalent to electricity bills of approximately
       £500,000 per year, but there is a suggestion from DECC that this threshold will be lowered
       to capture small organisations that have half hourly meters. In short, organisations involved
       in the CRC have to reduce their carbon emissions to avoid the financial penalties
       associated with emissions. Thus, there is a clear financial incentive to perform well in the
       CRC because organisations will reduce the number of emissions allowances they need to
       buy which cost £12 per ton of CO2 they emit, putting them at a cost advantage to
       competitors that have not cut emissions.




                                                 14
                                                              Author: James Bridges, Sustainability Officer – May 2011
                     Appendix 1: Progress with delivery on sustainability from May 2010 until May 2011
PART A - Cornerstone actions delivered prior to those referred to in the Sustainable Development Strategy
Month                                Action                                                               Comment                                                                   Progress/officer
May 2010                             Salix energy efficiency funding of £65,000 approved                  Energy Manger is using this pot of money with the                         Completed: Sustainability
                                     by Salix Finance and SBC.                                            Council’s own contribution to take forward energy                         Officer/Asset
                                                                                                          efficiency measures – see the table for priority 2, below.                Management/Energy Manager.
June 2010                            Signed up to the 10:10 Campaign                                      The Council has signed up to the national 10:10                           Completed: Energy Manager.
                                                                                                          Campaign to demonstrate it’s commitment to reducing
                                                                                                          its carbon emissions within its own operations by 10%
                                                                                                          over a 12 month period starting in June 2010.
May - September 2010                 Consultation and completion of the Council’s                         Progress against delivery of the action plan is                           Completed: Sustainability
                                     Sustainable Development Strategy and action                          highlighted in the following Tables of this Appendix.                     Officer.
                                     delivery plan.
September 2010                       Developed a comprehensive sustainability section                     There are subsequent up-dates to the sustainability                       Completed: Sustainability
                                     on the Council website.                                              section on policy context and funding opportunities etc.                  Officer.



PART B - Progress of Delivery on the Sustainable Development Strategy Action Plan (September) 2010-2013
Legend for progress assessment in delivering on sustainability:
The Table’s below provide an overview of progress with actions to be progressed as highlighted in the Sustainable Development Strategy (and its delivery
plan) since its publication in September 2011 (over the last 8 months). To provide clarity in assessing progress, the right columns of the tables’ provide a
progress assessment which is structured into five classifications as follows:

      Actions completed: Actions completed as a tangible outcome (e.g. develop a screen saver, set-up Energy Champions Group, develop a template).
      Actions in progress and as an on-going basis: (e.g. working with communities and businesses).
      Actions in progress to be completed: Actions in working progress but yet to be completed as a tangible outcome (e.g. developing a bus map).
      Actions yet to be started: (either as a tangible outcome or actions more aligned to be undertaken on an on-going basis).
      Actions unlikely to be started /completed: This is due to financial or time implications4.



4
    For those actions that can not be started or progressed because, for example, the funding support is not available, then these actions will be deleted to ensure completion in the delivery of the action plan.
                                                                                                             15
                                                                                                                                                                    Author: James Bridges, Sustainability Officer – May 2011
Priority 1: Building capacity and local management towards sustainability
Objectives      Scope of activity        Proposed actions and targets                    Timescales       Comment/assessment                     Progress/Officer
1 To build      Raise awareness,        Undertake a series of presentations and          One lunchtime    (a) Presentations have been            Completed: Sustainability
participation   develop skills and      workshops with Officers from respective          seminar          developed around the draft             Officer.
and             understanding of        units and Members.                               workshop or      Sustainability Impact
sustainable     sustainability, with                                                     unit staff       Assessment template for the
development     employees and           The presentations and workshops will cover       meeting each     business units of the Council.
capacity        members across the      both sustainability and energy                   month starting   Previous presentation has been
within SBC      Council.                management.                                      in October       trialled with Sustainability
and through                                                                              2010             Working Group and the
its Members                                                                                               Environmental Services
and officers.                                                                                             Department.

                                                                                                          (b) Set dates: Members will be
                                                                                                          invited to Officer training            (b) On-going to be completed:
                                                                                                          sessions once dates are set in         Sustainability Officer/Policy and
                                                                                                          May/June2011.                          Performance Manager.
                                        Explore the use of the on-line learning pool     By end of        ICT have confirmed that a              Completed: Sustainability
                                        to promote sustainability and energy             November         sustainability learning module         Officer/ICT.
                                        efficiency and implement as appropriate.         2010.            can be put onto Learning Pool.

                                                                                                          Started work on developing a           On-going to be completed:
                                                                                                          module, to be completed end of         Sustainability Officer/ICT
                                                                                                          July 2011.                             Manager. To be completed by
                                                                                                                                                 end of July 2011.
                                        Set-up a sustainability champions officers       By end of        (a) The Energy Manger has set-         (a) Completed: Energy Manager
                                        group to promote sustainability and energy       October 2010.    up an energy champions group.
                                        management by asking for volunteers from                          (b) Need to align the energy           (b) On-going to be completed:
                                        the various Council departmental units to be                      group to a Sustainability              Sustainability Officer.
                                        a point of contact to drive the sustainability                    Officers Group with reps from a        Sustainability Officer to facilitate
                                        agenda, disseminate information and to                            range of units. May 2011 Echo          merger with a Sustainability
                                        feed back information to the Sustainability                       article has an article asking for      champion’s group in June 2011.
                                        Working group.                                                    volunteers.
                                        Ensure awareness about sustainable               Ongoing.         Human Resources will ensure            Completed: Sustainability
                                        development and energy efficiency is built                        there is a slot to discuss             Officer.
                                        into staff induction.                                             sustainability. Training will also
                                                                                                          be provided for new Members
                                                                                                          in July 2011.
1, 2, 3         Increase capacity for   Build a framework for sustainability
                all Officers and        measures across the Council’s strategies,

                                                                                    16
                                                                                                                                 Author: James Bridges, Sustainability Officer – May 2011
          Members to maximise       projects, plans, policies, programmes,
          sustainability            budgets and activities:                              (a) By end         (a) Need to review Service            (a)Yet to start: Sustainability
          activities within their   (a) Develop a more meaningful                        March 2011.        Plans and to adopt                    Officer.
          own work and              sustainability statement that can be adapted                            sustainability statements as
          decision making for       as appropriate for Service and business                                 appropriate, link into an
          the local authority.      plans templates so that any sustainability                              outcome of sustainability
                                    become more embedded.                                                   training for Officers.

                                    (b) The Council should develop a                     (b) Start by end   (bi) - The SIA template has           (bi) - Completed: Sustainability
                                    Sustainability Impact Assessment (SIA), a            October 2010       been modified and completed           Officer.
                                    sustainability checklist that will inform all        and on-going.      with approval from the
                                    decision-making including Cabinet reports.                              Sustainability Working Group.

                                                                                                            (bii) The SIA is awaiting formal      (bii) - On-going yet to be
                                                                                                            approval for use with Cabinet         completed. Policy and
                                                                                                            reports. Policy and                   Performance Manager. Awaiting
                                                                                                            Performance Manager to liaise         formal approval for use with
                                                                                                            with the Senior Management            Cabinet reports. May/June 2011.
                                                                                                            Team on progress.

                                    (c) Ensure that key sustainability issues are        (c) By end         (c) A report has been                 (c) On-going to be completed:
                                    highlighted on the Council’s Risk Register,          October 2010.      developed as to the need for          Sustainability Officer/Asset and
                                    for example, the impacts of climate change.                             adaptation in the risk register       Finance Manager. Arrange
                                                                                                            and now risk assessment work          meeting for June 2011.
                                                                                                            has now been completed, this
                                                                                                            action can be advanced.

                                    (d) Anchored sustainable development                 (d) Immediate.     (d) Confirmed as Hillary Jones.       (d) Completed: Policy and
                                    within the Council by nominating a Strategic                                                                  Performance Manager.
                                    Director as a Sustainability Champion.                                  (e) Sustainability Officer has
                                                                                                            commented on the Energy               (e) An on-going basis:
                                    (e) Ensure that Sustainability Appraisal             (e) On-going       Statement for Middle Deep             Sustainability Officer/ Forward
                                    (SA), Strategic Environmental Assessments                               Dale, The draft Sustainability        Planning.
                                    (SEAs) and Sustainability Statements for all                            Impact Assessment has been
                                    major developments are properly developed                               developed; and sustainability
                                    and utilised.                                                           statements produced as
                                                                                                            appropriate, but these have
                                                                                                            been infrequent.

