0-2 Year Wastewater Projects (Local and Regional Rankings)
Project Status in Category 2: Project Category 5: Local Tie
WRIS Delivery Need/Ranking Points Category 6: Water Breaker/
WRIS Project System/Funding Category 1: Type of (Regional/Non- Category 3: Project Category 4: (#1=20, #2=16, Management Council Custermers TOTAL Regional
Project Owner Number Project Description Status Project regional) Status Funding Status #3=13 etc..) Bonus Points per mile SCORE Ranking
Feasibility Studies/Facilities Plans/Evaluations
This project involves completion of a Regional Wastewater Facilities Plan and
Sewer System Evaluation Survey, as required by the City's Agreed order with the
Kentucky Division of Water. North Middletown has never had a Facilities Plan
completed for its wastewater system and suffers from excessive I/I in its
City of North Middletown Facilities Plan and SSES SX21017002 collection system. SUBMITTED
This project involves updating the existing Frankfort Wastewater facilities plan, as
required by the KY Division of Water, to address the Farmdale Sanitation District
Farmdale Sanitation District-Wastewater Facilities Plan SX21073015 service area. SUBMITTED
This project involves the completion of a sewer system evaluation survey for
existing collection lines within the proposed Farmdale Sanitation District service
area. Also included are sewer line repairs to eliminate the sources of inflow and
infiltration located as a result of the SSES. This work will reduce treatment costs
Farmdale Sanitation District-SSES & Collection System SX21073014 for the sanitation district by eliminating excess inflow and infiltration. SUBMITTED
Lancaster Wastewater Facilities Plan Update SX21079006 Update the Regional Wastewater Facilities Plan. SUBMITTED
40,000 is needed for the purposes of planning for the Lincoln County Sanitation
District. Grant(s) that have been awarded that complement this potential grant is
the 604B KYDOW grant of 20,000 to ensure the completion of the regional
Facilities Plan for the proposed Lincoln Co. Sanitation District's Phase I, and
Lincoln Co. Sanitation District-Planning Project SX21137005 Phase II; Regional Wastewater project SX2113700 SUBMITTED
Conduct a Comprehensive Wastewater Facility Plan for Nicholas County in
accordance with 401 KAR 5:006. In conjunction with the Wastewater Facility
Plan, conduct a Sanitary Sewer Evaluation Survey of the Carlisle Wastewater
City of Carlisle, Nicholas County Wastewater Facilities Plan & Eval. SX21181004 Collection System SUBMITTED
Wastewater Facilities Plan to provide the most environmentally sound, cost
effective and implementable wastewater treatment works to serve Jessamine
201 Wastewater Facilities Plan - Jessamine County SX21113002 County, Kentucky. SUBMITTED
This project has two parts: to complete the Stanton / Clay City Facilities Plan and
to perform a Sanitary Sewer Evaluation study. The ultimate goal of the project is
to identify what specific improvements need to be made as part of project
Clay City Sewer Study SX21197009 SX21197005, Inflow and Infiltration Improvements. SUBMITTED
This project has two parts: to complete the Stanton / Clay City Facilities Plan and
to perform a Sanitary Sewer Evaluation Study. The ultimate goal of the project is
to identify what specific improvements need to be made as part of project
Stanton Sewer Study SX21197010 SX21197007. SUBMITTED
This project involves the completion of a Sewer System Evaluation Survey for the
City of Sadieville's wastewater system. The existing wastewater treatment plant
is aged. The planning area will be expanded to include future residential and
commercial development and the I-75/KY 32 interchange commercial
City of Sadieville Sewer System Evaluation and Repair SX21209005 development zone. SUBMITTED
Comprehensive evaluation of the condition of the sanitary sewer collection
system. Involves televising inside of all sewer lines, smoke testing for illegal
Lancaster Sanitary Sewer Evaluation Survey SX21079005 connections, inspection of manholes. SUBMITTED
Sewer system evaluation of the +/- 2.5 square mile Otter Creek drainage basin to
Richmond Utilities SSES - Otter Creek Outfall Area SX21151007 identify and reduce excessive flows in the transportation and treatment system. SUBMITTED
Project consists of the installation of 13,200 ft. of 8-inch gravity sewer and six lift
stations to serve 113 homes along Old Highway 127 in the Stringtown
Wastewater System Improvements Study, City of Carlisle SX21181001 Community. SUBMITTED
Anderson County
Construction Projects
Project consists of the installation of 13,200 ft. of 8-inch gravity sewer and six lift
stations to serve 113 homes along Old Highway 127 in the Stringtown
Lawrenceburg Wastewater Treatment Plant Expansion SX21005002 Community. SUBMITTED 20 10 20 20 13 83 11
Project consists of video recording approx. 10,000' of 8" gravity sewer line,
replacement of approx. 2,600' of 8" gravity sewer line and repairing point source
City of Lawrenceburg-Stringtown Sewer System SX21005004 infiltration and inflow sources in the South Lawrenceburg sewer system area. FULLY FUNDED
Expand existing WWTP to a facility rated at 2.3 MGD average daily flow with a
peak flow capacity of 6.9 MGD. New construction includes new preliminary
treatment facility with mechanical bar screen and grit removal, new primary rotary
screen, new concentric channel oxidation ditch, two new clarifiers, new
South Lawrenceburg Sewer System Evaluation & Renovations SX21005001 disinfection basin. SUBMITTED 20 10 15 0 16 10 71 27
It has been determined that the City of Lawrenceburg needs to complete a sewer
line expansion along the Hwy 127 Bypass. At this time, lines are available to
Highview, which is just south of the intersection of Hwy. 127 Bypass and Hwy.
62. An expansion project form Highview to the Bluegrass Parkway via the Hwy.
127 Bypass, would be very beneficial to the community. The City of
Lawrenceburg, which currently has a new sewer processing plant soon to be
operational, and a brand new water processing plant, is willing to support an
expansion project of this magnitude. This sewer expansion project, which would
connect to the City's sewer lines, would provide opportunities to create jobs
through the development of additional commercial, industrial and residential
Lawrenceburg Sewer Expansion to Bluegrass Parkway SX21005005 areas, which have previously not been available. SUBMITTED 20 20 5 10 20 10 85 8
Bourbon County
Construction Projects
This project will extend sanitary sewer service to the Community of Centerville in
Bourbon County Fiscal Court - Centerville Sewer Project SX21017009 rural Bourbon County. SUBMITTED 20 10 15 10 20 10 85 9
The project will extend sanitary sewers fro the Paris wastewater system into the
new 135 acre industrial park. The project consists of 5,522 feet of 8" and 10"
PVC gravity sewer, 5,811 feet of 6" force main and (1) one pump station. This
Paris-Bourbon Co. Industrial Park WW Expansion SX21017003 project will extend new service to approx. 135 acres of industrial property. SUBMITTED 20 10 15 10 11 66 36
Rehabilitation of approximately 10,000 l.f. of gravity sewer line and replacement
of 55 manholes to significantly reduce the excessive infiltration and inflow (I/I)
which enters the system during rain events. During wet weather, the existing
WWTP designed for 0.085 mgd is forced to treat in excess of 0.20 mgd.
