					0-2 Year Wastewater Projects (Local and Regional Rankings)
                                                                                                                                                                                Project Status in                         Category 2: Project                                             Category 5: Local                       Tie
                                                                                                                                                                                     WRIS                                      Delivery                                                  Need/Ranking Points Category 6: Water  Breaker/
                                                                       WRIS Project                                                                                             System/Funding      Category 1: Type of    (Regional/Non-     Category 3: Project    Category 4:           (#1=20, #2=16,   Management Council Custermers   TOTAL        Regional
                               Project Owner                            Number                                       Project Description                                             Status              Project              regional)            Status           Funding Status           #3=13 etc..)      Bonus Points     per mile    SCORE        Ranking

       Feasibility Studies/Facilities Plans/Evaluations
                                                                                      This project involves completion of a Regional Wastewater Facilities Plan and
                                                                                      Sewer System Evaluation Survey, as required by the City's Agreed order with the
                                                                                      Kentucky Division of Water. North Middletown has never had a Facilities Plan
                                                                                      completed for its wastewater system and suffers from excessive I/I in its
City of North Middletown Facilities Plan and SSES                      SX21017002     collection system.                                                                         SUBMITTED
                                                                                      This project involves updating the existing Frankfort Wastewater facilities plan, as
                                                                                      required by the KY Division of Water, to address the Farmdale Sanitation District
Farmdale Sanitation District-Wastewater Facilities Plan                SX21073015     service area.                                                                              SUBMITTED

                                                                                      This project involves the completion of a sewer system evaluation survey for
                                                                                      existing collection lines within the proposed Farmdale Sanitation District service
                                                                                      area. Also included are sewer line repairs to eliminate the sources of inflow and
                                                                                      infiltration located as a result of the SSES. This work will reduce treatment costs
Farmdale Sanitation District-SSES & Collection System                  SX21073014     for the sanitation district by eliminating excess inflow and infiltration.                 SUBMITTED
Lancaster Wastewater Facilities Plan Update                            SX21079006     Update the Regional Wastewater Facilities Plan.                                            SUBMITTED

                                                                                      40,000 is needed for the purposes of planning for the Lincoln County Sanitation
                                                                                      District. Grant(s) that have been awarded that complement this potential grant is
                                                                                      the 604B KYDOW grant of 20,000 to ensure the completion of the regional
                                                                                      Facilities Plan for the proposed Lincoln Co. Sanitation District's Phase I, and
Lincoln Co. Sanitation District-Planning Project                       SX21137005     Phase II; Regional Wastewater project SX2113700                                            SUBMITTED
                                                                                      Conduct a Comprehensive Wastewater Facility Plan for Nicholas County in
                                                                                      accordance with 401 KAR 5:006. In conjunction with the Wastewater Facility
                                                                                      Plan, conduct a Sanitary Sewer Evaluation Survey of the Carlisle Wastewater
City of Carlisle, Nicholas County Wastewater Facilities Plan & Eval.   SX21181004     Collection System                                                                          SUBMITTED
                                                                                      Wastewater Facilities Plan to provide the most environmentally sound, cost
                                                                                      effective and implementable wastewater treatment works to serve Jessamine
201 Wastewater Facilities Plan - Jessamine County                      SX21113002     County, Kentucky.                                                                          SUBMITTED

                                                                                      This project has two parts: to complete the Stanton / Clay City Facilities Plan and
                                                                                      to perform a Sanitary Sewer Evaluation study. The ultimate goal of the project is
                                                                                      to identify what specific improvements need to be made as part of project
Clay City Sewer Study                                                  SX21197009     SX21197005, Inflow and Infiltration Improvements.                                          SUBMITTED
                                                                                      This project has two parts: to complete the Stanton / Clay City Facilities Plan and
                                                                                      to perform a Sanitary Sewer Evaluation Study. The ultimate goal of the project is
                                                                                      to identify what specific improvements need to be made as part of project
Stanton Sewer Study                                                    SX21197010     SX21197007.                                                                                SUBMITTED
                                                                                      This project involves the completion of a Sewer System Evaluation Survey for the
                                                                                      City of Sadieville's wastewater system. The existing wastewater treatment plant
                                                                                      is aged. The planning area will be expanded to include future residential and
                                                                                      commercial development and the I-75/KY 32 interchange commercial
City of Sadieville Sewer System Evaluation and Repair                  SX21209005     development zone.                                                                          SUBMITTED
                                                                                      Comprehensive evaluation of the condition of the sanitary sewer collection
                                                                                      system. Involves televising inside of all sewer lines, smoke testing for illegal
Lancaster Sanitary Sewer Evaluation Survey                             SX21079005     connections, inspection of manholes.                                                       SUBMITTED

                                                                                      Sewer system evaluation of the +/- 2.5 square mile Otter Creek drainage basin to
Richmond Utilities SSES - Otter Creek Outfall Area                     SX21151007     identify and reduce excessive flows in the transportation and treatment system.            SUBMITTED
                                                                                      Project consists of the installation of 13,200 ft. of 8-inch gravity sewer and six lift
                                                                                      stations to serve 113 homes along Old Highway 127 in the Stringtown
Wastewater System Improvements Study, City of Carlisle                 SX21181001     Community.                                                                                 SUBMITTED

                          Anderson County
                        Construction Projects
                                                                                      Project consists of the installation of 13,200 ft. of 8-inch gravity sewer and six lift
                                                                                      stations to serve 113 homes along Old Highway 127 in the Stringtown
Lawrenceburg Wastewater Treatment Plant Expansion                      SX21005002     Community.                                                                                 SUBMITTED                           20                    10                 20                 20                     13                                          83         11

                                                                                      Project consists of video recording approx. 10,000' of 8" gravity sewer line,
                                                                                      replacement of approx. 2,600' of 8" gravity sewer line and repairing point source
City of Lawrenceburg-Stringtown Sewer System                           SX21005004     infiltration and inflow sources in the South Lawrenceburg sewer system area.              FULLY FUNDED
                                                                                      Expand existing WWTP to a facility rated at 2.3 MGD average daily flow with a
                                                                                      peak flow capacity of 6.9 MGD. New construction includes new preliminary
                                                                                      treatment facility with mechanical bar screen and grit removal, new primary rotary
                                                                                      screen, new concentric channel oxidation ditch, two new clarifiers, new
South Lawrenceburg Sewer System Evaluation & Renovations               SX21005001     disinfection basin.                                                                        SUBMITTED                           20                    10                 15                     0                  16                  10                      71         27
                                                                                 It has been determined that the City of Lawrenceburg needs to complete a sewer
                                                                                 line expansion along the Hwy 127 Bypass. At this time, lines are available to
                                                                                 Highview, which is just south of the intersection of Hwy. 127 Bypass and Hwy.
                                                                                 62. An expansion project form Highview to the Bluegrass Parkway via the Hwy.
                                                                                 127 Bypass, would be very beneficial to the community. The City of
                                                                                 Lawrenceburg, which currently has a new sewer processing plant soon to be
                                                                                 operational, and a brand new water processing plant, is willing to support an
                                                                                 expansion project of this magnitude. This sewer expansion project, which would
                                                                                 connect to the City's sewer lines, would provide opportunities to create jobs
                                                                                 through the development of additional commercial, industrial and residential
Lawrenceburg Sewer Expansion to Bluegrass Parkway                 SX21005005     areas, which have previously not been available.                                         SUBMITTED      20   20    5   10   20   10   85    8

                          Bourbon County
                        Construction Projects
                                                                                 This project will extend sanitary sewer service to the Community of Centerville in
Bourbon County Fiscal Court - Centerville Sewer Project           SX21017009     rural Bourbon County.                                                                    SUBMITTED      20   10   15   10   20   10   85    9

                                                                                 The project will extend sanitary sewers fro the Paris wastewater system into the
                                                                                 new 135 acre industrial park. The project consists of 5,522 feet of 8" and 10"
                                                                                 PVC gravity sewer, 5,811 feet of 6" force main and (1) one pump station. This
Paris-Bourbon Co. Industrial Park WW Expansion                    SX21017003     project will extend new service to approx. 135 acres of industrial property.             SUBMITTED      20   10   15   10   11        66   36
                                                                                 Rehabilitation of approximately 10,000 l.f. of gravity sewer line and replacement
                                                                                 of 55 manholes to significantly reduce the excessive infiltration and inflow (I/I)
                                                                                 which enters the system during rain events. During wet weather, the existing
                                                                                 WWTP designed for 0.085 mgd is forced to treat in excess of 0.20 mgd.
                                                                                 Additionally, several manholes within the system surcharge during wet weather
                                                                                 allowing untreated sewage to spill onto the ground and into drainage ditches and
City of North Middletown Wastewater Collection System             SX21017001     creeks.                                                                                  SUBMITTED      20   10   20    0    9        59   60
                                                                                 The City of Paris- Bourbon Hills Sanitary Sewer Project will consist of
                                                                                 constructing approximately 2,000 L.F. of 8" collector sewer and appurtenances.
                                                                                 This project will provide a reliable source of sanitary sewer service to
City of Paris-Bourbon Hills Sanitary Sewer Collection             SX21017006     approximately 40 unserved users.                                                        FULLY FUNDED
                                                                                 The City of Paris-Horseshoe Sanitary Sewer Project will consist of constructing
                                                                                 approximately 5,800L.F. of 8" collector sewer and appurtenances. This project
                                                                                 will provide a reliable source of sanitary sewer service to approximately 86
City of Paris-Horseshoe Sanitary Sewer Collection                 SX21017007     unserved users.                                                                          SUBMITTED      20   10   20    0   16        66   37
                                                                                 The City of Paris-Bedford Acres Sanitary Sewer Project will consist of
                                                                                 constructing approximately 13,500 L.F. of 8" collector sewer and appurtenances.
                                                                                 this project will provide a reliable source of sanitary sewer service to
City of Paris-Bedford Acres Sanitary Sewer Project                SX21017008     approximately 177 unserved users.                                                        SUBMITTED      20   10   20    0   13        63   49
                                                                                 The City of Paris-Mill Run Road & Cathy Drive Sanitary Sewer Project will consist
                                                                                 of constructing approximately 6,600 L.F. of 8" collector sewer and
                                                                                 appurtenances. This project will provide a reliable source of sanitary sewer
City of Paris-Mill Run Road & Cathy Drive Sanitary Sewer System   SX21017005     service to approximately 76 unserved users.                                              SUBMITTED      20   10   20    0    7        57   64

                           Boyle County
                        Construction Projects
                                                                                 Construction of a new 10" force main and new sewer pump station. The new
Danville East Main Sewer Force Main and Pump Station              SX21021002     force main will be about 5,000 feet in length.                                           COMPLETED
                                                                                 The pump station basically is comprised of six components as follows: inlet
                                                                                 screening structure, dual wetwells, submersible pumps and appurtenances,
                                                                                 discharger force main, site and structures, and electrical instrumentation. This
                                                                                 station is 21 years old and exhibits a history of overflow events during heavy
Upgrade of Clarks Run Pump Station, Danville                      SX21021003     rains.                                                                                   SUBMITTED       3   10   20   15   20   10   78   21

                                                                                 Design/construction of a wastewater pumping station and force main needed to
                                                                                 allow construction of 18,000 LF of 18" to 24" gravity interceptor sewer to provide
                                                                                 transportation of sewage from Junction City to Danville's WWTP. Project will
                                                                                 facilitate elimination of health hazards in Junction City and Boyle County and
                                                                                 alleviate Agreed Order in Junction City. The pump station is essential for
                                                                                 interceptor sewer project by Junction City. Additionally, project will consist of the
                                                                                 abandonment of the Mitchell Street and Henry Street pumping stations. There
                                                                                 will also be a replacement of the York Lane pumping station. Moreover, this
                                                                                 project will incorporate the scope of work proposed in this project SX21021001
                                                                                 and projects SX21021002 & SX2102007. The funding will remain separated
City of Danville Sewer System Upgrade - Junction City             SX21021001     however.                                                                                 FULLY FUNDED
Danville-Burgin Rd Pump Station & Force Main                      NEED PROFILE                                   NOT SUBMITTED                                           NOT SUBMITTED                       13        13   87

                                                                                 Regional project to provide gravity sewers in currently unsewered areas in Boyle
                                                                                 and Lincoln County. Project will also provide sewer service to the Danville/Boyle
                                                                                 Co. Airport. The project area contains many failing septic tanks and is a
Boyle County Sewer System Improvements-Phylben Village            SX21021008     documented health hazard, per Boyle and Lincoln Co. Health Depts.                        SUBMITTED      20   20   20    0   16        76   22
                                                                                 Project is to alleviate D.O.W. sewer sanctions on sewer system. Project will
                                                                                 remove one overwhelmed pump station and install 14600 ft of 21" gravity sewer
                                                                                 to City of Danville's system for treatment. The 21" gravity line will serve aprox. 50
Junction City Sewer System Improvements                           SX21021007     customers.                                                                              FULLY FUNDED

                           Clark County
                        Construction Projects
                                                                                 This project will provide sanitary sewers to unincorporated area of Clark County.
                                                                                 Area includes 64 residential properties served by septic tank systems, many of
WMU-Westchester Manor/Woodford Estates Sanitary Sewer             SX21049018     which are now failing.                                                                   SUBMITTED      20   10   10   10    4        54   74
                                                                                    Provide backbone sanitary sewer infrastructure to serve existing and planned
                                                                                    developments in the Lower Howards Creek watershed. Requires gravity sewers,
Lower Howards Creek Backbone Interceptor/Pump Station                  SX21049004   pump stations, and force mains.                                                         SUBMITTED   18   10   10    0   16   10    64   47

                                                                                    Provide backbone sanitary sewer infrastructure to serve existing and planned
Hoods Creek Sanitary Sewer Interceptor                                 SX21049017   developments in the Hoods Creek watershed. Requires bore under I-64.                    SUBMITTED    3   10   10    0   20   10    53   76
                                                                                    Provide backbone sanitary sewer infrastructure to serve existing and planned
                                                                                    developments in the Hancock Creek watershed. Requires gravity sewers,
Hancock Creek Backbone Interceptor/Pump Station/Force Main             SX21049007   multiple pump stations, and force main sewers.                                          SUBMITTED    5   20   10   10    5         50   78
                                                                                    Provide sanitary sewers to unincorporated area of Clark County. Area includes
                                                                                    59 residential properties served by septic tank systems, many of which are now
Skylark Drive/Chickadee Lane/Redwing Drive Sanitary                    SX21049015   failing.                                                                                SUBMITTED   20   10   15   20    9         74   24
                                                                                    Design and construction of an 6.0 mgd wastewater treatment plant. WMU is
                                                                                    under A.O. 03060 and is to be constructed and operational by January 1, 2008.
                                                                                    The construction of the WWTPA will alleviate chronic S.S.O. at the WWTP to a
Wastewater Treatment Plant                                             SX21049014   stream classified as impaired.                                                          SUBMITTED   20   10   20   20   13         83   12
WMU: Industrial Park Sanitary Sewer Improvements                       SX21049013   Sanitary sewer improvements to serve new 300+ acre industrial park.                     SUBMITTED   20   10   20   20   11         81   15
                                                                                    Sanitary sewer extension to facilitate DOW ordered connection of East Kentucky
                                                                                    Power Corporate Facilities to WMU and eliminate package WWTP now serving
WMU: US60/EKP Sanitary Sewer                                           SX21049012   that facility.                                                                          SUBMITTED    3   10   10    5    6         34   85

                                                                                    Provide sanitary sewer to unsewered areas of Clark County. Areas include 20
                                                                                    residential properties served by septic tank systems, some of which are now
South Main Street, Two Mile Road, Fair Avenue Sanitary Sewer           SX21049016   failing and 18 underserved residences. Also, includes 24 unit mobile home park.         SUBMITTED   20   10   10   20    7         67   33

                           Estill County
                        Construction Projects
                                                                                    Broadway and Bryant Street stormwater runoff flooding problem
                                                                                    Design and construction of approximately 150 L.F. 30 inch gravity storm drain
City of Irvine, Kentucky Stormwater                                    SX21065001   system.                                                                                 SUBMITTED    5   10   20   15   16         66   38

