					Bioreactor Landfill Project
         Update
 FCSHWM Advisory Board Meeting
      December 10, 1999

         Debra Reinhart
         Tim Townsend
      Progress Since Last
     Advisory Board Meeting
•   Permit Application Progress
•   Operations Plan
•   Baseline Monitoring
•   Installation of Leach Field
•   Sensor Fabrication and Testing
•   Additional Bioreactor Site Investigation
Permit Application Progress

• DEP has issued a second RAI.
• Project team members met with the NE
  District DEP permit engineers to discuss
  issues.
• Responses to second RAI scheduled to
  be submitted on December 10, 1999.
         Operations Plan
• Submittal of a detailed operations plan
  was a part of RAI 2.
• Operations plan designed to be an
  evolving document, but a basic “game
  plan” was established.
         Operations Plan
• Define project participant roles and
  responsibilities.
• Define method of communication and
  decision making.
• Define reporting requirements to DEP
  district.
• Define basic health and safety criteria.
          Operations Plan
• Define contingencies and responsive
  actions.
• Outline site inspection and maintenance
  requirements.
• Define monitoring controls for the issues
  of landfill fires, explosive conditions, and
  leachate flow.
     Measure Gas Concentration:
            % O2                                          Control Diagram
            % CH4
            % CO2
            % N2
            %CO


                                  Gas in explosive         Immediately stop air
        Plot data on a landfill       range or             injection to
        gas flammability chart.    safety range.           impacted area.
                                                           Monitor again after
                                                           one hour.
  Gas outside of
explosive range and
   safety range.



                                                               Inspect area for leaks.
                                                               Investigate and revise
        Monitoring Point is                          Yes
                                                               area operations as
        in Target Anaerobic        O2 >2 %                     necessary.
        Area                      CH4 <40%

                                                      No          Conditions OK




        Monitoring Point is                            Yes
        in Target Anaerobic         O2 >2 %
                                                               Decrease Air Flow Rate
        Area                                No


                                   O2 <2 %
                                  CH4 >10%                     Consider Increasing
                                                               Flow Rate as Needed
         Operations Plan
• Outlines a series of research phases.
  – Construction monitoring.
  – Baseline monitoring.
  – Startup monitoring.
  – Construction monitoring.
       Cap Issues Paper
• A number of parties have raised
  concerns about the cap. An “issues
  paper” was prepared to address why
  the cap system was desired and to
  describe how the researchers believe
  the concerns are addressed.
               Issue 1
• Ballooning of the Cap
               Issue 2
• Internal Landfill Temperatures
Issue 3 - Explosive Conditions
                                        Mixtures that can
                                         not be formed

                 Explosive
                 Range


                           Capable of forming flammable
                           mixtures with air (contains too
                              much methane to be in
                                 explosive range)
        Not capable of
      forming flammable
       mixtures with air
      Update on Monitoring


•   Leachate
•   Gas
•   Waste
•   Settlement
•   Head on the Liner Measurements
               Leachate
• Almost a year’s worth of background
  leachate data has been collected.
  – Conventional water quality parameters
  – Organic trace compounds
  – Heavy metals
                    Gas
•   Instrumentation has been set up for:
•   Fixed gases (CH4, CO2, N2, O2)
•   Trace organic compounds
•   Sulfur gases
•   N 2O
                   Waste
• The bioprocess lab is nearing
  completion.
  – Processing waste.
  – BMP analysis.
  – Cellulose, lignin analysis.
            Settlement
• The GPS system is in. Students have
  undergone training.
• Training near completion.
              Head on the Liner
               Measurements
              LCS Surface

                                       Drainage
                                       Layer

Geomembrane




              Geofabric     Pressure Transducer
      Transducer Layout
Pressure Transducers   Geomembrane
                 LCS


        100ft
0
    2
           4
                  6
                            8
                                10




        Liquid Depth, in.
                                                                               7.00
             Cross-section of rdgs. obtained on Oct. 25 for
             Sensor row C                                                      6.00
                                                                                    )
                                                                                    h
                                                                               5.00 c
                                                                                    n
)
h                                                                                   i
                                                                                    (
c
n                                                                                   h
i
( 5.00                                                                              t
                                                                                    p
n
o                                                                              4.00 e
                                                                                    D
i
t
a
v                                                                                   d
e                                                                                   i
                                                                                    u
l
E                                                                                   q
                                                                               3.00 i
                                                                                    L
142.00

     12970.0 12980.0 12990.0 13000.0 13010.0 13020.0 13030.0 13040.0 13050.0
     0       0       0       0       0       0       0       0       0         2.00


                                                                               1.00


                                                                               0.00
                         Comparison of Sensor B rdgs. and Rainfall over 10 days

                  8                                                7.00
                  7                                                6.00




                                                                           Average Sensor B rdgs.
                  6                                                5.00                             Rainfall
                                                                                                    vs Day
Rainfall (inch)




                  5                                                4.00
                                                                                                    Sensor




                                                                                   (inch)
                  4                                                3.00                             B5 vs
                                                                                                    Day
                  3                                                2.00                             Sensor
                  2                                                1.00                             B10 vs
                                                                                                    Day
                  1                                                0.00                             Sensor
                                                                                                    B17 vs
                  0                                                -1.00                            Day
                      15- 16- 17- 19- 20- 21- 22- 23- 24- 25-                                       Sensor
                                                                                                    B18 vs
                      Oct Oct Oct Oct Oct Oct Oct Oct Oct Oct
                                                                                                    Day
                                       Days                                                         Sensor
                                                                                                    B19 vs
  Installation of Leach Field
A leachate field has been installed in the
  Southern corner of Cell 2 to supply
  known quantities of liquid to the area
  over the pressure transducers.
Cross Section of Leach Field
   Southern boundary of Cell 2




                                                                S o l id P i p e s e c t io n



                                                                                                                          P e r f o ra t e d P ip e s e c ti o n




                                 C o n tr a c to r’ s B e r m




                                                                                                                   A p p ro x im a te lo c a t io n o f t r a n s d u c e r r o w s
                                                                                            8 ft         L C S li n e r
                                      5 ft


                                       5 ft       10ft                                          6 5f t                           120ft




                                 Figure 3. North-South Cross-section of the Leach Field
Aerial View of Leach Field
                                                                                 Perforated pipe section
                                                            Solid pipe section                             T rans duc er Row s

                                                  150                                                                                                 Lateral
        Distance from Cell2/Cell3 interface, ft




                                                  125


                                                                                                                                                 Collection Bay
                                                  100                                                                                            Divide


                                                  75


                                                                                            10ft                                          10ft
                                                  50                                                                                                 Lateral

                                                                                                                          100ft
                                                  25                                50ft



                                                   0
                                                        0            25            50              75        100         125      150   175           200
Southern corner of Cell 2
                                                                                    Distance from the Southern boundary of Cell2, ft


                                                              Figure 1. An areal view of leach field and the pressure transducer
                                                                                              field
Future Instrumentation


   • Temperature Sensors
   • Moisture Sensors
Site Visit to Volusia County
Questions?

				