					                                        Ferguson Road Widening
Item   Tech Spec         Description with Unit Prices         Quantity Unit of Measure

                       PREPARING RIGHT OF WAY
 1           101S-B                                             31.30        STA
                       at Dollars and Cents per Station

                       EXCAVATION
 2           111S-A                                            6,091.00      CY
                       at Dollars and Cents per Cubic Yard

                       EMBANKMENT
 3           132S-A                                            1,084.00      CY
                       at Dollars and Cents per Cubic Yard

                     FL BS (CMP IN PLC)(TY A GR 1)(FNAL
 4          247-2041 POS)                                      1,788.00      CY

                       at Dollars and Cents per Cubic Yard

                       PRIME COAT (MC-30 OR AE-P)
 5          310-2005                                           1,030.00      GAL
                       at Dollars and Cents per Gallon

                       ASPH (AC-20-5TR)
 6          316-2006                                           2,060.00      GAL
                       at Dollars and Cents per Gallon

                       AGGR (TY-PD GR-4 SAC-B)
 7          316-2239                                            43.00        CY
                       at Dollars and Cents per Cubic Yard

                       D-GR HMA (METH) TY-D SAC-B PG70-22
 8          340-2120                                           718.00        TON
                       at dollars and Cents per Ton

                       CL A CONC (COLLAR)
 9          420-2090                                             4.00        EA
                       at dollars and Cents per Each

                       RIPRAP (MOW STRIP)(4 IN)
 10         432-2039                                            34.00        CY
                       at Dollars and Cents per Cubic Yard

                       RC PIPE (CL III)(18 IN)
 11     464-2003                                                55.00         LF
                       at Dollars and Cents per Linear Feet

                       RC PIPE (CL III)(24 IN)
 12     464-2005                                               133.00         LF
                       at Dollars and Cents per Linear Feet
                RC PIPE (CL III)(36 IN)
13   464-2009                                           10.00      LF
                at Dollars and Cents per Linear Feet

                SET (TY II)(24 IN)(RCP)(4:1)(C)
14   467-2224                                            2.00      EA
                at Dollars and Cents per Each

                SET (TY II)(18 IN)(RCP)(6:1)(P)
15   467-2286                                            2.00      EA
                at Dollars and Cents per Each

                SET (TY II)(24 IN)(RCP)(6:1)(P)
16   467-2288                                            4.00      EA
                at Dollars and Cents per Each

                SET (TY II)(36 IN)(RCP)(5:1)(C)
17   467-XXXX                                            2.00      EA
                at Dollars and Cents per Each

                CONC CURB (TY II)
18   529-2002                                           77.00      LF
                at Dollars and Cents per Linear Feet

                MTL W-BEAM GD FEN (TIM POST)
19   540-2001                                           500.00     LF
                at Dollars and Cents per Linear Feet

                DOWNSTREAM ANCHOR TERMINAL
20   540-2044   (DAT)(SECTION                            3.00      EA

                at Dollars and Cents per Each

                GUARDRAIL END TREATMENT
21   544-2001   (INSTALL)                                3.00      EA

                at Dollars and Cents per Each

                MAILBOX INSTALL-S (TWW-POST) TY 4
22   560-2015   FND-TB                                   1.00      EA

                at Dollars and Cents per Each

                NON-NATIVE SEEDING FOR EROSION
23    604S-A    CONTROL                                15,157.00   SY

                at Dollars and Cents per Square Yard

                SOIL RETENTION BLANKET CLASS
24    605S-A    1;TYPE A                               15,157.00   SY

                at Dollars and Cents per Square Yard
                ROCK BERM
25    639S                                             160.00     LF
                at Dollars and Cents per Linear Feet

                STABILIZED CONSTRUCTION
26    641S      ENTRANCE                                 2.00     EA

                at Dollars and Cents per Each

                SILT FENCE FOR EROSION CONTROL
27    642S                                             575.00     LF
                at Dollars and Cents per Linear Feet

                IN SM RD SN SUP&AM TY10BWG(1)SA(P)
28   644-2001                                            5.00     EA
                at Dollars and Cents per Each