                                                                                    Regionalization of wastewater system in Estill County. The project involves
                                                                                    preliminary studies, design, and construction of wastewater facilities to resolve
                                                                                    environmental compliance issues with the Irvine Municipal Utilities and the Estill
                                                                                    County Water District treatment plants. Both WWTPs are currently operating at
                                                                                    or above their capacity, and the ECWD plant exceeds its discharge limits. This
                                                                                    project will involve consolidating the two wastewater utilities, constructing one
                                                                                    new treatment plant, constructing a pump station and force main to combine the
                                                                                    two flows, extending new gravity sewers to two unsewered area, and addressing
Irvine Municipal Utilities-Estill County Regional Wastewater Project   SX21065005   local infiltration and inflow problems.                                                 SUBMITTED   20   20   20   10   20   10   100    1

                                                                                    Estill County Water District (ECWD) seeks funding to build a new pump station to
                                                                                    replace the existing West Irvine Pump Station located across the street. The
                                                                                    existing pump station has experienced severe corrosion problems created by the
                                                                                    associated collection system that utilized residential septic tanks for preliminary
                                                                                    treatment prior to reaching the ECWD Wastewater Treatment Plant. Since the
                                                                                    existing pump station receives all wastewater going to the ECWD WWTP, this
                                                                                    facility will continue to be viable regardless of the regionalization approach and
                                                                                    location of a new Regional WWTP. Part of the cost includes capacity expansion
                                                                                    for the new facility to meet the projected growth for regionalization, while
Estill County Water District -- West Irvine Pump                       SX21065003   addressing the current corrosion concerns.                                              SUBMITTED   20   10   20   10   13         73   26

                          Fayette County
                        Construction Projects

                                                                                    The Lexington-Fayette Urban County Government is negotiating acquisition of the
                                                                                    Blue Sky Wastewater Treatment Plant. Once the WWTP is acquired, upgrades
                                                                                    for enhanced nutrient removal is expected. Upgrades would include improved
Blue Sky Wastewater Treatment Acquisition                              SX21067007   nitrification and phosphorus removal by chemical precipitation.                         SUBMITTED   20   10   20    0   20   10    80   17

                                                                                    In accordance with approved 201 Facilities Plan, project would design/construct
                                                                                    modification of solids process to handle increased loading. Process changes
                                                                                    would include conversion of primary and secondary digesters to temperature
                                                                                    phased digestion process, expand polymer/washwater facilities, and improve
Enhanced Solids Process - Town Branch Wastewater Treatment             SX21067005   associated odor control systems.                                                        SUBMITTED    3   10   20   20    7         60   59

                                                                                    Upgrade of existing pump station from 7,600 gpm to 12,000 gpm. Construction
                                                                                    of new 24-inch force main to parallel existing force main. Upgraded facility would
South Elkhorn Pump Station and Force Main                              SX21067004   abate #2 priority pump station SSO. Average SSO's 10 per year (1999-2001).              SUBMITTED    3   10   20   20   11         64   48

                                                                                    Project to provide collection and conveyance facilities for existing sanitary sewer
                                                                                    service customers in addition to future customers within Expansion Area Three,
                                                                                    which consists of approximately 534 acres. Key component of this project is that
                                                                                    it provides for the elimination of four (4) existing pump stations, three(3) of which
Expansion Area Three Sanitary Sewer Infrastructure                     SX21067002   have been identified as priority SSO's in the LFUCG Sanitary Overflow Plan.             SUBMITTED   20   10   20   10    9         69   31

                                                                                    Construction of a new 13,200 gpm pump station for the purpose of sewering
                                                                                    Urban Service Area expansion areas and balancing overall system wastewater
                                                                                    flows between the two existing wastewater treatment plants. Related facilities
North Elkhorn Diversion Pump Station and Force Main                    SX21067003   would eliminate SSOP Priority #8 (future. Relieves SSOP Priorities #7 and #9.           SUBMITTED    3   10   20   20   13         66   39
                                                                              Expansion Area 2A, brought in Lexington's Urban Service Area in 1996, is
                                                                              experiencing rapid development. The system of trunk sewers recommended by
                                                                              the adopted 1999 201 Facilities Plan Update is being constructed in the upper
                                                                              portions of the North Elkhorn watershed, but there are no immediate plans for
                                                                              development, including sewer facilities, in the lower portion. This project would
                                                                              design and build 201 Plan facilities, allowing elimination of existing interim pump
Expansion Area 2A Class A Pump Station and Trunk Station         SX21067006   stations and reducing demands on the aging North Elkhorn force main.                     SUBMITTED     10   20   20    0    6        56   68

                                                                              The project provides sanitary sewer service for 252 unserved households in the
                                                                              Lexington-Fayette Urban Co. Govn't (LFUCG) Urban Service Area. The areas
                                                                              included are Bracktown, Cadentown, and Wilderness Road, which are primarily
                                                                              lower-income and older neighborhoods. Financial assistance is required to
Comprehensive Sanitary Sewer Project - Remaining Areas           SX21067001   provide a cost effective solution to failed on-site septic systems.                     FULLY FUNDED

                                                                              The project provides sanitary sewer service for unserved households within the
                                                                              Lexington-Fayette Urban County Government Urban Service Area. The areas
                                                                              included are: Lin Wal Drive, Lisle Industrial Avenue, Inner Liberty Road, South
                                                                              Forbes Road, Versailles Road, Viley/Calumet Terrace Area, Inner North
                                                                              Broadway, Shadybrook Lane, Old Paris Pike, and Beverly Avenue, which are
                                                                              primarily lower-income or older neighborhoods. Financial assistance is required
Comprehensive Sanitary Sewer Project - Remaining Areas-Phase 2   SX21067008   to provide a cost-effective solution to on-site septic systems subject to failure.       SUBMITTED     20   10   20   10   16        76   23

                          Franklin County
                        Construction Projects
                                                                              This project provides sewer services to approximately 70 residential and
                                                                              commercial businesses along Skyline, Skyview, Pierce Lane, and Holly Hills.
                                                                              Currently, there are no sewer services available in this area. The project consists
                                                                              of appro. 3,400 l.f. of gravity sewer, 4,000 l.f. of low pressure mains and 42
Choateville Sewer Project (Phase 2)                              SX21073003   grinder pump stations.                                                                   SUBMITTED     20   10   20    0   13        63   50

                                                                              This project includes approx. 22,000 linear feet of 15" gravity sewer; 9,000 linear
                                                                              feet of 10" gravity sewer; 62,000 linear feet 8" gravity sewer; 16,000 linear feet of
                                                                              12" force main; 4,000 linear feet of 10" force mains; 7,000 linear feet of 8" force
                                                                              mains; 15,000 linear feet of 6" force mains, and 10 pumping stations serving
Farmdale Sewer System Improvements                               SX21073001   approx. 1,400 new customers.                                                             SUBMITTED     20   10   20    0   20   10   80   18
                                                                              Replacement of 310' of 8-inch gravity sewer to serve 10 underserved
Shelby Street Sewers/City of Frankfort, Frankfort                SX21073004   households.                                                                              SUBMITTED      5   10   15    0    7        37   84
                                                                              Wastewater collection system project. Includes replacement of 1300 LF of 6"
Allnut Drive Sewer Replacement                                   SX21073005   gravity sewer with new 8" sewer.                                                         SUBMITTED      5   10   20    0    6        41   82
                                                                              Wastewater collection system project. Includes upgrade of existing Bon Air pump
                                                                              station and installation of 6700 LF of 18" force main to replace existing 12" force
                                                                              main. Project will reduce and potentially eliminate three sanitary sewer overflows
Bon Air Pump Station & Force Main Replacement                    SX21073006   (SSOs) in the Two Creek area.                                                            SUBMITTED     20   10   20    0    3        53   77

                                                                              Wastewater collection system project. Includes replacement of existing Cardinal
                                                                              Hills pump station and installation of 326 LF of 6" force main to replace existing 4"
                                                                              force main. Project will reduce and potentially eliminate the sanitary sewer
Cardinal Hills Pump Station & Force Main Replacement             SX21073007   overflow (SSO) at the Cardinal Hills pump station.                                       SUBMITTED     10   10   20    0    3        43   79

                                                                              Wastewater collection system project. Includes replacement of existing Industrial
                                                                              Park pump station and installation of 2300 LF of 10" force main to parallel
                                                                              existing 10" force main. Project will reduce an potentially eliminate the sanitary
Industrial Park Pump Station & Force Main Replacement            SX21073008   sewer overflow (SSO) at the Industrial Park pump station.                                SUBMITTED     19   10   20    0   13        62   54
                                                                              Wastewater collection system project. Includes replacement of existing Miami
Miami Trail Pump Station Replacement                             SX21073009   Trail pump station and replacement of 100 LF of 4" force main.                           SUBMITTED     10   10   20    0    2        42   80

                                                                              Wastewater collection system project. Includes replacement of 1500 LF of 14"
                                                                              sewer with new 30" sewer. Project will reduce and potentially eliminate the
Schenkel Lane Sewer Replacement                                  SX21073011   sanitary sewer overflow (SSO) at the cave entrance near Schenkel Lane.                   SUBMITTED     20   10   20   20   16        86    6

                                                                              Wastewater collection system project. Includes replacement of existing Two
                                                                              Creeks #2 pump station and installation of 1300 LF of 6" force main to replace
                                                                              existing 4" force main. Project will reduce and potentially eliminate the sanitary
Two Creeks #2 Pump Station & Force Main Replacement              SX21073012   sewer overflow (SSO) at the Two Creeks #2 pump station.                                  SUBMITTED     10   10   20    0    1        41   83
                                                                              Wastewater collection system project. Includes installation of 6,500 LF 8", 10",
                                                                              and 12" gravity sewer lines, a new submersible pump station, and 4,500 LF of
                                                                              10" force main. the project will eliminate three (3) existing pump stations and
                                                                              reduce or eliminate the existing sanitary sewer overflow (SSO) at National Guard
National Guard Sewer Extensions and Pump Station Replacement     SX21073010   Pump station #1.                                                                         SUBMITTED     10   10   20    0    2        42   81

                                                                              Project involves emergency replacement of existing sanitary sewer collection
                                                                              system infrastructure. Existing force main crossing at Benson Creek was severed
                                                                              during 2003 from debris impact during flood flows. Replacement force main will
                                                                              be constructed along parallel alignment utilizing horizontal directional drilling
                                                                              (HDD) method to minimize environmental impact to aquatic ecosystems. Existing
                                                                              force main services an urbanized area of approx. 580 acres of mixed residential
Benson Creek Sanitary Force Main Crossing                        SX21073013   and commercial land use.                                                                 SUBMITTED     15   10   20   20    1        66   40

                                                                              Replacement/rehabilitation of approximately 16,000' of deteriorated combined
                                                                              storm/sanitary sewer, and 90 manhole replacements. The project will separate
                                                                              the storm sewer from the sanitary sewer thereby eliminating several sanitary
                                                                              sewer overflows which result in the discharge of untreated sewage into open
                                                                              ditches, streams, and the Kentucky River during rain events. This project will be
                                                                              coordinated with the City of Frankfort Holmes Street Storm Sewer Project, which
                                                                              is currently in the design and construction phases at a cost of approximately $7
City of Frankfort/Frankfort Sewer Department-Holmes Street       SX21073002   million.                                                                                 SUBMITTED     18   10   20   10    4        62   55
                          Garrard County
                        Construction Projects

Lancaster Sanitary Sewer Rehabilitation                   SX21079004     Rehab of sewer lines identified by the sanitary Sewer Evaluation Survey                    SUBMITTED     20   10   20    0   13        63   51
                                                                         This project involves improvements at the wastewater treatment plant.
                                                                         Improvements include replacing the grit removal system and bar screen. New
Lancaster Wastewater Treatment Plant Improvements         SX21079001     and additional lab equipment will be purchased.                                            SUBMITTED     20   10   20    0   20        70   28

                                                                         Extension of approximately 13,200 linear feet of sanitary sewer line to serve 47
Lancaster - Sewer Line Extension - Merriwood Estate       SX21079011     homes in Merriwood Estates that currently have inadequate sewage disposal.                 SUBMITTED     20   10   20    0   11        61   56

                                                                         Extension of approximately 7,500 linear feet of sanitary sewer line to serve 38
Lancaster - Sewer Line Extension - Glenmore Estate        SX21079010     homes in Glenmore Estates that currently have inadequate sewage disposal.                  SUBMITTED     20   10   20    0    9        59   61
                                                                         Extension of approximately 6450 linear feet of sanitary sewer line to serve 50
                                                                         homes and businesses along US 27 in the Northern portion of the city that
Lancaster - Sewer Line Extension - US 27 North            SX21079009     currently have inadequate sewage disposal.                                                 SUBMITTED     20   10   20    0    7        57   65

                                                                         Extension of approximately 1,425 linear feet of sanitary sewer line to serve eight
Lancaster - Sewer Line Extension - Buckeye Street         SX21079007     (8) homes on Buckeye Street that currently have inadequate sewage disposal.                SUBMITTED     20   10   20    0   16        66   41

                          Harrison County
                        Construction Projects
                                                                         The proposed Ball Park pump station will have a pumping capacity of 3.0 MGD.
                                                                         It will pump flows from the south and southeast sewer service areas to the new
                                                                         WWTP. The force main will consist of 2,500 feet of 16-inch PVC pipe. Flows
                                                                         will be diverted to the new pump station through 1,200 feet of new 12-inch
Cynthiana Ball Park Pump Station and Force Main            SX21097004    interceptor line.                                                                          SUBMITTED     20   10   20    0   16        66   42

                                                                         Includes a new 2.0 MGD oxidation ditch WWTP and rehabilitation of portions of
Cynthiana Wastewater System Improvements                  SX21097001     the existing collection system. Includes collection to the new Industrial Park.            SUBMITTED     20   10   20    0   20        70   29

                         Jessamine County
                        Construction Projects

                                                                         The City of Nicholasville is under an Agreed Order (Case No. DOW 04081) with
                                                                         KDOW and the EPA to construct the Town Branch Interceptor and related
                                                                         improvements to the Jessamine Creek Environmental Control Facility #1, thereby
City of Nicholasville Wastewater Improvements             SX21113007     permitting the decommissioning of the Brown Street WWTP.                                   SUBMITTED     20   10   20    0   20   10   80   19

                                                                         Sanitary trunk and collector sewer project to extend to commercial, industrial, and
                                                                         residential properties in a recently annexed area north of Nicholasville. Existing
                                                                         on-site sewage treatment and disposal systems shall be eliminated during this
                                                                         project. This effort will include the elimination of on-site disposal systems and
                                                                         straight-pipes associated with three mobile home parks and the Bluegrass
North End Sanitary Sewer Project, Nicholasville           SX21113006     Industrial Park (Dragstrip).                                                              FULLY FUNDED

                                                                         The North Jessamine Sanitary Sewer Extension Project will consist of
                                                                         constructing approximately 44,000 L.F. of 8" collection sewer, 19,000 L.F. of
                                                                         force main, three pump stations, and appurtenances. This project will provide a
North Jessamine Sanitary sewer Extension Project          SX21113004     reliable source of sanitary sewer service to approximately 677 unserved users.            FULLY FUNDED

                                                                         The Bluegrass Industrial Park (Dragstrip) is a densely developed area on the
                                                                         north end of Nicholasville that is not served by sanitary sewers. The project would
                                                                         result in the installation of collector and interceptor sewers at a cost of $8.9
                                                                         million. This would avert what state public health officials have called a "crisis". In
                                                                         the words of these officials, "the extension of sanitary sewers to this area is
                                                                         critical in the protection of our community's health and preservation of our
Nicholasville-(dragstrip) Sanitary Sewer                  SX21113005     environment".                                                                              SUBMITTED     20   10   20   20   13        83   13
City of Wilmore-Wilmore I/I                               NEED PROFILE   NOT SUBMITTED                                                                             NEED PROFILE                       11        11   88
                                                                         Construction of a new wastewater pump station and collection system to serve
                                                                         the community of Keene, KY. Keene is currently served by septic systems
Keene Wastewater Pump Station and Collection System       SX21113001     exclusively.                                                                               SUBMITTED     20   10   20    0   16        66   43