1, 2, 4   Manage                    Communicate the Council’s commitment to              (a) – (d) On-      (a) N Yorkshire Climate Risk          (a) An on-going basis: North
          environmental risk by     sustainability and environmental risk                going - as and     Officer has undertaken a              Yorkshire Climate Risk
                                                                                    17
                                                                                                                                  Author: James Bridges, Sustainability Officer – May 2011
working effectively     management to stakeholders by:                     when meetings     presentation at Scarborough            Assessment Officer/Sustainability
with our partner        (a) Highlighting this at Local Strategic           arise.            LSP board, further meetings to         Officer.
organisations,          Partnership meetings and meetings with                               follow to partner organisations
stakeholders; and       other partner organisations.                                         in mid-summer 2011and to
through other                                                                                Scarborough Emissions
local, regional and                                                                          Working Group.
national partnerships
and networks.           (b) Sharing good practice on environmental                           (b) Partner organisations attend       (b) An on-going basis:
                        management.                                                          quarterly sustainability               Sustainability Officer.
                                                                                             meetings.
                        (c) Circulating the Sustainable Development
                        Strategy and Action Plan to Council                                  (c) Highlighted on SBC website,        (c) Completed: Sustainability
                        partners.                                                            consultation involvement,              officer.
                                                                                             emails, media releases,
                                                                                             meetings
                        (d) Encouraging partners to develop an
                        Environmental Strategy and related action                            (d) The Sustainability Officer         (d) An on-going basis:
                        plans and set targets and outcomes to                                has started work on an                 Sustainability Officer.
                        deliver on.                                                          Environmental Strategy/Action
                                                                                             Plan template that businesses
                        (This link’s into a businesses environmental                         can adapt. Work includes
                        support action plan which the Sustainability                         contacting businesses to find
                        Officer has developed which highlights key                           out about case studies of good
                        actions that can be undertaken to support                            energy management practice
                        businesses - see also appropriate section                            and information they want in a
                        under objective 24 below).                                           template. Template to be
                                                                                             completed end of July 2011.
                        Report annually to stakeholders on the             Annually to       Annual report completed (this          Completed: Sustainability
                        environmental impacts of the Authority’s           align with the    document). Circulated to the           Officer.
                        activities, by circulating an annual               financial year.   LSP Emissions Working Group
                        sustainability report.                                               and partner organisations.
                        Increase sub-regional co-operations, for           Evidence of       Successful carbon modelling            Completed: Sustainability
                        example, the York and North Yorkshire              project-working   bid to help develop an evidence        Officer.
                        Sustainability Officers Group to apply for at      end of May        base for key intervention
                        least one funding stream for project-working       2011.             measures in the respective
                        by end of May 2011, for example, in a bid to                         districts. Carbon modelling
                        the Regional Efficiency and Improvement                              work to progress through the
                        Programme (REIP) for help with developing                            summer of 2011.
                        sub regional climate - change action plans.
                        Strengthen the international cooperation of        (a) By end of     (a) Sustainability Officer/Policy      (a) On-going to be completed:
                        towns and cities and develop local                 December          and Performance Manager –              Sustainability Officer/Policy and
                                                                      18
                                                                                                                    Author: James Bridges, Sustainability Officer – May 2011
                                    responses to global problems.                        2010.              confirm with Leader of the            Performance Manager.
                                    (a) Sign-up to the Aalborg Commitments to                               Council as to whether he can
                                    formalise processes and knowledge                                       sign as soon as possible or
                                    exchange between towns and cities.                                      whether we need Cabinet
                                                                                                            approval. Sustainability Officer
                                                                                                            has produced a report
                                                                                                            highlighting the benefits of
                                                                                                            signing-up.                           (b) Yet to start/progress
                                                                                                                                                  /delayed/postponed:
                                    (b) Increase the quality of city partnerships        (b) On-going.      (b) Budget cuts have affected         Sustainability Officer/Twinning
                                    and twinning with regard to sustainability.                             delivering on this action.            Team.
1, 2, 3, 4   Manage performance     If viable, look to achieve external                  By end of          Still to be progressed (on            Yet to start - Energy
             to reduce our impact   accreditation under EMAS (Eco                        December           schedule with timescale).             Manager/Corporate Policy Unit.
             on the environment.    Management and Audit Scheme) and                     2012.
                                    possibly ISO 14001 – both of which are
                                    international standards for assessing and
                                    improving environmental performance.
                                    Adopt an evaluation process of the                   Annual             Annual report completed (this         Completed: Sustainability
                                    sustainability performance of the Council            Sustainability     document).                            Officer.
                                    against the Alborg commitments, baseline             Report to be
                                    review, and targets outlined in the                  produced by
                                    Sustainable Development Strategy.                    the end of April
                                                                                         each year.
                                    Co-operate with other signatories of the             (a) Annual         (a) Still to be progressed – on       (a)Sustainability Officer: Yet to
                                    Aalborg commitments to monitor and                   Sustainability     schedule (if the Council signs        start.
                                    evaluate our progress towards meeting our            Report to be       up to the Aalborg
                                    sustainability targets:                              submitted to       commitments).
                                    (a) Submit our annual Aalborg commitments            the Aalborg
                                    report (this sustainability report) to the           secretariat
                                    Aalborg commitments secretariat.                     each year.

                                    (b) Attend meetings of the UK-based                  (b) As and         Still to be progressed. Once we       (b) Sustainability Officer: Yet to
                                    Aalborg commitments network in the                   when meetings      have joined the Aalborg               start.
                                    learning and sharing of good practice in             arise.             commitments we can join the
                                    addressing sustainability measures.                                     UK-based network.




                                                                                    19
                                                                                                                                  Author: James Bridges, Sustainability Officer – May 2011
Priority 2: Buildings and estates and activities within the council’s own operations: Making effective use of resources.
Objectives      Scope of activity       Proposed Actions                              Timescales      Comment/assessment                     Progress/officer
5               Understanding and       Ensure collection of accurate data through    Annually to     (a) Npower have installed 105          (a) On-going to be completed:
                qualifying SBCs use     the installation of smart meters and by       align with the  smart meters across are                Energy Manager/Npower.
                of natural resources    taking accurate readings: Service Managers financial year.    portfolio of 180 sites. The
                and identifying the     in key Council properties to report on a                      second roll out will begin in May
                main influencing        monthly basis to the Energy Manager.                          2011.
                factors.                                                                              (b) All of large sites on smart        (b) Completed: Energy Manger.
                                                                                                      meters electric, the Energy
                                                                                                      Manager receives monthly gas
                                                                                                      readings from large and
                                                                                                      medium sites.
                                        Top 10 buildings for high usage of gas and    On-going.       All of 10 buildings have electric      Completed: Energy Manager.
                                        electricity have been identified respectively                 smart meters. For gas meters
                                        and will have accurate monthly readings by                    we have a monthly meter
                                        installing smart meters.                                      reading entered onto supplier’s
                                                                                                      website.
                                        Potential costs to be explored to suggest     By end of       Quotes have suggested this will        Completed: Energy Manager.
                                        the financial viability of upgrading the      December        prove to be too expensive at
                                        Building Management System to an internet 2010.               approximately £70k to
                                        based system so that a centralised                            implement.
                                        monitoring system can collate and analyse
                                        energy usage information.
                                        Ensure that all public buildings that require Annual          All sites now have a DEC with          Completed: Energy Manager.
                                        a Display Energy Certificate (DECs) have a                    formal assessments.
                                        proper formal assessment displayed.
6               Reduce primary          Develop an updated corporate Energy           End of                                                 On-going to be completed:
                energy consumption,     Strategy for the Council, which includes an   December                                               Energy Manager. To be
                and improve end-use     identification of Council operations that     2010.                                                  completed end of May 2011.
                energy efficiency in    produce most carbon and target these
                existing properties.    areas as a priority.
                                        Energy Manager to work with Senior            Energy Action   All key sites set 10% energy           Completed: Energy
                                        Managers to develop respective energy         Plans to be     reduction targets.                     Manager/Senior managers with
                                        reduction and energy efficiency action plans developed by                                            responsibility for respective
                                        for key Council properties (these will sit    end December                                           buildings.
                                        under the corporate Energy Strategy).         2010.
                                        Ensure sustainability targets are built into  By end          All key sites set 10% energy           Completed: Energy
                                        performance objectives for staff. For         December        reduction targets:                     Manager/Senior managers with
                                        example, the energy action plans will have    2010.                                                  responsibility for respective
                                        built into them energy reduction targets and                                                         buildings.
                                        energy performance objectives.
                                                                                  20
                                                                                                                             Author: James Bridges, Sustainability Officer – May 2011
                      To ensure the energy efficiency fund that        By end            Salix energy efficiency fund                 Completed: Energy Manager.
                      has been established is up and running.          September         established with match funding
                                                                       2010.             from Council, expect to make
                                                                                         third tranche draw down in May
                                                                                         2011. See Table 1 in main
                                                                                         report for more detail on the
                                                                                         range of projects implemented).
                      To take forward energy efficiency projects       The Council       Target achieved. Examples                    An on-going basis: Energy
                      within the council’s own buildings through       implements        include:                                     Manager.
                      investment in technologies such as voltage       four energy       - PIRs in 50% of PCs.
                                                                                         - Modern control boiler Whitby
                      optimisers, Passive Infra Red lights, modern     efficiency        swimming pool.
                      controls for swimming pools, and heat            projects by end   - Pool covers for Whitby and
                      recovery extraction systems.                     of March 2011.    Scarborough swimming pools.
                                                                                         - Quattro Seal draft exclusion installed
                                                                                         at Whitby Spa.
                                                                                         - Scarborough Market Hall lighting
                                                                                         project with procurement.
                                                                                         - Retro-fit T5 light adaptors installed at
                                                                                         Whitby and Scarborough swimming
                                                                                         pools (See Table 1 in main document
                                                                                         for more detail on the range of projects
                                                                                         implemented.