                IN SM RD SN SUP&AM
29   644-2004   TY10BWG(1)SA(T)                          1.00     EA

                at Dollars and Cents per Each

                RELOCATE SM RD SN SUP & AM TY
30   644-2056   10BWG                                    2.00     EA

                at Dollars and Cents per Each

                BARRICADES, SIGNS AND TRAFFIC
31   803S-MO    HANDLING                                 3.00     MO

                at Dollars and Cents per Month

                WK ZN PAV MRK REMOV (W) 4' (SLD)
32   870S-A                                             80.00     LF
                at Dollars and Cents per Linear Feet

                WK ZN PAV MRK NON-REMOV (Y) 4'
33   870S-A     (SLD)                                  160.00     LF

                at Dollars and Cents per Linear Feet

                WK ZN PAV MRK NON-REMOV (W) 4'
34   870S-B     (SLD)                                  3,129.00   LF

                at Dollars and Cents per Linear Feet

                WK ZN PAV MRK NON-REMOV (Y) 4'
35   870S-B     (SLD)                                  6,258.00   LF

                at Dollars and Cents per Linear Feet
                       REFL PAV MRK TY I (W) 4'
    36       871S-A    (BRK)(100MIL)                            1,304.00   LF

                       at Dollars and Cents per Linear Feet

                       REFL PAV MRK TY I (W) 4' (SLD)(100MIL)
    37       871S-A                                             5,797.00   LF
                       at Dollars and Cents per Linear Feet


                       REFL PAV MRK TY I (W) 8' (SLD)(100MIL)
    38       871S-A                                             719.00     LF
                       at Dollars and Cents per Linear Feet


                       REFL PAV MRK TY I (W) 24'
    39       871S-A    (SLD)(100MIL)                            155.00     LF

                       at Dollars and Cents per Linear Feet

                       REFL PAV MRK TY I (Y) 4' (SLD)(100MIL)
    40       871S-A                                             5,570.00   LF
                       at Dollars and Cents per Linear Feet

                       REFL PAV MRK TY I (W)(WORD)(100MIL)
    41       871S-B                                               4.00     EA
                       at Dollars and Cents per Each


                       REFL PAV MRK TY I
    42       871S-D    (W)(ARROW)(100MIL)                         4.00     EA

                       at Dollars and Cents per Each

                       ELIM EXT PAV MRK & MRKS (4")
    43       874S-A                                             9,547.00   LF
                       at Dollars and Cents per Linear Feet

                       GEOGRID BASE REINFORCEMENT
    44        7000                                              7,601.00   SY
                       at Dollars and Cents per Square Yard

                       TOTAL MOBILIZATION PAYMENT
    45       700S-TM                                              1.00     LS
                       at Dollars and Cents per Lump Sum

Total Cost
ng                                                                    Ferguson N
     Unit Cost   Amount        Item            Description      Qty


            $-            $-    1         Labor                 ???



            $-            $-    2         Materials              1



            $-            $-    3         Sub-Contractor         1




            $-            $-    4         Equipment              1




            $-            $-    5         Insurance              1



            $-            $-    6         Bonds                  1



            $-            $-    7         Overhead and Profit    1



            $-            $-    8         Other                  1



            $-            $-
                                      9           Total          1


            $-            $-



            $-            $-



            $-            $-
$-   $-



$-   $-



$-   $-



$-   $-



$-   $-



$-   $-



$-   $-




$-   $-




$-   $-




$-   $-




$-   $-




$-   $-
$-   $-




$-   $-




$-   $-




$-   $-




$-   $-




$-   $-




$-   $-




$-   $-




$-   $-




$-   $-




$-   $-
$-   $-




$-   $-




$-   $-




$-   $-




$-   $-




$-   $-




$-   $-




$-   $-



$-   $-



$-   $-


     $-
Ferguson North Gate
  Unit of Measure   Unit Cost   Amount          Note


      Hours            $-         $-



        LS             $-         $-



        LS             $-         $-




        LS             $-         $-




        LS             $-         $-



        LS             $-         $-



        LS             $-         $-



        LS             $-         $-     Please explain other



                                  $-
        LS              -

				