                          Lincoln County
                        Construction Projects

                                                                         Project will extend the City of Stanford's sanitary sewer into 2 areas. Fosters
                                                                         Lane, near the new Stanford/Lincoln County Elementary School, and Ridgeway
                                                                         Drive, off US Hwy 27 immediately North of the newly constructed Wal-Mart
                                                                         Complex. Residents within the project area currently depend on much failing
                                                                         septic systems. The project area will be served by the City of Stanford's Sewer
                                                                         System. 8-inch sewer mains will be constructed to tie in to the City's system
Lincoln County-Foster Lane/Ridgeway Dr. Sewer Extension   SX21137008     which is adjacent to the project area.                                                     SUBMITTED     20   10   20   20   16        86    7
                                                                         Design/construction of new gravity sewer system in the City of Eubank and
                                                                         surrounding area. Project involves approximately 38,000 lf of 8" gravity sewer, six
                                                                         pump stations, and approximately 40,000 lf of force main to Science Hill WWTP
                                                                         for treatment. Proposed project will provide service to approximately 225
City of Eubank-Eubank Sewer System Project                SX21137007     currently unserved households.                                                             SUBMITTED     20   10   20    0    5        55   71
                                                                         This project will extend public sewer service to approximately 150 households to
                                                                         serve the Rowland Community, Ridgeway Drive, Candlelight Estates and the
                                                                         Carman Lake area. The project will eliminate approximately 100 failing septic
City of Stanford - Sewer system Extensions Project        SX21137002     tanks.                                                                                     SUBMITTED     20   10   20    0    6        56   69
                                                                           This project will provide collection and transmission to approx 65 residential and
                                                                           commercial customers in the eastern portion of Lincoln County, including, but not
                                                                           limited to, homes and businesses in the unsewered areas of the City of Crab
                                                                           Orchard. The area to be sewered extends from the western city limits along
                                                                           William Whitley Road and new US 150 to Cedar Creek Lake. The proposed
                                                                           system will eliminate septic systems and straight pipes, which could lead to
                                                                           untreated sewage entering Cedar Creek Lake. Also, the project would prepare
                                                                           the City of Crab Orchard to provide sewage collection and treatment for
Lincoln Co. Regional Wastewater Project (Crab Orchard)      SX21137006     development around the Lake.                                                            SUBMITTED      20   20   20   10   13   10   93    3

                                                                           Provide wastewater collection and treatment to approximately 350 residential and
                                                                           commercial customers in the northern portion of Lincoln County, including , but
                                                                           not limited to, homes and businesses in the unsewered city of Hustonville, the
                                                                           community of Moreland, and along US 127 between the two. Current sewage
                                                                           disposal consists of a combination of septic tanks and straight pipes, resulting in
                                                                           direct discharges of raw sewage of septic tank effluent to the ground surface.
Lincoln County Regional Wastewater Project (Hustonville)    SX21137001     Sewage treatment will be provided by the City of Danville.                              SUBMITTED      20   20   20   10   11        81   16

                                                                           Sludge is currently pumped out and hauled for land spreading. During the winter
                                                                           and wet months, a private contractor collects and disposes of the sludge outside
                                                                           the planning area. This project would provide for a sludge filter press that would
                                                                           allow for more sludge to be disposed in a landfill and eliminate the need for
City of Stanford-WWTP Sludge Improvements Project           SX21137004     expensive private disposal and additional land for spreading of sludge.                 SUBMITTED      20   10   20   10    7        67   34
                                                                           The existing 0.8 MGD (two 0.4 MGD oxidation ditches) wastewater treatment
                                                                           plant has a average flow of 0.75 MGD. The expansion would add one 0.4 MGD
                                                                           oxidation ditch, clarifier, aerobic digestor, and disinfection units. The expansion
                                                                           would provide a total of 1.2 MGD to handle existing, failing septic tanks and new
City of Stanford-WWTP Expansion Project                     SX21137003     areas outside the City.                                                                  SUBMITTED     20   10   20   10    9        69   32
Halls Gap Sewer Expansion                                   NEED PROFILE                                    NOT SUBMITTED                                         NOT SUBMITTED                       20        20   86

                          Madison County
                        Construction Projects

                                                                           Sanitary Sewer Collection System with gravity sewers. The community of Terrill
                                                                           has approximately 176 homes, none of which have public sewer collection and
                                                                           treatment. The method of treatment for these homes is either septic tanks or in
                                                                           some instances straight pipes to a creek. Many of these septic systems are in
                                                                           poor condition and failing. Visual inspection of creeks in this area reveal signs of
                                                                           raw sewage. This collection system will discharge into the existing Battlefield sub-
                                                                           division collection system for treatment at their existing Wastewater Treatment
Madison County - Madison County Utilities-Terrill Sewer     SX21151016     Plant.                                                                                  SUBMITTED      18   10   20   10   16        74   25
                                                                           Construct 1.0 MGD sequencing batch reactor wastewater treatment plant and a
                                                                           collection pump station system to transport wastewater to the new WWTP for
Northern Madison County Sanitation District - I-75          SX21151001     treatment.                                                                              SUBMITTED      20   10   20    0   20        70   30

                                                                           Approximately 9,600 linear feet of 8 inch, 12 inch, and 30 inch sewer pipe. The
                                                                           installation of this gravity sewer will allow for the elimination of the Tates Creek
Richmond Utilities Red House Road Relief Sewers             SX21151005     Wastewater Treatment Plant and four pumping stations.                                   SUBMITTED      20   10   20    0   11        61   57
                                                                           Trunk sewer extension to provide sewer service to Terrill Branch Road area
Sugarville/Terrill Branch Interceptor, Berea                SX21151014     including about 25 existing homes. Eliminate existing pump station.                     SUBMITTED      20   10   20    0    9        59   62
                                                                           New trunk sewer, pump station, and force main to provide sewer service on
West 595 Trunk Sewer, Pump Station, and Force Main          SX21151012     Highway 595, west of I-75.                                                              SUBMITTED      20   10   20    0    7        57   66
                                                                           Project will add a new digester at the wastewater treatment plant to provide
                                                                           better treatment and enable biosolids to be landfarmed. Purchase landfarming
Berea-New Biosolids Digester and Landfarming Equipment      SX21151015     equipment.                                                                              SUBMITTED      20   10   20    0    6        56   70
                                                                           Collector sewers for 50 homes and pump station and force main to pump the
Berea-Dogwood Heights Collector Sewers                      SX21151013     wastewater to the existing sewer system.                                                SUBMITTED      20   10   20    0    5        55   72
                                                                           Providing trunk sewers to newly annexed areas with large masses prior to
US 25 North Sewer Extension Project, Berea                  SX21151011     development, preventing need for other treatment process.                               SUBMITTED      20   10   20    0    4        54   75

                                                                           The project consists of the construction of a new wastewater treatment plant on
                                                                           Otter Creek at the confluence of Dreaming Creek. The new plant will be 8.1
                                                                           MGD (average) and 11.6 MGD (peak). The elimination of the Dreaming Creek
Richmond Utilities Otter Creek Wastewater Treatment Plant   SX21151004     Plant (KY0022845) and the Tates Creek Plant (KY0022853).                                SUBMITTED      20   10   20    0   13        63   52

                                                                           Expansion of the city of Berea's existing WWTP. City of Berea is currently under
J.C. Chambers WWTP Expansion Project                        SX21151010     administrative order due to over capacity flows at WWTP.                               CONSTRUCTED

                           Mercer County
                        Construction Projects

                                                                           Improvements to the collection system to increase capacity: Project includes
                                                                           replacing existing grinder station with duplex non-clog P.S., approximately 3200
Harrodsburg Anderson-Dean Pump Station Replacement          SX21167007     l.f. of 6" dia. force main and upgrading of downstream station.                        FULLY FUNDED

                                                                           Interceptor sewer to collect and transport existing and future flows from the south
                                                                           and east sections of the planning area. Project includes approximately 4500 l.f. of
Harrodsburg South Interceptor Sewer Extension               SX21167008     24" dia. sewer lines, 15 manholes, and two (2) highway bores.                          FULLY FUNDED
                                                                           Development of a county-wide plan for initiating wastewater collection and
                                                                           treatment for Mercer County. Funds will be used to secure skilled consultant
                                                                           engineers to lead our fiscal court and county in this planning process. It includes
                                                                           the following: 1. Wastewater education, awareness and plan, 2. Required funds
                                                                           and sources of funds. 3. Recommend and engage with appropriate state and
Mercer Co. Fiscal Court-Wastewater Planning Project         SX21167006     federal agencies.                                                                      FULLY FUNDED
                          Nicholas County
                        Construction Projects

                                                                               This project will provide sewage collection for over 100 homes, in the drainage
                                                                               basin of Lake Carnico (2 public recreational lakes) and for UK's North Central 4H
                                                                               Camp serving thousands of young people, and pipe it on to the Carlisle City
                                                                               Wastewater Plant for treatment. This system will replace various individual
                                                                               wastewater treatment septic systems (many now failing) at the homes and a
Nicholas Sanitation District Lake Carnico Area Sanitation Sewer   SX21181003   package plant at the 4H Camp.                                                             SUBMITTED     20   10   20   10   20   10    90    4

                                                                               Regional Wastewater Improvement Program for Carlisle and Nicholas County,
                                                                               which may include, but not be limited to, the following: I/I reduction measures for
                                                                               the Carlisle collection system, WWTP Improvements for compliance with correct
                                                                               regulation, construction of a Wastewater Collection System for Nicholas County
                                                                               Sanitation District No. 2, collection of a transmission system to transport flow to
                                                                               Carlisle for treatment, retirement of the existing 4-H Camp package WWTP
                                                                               located within SD#2, retirement of the existing Jockey International WWTP,
                                                                               WWTP improvements for Carlisle to accept wastewater from bother SD#2 and
Carlisle Regional Wastewater Improvement Program                  SX21181002   Jockey.                                                                                   SUBMITTED     20   10   20    0   16         66   44

                           Powell County
                        Construction Projects

                                                                               Expand the service area to include the West Bend/Virden Ridge and Adams
Clay City-Sanitary Sewer Expansion, Phase I                       SX21197008   Ridge areas and install a conventional gravity sewer and conveyance system.               SUBMITTED     20   10   20    0   11         61   58

                                                                               Construction of stormwater relief sewers, catch basins, ditch reconstruction for
Clay City Stormwater Relief Project                               SX21197002   area within city limits south of KY 11/15 from 7th to 12th streets.                       SUBMITTED     20   10   20    0    9         59   63

                                                                               This project will extend 4,000 L.F. of 8 inch gravity sewers and 3,700 L.F. of 4
                                                                               inch force main sewers to serve 53 households, 1 general store and 5 churches
                                                                               currently on failing septic systems or straight pipes. The project will eliminate
Powells Valley WD-Slade/Nada Sewer Line Extensions                SX21197003   approximately 32 straight pipes and 27 failing septic systems                            READY TO BID

                                                                               Expand the existing 0.200 MGD wastewater treatment plant to 0.538 MGD to
Clay City-Wastewater Treatment Plant Expansion                    SX21197004   meet to sanitary sewer treatment needs of the city and surrounding areas.                 SUBMITTED     20   10   20   10    7         67   35
                                                                               The project will entail the TV inspection of approximately 28,000 L.F. of gravity
                                                                               sanitary sewer main in Clay City and make repairs by spot repair, replace or
Clay City-Sanitary Sewer Inflow/Infiltration Reduction            SX21197005   reline pipes                                                                              SUBMITTED     20   10   20   15   20         85   10
                                                                               Extend the sanitary sewer service area and install a gravity sewer system in the
Stanton-Sanitary Sewer Service Area Expansion                     SX21197006   Boone Creek and Allen Acres areas of Powell County.                                       SUBMITTED     20   10   20    0   13         63   53

                                                                               Expand the existing 0.46 MGD wastewater treatment plant to 0.872 MGD to
Stanton Wastewater Treatment Plant Expansion                      SX21197007   provide wastewater treatment for Stanton and areas of the county near the city.           SUBMITTED     20   10   20    0   16         66   45

                              Scott County
                                Projects
                                                                               This project includes construction of a new pump station and force main to serve
                                                                               the Etterwood Subdivision area which currently contains aging and failing septic
                                                                               systems. Also included are new gravity sewer mains from the pump station to
City of Georgetown - Etterwood Pump Station                       SX21209006   Etterwood.                                                                                SUBMITTED     20   10   20   20    9         79   20

                                                                               Project includes replacement of aged, undersized and failing package WWTP
                                                                               with a new package WWTP sized to 2/3 of the projected 20year demand
                                                                               capability and expandable. Also includes a primary East-West interceptor sewer
                                                                               from the WWTP at the East side of Sadieville to the I-75/KY 32 interchange
                                                                               commercial development zone, providing regional wastewater treatment access
                                                                               to existing and future residential and commercial development throughout the
Sadieville Wastewater System Improvements                         SX21209001   expanded Sadieville Planning Area.                                                        SUBMITTED     20   10   20    0   16         66   46

                                                                               The proposed project is a regional effort by and between the Cities of Sadieville
                                                                               and Georgetown to facilitate the transfer of all sanitary sewage flow from the City
                                                                               of Sadieville to Georgetown's collection and treatment system. This would allow
                                                                               the decommissioning of Sadieville's aging package WWTP. The City of
                                                                               Sadieville has recently completed a regional Facilities Plan and has obtained
                                                                               partial funding for implementation of its recommendations. This project will
                                                                               include an Update of the Facilities Plan, as Georgetown has made a new
                                                                               proposal to bring their collection system to within approx.. 8,000 ft. of Sadieville's
                                                                               proposed new collection system near I-75. Also, included is the design and
                                                                               construction of the necessary pumps station and force main infrastructure to
City of Sadieville Wastewater System Improvements                 SX21209004   reach the proposed connection point with Georgetown                                       SUBMITTED     20   20   20    0   13   10    83   14

                                                                               The City of Georgetown owns two landfills; the Double Culvert Road Landfill and
                                                                               the Sims Road Landfill. The Division of Waste Management has deemed that
                                                                               leachate collection and disposal a both sites is inadequate. To avoid future
                                                                               NOV's and allow for closure of inactive cells at each site, this project proposes to
                                                                               install a force main system from these landfills to the Georgetown WWTP#2.
                                                                               Additionally, given its proposed route, the forcemain will be conveniently located
                                                                               for connection of a forcemain from Sadieville, thereby eliminating an aging
                                                                               package WWTP, and for future residential and commercial connections along a
Georgetown WWTP#2-Northern Scott Co. Sewer Extension              SX21209003   busy State highway                                                                        SUBMITTED     20   20   20   20   20        100    2

                                                                               This project includes demolition of 26 rotating biological contactors which are no
                                                                               longer utilized at the Georgetown WWTP #1 for wastewater treatment. Also
Georgetown-WWTP #1 RBC Demolition                                 SX21209007   included is the demolition of the abandoned screen building.                              SUBMITTED     19   10   20    0    6         55   73
                                                         Construction of a new 200,000 gallon elevated water storage tank, demolition of
                                                         an existing 100,000 gallon water tank, replacement of undersized water lines, and
                                                         water system interconnection with the Georgetown Municipal Water System.
                                                         Project also includes upgrades and restoration enhancements for wastewater
Stamping Ground System Improvements         SX21209002   system.                                                                             SUBMITTED   20   10   20    0    7   57   67

                        Woodford County
                           Projects

                                                         This project consists of wastewater collection system improvements that includes
                                                         39,400 linear feet of interceptor sewers (8" through 36") four new wastewater
                                                         pumping stations, 11,800 linear feet of force main (12" through 18") and the
                                                         decommissioning of eight (8) existing wastewater pumping stations. The project
                                                         also includes wastewater treatment plant improvements to improve stabilization,
Versailles Wastewater System Improvements   SX21239001   dewatering and disposal of biosolids.                                               SUBMITTED   20   10   20   20   20   90    5
0-2 Year Water Projects (Local and Regional Rankings)
                                                                                                                                                    Project Status in                         Category 2: Project                                              Category 5: Local                       Tie
                                                                                                                                                         WRIS                                      Delivery                                                   Need/Ranking Points Category 6: Water  Breaker/
                                                                WRIS Project                                                                        System/Funding      Category 1: Type of    (Regional/Non-       Category 3: Project   Category 4: Funding   (#1=20, #2=16,   Management Council Customers   TOTAL    Regional
                         Project Owner                           Number                               Project Description                                Status              Project              regional)              Status                 Status            #3=13 etc..)      Bonus Points     per mile   SCORE    Ranking
                       Feasibility Studies