Additionally, several manholes within the system surcharge during wet weather
allowing untreated sewage to spill onto the ground and into drainage ditches and
City of North Middletown Wastewater Collection System SX21017001 creeks. SUBMITTED 20 10 20 0 9 59 60
The City of Paris- Bourbon Hills Sanitary Sewer Project will consist of
constructing approximately 2,000 L.F. of 8" collector sewer and appurtenances.
This project will provide a reliable source of sanitary sewer service to
City of Paris-Bourbon Hills Sanitary Sewer Collection SX21017006 approximately 40 unserved users. FULLY FUNDED
The City of Paris-Horseshoe Sanitary Sewer Project will consist of constructing
approximately 5,800L.F. of 8" collector sewer and appurtenances. This project
will provide a reliable source of sanitary sewer service to approximately 86
City of Paris-Horseshoe Sanitary Sewer Collection SX21017007 unserved users. SUBMITTED 20 10 20 0 16 66 37
The City of Paris-Bedford Acres Sanitary Sewer Project will consist of
constructing approximately 13,500 L.F. of 8" collector sewer and appurtenances.
this project will provide a reliable source of sanitary sewer service to
City of Paris-Bedford Acres Sanitary Sewer Project SX21017008 approximately 177 unserved users. SUBMITTED 20 10 20 0 13 63 49
The City of Paris-Mill Run Road & Cathy Drive Sanitary Sewer Project will consist
of constructing approximately 6,600 L.F. of 8" collector sewer and
appurtenances. This project will provide a reliable source of sanitary sewer
City of Paris-Mill Run Road & Cathy Drive Sanitary Sewer System SX21017005 service to approximately 76 unserved users. SUBMITTED 20 10 20 0 7 57 64
Boyle County
Construction Projects
Construction of a new 10" force main and new sewer pump station. The new
Danville East Main Sewer Force Main and Pump Station SX21021002 force main will be about 5,000 feet in length. COMPLETED
The pump station basically is comprised of six components as follows: inlet
screening structure, dual wetwells, submersible pumps and appurtenances,
discharger force main, site and structures, and electrical instrumentation. This
station is 21 years old and exhibits a history of overflow events during heavy
Upgrade of Clarks Run Pump Station, Danville SX21021003 rains. SUBMITTED 3 10 20 15 20 10 78 21
Design/construction of a wastewater pumping station and force main needed to
allow construction of 18,000 LF of 18" to 24" gravity interceptor sewer to provide
transportation of sewage from Junction City to Danville's WWTP. Project will
facilitate elimination of health hazards in Junction City and Boyle County and
alleviate Agreed Order in Junction City. The pump station is essential for
interceptor sewer project by Junction City. Additionally, project will consist of the
abandonment of the Mitchell Street and Henry Street pumping stations. There
will also be a replacement of the York Lane pumping station. Moreover, this
project will incorporate the scope of work proposed in this project SX21021001
and projects SX21021002 & SX2102007. The funding will remain separated
City of Danville Sewer System Upgrade - Junction City SX21021001 however. FULLY FUNDED
Danville-Burgin Rd Pump Station & Force Main NEED PROFILE NOT SUBMITTED NOT SUBMITTED 13 13 87
Regional project to provide gravity sewers in currently unsewered areas in Boyle
and Lincoln County. Project will also provide sewer service to the Danville/Boyle
Co. Airport. The project area contains many failing septic tanks and is a
Boyle County Sewer System Improvements-Phylben Village SX21021008 documented health hazard, per Boyle and Lincoln Co. Health Depts. SUBMITTED 20 20 20 0 16 76 22
Project is to alleviate D.O.W. sewer sanctions on sewer system. Project will
remove one overwhelmed pump station and install 14600 ft of 21" gravity sewer
to City of Danville's system for treatment. The 21" gravity line will serve aprox. 50
Junction City Sewer System Improvements SX21021007 customers. FULLY FUNDED
Clark County
Construction Projects
This project will provide sanitary sewers to unincorporated area of Clark County.
Area includes 64 residential properties served by septic tank systems, many of
WMU-Westchester Manor/Woodford Estates Sanitary Sewer SX21049018 which are now failing. SUBMITTED 20 10 10 10 4 54 74
Provide backbone sanitary sewer infrastructure to serve existing and planned
developments in the Lower Howards Creek watershed. Requires gravity sewers,
Lower Howards Creek Backbone Interceptor/Pump Station SX21049004 pump stations, and force mains. SUBMITTED 18 10 10 0 16 10 64 47
Provide backbone sanitary sewer infrastructure to serve existing and planned
Hoods Creek Sanitary Sewer Interceptor SX21049017 developments in the Hoods Creek watershed. Requires bore under I-64. SUBMITTED 3 10 10 0 20 10 53 76
Provide backbone sanitary sewer infrastructure to serve existing and planned
developments in the Hancock Creek watershed. Requires gravity sewers,
Hancock Creek Backbone Interceptor/Pump Station/Force Main SX21049007 multiple pump stations, and force main sewers. SUBMITTED 5 20 10 10 5 50 78
Provide sanitary sewers to unincorporated area of Clark County. Area includes
59 residential properties served by septic tank systems, many of which are now
Skylark Drive/Chickadee Lane/Redwing Drive Sanitary SX21049015 failing. SUBMITTED 20 10 15 20 9 74 24
Design and construction of an 6.0 mgd wastewater treatment plant. WMU is
under A.O. 03060 and is to be constructed and operational by January 1, 2008.