                                                                                         - Thermal imagining camera to
                                                                                         be demonstrated in June 2011
                                                                                         with a view to purchase to help
                                                                                         identify where further energy
                                                                                         savings can be made.
                      To seek energy efficiency improvements in        Each building     Next assessments, mid-                       An on-going basis: Energy
                      buildings where Display Energy Certificates      to have an        summer 2011.                                 Manager/Senior managers with
                      (DECs) are required, with an improved            improved DEC                                                   responsibility for respective
                      rating for each respective building year-on-     rating on its                                                  buildings.
                      year, based on their 2010 rating                 2010 baseline
                      assessments.                                     assessment
                                                                       year-on year.
7   Increase the      (a) Identify potential renewable                 (a) By end        (a) - Filey Caravan Park                     (a) An on-going basis: Energy
    share of          technologies, for example, wind turbines,        December          identified as a potential site for           Manager.
    renewable         photovoltaics and solar thermal heating          2010.             wind turbines.
    energies          within the council’s own buildings.                                - The proposed new depot site
    utilised by the                                                                      awaiting surveys for solar
    Council.                                                                             thermal, biomass and PV solar
                                                                                         panels.
                                                                                                                                      (b) An on-going basis: Energy
                                                                  21
                                                                                                                     Author: James Bridges, Sustainability Officer – May 2011
                              (b) Invite at least four renewable technology        (b) By the end   (b) Ridgeblade wind turbine            Manager.
                              manufacturers and installers from the                of March 2011.   presentation, but product is
                              regional micro-generation partnership to                              awaiting MCS accreditation
                              present to the Sustainability Working Group                           before further investigation.
                              on the viability of their respective renewable                        Also, see the above action as
                              technologies within the council’s own                                 the Energy Manager has held
                              buildings.                                                            meetings with renewable
                                                                                                    energy suppliers who have also         (c) An on-going basis : Energy
                                                                                                    undertaken feasibility                 Manager/
                                                                                                    assessments although these             Finance and Asset Management
                                                                                                    suppliers have not attended            Unit.
                                                                                                    SWG meetings.

                              (c) Make arrangements to uptake the                  (c)              (c) Feasibility studies being
                              renewable technology in existing buildings           Implementation   undertaken with a view to
                              as appropriate, by demonstrating an                  as soon as       implementation at the proposed
                              increase in the share of electricity and heat        viable, e.g.     new depot and Filey Caravan
                              from renewable or environmentally                    monies           Park.
                              preferable energy sources on 2009/10 year.           available from
                                                                                   the Salix
                                                                                   energy fund.
                                                                                                                                           (d) Yet to start: Energy
                              (d) Explore the potential to invest in larger        (d) On-going.                                           Manager/Finance and Asset
                              scale wind turbine schemes.                                                                                  Management Unit.
1, 8   Save water,            Explore ways to make water savings, for              By end           An assessment of rain water            An on-going basis: Energy
       and use water          example, the use of more water efficient             December         harvesting and surface water           Manager.
       more efficiently.      products, rain water capture systems (rain           2010.            collection tank for cleaning
                              water harvesting to flush toilets), water                             vehicles for the proposed new
                              sensors for toilet s and highlight these in                           depot has suggested this is not
                              respective building energy action plans.                              economically feasible.
                                                                                                    However, the Energy Manager
                                                                                                    is exploring options for installing
                                                                                                    water butts at Council sites.
9      Minimise the           Role out recycling units (to separate paper,         By end of                                               Completed: Recycling and
       production of          cans, plastic from landfill waste) to                December                                                Waste Enforcement Unit.
       waste from             respective offices across the Council                2010.
       the Council. Ensure    buildings.
       maximum amount is
       reused and recycled.
10     Make sure that all     Develop quantified sustainability targets for        By end of        The Council have explored              Procurement Unit.
       procurement            the procurement policy and strategy                  December         purchasing electricity from a
                                                                              22
                                                                                                                           Author: James Bridges, Sustainability Officer – May 2011
practices reflect       associated with their sustainability             2010.              renewable energy supplier, but
social and              objectives, for example: % of renewable                             due to npower disputes that
environmental as well   energy supplied to the Council; % goods                             action has been put on hold
as economic costs.      purchased that are from local suppliers;                            until these have been resolved.
                        number of local suppliers on approved list.
                        Support local business by encouraging            On-going                                                  Procurement Unit.
                        them to compete for contracts let by the
                        Council. For example, hold ‘Meet the
                        Buyer’ events with local businesses about
                        how to apply for contracts.
                        Review efficiency of paper usage:
                        (a) The Council is purchasing 80% recycled       (a) By end April   (a) This option has been               (a) Completed: Procurement Unit
                        paper as it is not yet cost effective to         2011.              explored. However, there are           /Print Plus.
                        purchase 100%recycled paper. However,                               problems with dust in the paper
                        where paper savings can be undertaken                               fabric affecting the printing
                        then look to purchase 100% recycled paper.                          machines and the quality of the
                                                                                            paper using 100% recycled is
                                                                                            reduced compared to using
                        (b) Explore ways to make paper savings.                             80%
                        For example, have a paper saving week            (b) Paper                                                 (b) Completed: Print Plus,
                        that draws attention to actions that can be      Saving week to     (b) Paper Saving week aligned          Sustainability Officer, ICT.
                        undertaken to reduce paper usage such as:        align with         with United Nations World
                        encouraging email rather than paper letters;     United Nations     Environment Day in June 2010.
                        don’t print paper copies of emails or make       World
                        paper file copies; print on both sides; and      Environment
                        use scraps of papers to make notes. Align        Day.
                        paper saving week with an international
                        environmental day such as the United
                                                            th
                        Nations World Environment Day 5 June
                        2010.
                                                                         (c) To align       (c) The screen saver was               (c) Completed: Print Plus,
                        (c) Develop a screen saver for Council           with United        developed and installed on             Sustainability Officer, ICT.
                        computers that promote paper saving top          Nations World      Council computers during
                        tips as highlighted in (b) for info about        Environment        World Environment Day, June
                        reducing paper usage.                            Day.               2010.

                        (d) Explore how IT systems are used and if       (d) On-going.      (di) - Wage slips now are              (di) Completed: Human
                        there are ways that paper usage can be                              electronic for those who have          Resources, ICT.
                        reduced, for example, submitting expense                            access to the internet.
                        claims electronically, or exploring ways to                         (dii) Other initiatives are being      (dii) an on-going basis: Human
                        email out payslips.                                                 explored.                              Resources, ICT.
                                                                    23
                                                                                                                   Author: James Bridges, Sustainability Officer – May 2011
5, 6, 10, 11   Take forward the         (a) Sustainability Officer to work with            (a) By end of    (a) Sustainability Officer and         (a) Completed: Sustainability
               existing Council         Technical Services to assess where we are          December         Performance Officer have taken         Officer/Performance Officer.
               travel to work plan      now with the travel to work plan and revise        2010.            a lead, in co-operation with
               that tackles the         this.                                                               Technical Services and Human
               issues of providing                                                                          Resources.
               access for all as well
               as reducing the          (b) Technical Services to write the revised        (b) By end of    (b) Sustainability Officer now         (b) On-going to be completed:
               environmental impact     travel to work plan with targets.                  December         writing the Travel Plan because        Sustainability Officer.
               of travel.                                                                  2010.            Technical Services has merged
                                                                                                            with other Services in April
                                                                                                            2011. To be completed by end
                                                                                                            of May 2011.