                                                                               The proposed project involves the hydraulic study of the entire
                                                                               water system. The system consist of approx. 400 mi of water
                                                                               line, 6 tanks & booster pump stations. There are approx. 5,000
                                                                               customers on the system. The Eubank system is experiencing
                                                                               low pressure in the Waynesburg area. The current growth is in
                                                                               the Northern area (Lincoln Co, KY) of the system. The study
City of Eubank Water System Hydraulic Study                     WX21137024     will identify these problem areas.                                    SUBMITTED
Lake Village Water Association-Contract 14 Water Main           WX21167010     Conduct a 20-year study for water system improvements.                SUBMITTED

                       Anderson County
                      Construction Projects

                                                                               The Phase VII Expansion Project will address the extension of
                                                                               water service to 120 Anderson County households, households
                                                                               that currently utilize contaminated water sources. Phase VII
                                                                               expansions will also include the construction of a water storage
                                                                               tank. As in Phase VI, Phase VII, will continue to provide
                                                                               potable water service to the remaining residences within the
                                                                               District's boundary, who are currently having to rely on wells
                                                                               and cisterns. This project will also continue to address health
                                                                               hazards with respect to water source's). For example, water
                                                                               utility personnel conducted water source tests for the Phase VI
                                                                               area and discovered that 95% of the cisterns were
                                                                               contaminated by fecal coliform. Conditions in the Phase VII
                                                                               area are identical. so it is a safe assumption that a very high
South Anderson Phase VII Expansions                             WX21005004     percentage of these cisterns are also contaminated.                   SUBMITTED                           20                    10                    15                  20                  20                 10                  95          3

                       Bourbon County
                     Construction Projects

                                                                               This project will consist of waterline extensions consisting of
                                                                               approx. 34.6 miles around the City of Paris. The grantee will be
                                                                               the Bourbon Co. Fiscal Court, with the City of Paris being the
                                                                               system who will own and operate the system. These new lines
                                                                               will be supplied by the City of Paris, it will serve an estimated
                                                                               242 people. Waterline extensions will provide municipal water
                                                                               service to KY 627, McKee Lane, Stoker Lane, Broadman Road,
                                                                               Russel Cave Road, and Furguson Road. These funds will
                                                                               further previous funding awards (20/20 loan in 2001, USDA RD
Bourbon Co. Fiscal Court/City of Paris-Various Waterline Ext.   WX21017002     loan, 2003 KIA tobacco grant)                                        FULLY FUNDED
                                                                               Proposed is the construction of an 18-mile water line project, at
                                                                               least 24 inches in diameter, to connect a potable water supply
                                                                               in Franklin County with the Kentucky American Water
                                                                               Company water distribution system in northern Fayette County.
                                                                               This initial construction phase will eventually link the water
                                                                               systems of Frankfort, Georgetown, Winchester, Paris,
                                                                               Cynthiana, Mt. Sterling, Lancaster, Nicholasville, and Kentucky
Bluegrass Water Supply Commission Phase 1 Water Line Project    WX21067003     American.                                                             SUBMITTED                           20                    20                    15                  20                  16                                     91          1
                                                                               Before construction can begin on a large regional water
                                                                               treatment plant, master planning, land acquisition, and final
                                                                               engineering must occur. This proposal is for assistance on
                                                                               those preconstruction activities that will (by 2011) lead to the
                                                                               construction of a large regional water treatment plant (probably
                                                                               30 million gallons per day) OR for another suitable potable
                                                                               water source alternative. Participants in this effort are
                                                                               Lexington, KY-American Water, Frankfort, Nicholasville,
                                                                               Georgetown, Cynthiana, Paris, Winchester, Lancaster, Mt.
Bluegrass Water Supply Commission Master Planning and Eng.      WX21067004     Sterling or other creditable potable water supply source.             SUBMITTED                           20                    20                    15                  10                  13                                     78          4
                                                                               The project consists of 5,755 feet of 12-inch ductile iron water
                                                                               main to connect the new industrial park tract to the City of Paris
Paris-Bourbon Co. Industrial Park Water Expansion               WX21017006     municipal Water System.                                               SUBMITTED                           20                    10                    20                   0                  20                 10                  80         12
                                                                               The proposed project requires the replacement of
                                                                               approximately 2,500 linear feet of 4" cast iron line along Sledd
                                                                               Street, Wilson Street and Liberty Street that is badly
                                                                               tuberculated. Due to the poor water quality caused by this line,
                                                                               the city must currently supply households served by these lines
City of North Middletown Waterline Replacement Project          WX21017005     with bottled water for drinking and cooking.                         FULLY FUNDED

                           Boyle County
                     Construction Projects

                                                                              The project relates to water treatment and involves treatment
                                                                              plant modifications to improve water quality and comply with
                                                                              disinfection byproduct regulations plus miscellaneous
                                                                              improvements. Improvements include a bulk powdered carbon
                                                                              feed system, additional alum storage, SCADA system upgrade,
                                                                              backup permanganate feeder, electrical equipment upgrade,
Danville WTP Improvements for Regulatory Compliance            WX21021003     security improvements, and miscellaneous.                           FULLY FUNDED

                        Clark County
                     Construction Projects

                                                                              Create two elevated pressure zones (EPZ) to improve water
                                                                              service and to provide for growth. EPZ No. 1 would service
                                                                              developed areas including Arlington Road, Lindburg Road,
                                                                              Finley Road, South Bloomfield, Sunset Heights, and portions of
                                                                              Beckner Street, Belmont Avenue, and French Avenue. EPZ
                                                                              No. 2 would service the Northeast Bypass corridor and portions
Winchester Elevated Pressure Zone - Nos. 1 and 2               WX21049011     of the Ecton Road, KY 15, and KY 89 corridors.                       SUBMITTED       5   10   20   20    7         62   36
                                                                              Construction of a new 18-inch waterline from the water
                                                                              treatment plant to the McClure Road/Colby Road and
Colby Road/Lexington Road Waterline Connector                  WX21049009     Lexington Road development corridors.                                SUBMITTED       3   10    5    0   13         31   62
                                                                              Proposed is the construction of an 18-mile water line project, at
                                                                              least 24 inches in diameter, to connect a potable water supply
                                                                              in Franklin County with the Kentucky American Water
                                                                              Company water distribution system in northern Fayette County.
                                                                              This initial construction phase will eventually link the water
                                                                              systems of Frankfort, Georgetown, Winchester, Paris,
                                                                              Cynthiana, Mt. Sterling, Lancaster, Nicholasville, and Kentucky
Bluegrass Water Supply Commission Phase 1 Water Line Project   WX21067003     American.                                                            SUBMITTED      20   20   15   20   20   10   105    1
                                                                              Before construction can begin on a large regional water
                                                                              treatment plant, master planning, land acquisition, and final
                                                                              engineering must occur. This proposal is for assistance on
                                                                              those preconstruction activities that will (by 2011) lead to the
                                                                              construction of a large regional water treatment plant (probably
                                                                              30 million gallons per day) OR for another suitable potable
                                                                              water source alternative. Participants in this effort are
                                                                              Lexington, KY-American Water, Frankfort, Nicholasville,
                                                                              Georgetown, Cynthiana, Paris, Winchester, Lancaster, Mt.
Bluegrass Water Supply Commission Master Planning and Eng.     WX21067004     Sterling or other creditable potable water supply source.             SUBMITTED     20   20   15   10   16   10    91    4
Clark Co. Fiscal Court-Lisletown Road Main Ext.                NEED PROFILE                            NOT SUBMITTED                              NOT SUBMITTED                        6          6   71
                                                                              Construction of a new 18 inch waterline, pump station, and
                                                                              related facilities to serve the existing and expanded industrial
Industrial Park Waterline Connector                            WX21049003     park and other areas North of I-64.                                  SUBMITTED      20   10   20   20    9         79   14
                                                                              The project will provide additional storage for the East Clark
                                                                              County Water District as well as provide increased pressure to
                                                                              areas that currently experience low pressure during high
                                                                              demand periods. The project will include a mixing system for
                                                                              an existing storage tank, a new tank and new pump station with
East Clark Co. Water District-Coal Road Tank & Pump            WX21049013     telemetry.                                                           SUBMITTED      20   10   20   10   11         71   24

                        Estill County
                     Construction Projects
                                                                              Project includes extension of waterlines to areas currently
                                                                              without service, construction of a 100,000 gallon ground
                                                                              storage tank to serve unserved and underserved areas, and
Irvine Municipal Utilities Mount Scratchum Water Extension     WX21065003     construction of a booster station to service the new tank.          FULLY FUNDED
                                                                              This water expansion project will consist of approximately 11
                                                                              miles of water mains throughout Estill County. The project will
                                                                              provide potable water to 60 unserved customers. Project will be
                                                                              constructed simultaneously with WX21065001. Construction
Phase 9 Water Expansion Project                                WX21065002     will begin February 2005.                                           FULLY FUNDED

                       Fayette County
                     Construction Projects
                                                                            Nine water utilities in a nine county Central Kentucky area
                                                                            have now concluded a significant potable water supply
                                                                            planning feasibility study. Ultimately, this regional project will
                                                                            have three major components. Proposed is the installation of a
                                                                            waterline grid that will connect the water systems of nine
                                                                            Central Kentucky water utilities. The second component is the
                                                                            construction of a new 30 mgd water treatment plant upstream
                                                                            of Kentucky River Dam 3. The third component is the
                                                                            installation of a large diameter raw waterline from the Ohio
                                                                            River (near Warsaw) to the new regional water treatment plant.
                                                                            Phase 1 of the overall project involves the installation of a
                                                                            laarge diameter water transmission line to connect the water
                                                                            system of the Frankfort Electric and Water Plant Board (in
                                                                            Franklin County)with that of the Kentucky-American Water
                                                                            Company (in northern Fayette County). The Frankfort
                                                                            connection will be somewhere near the community of Duckers
                                                                            Crossroads. The Kentucky American connection will be made
                                                                            somewhere near the Fayette-Scott line and Newtown Pike.
                                                                            This "first leg" will be capable of conveying up to 5 MGD of
Preconstruction Activities Related to the Bluegrass Region     WX21067002   water from the Frankfort water system to the Kentucky-               FULLY FUNDED
                                                                            Proposed is the construction of an 18-mile water line project, at
                                                                            least 24 inches in diameter, to connect a potable water supply
                                                                            in Franklin County with the Kentucky American Water
                                                                            Company water distribution system in northern Fayette County.
                                                                            This initial construction phase will eventually link the water
                                                                            systems of Frankfort, Georgetown, Winchester, Paris,
                                                                            Cynthiana, Mt. Sterling, Lancaster, Nicholasville, and Kentucky
Bluegrass Water Supply Commission Phase 1 Water Line Project   WX21067003   American.                                                             SUBMITTED     20   20   15   20    0        75    1
                                                                            Before construction can begin on a large regional water
                                                                            treatment plant, master planning, land acquisition, and final
                                                                            engineering must occur. This proposal is for assistance on
                                                                            those preconstruction activities that will (by 2011) lead to the
                                                                            construction of a large regional water treatment plant (probably
                                                                            30 million gallons per day) OR for another suitable potable
                                                                            water source alternative. Participants in this effort are
                                                                            Lexington, KY-American Water, Frankfort, Nicholasville,
                                                                            Georgetown, Cynthiana, Paris, Winchester, Lancaster, Mt.
Bluegrass Water Supply Commission Master Planning and Eng.     WX21067004   Sterling or other creditable potable water supply source.             SUBMITTED     20   20   15   10    0        65    4

                       Franklin County
                     Construction Projects
                                                                            Proposed is the construction of an 18-mile water line project, at
                                                                            least 24 inches in diameter, to connect a potable water supply
                                                                            in Franklin County with the Kentucky American Water
                                                                            Company water distribution system in northern Fayette County.
                                                                            This initial construction phase will eventually link the water
                                                                            systems of Frankfort, Georgetown, Winchester, Paris,
                                                                            Cynthiana, Mt. Sterling, Lancaster, Nicholasville, and Kentucky
Bluegrass Water Supply Commission Phase 1 Water Line Project   WX21067003   American.                                                             SUBMITTED     20   20   15   20   16        91    1
                                                                            Before construction can begin on a large regional water
                                                                            treatment plant, master planning, land acquisition, and final
                                                                            engineering must occur. This proposal is for assistance on
                                                                            those preconstruction activities that will (by 2011) lead to the
                                                                            construction of a large regional water treatment plant (probably
                                                                            30 million gallons per day) OR for another suitable potable
                                                                            water source alternative. Participants in this effort are
                                                                            Lexington, KY-American Water, Frankfort, Nicholasville,
                                                                            Georgetown, Cynthiana, Paris, Winchester, Lancaster, Mt.
Bluegrass Water Supply Commission Master Planning and Eng.     WX21067004   Sterling or other creditable potable water supply source.             SUBMITTED     20   20   15   10   13        78    4
                                                                            The proposed project involves the upgrade of aprox. 9.1 miles
                                                                            of waterlines along Ninevah and Green Wilson Roads and
                                                                            Mills Lane to improve pressure and Flow in rural Franklin
Farmdale Water District-Waterline Upgrade Project              WX21073005   County.                                                               SUBMITTED     15   10   15    0   20   10   70   27

                       Garrard County
                     Construction Projects
                                                                            The Garrard County Water Association is proposing a
                                                                            waterline extension project to provide first time potable water
                                                                            service to 13 rural homes and farms. The waterline
                                                                            construction would consist of approximately 8,600 feet of 3
                                                                            inch and 4 inch PVC pipeline along Naylor and Edwards Roads
Garrard County Water Association-Extension 11                  WX21079009   and Gooch Pike.                                                      FULLY FUNDED
                                                                            Project consists of approx. 3,800 L.F. of 6-inch water line,
                                                                            approximately 4,200 L.F. of 3-inch water line and replacing 20
City of Lancaster-Water System Improvement Project             WX21079010   existing flush hydrants.                                             FULLY FUNDED
                                                                            Proposed is the construction of an 18-mile water line project, at
                                                                            least 24 inches in diameter, to connect a potable water supply
                                                                            in Franklin County with the Kentucky American Water
                                                                            Company water distribution system in northern Fayette County.
                                                                            This initial construction phase will eventually link the water
                                                                            systems of Frankfort, Georgetown, Winchester, Paris,
                                                                            Cynthiana, Mt. Sterling, Lancaster, Nicholasville, and Kentucky
Bluegrass Water Supply Commission Phase 1 Water Line Project   WX21067003   American.                                                            SUBMITTED     20   20   15   20   20   95    1
                                                                            Before construction can begin on a large regional water
                                                                            treatment plant, master planning, land acquisition, and final
                                                                            engineering must occur. This proposal is for assistance on
                                                                            those preconstruction activities that will (by 2011) lead to the
                                                                            construction of a large regional water treatment plant (probably
                                                                            30 million gallons per day) OR for another suitable potable
                                                                            water source alternative. Participants in this effort are
                                                                            Lexington, KY-American Water, Frankfort, Nicholasville,
                                                                            Georgetown, Cynthiana, Paris, Winchester, Lancaster, Mt.
Bluegrass Water Supply Commission Master Planning and Eng.     WX21067004   Sterling or other creditable potable water supply source.            SUBMITTED     20   20   15   10   16   81    4
                                                                            The Garrard County Water Association is proposing a
                                                                            waterline extension project to provide first time potable water
                                                                            service to 25 rural homes and farms. The waterline
                                                                            construction would consist of approximately 33,000 feet of 4
                                                                            inch PVC pipeline along Back Creek, Long Branch and
Garrard County Water Association - Extension 10                WX21079008   Teatersville roads.                                                 FULLY FUNDED
                                                                            The Garrard County Water Association is proposing a
                                                                            waterline extension project to provide first time potable water
                                                                            service to 40 rural homes and farms. The waterline
                                                                            construction would consist of approximately 8,300 feet of 4 and
                                                                            3 inch PVC pipeline along Ronclair Drive, Bill Layton Road,
Garrard County Water Association - Extension 9                 WX21079007   and Mildred Lane.                                                   FULLY FUNDED

