SEH 0798 SyedMuhammadRehanAbidi
Document Sample


SYED MUHAMMAD REHAN ABIDI
OBJECTIVE
Seeking A Long Term, Challenging And Responsible Position In A Leading Organization Offering
Competitive Environment Conducive To Mutual Development
PERSONAL PROFILE
Full Name: Syed Muhammad Rehan Abidi
Father’s Name: Syed Afsar Ali Abidi
Father’s Occupation: Advocate Supreme Court (Khalid Anwer & Co.)
Date Of Birth: Oct. 14th 1969.
Martial Status: Married
Domicile: Karachi (Sindh) Urban Area
Religion: Islam
Nationality: Pakistani
NIC #: 42101-13699903
B-89, Block I, North Nazimabad, Karachi.
(021) 6633669 – 6639019
Mobile: 0300 - 2257966
EXPERIENCE
July 2003 Till Date English Biscuits Manufactures
Manager Engineering
Preparation Of Feasibility Report For Various Plant Machines That Facilate Top Management In
Taking Short / Long-Term Decisions.
Prepare / Monitor The Annual And Preventive Maintenance Plans Of Main Plant & Utilities.
Rectify / Follow Up The Corrective Maintenance As Per Job Card Requirement.
Study, Identify, And Plan The Modifications.
Prepare, Modify, / Follow Up The ISO & HACCP Document.
Develop The Work Schedule For Building Maintenance.
Arrange / Follow The Review Of Contracts / Govt. Inspection Etc. In Co-Ordination With Admin
Dept.
Arrange And Ensure The Availability Of Technical Items To Avoid Any Major Breakdown.
Prepare And Ensure Implementation Of The Shutdown Plans / Work Schedule.
Prepare The Annual Budget Of The Plant / Machines / Modifications.
Prepare Feasibility Of Civil / Mechanical / Electrical / HVACR Unit And Machines In Conjunction
With Top Management.
Prepare And Implement The Project Plans / Drawings / BOQ’S.
Prepare And Ensure Implementation / Follow Up Of The Planning / Scheduling / Routing Of
Projects.
Page 1 of 5
Installation And Commissioning Of Imaforni Biscuit Line (Italy); (I.E. Mixer, Cutting & Oven
Section Complete)
Design, Installation, & Commissioning Of All Conveyors Locally Manufactured.
Installation Of Stand By Generator (i.e. 1024 KW; CAT)
Installation Of 02 Numbers Of Saynio Direct Fired Absorption Chiller (i.e. 210TR Each) Including
Cooling Towers, AHU’s & Pumps.
False Ceiling In All Section (i.e. 40000Ft2 )
Design, Installation, & Commissioning Of 01 Number Of Cold Room (i.e. 880Ft2)
Advise Sr. Manager Commercial On Tech Aspect Of Material / Service For EBM & CFL.
Correspond With Local / Imported Suppliers In Consultation With Top Management.
Working On Up Coming Project Including Designing, Installing And Commissioning Of New
Chocolate Plant (U.K), New Imaforni Oven (Italy), Mixing Plant (U.K) And Complete Imaforni
Biscuit Line (Italy).
July 2000 ~ June 2003 English Biscuits Manufactures
Sr. Asstt. Manager Engineering
System Improvement And Development.
Project Planning And Execution.
Project Costing.
Attend MR (Management Review) Meeting And Discuss Relevant Operational And Maintenance
Issue.
Installation & Commissioning Of Imaforni Cutting Line (Italy).
BMR Of Complete Biscuit Line (i.e. Meincke Line; Denmark).
Feb 1999 ~ June 2000 English Biscuits Manufactures
Engineering Officer
Job Allocation And Supervision.
Procurement Of Engineering Material & Parts.
Preparation Of Feasibility Reports.
Supervision Of Daily And Weekly Maintenance Jobs.
Preparation Of Maintenance Report.
Preparation Of Weekly Roaster.
Internal Auditor Quality Management System (ISO 9000)
July 1996 ~ June 1998 Dewan Salman Drawing Section. (Fiber Line)
Shift Engineer
Worked As A Shift Engineer Dewan Salman Fiber Experienced Of Staple Fiber Plant Spinning And
Drawing Section
July 1995 ~ June 1996 Dewan Salman Fiber P C T Dept.