The construction of the WWTPA will alleviate chronic S.S.O. at the WWTP to a
Wastewater Treatment Plant SX21049014 stream classified as impaired. SUBMITTED 20 10 20 20 13 83 12
WMU: Industrial Park Sanitary Sewer Improvements SX21049013 Sanitary sewer improvements to serve new 300+ acre industrial park. SUBMITTED 20 10 20 20 11 81 15
Sanitary sewer extension to facilitate DOW ordered connection of East Kentucky
Power Corporate Facilities to WMU and eliminate package WWTP now serving
WMU: US60/EKP Sanitary Sewer SX21049012 that facility. SUBMITTED 3 10 10 5 6 34 85
Provide sanitary sewer to unsewered areas of Clark County. Areas include 20
residential properties served by septic tank systems, some of which are now
South Main Street, Two Mile Road, Fair Avenue Sanitary Sewer SX21049016 failing and 18 underserved residences. Also, includes 24 unit mobile home park. SUBMITTED 20 10 10 20 7 67 33
Estill County
Construction Projects
Broadway and Bryant Street stormwater runoff flooding problem
Design and construction of approximately 150 L.F. 30 inch gravity storm drain
City of Irvine, Kentucky Stormwater SX21065001 system. SUBMITTED 5 10 20 15 16 66 38
Regionalization of wastewater system in Estill County. The project involves
preliminary studies, design, and construction of wastewater facilities to resolve
environmental compliance issues with the Irvine Municipal Utilities and the Estill
County Water District treatment plants. Both WWTPs are currently operating at
or above their capacity, and the ECWD plant exceeds its discharge limits. This
project will involve consolidating the two wastewater utilities, constructing one
new treatment plant, constructing a pump station and force main to combine the
two flows, extending new gravity sewers to two unsewered area, and addressing
Irvine Municipal Utilities-Estill County Regional Wastewater Project SX21065005 local infiltration and inflow problems. SUBMITTED 20 20 20 10 20 10 100 1
Estill County Water District (ECWD) seeks funding to build a new pump station to
replace the existing West Irvine Pump Station located across the street. The
existing pump station has experienced severe corrosion problems created by the
associated collection system that utilized residential septic tanks for preliminary
treatment prior to reaching the ECWD Wastewater Treatment Plant. Since the
existing pump station receives all wastewater going to the ECWD WWTP, this
facility will continue to be viable regardless of the regionalization approach and
location of a new Regional WWTP. Part of the cost includes capacity expansion
for the new facility to meet the projected growth for regionalization, while
Estill County Water District -- West Irvine Pump SX21065003 addressing the current corrosion concerns. SUBMITTED 20 10 20 10 13 73 26
Fayette County
Construction Projects
The Lexington-Fayette Urban County Government is negotiating acquisition of the
Blue Sky Wastewater Treatment Plant. Once the WWTP is acquired, upgrades
for enhanced nutrient removal is expected. Upgrades would include improved
Blue Sky Wastewater Treatment Acquisition SX21067007 nitrification and phosphorus removal by chemical precipitation. SUBMITTED 20 10 20 0 20 10 80 17
In accordance with approved 201 Facilities Plan, project would design/construct
modification of solids process to handle increased loading. Process changes
would include conversion of primary and secondary digesters to temperature
phased digestion process, expand polymer/washwater facilities, and improve
Enhanced Solids Process - Town Branch Wastewater Treatment SX21067005 associated odor control systems. SUBMITTED 3 10 20 20 7 60 59
Upgrade of existing pump station from 7,600 gpm to 12,000 gpm. Construction
of new 24-inch force main to parallel existing force main. Upgraded facility would
South Elkhorn Pump Station and Force Main SX21067004 abate #2 priority pump station SSO. Average SSO's 10 per year (1999-2001). SUBMITTED 3 10 20 20 11 64 48
Project to provide collection and conveyance facilities for existing sanitary sewer
service customers in addition to future customers within Expansion Area Three,
which consists of approximately 534 acres. Key component of this project is that
it provides for the elimination of four (4) existing pump stations, three(3) of which
Expansion Area Three Sanitary Sewer Infrastructure SX21067002 have been identified as priority SSO's in the LFUCG Sanitary Overflow Plan. SUBMITTED 20 10 20 10 9 69 31
Construction of a new 13,200 gpm pump station for the purpose of sewering
Urban Service Area expansion areas and balancing overall system wastewater
flows between the two existing wastewater treatment plants. Related facilities
North Elkhorn Diversion Pump Station and Force Main SX21067003 would eliminate SSOP Priority #8 (future. Relieves SSOP Priorities #7 and #9. SUBMITTED 3 10 20 20 13 66 39
Expansion Area 2A, brought in Lexington's Urban Service Area in 1996, is
experiencing rapid development. The system of trunk sewers recommended by
the adopted 1999 201 Facilities Plan Update is being constructed in the upper
portions of the North Elkhorn watershed, but there are no immediate plans for
development, including sewer facilities, in the lower portion. This project would
design and build 201 Plan facilities, allowing elimination of existing interim pump
Expansion Area 2A Class A Pump Station and Trunk Station SX21067006 stations and reducing demands on the aging North Elkhorn force main. SUBMITTED 10 20 20 0 6 56 68
The project provides sanitary sewer service for 252 unserved households in the
Lexington-Fayette Urban Co. Govn't (LFUCG) Urban Service Area. The areas
included are Bracktown, Cadentown, and Wilderness Road, which are primarily
lower-income and older neighborhoods. Financial assistance is required to
Comprehensive Sanitary Sewer Project - Remaining Areas SX21067001 provide a cost effective solution to failed on-site septic systems. FULLY FUNDED
The project provides sanitary sewer service for unserved households within the
Lexington-Fayette Urban County Government Urban Service Area. The areas
included are: Lin Wal Drive, Lisle Industrial Avenue, Inner Liberty Road, South
Forbes Road, Versailles Road, Viley/Calumet Terrace Area, Inner North
Broadway, Shadybrook Lane, Old Paris Pike, and Beverly Avenue, which are
primarily lower-income or older neighborhoods. Financial assistance is required
Comprehensive Sanitary Sewer Project - Remaining Areas-Phase 2 SX21067008 to provide a cost-effective solution to on-site septic systems subject to failure. SUBMITTED 20 10 20 10 16 76 23
Franklin County
Construction Projects
This project provides sewer services to approximately 70 residential and
commercial businesses along Skyline, Skyview, Pierce Lane, and Holly Hills.
