SEH 0798 SyedMuhammadRehanAbidi

W
Shared by: HC12083109022
Categories
Tags
-
Stats
views:
10
posted:
8/31/2012
language:
English
pages:
5
Document Sample
scope of work template
							               SYED MUHAMMAD REHAN ABIDI


OBJECTIVE
Seeking A Long Term, Challenging And Responsible Position In A Leading Organization Offering
Competitive Environment Conducive To Mutual Development

PERSONAL PROFILE
Full Name:             Syed Muhammad Rehan Abidi
Father’s Name:         Syed Afsar Ali Abidi
Father’s Occupation:   Advocate Supreme Court (Khalid Anwer & Co.)
Date Of Birth:         Oct. 14th 1969.
Martial Status:        Married
Domicile:              Karachi (Sindh) Urban Area
Religion:              Islam
Nationality:           Pakistani
NIC #:                 42101-13699903
                      B-89, Block I, North Nazimabad, Karachi.
                      (021) 6633669 – 6639019
Mobile:                0300 - 2257966

EXPERIENCE

July 2003 Till Date               English Biscuits Manufactures
                                      Manager Engineering

    Preparation Of Feasibility Report For Various Plant Machines That Facilate Top Management In
    Taking Short / Long-Term Decisions.
    Prepare / Monitor The Annual And Preventive Maintenance Plans Of Main Plant & Utilities.
    Rectify / Follow Up The Corrective Maintenance As Per Job Card Requirement.
    Study, Identify, And Plan The Modifications.
    Prepare, Modify, / Follow Up The ISO & HACCP Document.
    Develop The Work Schedule For Building Maintenance.
    Arrange / Follow The Review Of Contracts / Govt. Inspection Etc. In Co-Ordination With Admin
    Dept.
    Arrange And Ensure The Availability Of Technical Items To Avoid Any Major Breakdown.
    Prepare And Ensure Implementation Of The Shutdown Plans / Work Schedule.
    Prepare The Annual Budget Of The Plant / Machines / Modifications.
    Prepare Feasibility Of Civil / Mechanical / Electrical / HVACR Unit And Machines In Conjunction
    With Top Management.
    Prepare And Implement The Project Plans / Drawings / BOQ’S.
    Prepare And Ensure Implementation / Follow Up Of The Planning / Scheduling / Routing Of
    Projects.

                                                                                       Page 1 of 5
   Installation And Commissioning Of Imaforni Biscuit Line (Italy); (I.E. Mixer, Cutting & Oven
   Section Complete)
   Design, Installation, & Commissioning Of All Conveyors Locally Manufactured.
   Installation Of Stand By Generator (i.e. 1024 KW; CAT)
   Installation Of 02 Numbers Of Saynio Direct Fired Absorption Chiller (i.e. 210TR Each) Including
   Cooling Towers, AHU’s & Pumps.
   False Ceiling In All Section (i.e. 40000Ft2 )
   Design, Installation, & Commissioning Of 01 Number Of Cold Room (i.e. 880Ft2)
   Advise Sr. Manager Commercial On Tech Aspect Of Material / Service For EBM & CFL.
   Correspond With Local / Imported Suppliers In Consultation With Top Management.
   Working On Up Coming Project Including Designing, Installing And Commissioning Of New
   Chocolate Plant (U.K), New Imaforni Oven (Italy), Mixing Plant (U.K) And Complete Imaforni
   Biscuit Line (Italy).


July 2000 ~ June 2003           English Biscuits Manufactures
                                Sr. Asstt. Manager Engineering
   System Improvement And Development.
   Project Planning And Execution.
   Project Costing.
   Attend MR (Management Review) Meeting And Discuss Relevant Operational And Maintenance
   Issue.
   Installation & Commissioning Of Imaforni Cutting Line (Italy).
   BMR Of Complete Biscuit Line (i.e. Meincke Line; Denmark).

Feb 1999 ~ June 2000              English Biscuits Manufactures
                                       Engineering Officer
   Job Allocation And Supervision.
   Procurement Of Engineering Material & Parts.
   Preparation Of Feasibility Reports.
   Supervision Of Daily And Weekly Maintenance Jobs.
   Preparation Of Maintenance Report.
   Preparation Of Weekly Roaster.
   Internal Auditor Quality Management System (ISO 9000)


July 1996 ~ June 1998            Dewan Salman Drawing Section. (Fiber Line)
                                            Shift Engineer
   Worked As A Shift Engineer Dewan Salman Fiber Experienced Of Staple Fiber Plant Spinning And
   Drawing Section



July 1995 ~ June 1996             Dewan Salman Fiber P C T Dept.
                          (Process Control & Technical And R & D Department Of Both Units)
                                           Shift In Charge
   Conduct Daily Coordination Meeting, Technical Meetings, Modification Approval Meetings And
   Special Meetings With Minutes.
   Prepare Daily Abnormality Reports, Monthly Reports, Annual Reports, And Major Abnormalities Of
   Both Units.
                                                                                       Page 2 of 5
   Relevant Activities Of MIS Department.