                       Harrison County
                     Construction Projects
                                                                            Installation of 1,800 feet of 6 and 10-inch water main to
                                                                            connect the City of Cynthiana water system to the Harrison
City of Cynthiana-Industrial Water Loop                        WX21097009   County Water Association near the Industrial Park.                   SUBMITTED      5   10   20    0    6   41   59
                                                                            Replacement of 4,000 linear foot of 6-inch PVC water main,
City of Cynthiana-Water Line Improvements-Lola Drive           WX21097010   valves and appurtenances.                                            SUBMITTED     10   10   20   15    5   60   38
                                                                            Installation of 3" and 4" PVC water main and appurtenances
                                                                            along the County Infirmary Road and Airport Road, south of
                                                                            Cynthiana, Kentucky. The first new pipe will begin at the
                                                                            intersection of KY 982 and County Infirmary Road and end
                                                                            6,950 feet west of the intersection. The first 3,055 feet will be
                                                                            4" PVC and the last section of 3,895 feet will be 3" PVC. The
                                                                            new pipe will connect to the existing 4" water main. There will
                                                                            be a 130 foot bore under the CSX railroad tracks. The second
                                                                            new pipe will begin at the intersection of County Infirmary Road
                                                                            and Airport Road and end 2,700 feet north of the intersection.
                                                                            The new pipe will connect to the new 4" PVC water main on
Harrison County Water Association-County Infirmary             WX21097008   County Infirmary Road.                                               SUBMITTED     10   10   20   20    4   64   33
                                                                            The project consists of improvements to the existing
                                                                            distribution system including a now 16 inch transmission main
                                                                            to the east end and replacement of existing mains on Gasser,
                                                                            Old Lair, Grandview and Somley Heights. Also included is a
2005 Water Distribution System Improvements                    WX21097006   new 500,000 Gallon elevation storage tank.                           SUBMITTED     20   10   20   10   16   76   15
                                                                            The proposed project consists of the replacement/upgrade of
                                                                            aging equipment at the WTP to assure future compliance with
2005 Water Treatment Plant Improvements                        WX21097007   water quality requirements.                                          SUBMITTED     20   20   20   10   11   81   11
                                                                            Proposed is the construction of an 18-mile water line project, at
                                                                            least 24 inches in diameter, to connect a potable water supply
                                                                            in Franklin County with the Kentucky American Water
                                                                            Company water distribution system in northern Fayette County.
                                                                            This initial construction phase will eventually link the water
                                                                            systems of Frankfort, Georgetown, Winchester, Paris,
                                                                            Cynthiana, Mt. Sterling, Lancaster, Nicholasville, and Kentucky
Bluegrass Water Supply Commission Phase 1 Water Line Project   WX21067003   American.                                                            SUBMITTED     20   20   15   20    2   77    1
                                                                            Before construction can begin on a large regional water
                                                                            treatment plant, master planning, land acquisition, and final
                                                                            engineering must occur. This proposal is for assistance on
                                                                            those preconstruction activities that will (by 2011) lead to the
                                                                            construction of a large regional water treatment plant (probably
                                                                            30 million gallons per day) OR for another suitable potable
                                                                            water source alternative. Participants in this effort are
                                                                            Lexington, KY-American Water, Frankfort, Nicholasville,
                                                                            Georgetown, Cynthiana, Paris, Winchester, Lancaster, Mt.
Bluegrass Water Supply Commission Master Planning and Eng.     WX21067004   Sterling or other creditable potable water supply source.            SUBMITTED     20   20   15   10    1   66    4
                                                                              The Friendship Rd., Dixon Rd. Coppage Pike, & Floyd Lair
                                                                              Lane will provide a reliable source of potable water to existing
                                                                              unserved customers. This project will consist of approximately
                                                                              5 miles of 4" and 6" water mains that will provide a source of
HCWA Friendship Rd., Dixon Rd., Coppage Pike                   WX21097005     potable water to 22 unserved customers.                              SUBMITTED      15   10   20    0   20   10   75   19
                                                                              The Contract 27 Telemetry Upgrade Project will involve
                                                                              modifications and improvements to the existing radio telemetry
                                                                              system. This project will replace outdated equipment and
                                                                              software, improve reliability and redundancy throughout the
Harrison, Bourbon, Nicholas, & Scott Telemetry Upgrade         WX21097003     entire four-county area.                                             SUBMITTED       3   10   20   20    3        56   43
                                                                              The proposed project will flood proof the existing water
                                                                              treatment plant using a flood wall and earth levee. The project
                                                                              also includes the installation of a backup pump and relocation
                                                                              of the valve vault at the auxiliary raw water pump station
Phase II Water System Improvements                             WX21097002     located at the main Licking River near Claysville.                    SUBMITTED     20   10   20    0    9        59   40
Ardery Tank Pump Station                                       NEED PROFILE                           NOT SUBMITTED                               NOT SUBMITTED                       13        13   67
Automatic Meter Reading                                        NEED PROFILE                           NOT SUBMITTED                               NOT SUBMITTED                        7         7   70

                      Jessamine County
                     Construction Projects
                                                                              Upgrade the existing 3 PVC water line Groggins Ferry Road to
                                                                              an 8" PVC water line to improve available pressures and flows
Jessamine County Water District No. 1 - Groggins               WX21113015     to the growing area and allow for fire protection.                   SUBMITTED      10   10   20    0    7        47   56

                                                                              Project will replace aged and troublesome existing 3" water line
                                                                              with new 6" PVC water line. Project will improve pressures and
Jessamine County Water District No. 1 - Baker Lane             WX21113014     flows to 36 existing commercial and residential customers.           SUBMITTED      15   10   20    0   11        56   44
                                                                              The existing water treatment plant will be renovated to enable
                                                                              compliance with the recent regulations of the USEPA. Process
                                                                              improvements for control of microbials and
                                                                              disinfectant/disinfection byproducts will be installed and
                                                                              implemented. The facility will also be expanded from 6 MGD to
                                                                              9 MGD capacity. Future scenarios will also involve
                                                                              supplemental supply from the Bluegrass Water Supply
                                                                              Commission (BWSC). An outline summary of the required
                                                                              improvements to meet the current and proposed regulations of
Nicholasville Water Treatment Plant Renovation                 WX21113011     the USEPA is provided.                                               SUBMITTED      20   10   15   15   20   10   90    5
                                                                              Project will provide interconnection to KAWC to supplement
                                                                              water supply in north end of system and improve service to
                                                                              existing customers. Project will also provide water service and
                                                                              fire protection to proposed large scale commercial and
                                                                              residential developments. Project includes master meter and
                                                                              3000 ft 24" line, 20,000 ft 10" line, and 6,000 ft 6" line into
Jessamine Co. WD #1 - Water System Improvements                WX21113010     unserved area.                                                       SUBMITTED      20   20   20    0    4        64   34
                                                                              This project involves construction of a new water storage tank
                                                                              in the northern portion of the JCWD #1's service area. The
                                                                              proposed tank is necessary to provide adequate pressure,
                                                                              flows, and fire protection to proposed developments (currently
Jessamine County Water District #1-Water Tank Project          WX21113012     underway) in the district.                                           SUBMITTED      15   10   15   20   16        76   16
                                                                              This project will create a connection between the City of
                                                                              Wilmore's distribution system and the City of Nicholasville's on
                                                                              Jessamine Station Rd. at Drake Lane. The connection will
                                                                              enable the two cities to transmit water to each other via 6"
                                                                              distribution mains during water shortages and water
Wilmore/Nicholasville Water Distribution Interconnection       WX21113013     catastrophes.                                                        SUBMITTED       3   20   20   15    3        61   37

                                                                              McGee Lane Water Main Extension. The project would
                                                                              provide water service to an unsewered rural area of southern
                                                                              Jessamine County. A total of 41 properties would be capable
                                                                              of receiving water service upon project completion…The city
                                                                              has been petitioned by 29 of the 41 property owners to extend
                                                                              water service to their property. The project would include
                                                                              approximately 6,600 linear feet of water main of varying
McGee Lane Water Main Extension                                WX21113009     diameters including necessary appurtenances.                         SUBMITTED      20   10   20   20    5        75   20
                                                                              Proposed is the construction of an 18-mile water line project, at
                                                                              least 24 inches in diameter, to connect a potable water supply
                                                                              in Franklin County with the Kentucky American Water
                                                                              Company water distribution system in northern Fayette County.
                                                                              This initial construction phase will eventually link the water
                                                                              systems of Frankfort, Georgetown, Winchester, Paris,
                                                                              Cynthiana, Mt. Sterling, Lancaster, Nicholasville, and Kentucky
Bluegrass Water Supply Commission Phase 1 Water Line Project   WX21067003     American.                                                            SUBMITTED      20   20   15   20    9        84    1
                                                                          Before construction can begin on a large regional water
                                                                          treatment plant, master planning, land acquisition, and final
                                                                          engineering must occur. This proposal is for assistance on
                                                                          those preconstruction activities that will (by 2011) lead to the
                                                                          construction of a large regional water treatment plant (probably
                                                                          30 million gallons per day) OR for another suitable potable
                                                                          water source alternative. Participants in this effort are
                                                                          Lexington, KY-American Water, Frankfort, Nicholasville,
                                                                          Georgetown, Cynthiana, Paris, Winchester, Lancaster, Mt.
Bluegrass Water Supply Commission Master Planning and Eng.   WX21067004   Sterling or other creditable potable water supply source.            SUBMITTED   20   20   15   10    6        71    4

                                                                          Jessamine South Elkhorn Water District proposes to construct
                                                                          a 1.0 MG elevated storage tank on property which they own on
                                                                          Catnip Hill Pike. The proposed site is in close proximity to the
                                                                          District's existing elevated storage for the northwest service
                                                                          area and will be constructed at the existing hydraulic gradient.
Catnip Hill Pike 1.0 MG Elevated Storage Tank                WX21113016   Therefore, additional booster pumping will not be required.          SUBMITTED   20   10   20    0    1        51   50
                                                                          Jessamine South Elkhorn Water District is currently completing
                                                                          the Southeast Rural Water Project, consisting of some 40 miles
                                                                          of line, serving in excess of 350 homes. There are still several
                                                                          unserved roads comprising some 80 homes that are yet
                                                                          unserved in this area. This is due solely to availability of funds
Southeast Rural Jessamine Unserved Areas                     WX21113004   and feasibility.                                                     SUBMITTED   19   10   20    0    2        51   51
                                                                          Keene is a small minority community dating from the Civil War
                                                                          that is presently served by a 4" main installed at the onset
                                                                          (1972) of the Jessamine South Elkhorn Water District. The
                                                                          community consists, in most part, of older wood frame
                                                                          structures situated close together on small lots. Situated in the
                                                                          center is an historic wood frame two-story structure being
                                                                          reconstructed under an ICTE Grant. This system is plagued
                                                                          with numerous leaks and relatively low flow and pressure
                                                                          problems. Ebenezer Church located on Ebenezer Road is an
                                                                          18th Century stone church that is still active and does not have
                                                                          potable water or fire protection. There are numerous other
                                                                          road segments as shown on the attached map which are not
                                                                          currently piped. This project will provide piping and loop
                                                                          completion that will enhance the overall system pressure and
Keene Reconstruction & Northwest Hydraulic Reinforcement     WX21113001   flow.                                                                SUBMITTED   18   10   10    0   13        51   52

                       Lincoln County
                     Construction Projects
                                                                          Provide necessary public infrastructure to the now developing
Lincoln County First Southern Veterans Memorial Park         WX21137019   recreational complex in Lincoln County.                              BID READY
                                                                          Project is for extension of water mains on the following,
                                                                          presently water-unserved, Lincoln County roads: Boone
                                                                          Connector; Chancelor, Hawkins Branch, Henry Clay, Old
                                                                          Ottenheim. Water service will be provided by the City of
Lincoln County/City of Stanford Waterline Extension          WX21137021   Stanford.                                                            SUBMITTED   18   10   20   20   20   10   98    2

                                                                          The project will connect the water systems of the City of
                                                                          Hustonville and the McKinney Water District (MWD) together.
                                                                          Thus providing for the benefit of mutual supply and for giving
                                                                          the MWD the option to purchase City of Danville water through
                                                                          the City of Hustonville's system. Routing will most likely be
                                                                          McCormack Church Rd. from Old US127 to Peyton Well Rd.,
                                                                          including a connection to Frog Branch Rd. for future use and
                                                                          reliability. Project also includes enlargement of the Hustonville
                                                                          pump station at Hustonville's water storage tank located in
Lincoln Co. Fiscal Ct. Waterline Expansion-Hustonville       WX21137020   Junction to provide necessary pressures for the expansion.           SUBMITTED   20   20   20   20    6        86    8
                                                                          Installation of approx. 8,000 LF of 6-inch water supply line
                                                                          along Airport Road in Lincoln County. The owner and water
                                                                          supplier of the line will be the City of Junction City. Project
                                                                          construction will replace existing 3/4-inch, 1-inch and 2-inch
                                                                          water supply line currently used by 50 water customers of the
Airport Road Waterline Extension for Lincoln County          WX21137012   City of Junction City.                                               SUBMITTED   20   10   15   15   16        76   17
                                                                          The Water transmission line replacement involves the
                                                                          replacement of a 12.0 mile deteriorated 6-inch asbestos
                                                                          cement (AC) transmission main with an 8-inch PVC line. This
                                                                          12.0 mile water line is the line that supplies all water to Crab
                                                                          Orchard from its water source (the City of Lancaster). This
                                                                          waterline replacement would allow Crab Orchard to avoid low
                                                                          levels in its water tower, and ensure the ability for future
City of Crab Orchard-Transmission Waterline Replacement      WX21137015   waterline tap-ons and fire protection.                               SUBMITTED   20   10   15    5    7        57   42
                                                                                  This project includes the installation of control valves and
                                                                                  telemetry needed to operate the existing three water storage
                                                                                  tanks in the downtown water distribution system. The current
                                                                                  operation does not allow the tanks to cycle fully and maintain
                                                                                  water quality. The City on occasion wastes the tanks' water to
City of Stanford Telemetry and Tank Control Project                  WX21137018   recycle them.                                                         SUBMITTED        3   10   20   10    9   52   49

                                                                                  This project consists of the construction of a raw water intake
                                                                                  on the City owned Buck Creek Lake in Lincoln County. Also
                                                                                  included in this project is the construction of the approximately
                                                                                  10 miles of 12" water line and pumping facilities to connect with
                                                                                  the City's existing system. The dam will be raised to increase
                                                                                  storage capacity of the lake and yield. The purpose of this
                                                                                  project is to increase the City's water supply, which currently
Buckcreek Lake Water Supply Project                                  WX21137002   during drought conditions runs dangerously low.                       SUBMITTED       19   10   20    0   11   60   39

                                                                                  Project consists of approximately 9,000 ft of 4" 63000 ft of 6"
                                                                                  and 4800 prof 8 water mains along with a 100,000 gallon water
                                                                                  storage tank and booster pumping station to improve service to
Lincoln Co. / McKinney Water District Line Extensions and Upgrades   WX21137016   existing customers and provide water to unserved areas.               SUBMITTED       20   10   10    5   13   58   41

                                                                                  The project provides for the replace of undersized waterlines
                                                                                  along Skyline Drive and the installation of new lines along
                                                                                  Greasy Ridge Road and Goodpaster Road, all located in the
                                                                                  southern part of Lincoln County, south of the City of Stanford.
                                                                                  New service will be provided to app. 25 water customers. All
Lincoln Co. / City of Eubank Water Line Extensions/Upgrades          WX21137022   lines will be owned and maintained by the City of Eubank.             SUBMITTED       20   10   10    5    5   50   53