Currently, there are no sewer services available in this area. The project consists
of appro. 3,400 l.f. of gravity sewer, 4,000 l.f. of low pressure mains and 42
Choateville Sewer Project (Phase 2) SX21073003 grinder pump stations. SUBMITTED 20 10 20 0 13 63 50
This project includes approx. 22,000 linear feet of 15" gravity sewer; 9,000 linear
feet of 10" gravity sewer; 62,000 linear feet 8" gravity sewer; 16,000 linear feet of
12" force main; 4,000 linear feet of 10" force mains; 7,000 linear feet of 8" force
mains; 15,000 linear feet of 6" force mains, and 10 pumping stations serving
Farmdale Sewer System Improvements SX21073001 approx. 1,400 new customers. SUBMITTED 20 10 20 0 20 10 80 18
Replacement of 310' of 8-inch gravity sewer to serve 10 underserved
Shelby Street Sewers/City of Frankfort, Frankfort SX21073004 households. SUBMITTED 5 10 15 0 7 37 84
Wastewater collection system project. Includes replacement of 1300 LF of 6"
Allnut Drive Sewer Replacement SX21073005 gravity sewer with new 8" sewer. SUBMITTED 5 10 20 0 6 41 82
Wastewater collection system project. Includes upgrade of existing Bon Air pump
station and installation of 6700 LF of 18" force main to replace existing 12" force
main. Project will reduce and potentially eliminate three sanitary sewer overflows
Bon Air Pump Station & Force Main Replacement SX21073006 (SSOs) in the Two Creek area. SUBMITTED 20 10 20 0 3 53 77
Wastewater collection system project. Includes replacement of existing Cardinal
Hills pump station and installation of 326 LF of 6" force main to replace existing 4"
force main. Project will reduce and potentially eliminate the sanitary sewer
Cardinal Hills Pump Station & Force Main Replacement SX21073007 overflow (SSO) at the Cardinal Hills pump station. SUBMITTED 10 10 20 0 3 43 79
Wastewater collection system project. Includes replacement of existing Industrial
Park pump station and installation of 2300 LF of 10" force main to parallel
existing 10" force main. Project will reduce an potentially eliminate the sanitary
Industrial Park Pump Station & Force Main Replacement SX21073008 sewer overflow (SSO) at the Industrial Park pump station. SUBMITTED 19 10 20 0 13 62 54
Wastewater collection system project. Includes replacement of existing Miami
Miami Trail Pump Station Replacement SX21073009 Trail pump station and replacement of 100 LF of 4" force main. SUBMITTED 10 10 20 0 2 42 80
Wastewater collection system project. Includes replacement of 1500 LF of 14"
sewer with new 30" sewer. Project will reduce and potentially eliminate the
Schenkel Lane Sewer Replacement SX21073011 sanitary sewer overflow (SSO) at the cave entrance near Schenkel Lane. SUBMITTED 20 10 20 20 16 86 6
Wastewater collection system project. Includes replacement of existing Two
Creeks #2 pump station and installation of 1300 LF of 6" force main to replace
existing 4" force main. Project will reduce and potentially eliminate the sanitary
Two Creeks #2 Pump Station & Force Main Replacement SX21073012 sewer overflow (SSO) at the Two Creeks #2 pump station. SUBMITTED 10 10 20 0 1 41 83
Wastewater collection system project. Includes installation of 6,500 LF 8", 10",
and 12" gravity sewer lines, a new submersible pump station, and 4,500 LF of
10" force main. the project will eliminate three (3) existing pump stations and
reduce or eliminate the existing sanitary sewer overflow (SSO) at National Guard
National Guard Sewer Extensions and Pump Station Replacement SX21073010 Pump station #1. SUBMITTED 10 10 20 0 2 42 81
Project involves emergency replacement of existing sanitary sewer collection
system infrastructure. Existing force main crossing at Benson Creek was severed
during 2003 from debris impact during flood flows. Replacement force main will
be constructed along parallel alignment utilizing horizontal directional drilling
(HDD) method to minimize environmental impact to aquatic ecosystems. Existing
force main services an urbanized area of approx. 580 acres of mixed residential
Benson Creek Sanitary Force Main Crossing SX21073013 and commercial land use. SUBMITTED 15 10 20 20 1 66 40
Replacement/rehabilitation of approximately 16,000' of deteriorated combined
storm/sanitary sewer, and 90 manhole replacements. The project will separate
the storm sewer from the sanitary sewer thereby eliminating several sanitary
sewer overflows which result in the discharge of untreated sewage into open
ditches, streams, and the Kentucky River during rain events. This project will be
coordinated with the City of Frankfort Holmes Street Storm Sewer Project, which
is currently in the design and construction phases at a cost of approximately $7
City of Frankfort/Frankfort Sewer Department-Holmes Street SX21073002 million. SUBMITTED 18 10 20 10 4 62 55
Garrard County
Construction Projects
Lancaster Sanitary Sewer Rehabilitation SX21079004 Rehab of sewer lines identified by the sanitary Sewer Evaluation Survey SUBMITTED 20 10 20 0 13 63 51
This project involves improvements at the wastewater treatment plant.
Improvements include replacing the grit removal system and bar screen. New
Lancaster Wastewater Treatment Plant Improvements SX21079001 and additional lab equipment will be purchased. SUBMITTED 20 10 20 0 20 70 28
Extension of approximately 13,200 linear feet of sanitary sewer line to serve 47
Lancaster - Sewer Line Extension - Merriwood Estate SX21079011 homes in Merriwood Estates that currently have inadequate sewage disposal. SUBMITTED 20 10 20 0 11 61 56
Extension of approximately 7,500 linear feet of sanitary sewer line to serve 38
Lancaster - Sewer Line Extension - Glenmore Estate SX21079010 homes in Glenmore Estates that currently have inadequate sewage disposal. SUBMITTED 20 10 20 0 9 59 61
Extension of approximately 6450 linear feet of sanitary sewer line to serve 50
homes and businesses along US 27 in the Northern portion of the city that
Lancaster - Sewer Line Extension - US 27 North SX21079009 currently have inadequate sewage disposal. SUBMITTED 20 10 20 0 7 57 65
Extension of approximately 1,425 linear feet of sanitary sewer line to serve eight
Lancaster - Sewer Line Extension - Buckeye Street SX21079007 (8) homes on Buckeye Street that currently have inadequate sewage disposal. SUBMITTED 20 10 20 0 16 66 41
Harrison County
Construction Projects
The proposed Ball Park pump station will have a pumping capacity of 3.0 MGD.