(Process Control & Technical And R & D Department Of Both Units)
Shift In Charge
Conduct Daily Coordination Meeting, Technical Meetings, Modification Approval Meetings And
Special Meetings With Minutes.
Prepare Daily Abnormality Reports, Monthly Reports, Annual Reports, And Major Abnormalities Of
Both Units.
Page 2 of 5
Relevant Activities Of MIS Department.
May 1994 ~ June 1995 Dewan Salman Fiber Unit – 2.
Project Engineer
Correspondence & Procurement Of Accessories For A Polymer Plant.
Civil Work Scheduling And Planning For A Polymer Plant.
Fabrication And Erection Of Creel Beams, Walker-Ways And Passage Way.
Fabrication And Erection Of Tanks, Vessels Of A Polymer Plant.
Equipment Erection, Piping & Commissioning Of A Polymer Plant.
EDUCATION
2000 – 2004 NED University Of Engineering & Technology
Done Masters Of Engineering (Manufacturing) With GPA = 3
1993 – 1994 Dawood College Of Engineering & Technology
Passed B. E. In Industrial Engineering With 1st Division
1992 University Of Karachi
Passed B.Com With 2nd Division
1991 Govt. College Of Engineering. & Technology
Passed Diploma Of Associate Engineer In Power Technology With 1st Division
1987 Karachi Board
Passed Intermediate Examination With 1st Division
1984 Karachi Board
Passed Matriculation Examination With 1st Division
MAJOR SUBJECTS IN M. E
Applied Mathematic
Automation In Control
Computer Adid Manufacturing
Advance Manufacturing Process 1
Computer Application
Computer Adid Designing
Quality Assurance And Reliability
Operation Research
Finite Element Analysis
Advance Manufacturing –Ll
Ms Project
Page 3 of 5
MAJOR SUBJECTS IN B. E
Marketing Management
Maintenance Management
Human Resource Management
Management Information System (MIS)
Industrial Organization & Management
Product Planning & Control
Operation Research
Quality Control
Method Engineering
Ergonomics
MAIN PROJECTS
Energy Project (Final Year B.E.)
Study & Evaluation Of Economical Viability Of Solar Energy In Textile Industries Of Pakistan.
Feasibility Report Of Knitting Out.
Enhancing The Capacity Of Wire Cut Machine Of Biscuit Cutting Line
SEMINARS ATTENDED
Agenda Agenda Time Management
Conducted By British Council
Venue Avari Tower
Duration 8th July 2004
Agenda Environment Management
Conducted By Main Sponsor: EBM, Co-Sponsor: PSO, SSGC, National Forum For Environment
Venue Avari Tower
Duration 29th & 30th June 2004
Agenda Motivating, Coaching & Delegating At Work
Conducted By KZR Associates
Venue Karachi Sheraton Hotel
Duration 9th & 10 June 2004
Agenda Effective Delegation
Conducted By TCS
Venue Avari Tower
Duration 30th April 2004
Agenda Auditing To ISO_9000 ~ 2000
Conducted By System 9000 International Training
Venue English Biscuits Manufactures
Duration 6th Nov. 2002
Agenda Baking Technology
Conducted By English Biscuits
Venue English Biscuits Manufactures
Duration 22nd October 2002
Page 4 of 5
Agenda Boiler Feed Water Treatment
Conducted By International Division Houseman Burman Ltd.
Venue Avari Tower Hotel
Duration 19th & 20th March 2002
Agenda Agenda Productivity Improvement Through Kaizen Activities
Conducted By Employers Federation Of Pakistan In Collaboration With “Nikkeirn” International
Cooperation Center Tokyo (Japan).
Venue Karachi Sheraton Hotel
Duration 9th March 2002
Agenda Awareness & Implementation Of HACCP In Biscuits Industries
Conducted By United Registrar Of System
Venue English Biscuits Manufactures
Duration 19th Jan. 2002
Agenda Auditing To ISO_9000
Conducted By System 9000 International Training
Venue English Biscuits Manufactures
Duration 8th April 1999.
Agenda Improving Boiler Operation Efficiency
Conducted By National Energy Conversation Center (ENERCON)
Venue Govt. College Of Engineering & Technology S.I.T.E. Karachi
Duration 3rd & 4th Feb. 1998.
RECOGANITION AWARD
Best Employee Of The Year Of EBM For The Year 2003.
COMPUTER FITNESS
MS Office 2000 & 2002
Page 5 of 5
Get documents about "