                                                                                  Project is to connect the water systems of the City of
                                                                                  Hustonville and the McKinney Water District. The most likely
                                                                                  route for this project at this time would be at McCormack
                                                                                  Church Rd from Old US 127 to Peyton Well Rd. also included
                                                                                  is a connection to Frog Branch Rd. for future use. Pump
Lincoln Co. / Hustonville McKinney Water System Interconnect         WX21137023   upgrading for the City of Hustonville is also included.               SUBMITTED       20   10   10    5    4   49   54
                                                                                  This project will increase the raw water supply for the Stanford
                                                                                  water system by increasing the raw water storage capacity of
                                                                                  Buck Creek which has recently been purchased by the City of
                                                                                  Stanford. Note that this project relates to Phase I
City of Stanford Water Commission -- Buck Creek Lake                 WX21137009   WX21137002.                                                          FULLY FUNDED
                                                                                  Construction of approximately 16,000 linear feet of 4 inch
                                                                                  diameter PVC water supply line and one hydropneumatic
                                                                                  pumping station. Project will replace 3 inch diameter existing
                                                                                  aged lines to 28 water customers and provide new water
                                                                                  service to 7 customers. The water provider will be the City of
Hustonville Water Upgrade and Expansion                              WX21137010   Hustonville.                                                        IN CONSTRUCTION

                       Madison County
                     Construction Projects
                                                                                  Extension of approximately 20,000 L.F. of 8" and 10" PVC
                                                                                  waterline, construction of two 600,000 water storage tanks, two
I-75 and KY 595 Water Extension Project                              WX21151003   water pump stations and all necessary appurtenances.                  SUBMITTED       20   10   20    5   13   68   28

                                                                                  The proposed project includes the extension of approximately
                                                                                  4,000 linear feet of 10 inch PVC water line and 16,000 linear
                                                                                  feet of 8 inch water line to serve the Bobtown area of Madison
                                                                                  County. the project will include the installation of a new
                                                                                  300,000 gallon water storage tank and a 400 gallon/per minute
                                                                                  water pump station. The project will reinforce and strengthen
                                                                                  the existing system and will allow for the addition of new
Southern Madison WD-Bobtown Area Water Extension Project             WX21151016   customers in the Bobtown area.                                        SUBMITTED       20   10   20    5   20   75   21

                                                                                  The proposed project includes the extension of approximately
                                                                                  4,000 linear feet of 4 inch PVC waterline, a new booster pump
                                                                                  station and a new 100,000 gallon water storage tank. The
                                                                                  project will strengthen and reinforce the existing system,
                                                                                  improve water service to the existing customers and allow for
                                                                                  the extension of water service to new customers in the Scaffold
Southern Madison WD-Scaffold Cane Area Waterline Extension           WX21151017   Cane Area of Madison County.                                          SUBMITTED       20   10   20    0   16   66   29
                                                                                  The plant will not be able to meet the new finished water
                                                                                  turbidity limit without this upgrade to its processes. The plant
                                                                                  will also be expanded from 9 MGD to 12 MGD to meet existing
Richmond Utilities Water Treatment Plant Expansion                   WX21151013   and near future demands. Old DWSRF #40.                              CONSTRUCTED
                                                                                  The intake was built in 1962. It has insufficient capacity and
                                                                                  needs upgrading to meet the existing and near future
                                                                                  demands. A new intake structure with expansion capability to
                                                                                  meet demands of at least 24 MGD is required. Old DWSRF
Richmond Utilities Upgrade Raw Water Intake                          WX21151011   number: 39.                                                          CONSTRUCTED
                                                                               Install 10,500 feet of 12-inch d.i. strengthening main to correct
                                                                               flow and low pressure problems. Old DWSRF number: 37.
                                                                               This line enhances service to the Richmond Community
                                                                               Church, the Mayfield Elementary School, the Madison County
                                                                               Health Department, various tobacco warehouses and the
Richmond Utilities Boggs Lane Main Phase II                       WX21151012   eastern portion of the city.                                        SUBMITTED   20   10   20    0    5        55   46
                                                                               This project, 6,000 linear feet of 12" water main, will increase
                                                                               water pressure to underserved customers in the Deer Creek,
                                                                               Meadows, Summit, and the Woods subdivisions. This project
                                                                               is needed in order to meet minimum pressure requirements of
                                                                               30psi during high demand periods. In addition to the
                                                                               residences, this line will serve four community churches; First
                                                                               Alliance, White Oak Pond Christian, Unity Baptist, and St.
Richmond Utilities Barnes Mill Road Waterline Extension           WX21151010   Thomas Lutheran.                                                    SUBMITTED    5   10   20    0    9        44   58

                                                                               Install 12,500 feet of 16" Ductile Iron water line along bypass
                                                                               from Four Mile Rd to US 25 interconnect. Water main will
                                                                               supply water to the newly approved 500 student Madison Co.
                                                                               Public Middle School. This main will also enhance domestic
                                                                               and fire protection service to the major commercial area
                                                                               contiguous to the northern I-75 interchange. Additionally,
                                                                               service will be enhanced to the White Hall Elementary School,
Richmond Utilities Robert Martin Bypass Connector                 WX21151005   Victory Christian Church, and the Church of Latter Day Saints.      SUBMITTED   19   10   20    0    7        56   45
                                                                               Construction of a 500,000 gallon elevated water storage tank
                                                                               near Highway 627 and Combs Ferry Road and pump station to
Boonesboro 500,000 Gallon Elevated Tank                           WX21151022   serve northern portion of utilities district.                       SUBMITTED   19   10   20    0    6        55   47
                                                                               Construction of a 300,000 gallon elevated water storage tank
                                                                               to replace an existing 100,000 gallon tank along Highway 25
                                                                               South. Old tank replaced due to age and cost of repairs and
Hwy. 25 S. 300,000 Gallon Replacement Tank                        WX21151023   painting.                                                           SUBMITTED   19   10   20    0    4        53   48

                                                                               Proposed project consists of 11.5 miles of 8 inch water line to
                                                                               replace 4 inch water lines on Hwy. 627, Jacks Creek and Hwy.
                                                                               52, construction of 16.5 miles of new water line to loop dead
                                                                               end connections, construction of 500,000 gallon elevated water
                                                                               storage tank, construction of water line extensions to connect
                                                                               to Kirksville Water Assoc., and Southern Madison County
                                                                               Water District and furnish and install telemetry panels to 4
Madison County Utilities Improvements, Phase II                   WX21151015   tanks, 9 master meters, and 5 pump stations.                        SUBMITTED   20   20   20    0   11        71   25
                                                                               Install 4,000 ft of 8" PVC water line to facilitate increased
                                                                               pressures and flows to the Meadows Subdivision. Tie in water
                                                                               lines at the Meadows, Willis Branch Rd and Deacon Hills
                                                                               Subdivision to eliminate dead-end water mains. This water
                                                                               main will also serve the congregation of Jehovahs Witnesses
Richmond Utilities Deacon Hills - Meadows Connector               WX21151004   Church.                                                             SUBMITTED   15   10   20    0    3        48   55
                                                                               0.9 mile water line extension in Taylor Fork Road to serve nine
                                                                               existing homes and a Madison County owned dock on Wil-O-
Kirksville Water Assoc. (Madison Co.)-Taylor Fork Water Line      WX21151018   Green Lake.                                                         SUBMITTED    5   10   10   15    1        41   60
                                                                               Replacement of 7,100 LF of 3 and 4 inch PVC pipe with 6 inch
                                                                               PVC pipe of higher pressure rating which has a history of leaks
Kirksville Water (Madison Co.)-Hwy. 1295 Water Line Replacement   WX21151019   and breaks.                                                         SUBMITTED   10   10   10    0    1        31   63
                                                                               Construction of 2.1 miles of 12 inch and 2.1 miles of 8 inch
                                                                               water line and new master meter to replace existing 4 inch
                                                                               water line. Water line will allow gravity feed to a tank and
                                                                               eliminate a pump station and provide a second master meter to
                                                                               the system. The new water line will provide fire flow to area
Kirksville Water (Madison Co.)-Caleast Rd. Water Line Upgrade     WX21151020   which anticipates growth due to new I-75 Exit.                      SUBMITTED   10   10   10    0    1        31   64
                                                                               Construction of 2.0 miles of 6 inch water line to replace an
                                                                               existing water line due to a history of leaks and breaks due to
Kirksville Water-Hwy. 595 Water Line Replacement                  WX21151025   use of class 160 pipe in higher pressure areas.                     SUBMITTED   10   10   10    0    1        31   65
                                                                               Construction of 1.1 miles of water line to serve two new
Kirksville Water-Arbuckle Road                                    WX21151027   customers and provide a loop in water line system.                  SUBMITTED   10   10   10   15    1        46   57
                                                                               Construction of 4200 LF of 8 inch water line on Barnes Mill
                                                                               Estates to supplement an existing 4 inch water main which will
                                                                               lower the pressure drop when Taylor Fork pump station
Kirksville Water-Barns Mill Estates Water Line Replacement        WX21151028   operates.                                                           SUBMITTED   15   10   10    0    1        36   61

                        Mercer County
                     Construction Projects
                                                                               The proposed project will consist of system improvements to
                                                                               increase the water supply and pressure into an area that is
                                                                               marginally served at the present. It is propose to install a
                                                                               214,000 gallon standpipe near the Dixville area in
                                                                               southwestern Mercer Co. Approximately 1800LF of 6" line will
                                                                               be installed to connect the proposed tank to the main supply
                                                                               line. A new water line will be constructed along Russell Branch
North Mercer Water District-2004 Extensions and Improvements      WX21167007   to close a dead end line.                                           SUBMITTED   10   10   20    5   20   10   75   22
                                                                            Expansion and Upgrade of existing Water Treatment Plant
Harrodsburg, KY Phase II Water System Improvements             WX21167006   from 4.0 MGD to 6.0 MGD.                                                  SUBMITTED     20   20   20   10   13        83    9
                                                                            Installation of 8 inch water main and appurtenances along
                                                                            Hughley Ln., beginning at Shakertown Rd. (KY 33) and ending
                                                                            east of the Robinson Rd. and Hughley Ln. Then 8 inch main
                                                                            goes north cross-country to KY 152, intersecting new 6 inch
                                                                            main. Installation of 6 inch PVC water main and
                                                                            appurtenances along KY 152 to a point east of Burgin, then 6
                                                                            inch main goes cross-country to a point where Curdsville Rd.
                                                                            and KY 33 split, northeast of Burgin, then 6 inch main follows
                                                                            Curdsville Rd. north until the main ends at Curdsville Ln. All
                                                                            new main will be installed along existing main, which will be
Lake Village Water Assoc.-Contract 13, Water Main              WX21167009   abandoned in place.                                                      FULLY FUNDED

                      Nicholas County
                    Construction Projects

                                                                            This is the primary source of water for the City of Carlisle and
                                                                            Nicholas County Water District. The Raw Water Intake
City of Carlisle Raw Water Intake Improvements                 WX21181004   structure draws from the Licking River where it crosses KY 32.            SUBMITTED     20   20   20    0   20   10   90    6

                                                                            The proposed project will include the replacement of
                                                                            approximately 6,600 linear feet of existing 4" asbestos cement
                                                                            water line. The project will include the replacement of 5,280
                                                                            linear feet of inadequately sized water line and approximately
                                                                            33,000 linear feet of water line to provide for existing dead end
                                                                            water distribution mains. The project also will replace an
                                                                            existing 50,000 gallon elevated water storage tank constructed
Nicholas County Water District-Phase IX Water System           WX21181003   in 1967 with a 100,000 gallon elevated water storage tank.                SUBMITTED     20   10   20    0   16        66   31
                                                                            The proposed Phase VIII county wide extension project will
                                                                            include approximately eight miles of new distribution lines,
                                                                            three miles of upsized water lines, and a 100,000 gallon
                                                                            ground storage tank with radio telemetry. This project will
                                                                            serve approximately 53 new residences and approximately 500
                                                                            existing residences with the additional water storage and
Nicholas County Water District Improvements                    WX21181002   upsized water lines.                                                      SUBMITTED     20   10   20   20   13        83   10

                                                                            Expansion of the existing Carlisle water treatment plant to 2.0
                                                                            MGD. Improvements include new raw water pump/intake
                                                                            facilities, low service pump station, conventional treatment
                                                                            units (rapid mix/flocculator-clarifiers/gravity filtration), clearwell
                                                                            expansion, high service & backwash pumps, chemical feed
                                                                            systems, together with all related site, structural, architectural,
Carlisle Water Treatment Plant Expansion                       WX21181001   mechanical/HVAC and electrical/I&C work.                                  SUBMITTED     20   20   20    0   11        71   26

                       Powell County
                    Construction Projects
                                                                            Construct a new 500,000 gallon storage tank to serve Stanton
                                                                            and Bowen, replace the Pendleton Street Pump Station,
                                                                            replace the Morris Creek Pump Station, add pressure reducing
                                                                            valves to Hatton Creek tank lines, install new control valves in
Stanton Water System Improvement Project                       WX21197002   the system and other appurtenances.                                       SUBMITTED     20   10   15    0   20   10   75   23
                                                                            Replace approximately 29,000 feet of existing old and
                                                                            undersized waterlines. These lines experience frequent leaks
                                                                            and can only marginally meet the current flow demand. Natural
                                                                            Bridge State Resort Park has committed to connect to the
                                                                            system once the undersized lines have been replaced. In
                                                                            addition, the project includes three line extensions to provide
Powells Valley Water District Improvements                     WX21197001   water to 46 unserved customers.                                           SUBMITTED     20   10   20    0   16   10   76   18

                       Scott County
                    Construction Projects
                                                                            This project includes the installation of an on-site sodium
                                                                            hypochlorite generation system to replace the existing chlorine
                                                                            gas disinfection process currently in use at the Georgetown
                                                                            Water Treatment Plant. The new process equipment would be
                                                                            contained in a new building to be constructed on the existing
City of Georgetown- WTP Disinfection Process Improvements      WX21209006   site.                                                                     SUBMITTED     20   10   20    0   13        63   35
                                                                            Proposed is the construction of an 18-mile water line project, at
                                                                            least 24 inches in diameter, to connect a potable water supply
                                                                            in Franklin County with the Kentucky American Water
                                                                            Company water distribution system in northern Fayette County.
                                                                            This initial construction phase will eventually link the water
                                                                            systems of Frankfort, Georgetown, Winchester, Paris,
                                                                            Cynthiana, Mt. Sterling, Lancaster, Nicholasville, and Kentucky
Bluegrass Water Supply Commission Phase 1 Water Line Project   WX21067003   American.                                                                 SUBMITTED     20   20   20   20   11        91    1
                                                                                    Before construction can begin on a large regional water
                                                                                    treatment plant, master planning, land acquisition, and final
                                                                                    engineering must occur. This proposal is for assistance on
                                                                                    those preconstruction activities that will (by 2011) lead to the
                                                                                    construction of a large regional water treatment plant (probably
                                                                                    30 million gallons per day) OR for another suitable potable
                                                                                    water source alternative. Participants in this effort are
                                                                                    Lexington, KY-American Water, Frankfort, Nicholasville,
                                                                                    Georgetown, Cynthiana, Paris, Winchester, Lancaster, Mt.
Bluegrass Water Supply Commission Master Planning and Eng.            WX21067004    Sterling or other creditable potable water supply source.               SUBMITTED     20   20   20   20    9        89    4
                                                                                    This project includes construction of approximately 2600 LF of
                                                                                    16" ductile iron water main along with all appurtenant features.
                                                                                    There are currently two new schools in this area that have
                                                                                    questionable fire protection capacity due to connection to a
                                                                                    dead-end main. This extension will complete a 16" feed from a
                                                                                    newly installed 750,000 gallon storage tank to the north area of
                                                                                    the city and therefore provide a two-way feed with more flow for
City of Georgetown-Champion Way 16" Water Main Extension              WX21209005    fire protection.                                                        SUBMITTED     20   10   20    0   16        66   32
                                                                                    285-acre water supply reservoir needed to supplement future
                                                                                    deficit to existing supply (Royal Springs) and as alternate
Scott County Reservoir                                               WX21209003     source when Royal Springs is contaminated.                              SUBMITTED     20   20   20   10   20        90    7