It will pump flows from the south and southeast sewer service areas to the new
WWTP. The force main will consist of 2,500 feet of 16-inch PVC pipe. Flows
will be diverted to the new pump station through 1,200 feet of new 12-inch
Cynthiana Ball Park Pump Station and Force Main SX21097004 interceptor line. SUBMITTED 20 10 20 0 16 66 42
Includes a new 2.0 MGD oxidation ditch WWTP and rehabilitation of portions of
Cynthiana Wastewater System Improvements SX21097001 the existing collection system. Includes collection to the new Industrial Park. SUBMITTED 20 10 20 0 20 70 29
Jessamine County
Construction Projects
The City of Nicholasville is under an Agreed Order (Case No. DOW 04081) with
KDOW and the EPA to construct the Town Branch Interceptor and related
improvements to the Jessamine Creek Environmental Control Facility #1, thereby
City of Nicholasville Wastewater Improvements SX21113007 permitting the decommissioning of the Brown Street WWTP. SUBMITTED 20 10 20 0 20 10 80 19
Sanitary trunk and collector sewer project to extend to commercial, industrial, and
residential properties in a recently annexed area north of Nicholasville. Existing
on-site sewage treatment and disposal systems shall be eliminated during this
project. This effort will include the elimination of on-site disposal systems and
straight-pipes associated with three mobile home parks and the Bluegrass
North End Sanitary Sewer Project, Nicholasville SX21113006 Industrial Park (Dragstrip). FULLY FUNDED
The North Jessamine Sanitary Sewer Extension Project will consist of
constructing approximately 44,000 L.F. of 8" collection sewer, 19,000 L.F. of
force main, three pump stations, and appurtenances. This project will provide a
North Jessamine Sanitary sewer Extension Project SX21113004 reliable source of sanitary sewer service to approximately 677 unserved users. FULLY FUNDED
The Bluegrass Industrial Park (Dragstrip) is a densely developed area on the
north end of Nicholasville that is not served by sanitary sewers. The project would
result in the installation of collector and interceptor sewers at a cost of $8.9
million. This would avert what state public health officials have called a "crisis". In
the words of these officials, "the extension of sanitary sewers to this area is
critical in the protection of our community's health and preservation of our
Nicholasville-(dragstrip) Sanitary Sewer SX21113005 environment". SUBMITTED 20 10 20 20 13 83 13
City of Wilmore-Wilmore I/I NEED PROFILE NOT SUBMITTED NEED PROFILE 11 11 88
Construction of a new wastewater pump station and collection system to serve
the community of Keene, KY. Keene is currently served by septic systems
Keene Wastewater Pump Station and Collection System SX21113001 exclusively. SUBMITTED 20 10 20 0 16 66 43
Lincoln County
Construction Projects
Project will extend the City of Stanford's sanitary sewer into 2 areas. Fosters
Lane, near the new Stanford/Lincoln County Elementary School, and Ridgeway
Drive, off US Hwy 27 immediately North of the newly constructed Wal-Mart
Complex. Residents within the project area currently depend on much failing
septic systems. The project area will be served by the City of Stanford's Sewer
System. 8-inch sewer mains will be constructed to tie in to the City's system
Lincoln County-Foster Lane/Ridgeway Dr. Sewer Extension SX21137008 which is adjacent to the project area. SUBMITTED 20 10 20 20 16 86 7
Design/construction of new gravity sewer system in the City of Eubank and
surrounding area. Project involves approximately 38,000 lf of 8" gravity sewer, six
pump stations, and approximately 40,000 lf of force main to Science Hill WWTP
for treatment. Proposed project will provide service to approximately 225
City of Eubank-Eubank Sewer System Project SX21137007 currently unserved households. SUBMITTED 20 10 20 0 5 55 71
This project will extend public sewer service to approximately 150 households to
serve the Rowland Community, Ridgeway Drive, Candlelight Estates and the
Carman Lake area. The project will eliminate approximately 100 failing septic
City of Stanford - Sewer system Extensions Project SX21137002 tanks. SUBMITTED 20 10 20 0 6 56 69
This project will provide collection and transmission to approx 65 residential and
commercial customers in the eastern portion of Lincoln County, including, but not
limited to, homes and businesses in the unsewered areas of the City of Crab
Orchard. The area to be sewered extends from the western city limits along
William Whitley Road and new US 150 to Cedar Creek Lake. The proposed
system will eliminate septic systems and straight pipes, which could lead to
untreated sewage entering Cedar Creek Lake. Also, the project would prepare
the City of Crab Orchard to provide sewage collection and treatment for
Lincoln Co. Regional Wastewater Project (Crab Orchard) SX21137006 development around the Lake. SUBMITTED 20 20 20 10 13 10 93 3
Provide wastewater collection and treatment to approximately 350 residential and
commercial customers in the northern portion of Lincoln County, including , but
not limited to, homes and businesses in the unsewered city of Hustonville, the
community of Moreland, and along US 127 between the two. Current sewage
disposal consists of a combination of septic tanks and straight pipes, resulting in
direct discharges of raw sewage of septic tank effluent to the ground surface.
Lincoln County Regional Wastewater Project (Hustonville) SX21137001 Sewage treatment will be provided by the City of Danville. SUBMITTED 20 20 20 10 11 81 16
Sludge is currently pumped out and hauled for land spreading. During the winter
and wet months, a private contractor collects and disposes of the sludge outside
the planning area. This project would provide for a sludge filter press that would
allow for more sludge to be disposed in a landfill and eliminate the need for
City of Stanford-WWTP Sludge Improvements Project SX21137004 expensive private disposal and additional land for spreading of sludge. SUBMITTED 20 10 20 10 7 67 34
The existing 0.8 MGD (two 0.4 MGD oxidation ditches) wastewater treatment
plant has a average flow of 0.75 MGD. The expansion would add one 0.4 MGD
oxidation ditch, clarifier, aerobic digestor, and disinfection units. The expansion
would provide a total of 1.2 MGD to handle existing, failing septic tanks and new
City of Stanford-WWTP Expansion Project SX21137003 areas outside the City. SUBMITTED 20 10 20 10 9 69 32
Halls Gap Sewer Expansion NEED PROFILE NOT SUBMITTED NOT SUBMITTED 20 20 86
Madison County
Construction Projects
Sanitary Sewer Collection System with gravity sewers. The community of Terrill
has approximately 176 homes, none of which have public sewer collection and
treatment. The method of treatment for these homes is either septic tanks or in
some instances straight pipes to a creek. Many of these septic systems are in
poor condition and failing. Visual inspection of creeks in this area reveal signs of
raw sewage. This collection system will discharge into the existing Battlefield sub-
division collection system for treatment at their existing Wastewater Treatment
Madison County - Madison County Utilities-Terrill Sewer SX21151016 Plant. SUBMITTED 18 10 20 10 16 74 25
Construct 1.0 MGD sequencing batch reactor wastewater treatment plant and a
collection pump station system to transport wastewater to the new WWTP for
Northern Madison County Sanitation District - I-75 SX21151001 treatment. SUBMITTED 20 10 20 0 20 70 30
Approximately 9,600 linear feet of 8 inch, 12 inch, and 30 inch sewer pipe. The
installation of this gravity sewer will allow for the elimination of the Tates Creek
Richmond Utilities Red House Road Relief Sewers SX21151005 Wastewater Treatment Plant and four pumping stations. SUBMITTED 20 10 20 0 11 61 57
Trunk sewer extension to provide sewer service to Terrill Branch Road area
Sugarville/Terrill Branch Interceptor, Berea SX21151014 including about 25 existing homes. Eliminate existing pump station. SUBMITTED 20 10 20 0 9 59 62