                                        (c) Sustainability Officer to co-ordinate          (c) Start work   (c) Actions completed include          (c) On-going to be completed:
                                        action and ensure delivery by those with           on this by end   working with Print Plus to             Sustainability Officer.
                                        appropriate responsibilities as laid out in the    of December      promote video-conferencing
                                        existing and revised travel to work plan.          2010.            through a climate week screen
                                                                                                            saver and a half day workshop
                                                                                                            on using the video-conferencing
                                                                                                            equipment.
5, 6, 10, 12   Green fleet transport    Ensure the Green Fleet Environmental               By end of        Because it is unclear as to the        Yet to start: Sustainability
               operations: Take         Management Plan (draft Green Fleet Policy          February 2011.   future of the Garage services,         Officer/Transport and Vehicle
               forward the Green        and draft Tyre Policy) for SBCs fleet are                           this action has been postponed         Maintenance Service.
               Fleet Environmental      amended with appropriate quantitative                               with a view to amending the
               Management Plan.         targets; and approved by the Council.                               management plan as
                                                                                                            appropriate.
                                        Explore the potential to have an Energy            By end of        On-going to be completed- The          On-going to be completed:
                                        Saving Trust green fleet review and link this      February 2011.   Sustainability Officer has liaised     Transport and Vehicle
                                        into the Environmental Management Plan to                           with the Energy Savings Trust          Maintenance Service/
                                        improve fleet performance, reduce CO2                               and Vehicle Maintenance                Sustainability Officer.
                                        emissions etc.                                                      Services. This action has been
                                                                                                            put on hold in light of the
                                                                                                            garage going out to tender but
                                                                                                            will be addressed accordingly.
                                        Explore how grey fleet can be revised to           By end of        This action links into a review of     On-going yet to be completed:
                                        save the Council money and to reduce CO2           February 2011.   the Council’s Travel plan which        Sustainability Officer/Performance
                                        emissions associated with Council fleet                             is currently being revised.            Officer/Human
                                        operations (e.g. when staff should use their                        Rates per mile for car                 Resources/procurement.
                                        own cars and when they should be using                              allowance have been reviewed,
                                        public transport or a hire car, and the                             but still need to be
                                        mileage rate that's paid to staff).                                 implemented.
                                                                                      24
                                                                                                                                   Author: James Bridges, Sustainability Officer – May 2011
Priority 3: To address the challenges presented by climate change and combat these in a sustainable manner.
Objectives    Scope of activity       Proposed Actions                                   Timescales       Comment/assessment                    Progress/officer

13            Raise awareness         Raise awareness of the impacts of climate          On-going.        Promoted in Council internal          An on-going basis:
              about the impacts of    change amongst Members and Officers by                              newsletter Echo, screen savers,       Sustainability Officer.
              climate change with     ensuring this is linked into sustainability                         a climate risk assessment and
              Council staff,          presentations, workshops, and induction                             media releases. SBC has
              members and the         day.                                                                signed the 10:10 campaign.
              wider community.                                                                            Still need to link climate change
                                                                                                          into sustainability training and
                                                                                                          induction day.
                                      Raise awareness of the impacts of climate          By end of July   The Sustainability Officer has        An-going basis: Sustainability
                                      change amongst the wider community of              2011 attend a    attended two area forums and          Officer.
                                      the Borough by attending meetings for each         meeting in       been involved with the
                                      Area Forum; and community group                    each Area        Scarborough and Whitby 10:10
                                      meetings.                                          Forum and        campaign groups, Fyling Dales
                                                                                         attend           low carbon community
                                                                                         meetings of a    challenge, Hawsker green
                                                                                         range of other   communities, and attended
                                                                                         community        various events on local food
                                                                                         groups as        production, energy efficiency in
                                                                                         appropriate.     the Borough, Local transport
                                                                                                          group meetings.
                                      Visit schools to promote the sustainability        From             The Sustainability Officer has        An on-going basis:
                                      agenda and how the impacts of climate              September        undertaken a presentation at          Sustainability Officer.
                                      change are likely to affect the region.            2010 onwards.    Graham school and been
                                                                                                          involved in sustainability
                                      Please note: Subsequent discussions with                            workshops and their fair day.
                                      the North Yorkshire County Council Officer                          The Sustainability Officer has
                                      have suggested the best way SBC can                                 attended a workshop on climate
                                      support climate change education is by                              change at Hawsker School in
                                      working with the CC Officer to undertake                            March 2011 organised by the
                                      training to teachers and by exploring ways                          North Yorkshire Climate
                                      to support teachers in educating children                           Change Officer. Sustainability
                                      about a changing climate, and by helping                            Officer has been involved in a
                                      with materials storage of activities that                           climate change workshop for
                                      teachers can draw upon.                                             teachers in May 2011
                                                                                                          organised by the CC Officer.
14            Address the impacts     Sustainability Officer to review Council           By end July      Completed for the Borough’s           On-going yet to be completed:
              of climate change on    policies, strategies, plans and operations,        2011.            Sustainable Community                 Sustainability Officer/other
              the councils’           and work with other Officers to ensure these                        Strategy, and draft planning          Officers within the Council that
                                                                                    25
                                                                                                                                Author: James Bridges, Sustainability Officer – May 2011
     operations and the     consider the impacts of climate change                            LDF. Through sustainability            have responsibilities where
     wider community.       (both positive and negative) as appropriate.                      training, senior managers can          adaptation needs to be
                                                                                              also develop awareness about           addressed.
                                                                                              reviewing their own documents
                                                                                              for the impacts of a changing
                                                                                              climate.
                            The emerging Core Strategy of the LDF has       On-going.         The climate change agenda is           Completed - Forward planning.
                            a proactive policy approach to development,                       captured in the draft Core
                            adapting to the environmental risks at the                        Strategy and generic
                            local level that result from environmental                        Sustainability Appraisal.
                            processes and climate change.
                            Make a commitment to address the impacts        By end            The Sustainability Officer has         On-going yet to be completed:
                            of climate change by highlighting the           December          developed a report as to the           Sustainability Officer/Asset and
                            impacts of climate change on the SBC risk       2010 and          need for adaptation in the risk        Finance Manager.
                            register.                                       updated every     register with specified actions;
                                                                            year as           and the climate risk
                                                                            appropriate.      assessment work has now
                                                                                              been completed (April 2011).
                                                                                              Discussions about highlighting
                                                                                              adaptation on the risk register
                                                                                              will take place in June 2011.
                            Develop a climate change adaptation plan        By end of April   The Sustainability Officer will be     Yet to start: Sustainability
                            for the council’s own operations and the        2011              developing a climate change            Officer.
                            Borough.                                                          action plan that will capture the
                                                                                              risks from the risk assessment,
                                                                                              adaptation actions and will tie in
                                                                                              with the carbon modelling
                                                                                              assessment work due to take
                                                                                              place in the summer 2011.
                                                                                              Draft climate change plan due
                                                                                              to be developed by end of
                                                                                              October 2011.
                            Ensure that adaptation to climate change is     See targets       To-date, climate change                An on-going basis:
                            captured, as appropriate, within the            and timescales    adaptation is captured in the          Sustainability Officer.
                            council’s sustainability framework for          under ‘capacity   draft Sustainability Impact
                            sustainability measures, for example,           building’ of      Assessment and the
                            sustainability statements, Cabinet reports,     priority 1        Sustainability Appraisal.
                            sustainability appraisals                       above.
15   Climate change         Raise awareness of reducing CO2                 On-going.         Will link into presentations on        On-going yet to be completed:
     mitigation: To raise   emissions amongst Members and Officers                            the Sustainability Impact              Sustainability Officer.
     awareness about how    by linking this into the sustainability                           Assessment and induction day
                                                                       26
                                                                                                                     Author: James Bridges, Sustainability Officer – May 2011
     to reduce CO2           presentations, sustainability workshops, and                    for Officers; and new Members
     emissions from within   induction day.                                                  in July 2011.
     the council’s own
     operations.
16   Climate change          Make a commitment to address climate            By end of       The Sustainability Working            Yet to start: Sustainability
     mitigation:             change issues by ensuring paragraphs to         March 2011.     Group has recommended it              Officer.
     Reduce CO2              this effect are highlighted in key Council                      would be better for the
     emissions from within   documents, for example, Service Plans and                       Sustainability Officer to link
     local authority         business Plans.                                                 climate change into
     operations.                                                                             sustainability training of senior
                                                                                             managers so that they can
                                                                                             review and amend accordingly
                                                                                             their own business plans for
                                                                                             this, than for the Sustainability
                                                                                             Officer to spend considerable
                                                                                             amounts of time reviewing a
                                                                                             range of policies and strategies.
                             Hold/be involved in a best practice             By July 2011.   The Sustainability Officer and        Completed: Sustainability
                             workshop for SBC and other local                                Energy Manager have been              Officer/Energy Manager.
                             authorities to exchange knowledge and                           involved in a range of
                             good practice in reducing carbon emissions                      Government Office seminars,
                             within the local authorities own operations.                    sub-regional exchange of good
                                                                                             practice meetings and low
                                                                                             carbon events. In November
                                                                                             2010 the Sustainability Officer
                                                                                             has led on a workshop at the
                                                                                             sub-regional low carbon
                                                                                             exchange event on baseline-
                                                                                             reviews and target setting for
                                                                                             sustainability.
                             Introduce some level of competition             By end March    In the pipeline, but need to be       Yet to start: Energy Manager.
                             between council buildings to see who can        2011.           careful how it is delivered in
                             save the most energy as a means to                              terms of highlighting the worst
                             encourage staff to be involved in energy                        performers.
                             reduction and efficiencies
17   Climate change          (a) Raise awareness about reducing carbon       (a) By end of   (a) Sustainability Officer has        An on-going basis:
     mitigation:             emissions (provide information about            July 2011       been involved with the                Sustainability Officer.
     To raise awareness      energy reduction and energy efficiency, and     attend a        Scarborough and Whitby 10:10
     about how to reduce     grants for renewable technologies, as well      meeting in      campaign groups, Fyling Dales
     CO2 emissions within    as information about their viability) amongst   each Area       low carbon community
     the wider community     the wider community of the Borough by           Forum. Attend   challenge, Hawsker green
                                                                        27
                                                                                                                   Author: James Bridges, Sustainability Officer – May 2011
and with local   attending a meeting in each Area Forum,           meetings of a      communities, and attended
businesses.      community group meetings and events.              range of other     various events on local food
                                                                   community          production, energy efficiency in
                                                                   groups when        the Borough, Local transport
                                                                   they meet and      forum.
                                                                   as appropriate.