May 1994 ~ June 1995               Dewan Salman Fiber Unit – 2.
                                      Project Engineer
   Correspondence & Procurement Of Accessories For A Polymer Plant.
   Civil Work Scheduling And Planning For A Polymer Plant.
   Fabrication And Erection Of Creel Beams, Walker-Ways And Passage Way.
   Fabrication And Erection Of Tanks, Vessels Of A Polymer Plant.
   Equipment Erection, Piping & Commissioning Of A Polymer Plant.


EDUCATION

2000 – 2004       NED University Of Engineering & Technology
                  Done Masters Of Engineering (Manufacturing) With GPA = 3

1993 – 1994       Dawood College Of Engineering & Technology
                  Passed B. E. In Industrial Engineering With 1st Division

1992              University Of Karachi
                  Passed B.Com With 2nd Division

1991              Govt. College Of Engineering. & Technology
                  Passed Diploma Of Associate Engineer In Power Technology With 1st Division

1987              Karachi Board
                  Passed Intermediate Examination With 1st Division

1984              Karachi Board
                  Passed Matriculation Examination With 1st Division



MAJOR SUBJECTS IN M. E

   Applied Mathematic
   Automation In Control
   Computer Adid Manufacturing
   Advance Manufacturing Process 1
   Computer Application
   Computer Adid Designing
   Quality Assurance And Reliability
   Operation Research
   Finite Element Analysis
   Advance Manufacturing –Ll
   Ms Project

                                                                                     Page 3 of 5
MAJOR SUBJECTS           IN B. E

   Marketing Management
   Maintenance Management
   Human Resource Management
   Management Information System (MIS)
   Industrial Organization & Management
   Product Planning & Control
   Operation Research
   Quality Control
   Method Engineering
   Ergonomics


MAIN PROJECTS
   Energy Project (Final Year B.E.)
   Study & Evaluation Of Economical Viability Of Solar Energy In Textile Industries Of Pakistan.
   Feasibility Report Of Knitting Out.
   Enhancing The Capacity Of Wire Cut Machine Of Biscuit Cutting Line

SEMINARS ATTENDED
Agenda Agenda Time Management
Conducted By  British Council
Venue         Avari Tower
Duration      8th July 2004

Agenda            Environment Management
Conducted By      Main Sponsor: EBM, Co-Sponsor: PSO, SSGC, National Forum For Environment
Venue             Avari Tower
Duration          29th & 30th June 2004

Agenda            Motivating, Coaching & Delegating At Work
Conducted By      KZR Associates
Venue             Karachi Sheraton Hotel
Duration          9th & 10 June 2004

Agenda            Effective Delegation
Conducted By      TCS
Venue             Avari Tower
Duration          30th April 2004

Agenda            Auditing To ISO_9000 ~ 2000
Conducted By      System 9000 International Training
Venue             English Biscuits Manufactures
Duration          6th Nov. 2002

Agenda            Baking Technology
Conducted By      English Biscuits
Venue             English Biscuits Manufactures
Duration          22nd October 2002
                                                                                        Page 4 of 5
Agenda           Boiler Feed Water Treatment
Conducted By     International Division Houseman Burman Ltd.
Venue            Avari Tower Hotel
Duration         19th & 20th March 2002

Agenda Agenda Productivity Improvement Through Kaizen Activities
Conducted By  Employers Federation Of Pakistan In Collaboration With “Nikkeirn” International
              Cooperation Center Tokyo (Japan).
Venue         Karachi Sheraton Hotel
Duration      9th March 2002

Agenda           Awareness & Implementation Of HACCP In Biscuits Industries
Conducted By     United Registrar Of System
Venue            English Biscuits Manufactures
Duration         19th Jan. 2002

Agenda           Auditing To ISO_9000
Conducted By     System 9000 International Training
Venue            English Biscuits Manufactures
Duration         8th April 1999.

Agenda           Improving Boiler Operation Efficiency
Conducted By     National Energy Conversation Center (ENERCON)
Venue            Govt. College Of Engineering & Technology S.I.T.E. Karachi
Duration         3rd & 4th Feb. 1998.


RECOGANITION AWARD
Best Employee Of The Year Of EBM For The Year 2003.

COMPUTER FITNESS
MS Office 2000 & 2002




                                                                                  Page 5 of 5

						
Related docs
Other docs by HC12083109022
Economics Due_____
Views: 0  |  Downloads: 0
Periodic Construction Observation Report
Views: 2  |  Downloads: 0
Legal Profession
Views: 6  |  Downloads: 0
Ron Hedges Bio
Views: 7  |  Downloads: 0
08130303 EN GPNMAURITIUSNPIP 19 06
Views: 3  |  Downloads: 0
Application for Registration as an
Views: 1  |  Downloads: 0
ce3401Lec36
Views: 0  |  Downloads: 0
Judicial Reform 101
Views: 1  |  Downloads: 0
INDEPENDENT PROJECT ENROLLMENT PROPOSAL
Views: 1  |  Downloads: 0