New trunk sewer, pump station, and force main to provide sewer service on
West 595 Trunk Sewer, Pump Station, and Force Main SX21151012 Highway 595, west of I-75. SUBMITTED 20 10 20 0 7 57 66
Project will add a new digester at the wastewater treatment plant to provide
better treatment and enable biosolids to be landfarmed. Purchase landfarming
Berea-New Biosolids Digester and Landfarming Equipment SX21151015 equipment. SUBMITTED 20 10 20 0 6 56 70
Collector sewers for 50 homes and pump station and force main to pump the
Berea-Dogwood Heights Collector Sewers SX21151013 wastewater to the existing sewer system. SUBMITTED 20 10 20 0 5 55 72
Providing trunk sewers to newly annexed areas with large masses prior to
US 25 North Sewer Extension Project, Berea SX21151011 development, preventing need for other treatment process. SUBMITTED 20 10 20 0 4 54 75
The project consists of the construction of a new wastewater treatment plant on
Otter Creek at the confluence of Dreaming Creek. The new plant will be 8.1
MGD (average) and 11.6 MGD (peak). The elimination of the Dreaming Creek
Richmond Utilities Otter Creek Wastewater Treatment Plant SX21151004 Plant (KY0022845) and the Tates Creek Plant (KY0022853). SUBMITTED 20 10 20 0 13 63 52
Expansion of the city of Berea's existing WWTP. City of Berea is currently under
J.C. Chambers WWTP Expansion Project SX21151010 administrative order due to over capacity flows at WWTP. CONSTRUCTED
Mercer County
Construction Projects
Improvements to the collection system to increase capacity: Project includes
replacing existing grinder station with duplex non-clog P.S., approximately 3200
Harrodsburg Anderson-Dean Pump Station Replacement SX21167007 l.f. of 6" dia. force main and upgrading of downstream station. FULLY FUNDED
Interceptor sewer to collect and transport existing and future flows from the south
and east sections of the planning area. Project includes approximately 4500 l.f. of
Harrodsburg South Interceptor Sewer Extension SX21167008 24" dia. sewer lines, 15 manholes, and two (2) highway bores. FULLY FUNDED
Development of a county-wide plan for initiating wastewater collection and
treatment for Mercer County. Funds will be used to secure skilled consultant
engineers to lead our fiscal court and county in this planning process. It includes
the following: 1. Wastewater education, awareness and plan, 2. Required funds
and sources of funds. 3. Recommend and engage with appropriate state and
Mercer Co. Fiscal Court-Wastewater Planning Project SX21167006 federal agencies. FULLY FUNDED
Nicholas County
Construction Projects
This project will provide sewage collection for over 100 homes, in the drainage
basin of Lake Carnico (2 public recreational lakes) and for UK's North Central 4H
Camp serving thousands of young people, and pipe it on to the Carlisle City
Wastewater Plant for treatment. This system will replace various individual
wastewater treatment septic systems (many now failing) at the homes and a
Nicholas Sanitation District Lake Carnico Area Sanitation Sewer SX21181003 package plant at the 4H Camp. SUBMITTED 20 10 20 10 20 10 90 4
Regional Wastewater Improvement Program for Carlisle and Nicholas County,
which may include, but not be limited to, the following: I/I reduction measures for
the Carlisle collection system, WWTP Improvements for compliance with correct
regulation, construction of a Wastewater Collection System for Nicholas County
Sanitation District No. 2, collection of a transmission system to transport flow to
Carlisle for treatment, retirement of the existing 4-H Camp package WWTP
located within SD#2, retirement of the existing Jockey International WWTP,
WWTP improvements for Carlisle to accept wastewater from bother SD#2 and
Carlisle Regional Wastewater Improvement Program SX21181002 Jockey. SUBMITTED 20 10 20 0 16 66 44
Powell County
Construction Projects
Expand the service area to include the West Bend/Virden Ridge and Adams
Clay City-Sanitary Sewer Expansion, Phase I SX21197008 Ridge areas and install a conventional gravity sewer and conveyance system. SUBMITTED 20 10 20 0 11 61 58
Construction of stormwater relief sewers, catch basins, ditch reconstruction for
Clay City Stormwater Relief Project SX21197002 area within city limits south of KY 11/15 from 7th to 12th streets. SUBMITTED 20 10 20 0 9 59 63
This project will extend 4,000 L.F. of 8 inch gravity sewers and 3,700 L.F. of 4
inch force main sewers to serve 53 households, 1 general store and 5 churches
currently on failing septic systems or straight pipes. The project will eliminate
Powells Valley WD-Slade/Nada Sewer Line Extensions SX21197003 approximately 32 straight pipes and 27 failing septic systems READY TO BID
Expand the existing 0.200 MGD wastewater treatment plant to 0.538 MGD to
Clay City-Wastewater Treatment Plant Expansion SX21197004 meet to sanitary sewer treatment needs of the city and surrounding areas. SUBMITTED 20 10 20 10 7 67 35
The project will entail the TV inspection of approximately 28,000 L.F. of gravity
sanitary sewer main in Clay City and make repairs by spot repair, replace or
Clay City-Sanitary Sewer Inflow/Infiltration Reduction SX21197005 reline pipes SUBMITTED 20 10 20 15 20 85 10
Extend the sanitary sewer service area and install a gravity sewer system in the
Stanton-Sanitary Sewer Service Area Expansion SX21197006 Boone Creek and Allen Acres areas of Powell County. SUBMITTED 20 10 20 0 13 63 53
Expand the existing 0.46 MGD wastewater treatment plant to 0.872 MGD to
Stanton Wastewater Treatment Plant Expansion SX21197007 provide wastewater treatment for Stanton and areas of the county near the city. SUBMITTED 20 10 20 0 16 66 45
Scott County
Projects
This project includes construction of a new pump station and force main to serve
the Etterwood Subdivision area which currently contains aging and failing septic
systems. Also included are new gravity sewer mains from the pump station to
City of Georgetown - Etterwood Pump Station SX21209006 Etterwood. SUBMITTED 20 10 20 20 9 79 20
Project includes replacement of aged, undersized and failing package WWTP
with a new package WWTP sized to 2/3 of the projected 20year demand
capability and expandable. Also includes a primary East-West interceptor sewer
from the WWTP at the East side of Sadieville to the I-75/KY 32 interchange
commercial development zone, providing regional wastewater treatment access
to existing and future residential and commercial development throughout the
Sadieville Wastewater System Improvements SX21209001 expanded Sadieville Planning Area. SUBMITTED 20 10 20 0 16 66 46
The proposed project is a regional effort by and between the Cities of Sadieville
and Georgetown to facilitate the transfer of all sanitary sewage flow from the City
of Sadieville to Georgetown's collection and treatment system. This would allow
the decommissioning of Sadieville's aging package WWTP. The City of
Sadieville has recently completed a regional Facilities Plan and has obtained
partial funding for implementation of its recommendations. This project will
include an Update of the Facilities Plan, as Georgetown has made a new
proposal to bring their collection system to within approx.. 8,000 ft. of Sadieville's
proposed new collection system near I-75. Also, included is the design and
construction of the necessary pumps station and force main infrastructure to
City of Sadieville Wastewater System Improvements SX21209004 reach the proposed connection point with Georgetown SUBMITTED 20 20 20 0 13 10 83 14
The City of Georgetown owns two landfills; the Double Culvert Road Landfill and
the Sims Road Landfill. The Division of Waste Management has deemed that
leachate collection and disposal a both sites is inadequate. To avoid future
NOV's and allow for closure of inactive cells at each site, this project proposes to
install a force main system from these landfills to the Georgetown WWTP#2.