                 (b) Support local businesses in promoting         (b) On-going.      (b) Sustainability Officer has         (b) An on-going basis:
                 the low carbon economy by promoting                                  attended and helped to                 Sustainability Officer.
                 renewable technologies, their viability and                          organise venues for Green
                 funding opportunities by attending business                          Business Club meetings,
                 forums; and invite the Energy Savings Trust                          attended regional low carbon
                 and Carbon Trust to provide more                                     exchange event workshops and
                 information as appropriate.                                          presented on sustainability and
                                                                                      funding opportunities.
                                                                                      Sustainability section of the
                                                                                      SBC website has a section for
                                                                                      businesses support.
                 (c) Undertake (a) and (b) above by:
                 disseminating information on the SBC              (c) On-going.      (c) Sustainability section of the      (c) An on-going basis:
                 website, media, Scarborough business                                 SBC website regularly up-              Sustainability Officer.
                 ecoblog website; and direct businesses to                            dated, information circulated to
                 the Carbon Trust, Energy Saving Trust,                               Scarborough business eco-
                 Sustianability4Yorkshire, CO2 Sense,                                 blog, media etc about
                 Regional Green Business club; and                                    environmental support events
                 Regional Micro-generation partnership as                             taking place in the sub-region.
                 appropriate.
                 Visit schools to promote the sustainability       Sustainability     The Sustainability Officer has         An on-going basis:
                 agenda and how we can reduce carbon               Officer to visit   undertaken a presentation at           Sustainability Officer.
                 emissions. The Sustainability Officer to also     schools from       Graham school and been
                 attend schools when the Recycling Officer         September          involved in sustainability
                 visits them where possible.                       2010 as            workshops and their fair day.
                                                                   appropriate.       The Sustainability Officer has
                 Please note: Subsequent discussions with                             attended a workshop on climate
                 the North Yorkshire County Council Officer                           change at Hawsker School
                 have suggested the best way SBC can                                  (March 2011) organised by the
                 support climate change education is by                               North Yorkshire Climate
                 working with the CC Officer to undertake                             Change Officer.
                 training to teachers and by exploring ways
                 to support teachers in educating children                            Sustainability Officer has been
                 about a changing climate, and by helping                             involved in a climate change
                                                              28
                                                                                                             Author: James Bridges, Sustainability Officer – May 2011
                             with materials storage of activities that                    workshop for teachers in May
                             teachers can draw upon.                                      2011 organised by the CC
                                                                                          Officer.
18   Climate change          Complete a project proposal for the              By end      Cabinet report project proposal        Completed: Sustainability
     mitigation: Reduce      Community Energy Savings Programme               December    completed based on meetings            Officer/Housing Manager.
     CO2 emissions from      (CESP) and bring key players together from       2010.       with EAGA and British Gas.
     within the wider        the Council and partner organisations to
     community and local     take this forward in the Borough.                            Financial match funding issues         An on-going basis:
     businesses through                                                                   by SBC and the delay in the            Sustainability Officer/Housing
     capacity building                                                                    comprehensive feasibility study        Team/Emissions Working
     relating to workshops                                                                by the partner organisations           Group/S4Y (Yorkshire Energy
     and renewable energy                                                                 (Yorkshire Energy Partnership          Partnership).
     projects.                                                                            and EAGA) involved in the
                                                                                          programme have hindered
                                                                                          CESP getting off the ground,
                                                                                          albeit the feasibility assessment
                                                                                          work is currently on-going.
                             Address energy efficiency and tackling fuel      On-going.   All private sector housing             An on-going basis: Housing
                             poverty in existing housing stock. This will                 renewal funding paid to local          Team.
                             link into CESP but is a wider action beyond                  authorities from Government
                             CESP around actually developing a                            has now ended. This means
                             dedicated programme of energy efficiency                     that energy efficiency measures
                             measures for homes across the Borough.                       in the future will need to be paid
                                                                                          for either via the obligations of
                                                                                          the providers (via Carbon
                                                                                          Emission Reduction Targets,
                                                                                          etc) or through local authorities
                                                                                          using their own resources.
                                                                                          Given austerity measures it’s
                                                                                          unlikely SBC will be able to use
                                                                                          its own capital funds to support
                                                                                          interventions in future years.
                             Work with communities on renewable               By end of   Sustainability Officer has             An on-going basis:
                             energy projects, for example, we will help to    December    helped establish 3 community           Sustainability Officer.
                             initiate and support at least 5 new              2011.       projects thus far – greener
                             community projects that demonstrate                          communities related projects in
                             sustainability action by exploring funding                   Fyling Dales, Hawsker and
                             opportunities, giving advice, supporting                     Whitby in co-operation with the
                             funding applications and helping them to get                 Energy Saving Trust advice
                             started.                                                     centre/Yorkshire Energy
                                                                                          Partnership. However, the
                                                                         29
                                                                                                                 Author: James Bridges, Sustainability Officer – May 2011
                                                                                             projects are not at the stage yet
                                                                                             where renewables have
                                                                                             actually been taken-up
                                                                                             alongside energy efficiency
                                                                                             measures, although this is part
                                                                                             of the plan. The Sustainability
                                                                                             Officer has supported funding
                                                                                             bids of the Esk Valley
                                                                                             Community Energy Group for a
                                                                                             small hydroelectric turbine.
                           Sustainability Officer to review relevant       On-going.         The Sustainability Working             Yet to start: Sustainability
                           policies, strategies plans, activities,                           Group has recommended it               Officer.
                           contracts etc and to work with other Officers                     would be better for the
                           across the Council to make comments on                            Sustainability Officer to link
                           these with regards to the consideration of                        climate change into
                           reducing carbon emissions.                                        sustainability training of senior
                                                                                             managers so that they can
                                                                                             review and amend accordingly
                                                                                             their own business plans for
                                                                                             this, than for the Sustainability
                                                                                             Officer to spend considerable
                                                                                             amounts of time reviewing a
                                                                                             range of policies and strategies.
                           Ensure reducing carbon emissions is             See targets       To-date, captured in the draft         An on-going basis:
                           captured, as appropriate, within the            and timescales    Sustainability Impact                  Sustainability Officer.
                           council’s sustainability framework for          under ‘capacity   Assessment and sustainability
                           sustainability measures, e.g, sustainability    building’ of      appraisal.
                           statements, cabinet reports and                 priority 1
                           Sustainability Impact Assessments (see the      above.
                           ‘capacity building’ under priority 1 above).
19   Encourage             Write-up the carbon reduction report as an      By end            Started but will still need to be      Delayed, unlikely to be
     sustainable design    outcome of the findings from a sub-regional     September         completed. Unlikely to be              completed: Sustainability Officer.
     and construction in   workshop (November 2009).                       2010.             completed due to time
     new commercial and                                                                      constraints and the detail that is
     housing                                                                                 still required to go into the
     developments in the                                                                     report.
     Borough.