                      Woodford County
                     Construction Projects

                                                                                    Replacement of approximately 1,600 ft of 6" waterline, 770 ft of
                                                                                    8" gravity sewer line, railroad crossings and associated
                                                                                    appurtenances along Main and Winter Streets in Midway.
                                                                                    Improvements are necessary to reduce water loss in existing
                                                                                    tuberculated cast iron and galvanized waterlines and to reduce
                                                                                    infiltration and inflow in existing gravity sewer lines. Completing
                                                                                    these improvements in conjunction with Midway's Downtown
                                                                                    Revitalization project will avoid the need to damage and repair
                                                                                    newly-paved streets and sidewalks after the revitalization
Midway Streetscape Utility Relocation                                WX21239007     project has been completed                                            CONSTRUCTED

                                                                                    Construction of 250,000 gal elevated water storage tank with
                                                                                    booster station and approximately 34,000 linear feet of 4" pvc
South Woodford Water District Phase 4 Improvements                   WX21239006     watermain in nine main extensions as loop connections.                FULLY FUNDED
                                                                                    .9 mile distribution system extension in Northeast Woodford
Sugar Hill Road Extension                                            WX21239009     County, serving 3 unserved households.                                FULLY FUNDED
                                                                                    This project is needed to improve water pressure, water
                                                                                    quality, fire protection and to allow for continued growth in the
                                                                                    southeastern portion of the city. The project includes 2,000 LF
Water System Improvements - 24" Water Main Extension                 WX21239010     of 24" water main and a 100-foot highway bore.                        FULLY FUNDED

                                                                                    This project will bring potable drinking water to an unserved
                                                                                    portion of Woodford County. It will also provide fire protection
Versailles - Clifton / McCracken / Steele Rd. Water Line Extension   WX21239011     and complete looping of some dead end sections of line.                 SUBMITTED     20   10   20    0   20   10   80   13
Frankfort - Clifton / McCracken Water Line Extension                 NEED PROFILE                            NOT SUBMITTED                                NOT SUBMITTED                       16        16   66
Northeast Woodford Phase II Connection to Frankfort                  NEED PROFILE                            NOT SUBMITTED                                NOT SUBMITTED                       13        13   68
Northeast Woodford Old Frankfort Pike Reconstruction                 NEED PROFILE                            NOT SUBMITTED                                NOT SUBMITTED                       11        11   69
                                                                                    This project is anticipated to consist of approximately 23,150
                                                                                    linear feet of 24" and 16" water main, a new 75,000 gallon
                                                                                    elevated storage tank, a new booster pumping station and
                                                                                    improvements to Versailles existing connection to KY-American
                                                                                    Water Co. This project will create a new pressure zone in the
                                                                                    southwest portion of the Versailles system, thus increasing the
                                                                                    level of service provided. It will also ultimately be able to serve
                                                                                    an initial link in the "grid" for the Bluegrass Water Supply
                                                                                    Commission by improving the existing connection between
Versailles Water Distribution System Improvements                    WX21239008     Versailles and KAWC.                                                  FULLY FUNDED
                                                                                    Expansion of existing Water Treatment Plant from 4MGD to 10
                                                                                    MGD with an additional 900,000 gallons of new clearwell
                                                                                    storage, 23,000 LF of new 24" DIF transmission main and
Versailles Water Treatment Plant                                     WX21239004     2,101 LF of new raw water intake main.                                FULLY FUNDED
Funding & Implementation Status Report for Wastewater Projects (0-2 yr.)
                                                                                      Project Status in
                                                                                           WRIS
                                                                       WRIS Project   System/Funding
                             Project Owner                              Number             Status                      Funding Status

       Feasibility Studies/Facilities Plans/Evaluations
City of North Middletown Facilities Plan and SSES                      SX21017002       SUBMITTED         KIA Grant
Farmdale Sanitation District-Wastewater Facilities Plan                SX21073015       SUBMITTED         KIA Grant
Farmdale Sanitation District-SSES & Collection System                  SX21073014       SUBMITTED         KIA Grant
Lancaster Wastewater Facilities Plan Update                            SX21079006       SUBMITTED         KIA Grant
Lincoln Co. Sanitation District-Planning Project                       SX21137005       SUBMITTED         KIA Grant/DOW 604-B
City of Carlisle, Nicholas County Wastewater Facilities Plan & Eval.   SX21181004       SUBMITTED         KIA Grant
201 Wastewater Facilities Plan - Jessamine County                      SX21113002       SUBMITTED         KIA Grant
Clay City Sewer Study                                                  SX21197009       SUBMITTED         KIA Grant
Stanton Sewer Study                                                    SX21197010       SUBMITTED         KIA Grant
City of Sadieville Sewer System Evaluation and Repair                  SX21209005       SUBMITTED         KIA Grant
Lancaster Sanitary Sewer Evaluation Survey                             SX21079005       SUBMITTED         KIA Grant
Richmond Utilities SSES - Otter Creek Outfall Area                     SX21151007       SUBMITTED         KIA Grant/KIA Loan
Wastewater System Improvements Study, City of Carlisle                 SX21181001       SUBMITTED         KIA Grant

                          Anderson County
                        Construction Projects
Lawrenceburg Wastewater Treatment Plant Expansion                      SX21005002      SUBMITTED          KIA Grant
City of Lawrenceburg-Stringtown Sewer System                           SX21005004     FULLY FUNDED        Project has secured all necessary funding
South Lawrenceburg Sewer System Evaluation & Renovations               SX21005001      SUBMITTED          KIA Grant
Lawrenceburg Sewer Expansion to Bluegrass Parkway                      SX21005005      SUBMITTED          KIA Grant

                          Bourbon County
                        Construction Projects
Bourbon County Fiscal Court - Centerville Sewer Project                SX21017009      SUBMITTED          KIA Grant
Paris-Bourbon Co. Industrial Park WW Expansion                         SX21017003      SUBMITTED          KIA Grant/Local funds
City of North Middletown Wastewater Collection System                  SX21017001      SUBMITTED          KIA Grant
City of Paris-Bourbon Hills Sanitary Sewer Collection                  SX21017006     FULLY FUNDED        Project has secured all necessary funding
City of Paris-Horseshoe Sanitary Sewer Collection                      SX21017007      SUBMITTED          KIA Grant
City of Paris-Bedford Acres Sanitary Sewer Project                     SX21017008      SUBMITTED          KIA Grant
City of Paris-Mill Run Road & Cathy Drive Sanitary Sewer System        SX21017005      SUBMITTED          KIA Grant

                           Boyle County
                        Construction Projects
Danville East Main Sewer Force Main and Pump Station                    SX21021002      COMPLETED         Project has secured all necessary funding
Upgrade of Clarks Run Pump Station, Danville                            SX21021003      SUBMITTED         KIA Grant
City of Danville Sewer System Upgrade - Junction City                  SX21021001      FULLY FUNDED       Project has secured all necessary funding
Danville-Burgin Rd Pump Station & Force Main                           NEED PROFILE   NOT SUBMITTED       KIA Grant
Boyle County Sewer System Improvements-Phylben Village                  SX21021008      SUBMITTED         KIA Grant
Junction City Sewer System Improvements                                SX21021007      FULLY FUNDED       Project has secured all necessary funding

                           Clark County
                        Construction Projects
WMU-Westchester Manor/Woodford Estates Sanitary Sewer                  SX21049018       SUBMITTED         KIA Grant
Lower Howards Creek Backbone Interceptor/Pump Station                  SX21049004       SUBMITTED         KIA Grant
Hoods Creek Sanitary Sewer Interceptor                                 SX21049017       SUBMITTED         KIA Grant
Hancock Creek Backbone Interceptor/Pump Station/Force Main             SX21049007       SUBMITTED         KIA Grant
Skylark Drive/Chickadee Lane/Redwing Drive Sanitary                    SX21049015     SUBMITTED     KIA Grant
Wastewater Treatment Plant                                             SX21049014     SUBMITTED     KIA Grant/CDBG
WMU: Industrial Park Sanitary Sewer Improvements                       SX21049013     SUBMITTED     KIA Grant
WMU: US60/EKP Sanitary Sewer                                           SX21049012     SUBMITTED     KIA Grant/Local Funds
South Main Street, Two Mile Road, Fair Avenue Sanitary Sewer           SX21049016     SUBMITTED     KIA Grant

                           Estill County
                        Construction Projects
City of Irvine, Kentucky Stormwater                                    SX21065001     SUBMITTED     KIA Grant
Irvine Municipal Utilities-Estill County Regional Wastewater Project   SX21065005     SUBMITTED     KIA Grant/KIA Loan/US EPA RD
Estill County Water District -- West Irvine Pump                       SX21065003     SUBMITTED     KIA Grant

                           Fayette County
                        Construction Projects
Blue Sky Wastewater Treatment Acquisition                              SX21067007     SUBMITTED     KIA Grant/Local funds
Enhanced Solids Process - Town Branch Wastewater Treatment             SX21067005     SUBMITTED     KIA Grant/Local funds
South Elkhorn Pump Station and Force Main                              SX21067004     SUBMITTED     KIA Grant/Local funds
Expansion Area Three Sanitary Sewer Infrastructure                     SX21067002     SUBMITTED     KIA Grant/Local funds
North Elkhorn Diversion Pump Station and Force Main                    SX21067003     SUBMITTED     KIA Grant/Local funds
Expansion Area 2A Class A Pump Station and Trunk Station               SX21067006     SUBMITTED     KIA Grant/Local funds
Comprehensive Sanitary Sewer Project - Remaining Areas                 SX21067001    FULLY FUNDED   Project has secured all necessary funding
Comprehensive Sanitary Sewer Project - Remaining Areas-Phase 2         SX21067008     SUBMITTED     KIA Grant/Local funds

                          Franklin County
                        Construction Projects
Choateville Sewer Project (Phase 2)                                    SX21073003     SUBMITTED     KIA Grant/Local Funds/CDBG
Farmdale Sewer System Improvements                                     SX21073001     SUBMITTED     KIA Grant
Shelby Street Sewers/City of Frankfort, Frankfort                      SX21073004     SUBMITTED     KIA Grant
Allnut Drive Sewer Replacement                                         SX21073005     SUBMITTED     KIA Grant
Bon Air Pump Station & Force Main Replacement                          SX21073006     SUBMITTED     KIA Grant
Cardinal Hills Pump Station & Force Main Replacement                   SX21073007     SUBMITTED     KIA Grant
Industrial Park Pump Station & Force Main Replacement                  SX21073008     SUBMITTED     KIA Grant
Miami Trail Pump Station Replacement                                   SX21073009     SUBMITTED     KIA Grant
Schenkel Lane Sewer Replacement                                        SX21073011     SUBMITTED     KIA Grant
Two Creeks #2 Pump Station & Force Main Replacement                    SX21073012     SUBMITTED     KIA Grant
National Guard Sewer Extensions and Pump Station Replacement           SX21073010     SUBMITTED     KIA Grant
Benson Creek Sanitary Force Main Crossing                              SX21073013     SUBMITTED     KIA Grant
City of Frankfort/Frankfort Sewer Department-Holmes Street             SX21073002     SUBMITTED     KIA Grant/Local Funds

                          Garrard County
                        Construction Projects
Lancaster Sanitary Sewer Rehabilitation                                SX21079004     SUBMITTED     KIA Grant
Lancaster Wastewater Treatment Plant Improvements                      SX21079001     SUBMITTED     KIA Grant
Lancaster - Sewer Line Extension - Merriwood Estate                    SX21079011     SUBMITTED     KIA Grant
Lancaster - Sewer Line Extension - Glenmore Estate                     SX21079010     SUBMITTED     KIA Grant
Lancaster - Sewer Line Extension - US 27 North                         SX21079009     SUBMITTED     KIA Grant
Lancaster - Sewer Line Extension - Buckeye Street                      SX21079007     SUBMITTED     KIA Grant

                          Harrison County
                        Construction Projects
Cynthiana Ball Park Pump Station and Force Main                         SX21097004    SUBMITTED     KIA Grant
Cynthiana Wastewater System Improvements                               SX21097001     SUBMITTED     KIA Grant

                          Jessamine County
                        Construction Projects
City of Nicholasville Wastewater Improvements                      SX21113007      SUBMITTED     KIA Grant/STA Grant/US EPA
North End Sanitary Sewer Project, Nicholasville                   SX21113006      FULLY FUNDED   KIA Grant/STA Grant/US EPA
North Jessamine Sanitary sewer Extension Project                  SX21113004      FULLY FUNDED   KIA Grant/CDBG
Nicholasville-(dragstrip) Sanitary Sewer                          SX21113005       SUBMITTED     KIA Grant/STA Grant/US EPA
City of Wilmore-Wilmore I/I                                       NEED PROFILE   NOT SUBMITTED   KIA Grant
Keene Wastewater Pump Station and Collection System               SX21113001       SUBMITTED     KIA Grant

                          Lincoln County
                        Construction Projects
Lincoln County-Foster Lane/Ridgeway Dr. Sewer Extension           SX21137008       SUBMITTED     KIA Grant
City of Eubank-Eubank Sewer System Project                        SX21137007       SUBMITTED     KIA Grant
City of Stanford - Sewer system Extensions Project                SX21137002       SUBMITTED     KIA Grant
Lincoln Co. Regional Wastewater Project (Crab Orchard)             SX21137006      SUBMITTED     KIA Grant/USDA RD
Lincoln County Regional Wastewater Project (Hustonville)          SX21137001       SUBMITTED     KIA Grant & Loan/ USDA RD/CDBG
City of Stanford-WWTP Sludge Improvements Project                 SX21137004       SUBMITTED     KIA Grant
City of Stanford-WWTP Expansion Project                           SX21137003       SUBMITTED     KIA Grant
Halls Gap Sewer Expansion                                         NEED PROFILE   NOT SUBMITTED   KIA Grant

                          Madison County
                        Construction Projects
Madison County - Madison County Utilities-Terrill Sewer           SX21151016      SUBMITTED      KIA Grant/KIA Loan/CEGG Grant
Northern Madison County Sanitation District - I-75                SX21151001      SUBMITTED      KIA Grant
Richmond Utilities Red House Road Relief Sewers                   SX21151005      SUBMITTED      KIA Grant
Sugarville/Terrill Branch Interceptor, Berea                      SX21151014      SUBMITTED      KIA Grant
West 595 Trunk Sewer, Pump Station, and Force Main                SX21151012      SUBMITTED      KIA Grant
Berea-New Biosolids Digester and Landfarming Equipment            SX21151015      SUBMITTED      KIA Grant
Berea-Dogwood Heights Collector Sewers                            SX21151013      SUBMITTED      KIA Grant
US 25 North Sewer Extension Project, Berea                        SX21151011      SUBMITTED      KIA Grant
Richmond Utilities Otter Creek Wastewater Treatment Plant         SX21151004      SUBMITTED      KIA Grant
J.C. Chambers WWTP Expansion Project                              SX21151010     CONSTRUCTED     Project has secured all necessary funding

                           Mercer County
                        Construction Projects
Harrodsburg Anderson-Dean Pump Station Replacement                SX21167007     FULLY FUNDED Project has secured all necessary funding
Harrodsburg South Interceptor Sewer Extension                     SX21167008     FULLY FUNDED Project has secured all necessary funding
Mercer Co. Fiscal Court-Wastewater Planning Project               SX21167006     FULLY FUNDED Project has secured all necessary funding

                          Nicholas County
                        Construction Projects
Nicholas Sanitation District Lake Carnico Area Sanitation Sewer   SX21181003      SUBMITTED      KIA Grant
Carlisle Regional Wastewater Improvement Program                  SX21181002      SUBMITTED      KIA Grant

                           Powell County
                        Construction Projects
Clay City-Sanitary Sewer Expansion, Phase I                       SX21197008      SUBMITTED      KIA Grant
Clay City Stormwater Relief Project                               SX21197002      SUBMITTED      KIA Grant
Powells Valley WD-Slade/Nada Sewer Line Extensions                SX21197003     READY TO BID    Project has secured all necessary funding
Clay City-Wastewater Treatment Plant Expansion                    SX21197004      SUBMITTED      KIA Grant
Clay City-Sanitary Sewer Inflow/Infiltration Reduction            SX21197005      SUBMITTED      KIA Grant
Stanton-Sanitary Sewer Service Area Expansion                     SX21197006      SUBMITTED      KIA Grant
Stanton Wastewater Treatment Plant Expansion                      SX21197007      SUBMITTED      KIA Grant