Additionally, given its proposed route, the forcemain will be conveniently located
for connection of a forcemain from Sadieville, thereby eliminating an aging
package WWTP, and for future residential and commercial connections along a
Georgetown WWTP#2-Northern Scott Co. Sewer Extension SX21209003 busy State highway SUBMITTED 20 20 20 20 20 100 2
This project includes demolition of 26 rotating biological contactors which are no
longer utilized at the Georgetown WWTP #1 for wastewater treatment. Also
Georgetown-WWTP #1 RBC Demolition SX21209007 included is the demolition of the abandoned screen building. SUBMITTED 19 10 20 0 6 55 73
Construction of a new 200,000 gallon elevated water storage tank, demolition of
an existing 100,000 gallon water tank, replacement of undersized water lines, and
water system interconnection with the Georgetown Municipal Water System.
Project also includes upgrades and restoration enhancements for wastewater
Stamping Ground System Improvements SX21209002 system. SUBMITTED 20 10 20 0 7 57 67
Woodford County
Projects
This project consists of wastewater collection system improvements that includes
39,400 linear feet of interceptor sewers (8" through 36") four new wastewater
pumping stations, 11,800 linear feet of force main (12" through 18") and the
decommissioning of eight (8) existing wastewater pumping stations. The project
also includes wastewater treatment plant improvements to improve stabilization,
Versailles Wastewater System Improvements SX21239001 dewatering and disposal of biosolids. SUBMITTED 20 10 20 20 20 90 5
0-2 Year Water Projects (Local and Regional Rankings)
Project Status in Category 2: Project Category 5: Local Tie
WRIS Delivery Need/Ranking Points Category 6: Water Breaker/
WRIS Project System/Funding Category 1: Type of (Regional/Non- Category 3: Project Category 4: Funding (#1=20, #2=16, Management Council Customers TOTAL Regional
Project Owner Number Project Description Status Project regional) Status Status #3=13 etc..) Bonus Points per mile SCORE Ranking
Feasibility Studies
The proposed project involves the hydraulic study of the entire
water system. The system consist of approx. 400 mi of water
line, 6 tanks & booster pump stations. There are approx. 5,000
customers on the system. The Eubank system is experiencing
low pressure in the Waynesburg area. The current growth is in
the Northern area (Lincoln Co, KY) of the system. The study
City of Eubank Water System Hydraulic Study WX21137024 will identify these problem areas. SUBMITTED
Lake Village Water Association-Contract 14 Water Main WX21167010 Conduct a 20-year study for water system improvements. SUBMITTED
Anderson County
Construction Projects
The Phase VII Expansion Project will address the extension of
water service to 120 Anderson County households, households
that currently utilize contaminated water sources. Phase VII
expansions will also include the construction of a water storage
tank. As in Phase VI, Phase VII, will continue to provide
potable water service to the remaining residences within the
District's boundary, who are currently having to rely on wells
and cisterns. This project will also continue to address health
hazards with respect to water source's). For example, water
utility personnel conducted water source tests for the Phase VI
area and discovered that 95% of the cisterns were
contaminated by fecal coliform. Conditions in the Phase VII
area are identical. so it is a safe assumption that a very high
South Anderson Phase VII Expansions WX21005004 percentage of these cisterns are also contaminated. SUBMITTED 20 10 15 20 20 10 95 3
Bourbon County
Construction Projects
This project will consist of waterline extensions consisting of
approx. 34.6 miles around the City of Paris. The grantee will be
the Bourbon Co. Fiscal Court, with the City of Paris being the
system who will own and operate the system. These new lines
will be supplied by the City of Paris, it will serve an estimated
242 people. Waterline extensions will provide municipal water
service to KY 627, McKee Lane, Stoker Lane, Broadman Road,
Russel Cave Road, and Furguson Road. These funds will
further previous funding awards (20/20 loan in 2001, USDA RD
Bourbon Co. Fiscal Court/City of Paris-Various Waterline Ext. WX21017002 loan, 2003 KIA tobacco grant) FULLY FUNDED
Proposed is the construction of an 18-mile water line project, at
least 24 inches in diameter, to connect a potable water supply
in Franklin County with the Kentucky American Water
Company water distribution system in northern Fayette County.
This initial construction phase will eventually link the water
systems of Frankfort, Georgetown, Winchester, Paris,
Cynthiana, Mt. Sterling, Lancaster, Nicholasville, and Kentucky
Bluegrass Water Supply Commission Phase 1 Water Line Project WX21067003 American. SUBMITTED 20 20 15 20 16 91 1
Before construction can begin on a large regional water
treatment plant, master planning, land acquisition, and final
engineering must occur. This proposal is for assistance on
those preconstruction activities that will (by 2011) lead to the
construction of a large regional water treatment plant (probably
30 million gallons per day) OR for another suitable potable
water source alternative. Participants in this effort are
Lexington, KY-American Water, Frankfort, Nicholasville,
Georgetown, Cynthiana, Paris, Winchester, Lancaster, Mt.