                                                                      30
                                                                                                                    Author: James Bridges, Sustainability Officer – May 2011
Hold/be involved in an up-dated best             By July 2011.   Sustainability Officer has been       Completed: Sustainability
practice workshop for SBC and other local                        involved in a range of                Officer.
authorities to exchange knowledge and                            Government Office seminars,
good practice in reducing carbon emissions                       sub-regional exchange of good
within the local authority’s communities.                        practice meetings and low
                                                                 carbon events. The
                                                                 Sustainability Officer has led on
                                                                 a workshop at the regional low
                                                                 carbon exchange event in
                                                                 November 2010 on baseline-
                                                                 reviews and target setting for
                                                                 sustainability.
Promote and deliver good sustainable
practice in all new buildings and                (a) On-going    Sustainability Officer has            (a) An on-going basis: Forward
developments:                                                    commented on the Energy               Planning/ Building Control/
(a) Assess: the number of Sustainability                         Statement for Middle Deep             Development Management/
Appraisals, Sustainability Environmental                         Dale, renewable energy viability      Sustainability Officer.
Assessments, and Sustainability                                  document for the Borough, the
Statements (as appropriate) reflect number                       sustainability statement for the
of major development proposals. Up-date                          proposed new depot site; and
the Sustainability Working Group as                              Tesco’s and Sainsbury’s
appropriate.                                                     proposals.
                                                                                                       (b) An on-going basis: Officers
(b) Evidence of a sustainability assessment      (b) On-going.   b) On-going.                          as appropriate which include:
that illustrates consideration that the                                                                Forward Planning/ Building
building(s) and/or site will be developed to a                                                         Control/ Development
high level of sustainable design and                                                                   Management.
construction.

(c) The Council will seek to maximise            (c) On-going.   (c) On-going.                         (c) An on-going basis: Officers
developer contributions and external                                                                   as appropriate that include:
funding to provide infrastructure for the                                                              Forward Planning/
creation of sustainable communities by                                                                 Building Control/
working closely with developers in                                                                     Development Management/
negotiations and exploring funding                                                                     Economic Regeneration/
opportunities to construct buildings to higher                                                         Project Management/
levels of sustainable design and                                                                       Sustainability Officer.
construction. Assess by: number of
buildings developed to higher levels of
sustainable design and construction than is
statutory, for example, under Code for
                                            31
                                                                                       Author: James Bridges, Sustainability Officer – May 2011
Sustainable Homes and BREEAM. Up-date
the SWG as appropriate

(d) Include sustainability as a key factor         (d) On-going.     (d) On-going                          (d and e) An on-going basis:
when awarding contracts to architects -                                                                    Officers as appropriate which
employ people who design buildings where                                                                   include: Forward Planning/
sustainability is considered a priority but                                                                Building Control/Development
that will not incur significant additional costs                                                           Management/Economic
to the developer.                                                                                          Regeneration/Project
                                                                                                           Management/Sustainability
(e) Sustainability Officer, where appropriate,     (e) On-going.     (e) Sustainability Officer has        Officer.
to provide comments on major development                             commented on the Energy
proposals and to join the project panel for                          Statement for Middle Deep
relevant major developments.                                         Dale, renewable energy viability
                                                                     document for the Borough, the
                                                                     sustainability statement for the
                                                                     proposed new depot site; and
                                                                     Tesco’s and Sainsbury’s
                                                                     proposals.
Explore how sustainable design and                 By end of April   Pyrolysis plant not working so        On-going yet to be completed:
construction can be improved in existing           2011.             cannot link into district heating     Officers as appropriate, for
developments such as Scarborough Green                               system. Climate risk                  example: Economic
Business Park, for example, linking up a                             assessment discussions in             Regeneration/
heating district system to the Pyrolysis                             January 2010 with the SBC             Project Management/
demonstrator plant.                                                  Economic Development                  Forward Planning/
                                                                     Manager have suggested                Sustainability Officer.
                                                                     working with the business park
                                                                     to promote renewable
                                                                     technologies: Sustainability
                                                                     Officer has completed a form
                                                                     for the MOD on wind turbines
                                                                     for Scarborough business park,
                                                                     but due to interference with
                                                                     radar, micro-generation maybe
                                                                     the best way forward on
                                                                     commercial buildings, so need
                                                                     to work with businesses to take
                                                                     this forward.
The Council to look at examples of good            By end of April   Energy Manager and                    Completed. Officers as
sustainable design and construction                2011.             Sustainability Officer have           appropriate, for example: Energy
practice it and others have developed.                               developed business cases for          Manager/Economic
                                              32
                                                                                           Author: James Bridges, Sustainability Officer – May 2011
                                                                                                  renewable technologies at the         Regeneration/
                                                                                                  proposed new Depot, through           Project Management/
                                                                                                  drawing on the expertise and          Forward Planning/
                                                                                                  experiences of installers of the      Sustainability Officer.
                                                                                                  Yorkshire and Humber micro-
                                                                                                  generation partnership and in
                                                                                                  working with the architect.
20   Promote more              Produce a bus map that draws together key         By end January   The Sustainable Development           On-going yet to be completed:
     sustainable modes of      bus routes to encourage alternative forms of      2010.            Officer is working with the           Sustainability Officer/Print Plus.
     transport e.g. walking,   transport. Also explore whether walking                            Scarborough Renaissance
     cycling and use of        and cycling routes can be added to this.                           Transport Group and Print Plus
     public transport.                                                                            in taking forward the bus map.
                                                                                                  The bus map has been started
                                                                                                  and is likely to be completed
                                                                                                  end of July 2011.
                               Explore how policies can give preference to       By end                                                 Yet to start: Sustainability
                               walking and cycling; for example, consider        December                                               Officer/Emissions Working Group.
                               developing proposals for extending                2010.
                               pedestrian priority areas in Scarborough
                               Town Centre, and to explore whether it is
                               possible to consider having cycle facilities at
                               the park and ride site.
                               Develop a climate change mitigation plan          By July 2011.    Tie in with the carbon modelling      Yet to start: Sustainability
                               for the council’s own operations and the                           assessment work due to take           Officer.
                               Borough.                                                           place in the summer 2011.
                                                                                                  Draft climate change plan due
                                                                                                  to be developed by end of
                                                                                                  October 2011.




                                                                            33
                                                                                                                        Author: James Bridges, Sustainability Officer – May 2011
Priority 4: Reduce the Borough’s ecological footprint*.
Principles of sustainability:
Objectives     Scope of activity       Proposed Actions                                Timescales          Comment/assessment                     Progress/officer
21             Community               Update sustainability section on the SBC        By end of           The Sustainability Officer has         An on-going basis:
               engagement:             website about environmental and energy          September           developed the sustainability           Sustainability Officer.
               Ensure good             grants, good practice, general sustainability   2010 and then       section of the SBC website and
               communication exists    issues, and organisations that help the         on a monthly        this is updated regularly with
               with the local          sustainability agenda. Promote events that      basis.              funding opportunities, business
               community at all        are held by the Yorkshire Energy                                    events etc.
               levels, including       Partnership, Carbon Trust, Green Business
               employers.              Club, CO2Sense, etc.
                                       Disseminate sustainability information via      On-going on a       Information about Green                An on-going basis:
                                       the Scarborough business ecoblog website        monthly basis.      Business Events, greener               Sustainability Officer.
                                       about environmental and energy grants,                              community’s schemes etc is
                                       good practice, general sustainability issues,                       sent to the co-ordinator of the
                                       and organisations involved in sustainability                        eco-blog for dissemination as
                                       practices.                                                          appropriate.
                                       Regular press releases on sustainability        On-going -          Examples include: polystyrene          An on-going basis:
                                       initiatives and updates.                        once a month.       waste, green business events,          Sustainability Officer.
                                                                                                           10:10 campaign, sustainability
                                                                                                           strategy, greener
                                                                                                           neighbourhood community
                                                                                                           projects.
                                       Promote the sustainability agenda in the        An article about    Examples include the meaning           An on-going basis:
                                       Borough News. Set 12 month article              sustainability in   of sustainability and top tips for     Sustainability Officer.
                                       programme at the Sustainability Working         each Borough        carbon reduction.
                                       Group.                                          News
                                                                                       publication.

                                       Sustainability Officer to attend business       As and when         Sustainability Officer has             An on-going basis:
                                       forums, meetings etc within the Borough to      meetings arise.     attended and helped to                 Sustainability Officer/Waste
                                       promote sustainability issues and attend as                         organise venues for Green              Enforcement and Recycling
                                       appropriate.                                                        Business Club meetings,                Team.
                                                                                                           attended low carbon exchange
                                                                                                           event workshops and presented
                                                                                                           on sustainability and funding
                                                                                                           opportunities.