                              Scott County
                              Projects
City of Georgetown - Etterwood Pump Station            SX21209006   SUBMITTED   KIA Grant
Sadieville Wastewater System Improvements              SX21209001   SUBMITTED   KIA Grant/State Solid Waste fund pool
City of Sadieville Wastewater System Improvements      SX21209004   SUBMITTED   KIA Grant/State Solid Waste fund pool
Georgetown WWTP#2-Northern Scott Co. Sewer Extension   SX21209003   SUBMITTED   KIA Grant
Georgetown-WWTP #1 RBC Demolition                      SX21209007   SUBMITTED   KIA Grant
Stamping Ground System Improvements                    SX21209002   SUBMITTED   KIA Grant

                         Woodford County
                            Projects
Versailles Wastewater System Improvements              SX21239001   SUBMITTED   KIA Grant/Local funds
                            Implementation


Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented



Yet to be implemented
Project is fully funded and in process of being implemented
Yet to be implemented
Yet to be implemented



Yet to be implemented
Yet to be implemented
Yet to be implemented
Project is fully funded and in projcess of being implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented



Project has been implemented
Yet to be implemented
Project is fully funded and in process of being implemented
Yet to be implemented
Yet to be implemented
Project is fully funded and in process of being implemented



Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented



Yet to be implemented
Yet to be implemented
Yet to be implemented



Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Project has been implemented
Yet to be implemented



Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented



Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented



Yet to be implemented
Yet to be implemented
Yet to be implemented
Project is in the process of being implemented
Project is in the process of being implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented



Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented



Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Project has been implemented



Project in progress of being implemented
Project in progress of being implemented
Project in progress of being implemented



Yet to be implemented
Yet to be implemented



Yet to be implemented
Yet to be implemented
Project is in projecess of being implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented



Yet to be implemented
Funding & Implementation Status Report for Water Projects (0-2 yr.)
                                                                               Project Status in
                                                                                    WRIS
                                                                WRIS Project   System/Funding
                         Project Owner                           Number             Status
                       Feasibility Studies
City of Eubank Water System Hydraulic Study                     WX21137024       SUBMITTED
Lake Village Water Association-Contract 14 Water Main           WX21167010       SUBMITTED

                      Anderson County
                     Construction Projects
South Anderson Phase VII Expansions                             WX21005004       SUBMITTED

                       Bourbon County
                     Construction Projects
Bourbon Co. Fiscal Court/City of Paris-Various Waterline Ext.   WX21017002       SUBMITTED
Bluegrass Water Supply Commission Phase 1 Water Line Project    WX21067003       SUBMITTED
Bluegrass Water Supply Commission Master Planning and Eng.      WX21067004       SUBMITTED
Paris-Bourbon Co. Industrial Park Water Expansion               WX21017006       SUBMITTED
City of North Middletown Waterline Replacement Project          WX21017005       SUBMITTED

                        Boyle County
                     Construction Projects
Danville WTP Improvements for Regulatory Compliance             WX21021003       SUBMITTED

                        Clark County
                     Construction Projects
Winchester Elevated Pressure Zone - Nos. 1 and 2                WX21049011      SUBMITTED
Colby Road/Lexington Road Waterline Connector                   WX21049009      SUBMITTED
Bluegrass Water Supply Commission Phase 1 Water Line Project    WX21067003      SUBMITTED
Bluegrass Water Supply Commission Master Planning and Eng.      WX21067004      SUBMITTED
Clark Co. Fiscal Court-Lisletown Road Main Ext.                 NEED PROFILE    SUBMITTED
Industrial Park Waterline Connector                             WX21049003      SUBMITTED
East Clark Co. Water District-Coal Road Tank & Pump             WX21049013     FULLY FUNDED

                        Estill County
                     Construction Projects
Irvine Municipal Utilities Mount Scratchum Water Extension      WX21065003       SUBMITTED
Phase 9 Water Expansion Project                                 WX21065002       SUBMITTED

                       Fayette County
                     Construction Projects
Preconstruction Activities Related to the Bluegrass Region      WX21067002     FULLY FUNDED
Bluegrass Water Supply Commission Phase 1 Water Line Project    WX21067003      SUBMITTED
Bluegrass Water Supply Commission Master Planning and Eng.      WX21067004      SUBMITTED

                       Franklin County
                     Construction Projects
Bluegrass Water Supply Commission Phase 1 Water Line Project    WX21067003       SUBMITTED
Bluegrass Water Supply Commission Master Planning and Eng.      WX21067004       SUBMITTED
Farmdale Water District-Waterline Upgrade Project               WX21073005       SUBMITTED
                       Garrard County
                     Construction Projects
Garrard County Water Association-Extension 11                         WX21079009    SUBMITTED
City of Lancaster-Water System Improvement Project                    WX21079010    SUBMITTED
Bluegrass Water Supply Commission Phase 1 Water Line Project          WX21067003    SUBMITTED
Bluegrass Water Supply Commission Master Planning and Eng.            WX21067004    SUBMITTED
Garrard County Water Association - Extension 10                       WX21079008    SUBMITTED
Garrard County Water Association - Extension 9                        WX21079007    SUBMITTED

                       Harrison County
                     Construction Projects
City of Cynthiana-Industrial Water Loop                               WX21097009    SUBMITTED
City of Cynthiana-Water Line Improvements-Lola Drive                   WX21097010   SUBMITTED
Harrison County Water Association-County Infirmary                     WX21097008   SUBMITTED
2005 Water Distribution System Improvements                           WX21097006    SUBMITTED
2005 Water Treatment Plant Improvements                                WX21097007   SUBMITTED
Bluegrass Water Supply Commission Phase 1 Water Line Project           WX21067003   SUBMITTED
Bluegrass Water Supply Commission Master Planning and Eng.             WX21067004   SUBMITTED
HCWA Friendship Rd., Dixon Rd., Coppage Pike                          WX21097005    SUBMITTED
Harrison, Bourbon, Nicholas, & Scott Telemetry Upgrade                 WX21097003   SUBMITTED
Phase II Water System Improvements                                     WX21097002   SUBMITTED
Artery Tank Pump Station-KY 1893                                       WX21097011   SUBMITTED
Automatic Meter Reading                                              WX21097012     SUBMITTED

                      Jessamine County
                     Construction Projects
Jessamine County Water District No. 1 - Groggins                      WX21113015    SUBMITTED
Jessamine County Water District No. 1 - Baker Lane                    WX21113014    SUBMITTED
Nicholasville Water Treatment Plant Renovation                        WX21113011    SUBMITTED
Jessamine Co. WD #1 - Water System Improvements                       WX21113010    SUBMITTED
Jessamine County Water District #1-Water Tank Project                 WX21113012    SUBMITTED
Wilmore/Nicholasville Water Distribution Interconnection              WX21113013    SUBMITTED
McGee Lane Water Main Extension                                       WX21113009    SUBMITTED
Bluegrass Water Supply Commission Phase 1 Water Line Project          WX21067003    SUBMITTED
Bluegrass Water Supply Commission Master Planning and Eng.            WX21067004    SUBMITTED
Catnip Hill Pike 1.0 MG Elevated Storage Tank                         WX21113016    SUBMITTED
Southeast Rural Jessamine Unserved Areas                              WX21113004    SUBMITTED
Keene Reconstruction & Northwest Hydraulic Reinforcement              WX21113001    SUBMITTED

                       Lincoln County
                     Construction Projects
Lincoln County First Southern Veterans Memorial Park                  WX21137019    SUBMITTED
Lincoln County/City of Stanford Waterline Extension                   WX21137021    SUBMITTED
Lincoln Co. Fiscal Ct. Waterline Expansion-Hustonville                WX21137020    SUBMITTED
Airport Road Waterline Extension for Lincoln County                   WX21137012    SUBMITTED
City of Crab Orchard-Transmission Waterline Replacement               WX21137015    SUBMITTED
City of Stanford Telemetry and Tank Control Project                   WX21137018    SUBMITTED
Buckcreek Lake Water Supply Project                                   WX21137002    SUBMITTED
Lincoln Co. / McKinney Water District Line Extensions and Upgrades    WX21137016    SUBMITTED
Lincoln Co. / City of Eubank Water Line Extensions/Upgrades           WX21137022    SUBMITTED
Lincoln Co. / Hustonville McKinney Water System Interconnect          WX21137023    SUBMITTED
City of Stanford Water Commission -- Buck Creek Lake              WX21137009      SUBMITTED
Hustonville Water Upgrade and Expansion                           WX21137010      SUBMITTED

                      Madison County
                    Construction Projects
I-75 and KY 595 Water Extension Project                           WX21151003      SUBMITTED
Southern Madison WD-Bobtown Area Water Extension Project          WX21151016     FULLY FUNDED
Southern Madison WD-Scaffold Cane Area Waterline Extension        WX21151017     FULLY FUNDED
Richmond Utilities Water Treatment Plant Expansion                WX21151013      SUBMITTED
Richmond Utilities Upgrade Raw Water Intake                       WX21151011      SUBMITTED
Richmond Utilities Boggs Lane Main Phase II                       WX21151012      SUBMITTED
Richmond Utilities Barnes Mill Road Waterline Extension           WX21151010      SUBMITTED
Richmond Utilities Robert Martin Bypass Connector                 WX21151005      SUBMITTED
Boonesboro 500,000 Gallon Elevated Tank                           WX21151022      SUBMITTED
Hwy. 25 S. 300,000 Gallon Replacement Tank                        WX21151023      SUBMITTED
Madison County Utilities Improvements, Phase II                   WX21151015      SUBMITTED
Richmond Utilities Deacon Hills - Meadows Connector               WX21151004      SUBMITTED
Kirksville Water Assoc. (Madison Co.)-Taylor Fork Water Line      WX21151018      SUBMITTED
Kirksville Water (Madison Co.)-Hwy. 1295 Water Line Replacement   WX21151019      SUBMITTED
Kirksville Water (Madison Co.)-Caleast Rd. Water Line Upgrade     WX21151020      SUBMITTED
Kirksville Water-Hwy. 595 Water Line Replacement                  WX21151025      SUBMITTED
Kirksville Water-Arbuckle Road                                    WX21151027      SUBMITTED
Kirksville Water-Barns Mill Estates Water Line Replacement        WX21151028    SUBMITTED

                       Mercer County
                    Construction Projects
North Mercer Water District-2004 Extensions and Improvements      WX21167007      SUBMITTED
Harrodsburg, KY Phase II Water System Improvements                WX21167006      SUBMITTED
Lake Village Water Assoc.-Contract 13, Water Main                 WX21167009      SUBMITTED

                      Nicholas County
                    Construction Projects
City of Carlisle Raw Water Intake Improvements                    WX21181004      SUBMITTED
Nicholas County Water District-Phase IX Water System              WX21181003      SUBMITTED
Nicholas County Water District Improvements                       WX21181002     CONSTRUCTED
Carlisle Water Treatment Plant Expansion                          WX21181001      SUBMITTED

                       Powell County
                    Construction Projects
Stanton Water System Improvement Project                          WX21197002     FULLY FUNDED
Powells Valley Water District Improvements                        WX21197001     FULLY FUNDED

                       Scott County
                    Construction Projects
City of Georgetown- WTP Disinfection Process Improvements          WX21209006     SUBMITTED
Bluegrass Water Supply Commission Phase 1 Water Line Project       WX21067003     SUBMITTED
Bluegrass Water Supply Commission Master Planning and Eng.         WX21067004     SUBMITTED
City of Georgetown-Champion Way 16" Water Main Extension           WX21209005     SUBMITTED
Scott County Reservoir                                            WX21209003      SUBMITTED

                     Woodford County
                    Construction Projects
Midway Streetscape Utility Relocation                                  WX21239007   SUBMITTED
South Woodford Water District Phase 4 Improvements                     WX21239006   SUBMITTED
Sugar Hill Road Extension                                              WX21239009   SUBMITTED
Water System Improvements - 24" Water Main Extension                   WX21239010   SUBMITTED
Versailles - Clifton / McCracken / Steele Rd. Water Line Extension     WX21239011   SUBMITTED
Woodford Co.-Frankfort - Clifton / McCracken Water Line Extension    WX21239014     SUBMITTED
Northeast Woodford Phase II Connection to Frankfort                  WX21239013     SUBMITTED
Northeast Woodford Old Frankfort Pike Reconstruction                 WX21239012     SUBMITTED
Versailles Water Distribution System Improvements                      WX21239008   SUBMITTED
Versailles Water Treatment Plant                                       WX21239004   SUBMITTED
s (0-2 yr.)


                                         Funding Status

          KIA Grant
          KIA Grant



          KIA Grant



          KIA Grant
          KIA Grant/KIA Loan (Fund F)/CEGG Grant/Local Funds/Other Borowed funds
          KIA Grant
          KIA Grant
          KIA Grant/CDBG



          KIA Grant



          KIA Grant
          KIA Grant
          KIA Grant/KIA Loan (Fund F)/CEGG Grant/Local Funds/Other Borowed funds
          KIA Grant
          KIA Grant
          KIA Grant
          KIA Grant



          KIA Grant
          KIA Grant



          All necessary funds have been succured for project
          KIA Grant
          KIA Grant



          KIA Grant/KIA Loan (Fund F)/CEGG Grant/Local Funds/Other Borowed funds
          KIA Grant
          KIA Grant
KIA Grant/KIA Loan
KIA Grant
KIA Grant/KIA Loan (Fund F)/CEGG Grant/Local Funds/Other Borowed funds
KIA Grant
KIA Grant/KIA Loan
KIA Grant/KIA Loan



KIA Grant
KIA Grant
KIA Grant
KIA Grant
KIA Grant
KIA Grant/KIA Loan (Fund F)/CEGG Grant/Local Funds/Other Borowed funds
KIA Grant
KIA Grant
KIA Grant
KIA Grant
KIA Grant
KIA Grant



KIA Grant/KIA Loan
KIA Grant
KIA Grant
KIA Grant
KIA Grant
KIA Grant
KIA Grant/KIA Loan
KIA Grant/KIA Loan (Fund F)/CEGG Grant/Local Funds/Other Borowed funds
KIA Grant
KIA Grant
KIA Grant/KIA Loan/Local Funds
KIA Grant



KIA Grant/CEGG Grant
KIA Grant
KIA Grant/USDA RD Funds
KIA Grant
KIA Grant
KIA Grant
KIA Grant
KIA Grant
KIA Grant
KIA Grant
KIA Grant
KIA Grant



KIA Grant/CDBG
All necessary funds have been sucured for project
All necessary funds have been sucured for project
KIA Grant
KIA Grant
KIA Grant
KIA Grant
KIA Grant
KIA Grant
KIA Grant
KIA Grant
KIA Grant
KIA Grant
KIA Grant
KIA Grant
KIA Grant
KIA Grant
KIA Grant



KIA Grant
KIA Grant
KIA Grant



KIA Grant
KIA Grant
Project has been constructed-all necessary funds have been secured
KIA Grant



All necessary fundst have been secured
All necessary fundst have been secured



KIA Grant
KIA Grant/KIA Loan (Fund F)/CEGG Grant/Local Funds/Other Borowed funds
KIA Grant
KIA Grant
KIA Grant/Local funds/US EPA
Project has secured all necessary funding
KIA Grant
KIA Grant
KIA Grant
KIA Grant
KIA Grant
KIA Grant
KIA Grant
KIA Grant
KIA Grant/Local funds
              Implementation

Not yet implemented
Not yet implemented



Not yet implemented



Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented



Not yet implemented



Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented



Not yet implemented
Not yet implemented



Soon to be implemented
Not yet implemented
Not yet implemented



Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented



Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented



Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented



Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented



Not yet implemented
Project has been implemented
Project has been implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented



Not yet implemented
Not yet implemented
Not yet implemented



Not yet implemented
Not yet implemented
Project has been implemented
Not yet implemented



Project has been implemented
Project has been implemented



Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
In the process of being implemented
Project is Bid Ready-ready to be implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Project is Bid Ready-ready to be implemented

				