									CDF


      L2 Processor Status


          Stephen Miller
         December 7, 2001
         L2 Trigger Review
CDF                                L2 Processor Status

• Hardware Status
     – 5 RevD Production boards
          • 1 in use at B0 since the summer
          • 2 in use at B0 for last 1-2 months
          • 2 in Michigan being debugged
               – 1 identified problem on each board
     – 5 Rev C Production Boards
          • 1 Pre-production board used at B0 since January
          • 4 production boards at Michigan with bad vias.
               – Would require different amounts of time to make functional.
               – 1 board was at B0. New bad vias every few months.
               – This design requires wire mods to run in fully optimal mode
               – Don’t plan on making these boards functional
     – 2 Prototype Boards
          • 1 functional board used in tests at Michigan



12/7/01                                                                        2
CDF                              L2 Processor Status

• Board performance
     – Boards work very reliably
          • Used in lots of runs (including tagging mode this summer)
          • Control firmware and software works well
          • No problems receiving data from interface boards
     – Multi Alpha Tests
          • Cosmic runs with 3 alphas have been run at 20KHz
          • 1 Alpha reads data loaded in other alphas to check for errors
          • Need to improve code for reliably running multiple Alphas




12/7/01                                                                     3
CDF                                L2 Processor Status

• Board performance cont…
     – Reading Reces over Magicbus
          • Alpha reliably reads Reces in standalone tests
          • During running, reading Reces leads to DoneTimeout Errors from Crate
               – Conflict is with VME read of Alpha immediately following an Alpha read of Reces
               – Problem is due to how PIO fpga terminates the PCI transaction in the Alpha
          • Having the crate controller retry several times on a VME Berr alleviates the problem
          • Will study the problem in a teststand at Michigan to fix the PIO firmware
          • MBus arbitration problems reading Reces can be solved by checking that interface boards have
            sent data.
               – Makes processing time for that event > loading time for next event.
     – Alpha to Alpha reads/writes
          • PIO firmware was improved to allow Alpha to Alpha writes over MagicBus.
          • Alpha to Alpha read functionality still needs to be fixed.
              – This is not a requirement for CDF or D0 operations.
          •



12/7/01                                                                                           4
CDF                         Improving Performance

• Board improvements
     – Improved control firmware
          • All control functions currently done by software read/writes to fpga registers
              – Includes getting L1A, configuring DMA buffers, sending startload, checking
                 mod_done bits, sending decision to the Trigger Supervisor.
              – Each PCI transaction takes about 150 to 200ns.
              – There is 5 to 10 us of overhead each event for these transactions.
          • Much of this functionality has been put into fpga firmware (work by Josh Davis at
            Michigan)
              – Will reduce overhead to 1 to 2 us per event.
              – Potential for even further improvements, but would need new firmware
          • Firmware needs further testing at B0 and new control code debugged.
          • Optimized software will also give some improvements.

          •


12/7/01                                                                                   5
CDF                      L2 Processor Tests at B0

• Additional Multi-Alpha tests
     – Need to improve Alpha software
     – Test with beam at high rates
• Tests of Reading Reces
     – Once new firmware is ready can test with Cosmic run
• New Firmware tests
     – Need tests with interface boards sending data
     – Cosmics tests sufficient to verify operation
• Testing of spare Alphas
     – Need to fix remaining 2 Alpha boards at Michigan




12/7/01                                                      6
CDF                               Maintaining Boards

• Documentation
     –    Extensive documentation for the AlphaPC164 motherboard and Alpha CPU
     –    Document written specifying functionality of FPGAS
     –    Need to provide document for general L2 expert
     –    Schematics exist at B0 and as postscript. Will put files on B0 web page
• Debug Software
     – Some test utilities part of the EBSDK code
     – Alpha based program for VME and MagicBus tests with 1 or more Alphas
     – Standalone C programs on Linux boxes
           • Used to read registers/status of Alpha
           • Provides standalone tests of interface boards with the Alpha
           • Need to organize code in CVS


12/7/01                                                                         7
CDF                                     Summary

• Alpha boards function very well
     – Have provided reliable operation at B0
     – Focus now shifting to trigger algorithm code (see other talks)


•    Several improvements needed for fullest functionality
     –    Reces Readout with improved firmware
     –    New control firmware for higher rate operation
     –    Improved software for Multi-Alpha running
     –    Can do tests without beam, but will need Cosmic tests with system