                                                                                                           Switch from polystyrene to
                                                                                                           cardboard packaging: the

                                                                                  34
                                                                                                                                  Author: James Bridges, Sustainability Officer – May 2011
                                                                                                        Sustainability Officer and the
                                                                                                        Waste Enforcement and
                                                                                                        Recycling Team are exploring
                                                                                                        the possibility of setting up a
                                                                                                        scheme where take-away
                                                                                                        outlets transfer to cardboard
                                                                                                        take-away packaging rather
                                                                                                        than polystyrene.
                                  Raise awareness of sustainability amongst         - Attend at least   Sustainability Officer –              An on-going basis:
                                  the wider community of the Borough by             one meeting for     Attended two Area Forums -            Sustainability Officer.
                                  attending at least one meeting for Area           each Area           Worked with the Scarborough
                                  Forum, and attending community group              Forum by end        and Whitby 10:10 campaign
                                  meetings and events as appropriate. Any           of July 2011        groups, Fyling Dales low
                                  Council services road shows for the public        and attend          carbon community challenge,
                                  to include a stand on sustainability.             meetings of a       Hawsker green communities,
                                                                                    range of other      and attended various events on
                                                                                    community           local food production, energy
                                                                                    groups as           efficiency in the Borough, Local
                                                                                    appropriate.        transport forum.
22, 24   Develop capacity         Get involved in workshops in co-operation         Attend              Attended community groups             An on-going basis:
         building to deliver on   with local Area Forums, local environmental       meetings of a       about taking forward energy           Sustainability Officer.
         sustainable              groups, public events and the Borough             range of other      efficiency measures in
         development within       Friends and Bloom groups, to actively             community           Hawsker, Fyling Dales, Whitby
         the Borough              engage residents in sustainability practices,     groups as           and Scarborough 10:10,
         communities, foster      for example, on making the most of cooking        appropriate.        Graham School environmental
         sustainable              from food waste, permaculture,                                        workshops.
         communities and          sustainability projects.
         facilitate sustainable
         lifestyles.
                                  Promote (through a number of mediums as           On-going.           Sustainable Communities Act is        Yet to start: Corporate Policy
                                  outlined in the raising awareness sections                            being revised.                        Unit/Borough LSP/
                                  above) and utilise the Sustainable                                                                          Economic Regeneration
                                  Communities Act 2007 (and any future                                                                        Unit/Emissions Working Group.
                                  revisions of this).
                                  The Council will help to initiate and support     By end of           The Sustainability Officer has        An on-going basis:
                                  at least 5 new community projects that            December            helped to facilitate 3 community      Sustainability Officer/Borough
                                  demonstrate sustainability action by              2011.               projects thus: greener                LSP/Economic Regeneration
                                  exploring funding opportunities, giving                               communities related projects in       Unit/Corporate Policy
                                  advice, supporting funding applications and                           Fyling Dales, Hawsker and             Unit/Emissions Working Group.
                                  helping them to get started.                                          Whitby in co-operation with the
                                                                                                        Yorkshire Energy Partnership.
                                                                               35
                                                                                                                              Author: James Bridges, Sustainability Officer – May 2011
    The Council will work with local                   By end of       There area number of                   On-going yet to be completed:
    communities to support Parish and                  December        communities across the                 Community Partnerships/Borough
    Community planning thus enabling                   2011.           Borough who have developed             LSP/Economic Regeneration
    individuals and groups in both urban and                           community plans. For example,          Unit/Emissions Working Group.
    rural areas to play an active part in planning                     currently SBC are working with
    for the future.                                                    Filey Town Council (plan was
                                                                       approved in October 2010),
    Please note: Participatory Budgeting (PB)                          which also includes working
    has first been rolled out in Eastfield ward.                       with Forward planning as part
    The Council have also undertaken a                                 of the ongoing LDF work.
    programme of PB across the Borough over
    the last year. PB is not explicitly linked to                      Plans are also underway in
    Parish Planning, although parish plan                              Hunmanby (refresh of existing
    priorities/schemes have been one of the                            plan), Gristhorpe and
    criteria for funding.                                              Lebberston (new plan) and
                                                                       Osgodby are keen to refresh
                                                                       their existing plan, although this
                                                                       work has not yet started.
                                                                       Discussions are also on-going
                                                                       with Whitby Town Council.
.   The Council will encourage and work with           By the end of   (a) Green business club                On-going yet to be completed:
    business to adopt sound environmental and          December        workshop at the Town Hall has          Sustainability Officer/Economic
    ethical practices by:                              2013.           promoted.                              and Regeneration Unit.
    (a) Promoting Environmental Management
    Systems (EMS) by approaching businesses                            (B and C) Sustainability Officer
    through the Scarborough business ecoblog,                          has developed an
    Emissions Working Group, CO2 sense, and                            environmental support
    via economic regeneration contacts, and at                         plan/framework as a set of
    business forums, etc. The target is an                             actions he can take forward to
    increased share of public and private                              support businesses. Once
    organisations adopting EMS.                                        action is the on-going
                                                                       development of an
    (b) Provide sustainability training to at least                    environmental action plan
    10 businesses by the end of 2013.                                  template for businesses to be
                                                                       completed by end of summer
    (c) Work with the Green Business Club and                          2011. The Sustainability Officer
    CO2 Sense to train businesses.                                     is in discussions with
                                                                       organisations and associations
                                                                       for their feedback on the draft
                                                                       template and for gathering case
                                                                       study information on how
                                                  36
                                                                                              Author: James Bridges, Sustainability Officer – May 2011
                                                                                                         businesses have reduced their
                                                                                                         energy usage and saved
                                                                                                         themselves money in the
                                                                                                         process etc.
                                 Visit schools to promote the sustainability        Sustainability       The Sustainability Officer has        An on-going basis:
                                 agenda. The Sustainability Officer to also         Officer to visit     undertaken a presentation at          Sustainability Officer.
                                 attend schools when the Recycling Officer          schools from         Graham school and been
                                 visits them where possible.                        September            involved in sustainability
                                                                                    2010 onwards         workshops and their fair day.
                                                                                    as appropriate.
23, 24   Increase capacity for   Audit existing activity to gain a fuller picture   By end July                                                Yet to start: Sustainability
         SBC to maximise         of community sustainability activity and           2011 audit                                                 Officer.
         ecological              develop an amended sustainability action           existing activity.
         sustainability          plan (to complement this one) as
         activities within the   appropriate for actions on engaging with the
         Borough.                community on sustainability projects.
                                 Work with partner and LSP organisations to         By end July          This will tie in with                 On-going yet to be completed:
                                 encourage the application of sustainability        2011.                environmental business                Sustainability Officer.
                                 principles within the Borough, for example,                             framework and environmental
                                 encourage partners to develop sustainability                            support action plan template for
                                 action plans and set targets and outcomes                               businesses that the
                                 to deliver on.                                                          Sustainability Officer will take
                                                                                                         forward with support from the
                                                                                                         Emissions Working Group.
                                 Assess the council’s present impacts on its        By end July          This will tie in with                 Yet to start: Sustainability
                                 stakeholders, the environment and the              2011.                environmental business                Officer/Emissions Working Group.
                                 communities in which it operates by                                     framework and environmental
                                 extending a Sustainability Appraisal into the                           support action plan template for
                                 LSP - undertake a Sustainability Appraisal                              businesses that the
                                 in relation to LSP partners.                                            Sustainability Officer will take
                                                                                                         forward with support from the
                                                                                                         Emissions Working Group.
                                 Ensure there is a long term vision for the         On-going.            As an example, the                    An on-going basis: Parks and
                                 Borough that considers its ecological                                   Sustainability Working Group          Countryside/Forward Planning/
                                 footprint. For example, increase the                                    will support the Flixton Carrs        Development Management/
                                 proportion of statutory plans that explicitly                           wetland project as a carbon           Sustainability Officer.
                                 contribute to the implementation of the long-                           sink and conservation area if
                                 term vision and include ecological                                      funding is threatened, for
                                 sustainability.                                                         examples, funding streams
                                                                                                         need to be explored or letters of
                                                                                                         support are required.
                                                                               37
                                                                                                                               Author: James Bridges, Sustainability Officer – May 2011
24, 25   Promote the           Explore innovative approaches that can be        On-going.         Consider planning permission          An on-going basis: Parks and
         biodiversity agenda   undertaken to restrict new developments on                         for land on brown field sites         Countryside/Forward Planning/
                               greenfield sites and protect this natural                          rather than green field sites.        Development Management/
                               resource and biodiversity.                                                                               Sustainability Officer.
                               Ensure new developments within the               On-going.         Biodiversity is captured in the       An on-going basis: Parks and
                               Borough address biodiversity and give                              generic Sustainability Appraisal      Countryside/Forward Planning/
                               regard to the Natural Environmental                                of the Council, but needs to be       Development Management/
                               Research Council Act 2006. This requires                           monitored for Sustainability          Sustainability Officer.
                               local authorities to ‘raise the profile and                        Statements etc, which will
                               visibility of biodiversity, to clarify and                         become clearer was proposals
                               consolidate existing commitments with                              are submitted for planning
                               regard to biodiversity’. For example, the                          consultation.
                               increased number of Sustainability
                               Statements, Sustainability Environmental
                               Assessments and Sustainability
                               Assessments that are submitted with each
                               development that addresses biodiversity.
25       Promote the           Complete the Woodland Management                 By end of June    It was agreed through the             Yet to start: Parks and
         management of         Strategy, once the agency agreement with         2011.             Sustainability Working Group          Countryside Unit.
         natural resources     the County has been assessed.                                      that a draft version will be
                                                                                                  completed by end of October
                                                                                                  2011.
                               Explore the possibility of implementing a        On-going.         The revised Tree Strategy (draft      On-going yet to be completed:
                               tree carbon offsetting programme on                                completed October 2011)               Tree Officer/Asset
                               Council land.                                                      should highlight options              Management/Sustainability
                                                                                                  available for a tree carbon           Officer.
                                                                                                  offsetting programme.
                               Explore funding mechanisms to help               On-going.         Sustainability Officer contacted      On-going yet to be completed:
                               support the infrastructure of key walking                          NYCC about Local Agenda 21            Parks and Countryside/
                               routes, for example, the Cinder Track                              funding for the Cinder Track but      Sustainability Officer/
                               railway walk. Look to increase the number                          a grant of this nature is not         Economic Regeneration/
                               of existing projects supported by funding to                       applicable as SBC owns this           Borough Community Partnership.
                               improve infrastructure.                                            land and therefore should be
                                                                                                  maintained by them.
                               Hold a wood stove workshop event                 By end of April   Looking to link in with the           Yet to start: Parks and
                               promoting biomass fuel.                          2011.             Secret Wood nature learning           Countryside Team.
                                                                                                  event in Raincliffe Woods in
                                                                                                  September 2011.
                               Organise a range of nature related events,       By end March      Secret Wood nature learning           An on-going basis: Parks and
                               for example, biodiversity guided walks.          2011.             event in Raincliffe Woods in          Countryside Team.
                                                                                                  September 2011.
                                                                           38
                                                                                                                        Author: James Bridges, Sustainability Officer – May 2011
                           Actively promote local sustainable                 (a) On-going.    (a) Examples include: Echo              (a) and (b) An on-going basis:
                           production and consumption:                                         article about Shearlings                Sustainability Officer/
                           (a) By encouraging markets for high quality                         scheme; sustainability section          Economic Regeneration/
                           local and regional produce, for example,                            of the website promotes local           Borough Community Partnership.
                           promoting the Scarborough Partnership                               production and consumption;
                           Shearlings project; and exploring how the                           10:10 campaign and exhibition
                           Council can also make use of these                                  in Whitby promotes fair trade;
                           products in its own purchasing.                                     media releases about the
                                                                                               indoor market Scarborough;
                           (b) Promoting (a) above as outlined in the         (b) On-going.    involved in the local food group        (c) An on-going basis: Asset
                           raising awareness sections (above).                                 meetings and events.                    Management/Forward Planning/
                                                                                                                                       Corporate Policy/Economic
                           (c) Exploring options for extending land                                                                    Regeneration/Borough
                           space for allotments for the community to          (c) On-going.                                            Community Partnership.
                           grow their own vegetables.
                                                                                                                                       (d) An on-going basis:
                           (d) Promoting eco-labeled, organic, ethical        (d) On-going                                             Sustainability Officer/Economic
                           and fair-trade products through the range of                                                                Regeneration/Borough
                           mediums as outlined in the raising                                                                          Community Partnership
                           awareness sections above.                                                                                   /Corporate Policy/Tourism Unit.
                           Assess how the community and businesses            By December      Still need to start – can tie in        Yet to start: Sustainability officer.
                           use SBC to deliver on environmental                2010.            with the audit of existing activity
                           initiatives by developing a questionnaire                           to gain a fuller picture of
                           which can be used to take forth further                             community sustainability activity
                           sustainability actions by the Council as                            as highlighted in the
                           appropriate. Circulate the questionnaire                            appropriate section under
                           through a number of mediums as outlined in                          objective 24 above.
                           the raising awareness sections above.
                           Continue with the successful compost               Two compost                                              An on-going basis: Recycling
                           giveaways.                                         giveaways                                                and Enforcement Unit.
                                                                              each year and
                                                                              all compost is
                                                                              given away.
26   Promote sustainable   Develop a sustainability guidelines booklet        By end October   Sustainability Officer has              On-going: yet to be completed:
     local tourism.        on sustainable tourism for events - for            2010.            developed a draft checklist for         Sustainability Officer/Tourism
                           example, a sustainability statement                                 this but it still needs to be taken     Unit.
                           checklist that addresses sustainable                                forward.
                           transport, use of local suppliers, use of
                           recyclable products, and low energy
                           efficiency usage.

