2009PotentialSolutionsTemplate2

Shared by: HC12083020388
Categories
Tags
-
Stats
views:
0
posted:
8/30/2012
language:
English
pages:
2
Document Sample
scope of work template
							                                            Columns for
                                            2007/2008 will be
                                            deleted

       First Year of IC Production            2007     2008     2009     2010     2011     2012     2013     2014     2015     2016     2017   2018   2019   2020   2021   2022   2023   2024




This legend indicates the time during which research, development, and qualification/pre-production should be taking place for the solution.
Research Required
Development Underway
Qualification / Pre-Production
Continuous Improvement


Work-in-Progress--Do Not Publish
Figure DESN5 Logical/Circuit/Physical Design Potential Solutions
                                            Columns for
                                            2007/2008 will be
                                            deleted

       First Year of IC Production           2007      2008     2009   2010    2011    2012     2013    2014    2015    2016     2017    2018   2019   2020   2021   2022   2023   2024

Synthesis and timing accounting for
variability



Circuit/layout enhancement accounting for
variability




Macro/chip leakage analysis




Power management analysis and logic
insertion SOI SoC tools




Analog synthesis (circuit/layout)




Non-static logic implementation




Cost-driven implementation flow


This legend indicates the time during which research, development, and qualification/pre-production should be taking place for the solution.
Research Required
Development Underway
Qualification / Pre-Production
Continuous Improvement


Work-in-Progress--Do Not Publish

						
Other docs by HC12083020388
DW 10 Programme Map 2011
Views: 6  |  Downloads: 0
Customer 2010 03
Views: 1  |  Downloads: 0
BANANA WORKERS GET DAY IN COURT
Views: 1  |  Downloads: 0
Detailed Design Review Notes - EDGE / Home
Views: 1  |  Downloads: 0
2009PotentialSolutionsTemplate2
Views: 0  |  Downloads: 0
psnatioanl
Views: 0  |  Downloads: 0
Association Rules
Views: 6  |  Downloads: 0
DSM Minnesota
Views: 2  |  Downloads: 0
TOCASIERRA FITNESS CENTRE
Views: 0  |  Downloads: 0