                                                                         39
                                                                                                                       Author: James Bridges, Sustainability Officer – May 2011
    Appendix 2 – Objectives’ of the Sustainable Development Strategy

Priority 1 - Building capacity and local management towards sustainability (links with
objectives 1-4).

Objective 1: To build participation and sustainable development capacity within Scarborough
Borough Council as an organisation and through its Members and officers at a personal and
professional level.

Objective 2: To strengthen Local Agenda 21/Aalborg commitments or other local sustainability
processes and mainstream them into the heart of local government.

Objective 3: To ensure that sustainability issues are central to decision-making processes.

Objective 4: To set-up a monitoring mechanism to ensure the prioritisation of sustainability is
apparent and is being delivered.


Priority 2 Buildings and estates and activities within the council’s own operations: Making
effective use of resources (links with objectives 5-12).

Objective 5: Understand and qualify SBCs use of natural resources with regards to energy
management and water usage.

Objective 6: Reduce primary energy consumption, and improve end-use energy efficiency.

Objective 7: Increase the share of renewable energies utilised in our operations.

Objective 8: Save water, and use water more efficiently.

Objective 9: Avoid and reduce waste, and increase re-use and recycling within the council’s own
operations.

Objective 10: Ensure prudent procurement and use of sustainable resources in all activities of the
Council.

Objective 11: Up-date existing travel to work action plan.

Objective 12: Take forward the Green Fleets Environmental Programme and draft Green Fleet
Strategy.


Priority 3 - To address the challenges presented by climate change and combat these in a
sustainable manner (links with objectives 13-20).

Objective 13: To raise awareness about the impacts of climate change with Council staff, Members
and the wider community.

Objective 14: To address the impacts of climate change concerning our own operations and the
wider community by mainstreaming climate protection policy into our policies in the areas of
planning, economic development, energy, transport, procurement, waste, housing, and community
engagement.

Objective 15: To raise awareness with Officers and Members about how to reduce carbon dioxide
emissions associated with all of the authority activities.

                                                  40
                                                              Author: James Bridges, Sustainability Officer – May 2011
Objective 16: To undertake actions to reduce carbon dioxide emissions associated with all of the
authority activities through capacity building.

Objective 17: To raise awareness with the local community and local businesses about how to
reduce carbon dioxide emissions.

Objective 18: To undertake actions to reduce carbon dioxide emissions associated with the local
community and businesses through capacity building.

Objective 19: Apply requirements for high levels of sustainable design and construction in new
commercial and housing developments in the Borough.

Objective 20: To reduce the impact of transport on the environment and public health by promoting
more sustainable modes of transport e.g. walking, cycling and use of public transport.


Priority 4: Reduce the Borough’s ecological footprint* (links with objectives 21-26).

Objective 21: Improve communication with local communities, local and regional agencies and
other key stakeholders in the promotion of the sustainability agenda.

Objective 22: Foster a shared sense of purpose and responsibility amongst all the people of the
Borough towards sustainable development by capacity building within the community to reduce the
Borough’s ecological footprint.

Objective 23: Increase capacity for SBC to maximise ecological sustainability activities within the
Borough.

Objective 24: Promote and increase biodiversity.

Objective 25: Undertake effective management of natural resources and increase the use of local
resources to satisfy local needs.

Objective 26: Ensure sustainable tourism and recreation events in the Borough.


*A difference between priority 3 and 4 is that the former gives prominent recognition to reducing
the carbon footprint of the Borough, whereas the latter is more about the broader environmental
footprint, with regards to biodiversity, natural resources, supporting local consumption and
production.




                                                   41
                                                              Author: James Bridges, Sustainability Officer – May 2011

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:7
posted:8/31/2012
language:Unknown
pages:42