Bluegrass Water Supply Commission Master Planning and Eng. WX21067004 Sterling or other creditable potable water supply source. SUBMITTED 20 20 15 10 13 78 4
The project consists of 5,755 feet of 12-inch ductile iron water
main to connect the new industrial park tract to the City of Paris
Paris-Bourbon Co. Industrial Park Water Expansion WX21017006 municipal Water System. SUBMITTED 20 10 20 0 20 10 80 12
The proposed project requires the replacement of
approximately 2,500 linear feet of 4" cast iron line along Sledd
Street, Wilson Street and Liberty Street that is badly
tuberculated. Due to the poor water quality caused by this line,
the city must currently supply households served by these lines
City of North Middletown Waterline Replacement Project WX21017005 with bottled water for drinking and cooking. FULLY FUNDED
Boyle County
Construction Projects
The project relates to water treatment and involves treatment
plant modifications to improve water quality and comply with
disinfection byproduct regulations plus miscellaneous
improvements. Improvements include a bulk powdered carbon
feed system, additional alum storage, SCADA system upgrade,
backup permanganate feeder, electrical equipment upgrade,
Danville WTP Improvements for Regulatory Compliance WX21021003 security improvements, and miscellaneous. FULLY FUNDED
Clark County
Construction Projects
Create two elevated pressure zones (EPZ) to improve water
service and to provide for growth. EPZ No. 1 would service
developed areas including Arlington Road, Lindburg Road,
Finley Road, South Bloomfield, Sunset Heights, and portions of
Beckner Street, Belmont Avenue, and French Avenue. EPZ
No. 2 would service the Northeast Bypass corridor and portions
Winchester Elevated Pressure Zone - Nos. 1 and 2 WX21049011 of the Ecton Road, KY 15, and KY 89 corridors. SUBMITTED 5 10 20 20 7 62 36
Construction of a new 18-inch waterline from the water
treatment plant to the McClure Road/Colby Road and
Colby Road/Lexington Road Waterline Connector WX21049009 Lexington Road development corridors. SUBMITTED 3 10 5 0 13 31 62
Proposed is the construction of an 18-mile water line project, at
least 24 inches in diameter, to connect a potable water supply
in Franklin County with the Kentucky American Water
Company water distribution system in northern Fayette County.
This initial construction phase will eventually link the water
systems of Frankfort, Georgetown, Winchester, Paris,
Cynthiana, Mt. Sterling, Lancaster, Nicholasville, and Kentucky
Bluegrass Water Supply Commission Phase 1 Water Line Project WX21067003 American. SUBMITTED 20 20 15 20 20 10 105 1
Before construction can begin on a large regional water
treatment plant, master planning, land acquisition, and final
engineering must occur. This proposal is for assistance on
those preconstruction activities that will (by 2011) lead to the
construction of a large regional water treatment plant (probably
30 million gallons per day) OR for another suitable potable
water source alternative. Participants in this effort are
Lexington, KY-American Water, Frankfort, Nicholasville,
Georgetown, Cynthiana, Paris, Winchester, Lancaster, Mt.
Bluegrass Water Supply Commission Master Planning and Eng. WX21067004 Sterling or other creditable potable water supply source. SUBMITTED 20 20 15 10 16 10 91 4
Clark Co. Fiscal Court-Lisletown Road Main Ext. NEED PROFILE NOT SUBMITTED NOT SUBMITTED 6 6 71
Construction of a new 18 inch waterline, pump station, and
related facilities to serve the existing and expanded industrial
Industrial Park Waterline Connector WX21049003 park and other areas North of I-64. SUBMITTED 20 10 20 20 9 79 14
The project will provide additional storage for the East Clark
County Water District as well as provide increased pressure to
areas that currently experience low pressure during high
demand periods. The project will include a mixing system for
an existing storage tank, a new tank and new pump station with
East Clark Co. Water District-Coal Road Tank & Pump WX21049013 telemetry. SUBMITTED 20 10 20 10 11 71 24
Estill County
Construction Projects
Project includes extension of waterlines to areas currently
without service, construction of a 100,000 gallon ground
storage tank to serve unserved and underserved areas, and
Irvine Municipal Utilities Mount Scratchum Water Extension WX21065003 construction of a booster station to service the new tank. FULLY FUNDED
This water expansion project will consist of approximately 11
miles of water mains throughout Estill County. The project will
provide potable water to 60 unserved customers. Project will be
constructed simultaneously with WX21065001. Construction
Phase 9 Water Expansion Project WX21065002 will begin February 2005. FULLY FUNDED
Fayette County
Construction Projects
Nine water utilities in a nine county Central Kentucky area
have now concluded a significant potable water supply
planning feasibility study. Ultimately, this regional project will
have three major components. Proposed is the installation of a
waterline grid that will connect the water systems of nine
Central Kentucky water utilities. The second component is the
construction of a new 30 mgd water treatment plant upstream
of Kentucky River Dam 3. The third component is the
installation of a large diameter raw waterline from the Ohio
River (near Warsaw) to the new regional water treatment plant.
Phase 1 of the overall project involves the installation of a
laarge diameter water transmission line to connect the water
system of the Frankfort Electric and Water Plant Board (in
Franklin County)with that of the Kentucky-American Water
Company (in northern Fayette County). The Frankfort
connection will be somewhere near the community of Duckers
Crossroads. The Kentucky American connection will be made
somewhere near the Fayette-Scott line and Newtown Pike.
This "first leg" will be capable of conveying up to 5 MGD of
Preconstruction Activities Related to the Bluegrass Region WX21067002 water from the Frankfort water system to the Kentucky- FULLY FUNDED
Proposed is the construction of an 18-mile water line project, at
least 24 inches in diameter, to connect a potable water supply
in Franklin County with the Kentucky American Water
Company water distribution system in northern Fayette County.
This initial construction phase will eventually link the water
systems of Frankfort, Georgetown, Winchester, Paris,
Cynthiana, Mt. Sterling, Lancaster, Nicholasville, and Kentucky
Bluegrass Water Supply Commission Phase 1 Water Line Project WX21067003 American. SUBMITTED 20 20 15 20 0 75 1
Before construction can begin on a large regional water
treatment plant, master planning, land acquisition, and final
engineering must occur. This proposal is for assistance on
those preconstruction activities that will (by 2011) lead to the
construction of a large regional water treatment plant (probably
30 million gallons per day) OR for another suitable potable
water source alternative. Participants in this effort are
Lexington, KY-American Water, Frankfort, Nicholasville,
Georgetown, Cynthiana, Paris, Winchester, Lancaster, Mt.
Bluegrass Water Supply Commission Master Planning and Eng. WX21067004 Sterling or other creditable potable water supply source. SUBMITTED 20 20 15 10 0 65 4
Franklin County
Construction Projects
Proposed is the construction of an 18-mile water line project, at
least 24 inches in diameter, to connect a potable water supply
in Franklin County with the Kentucky American Water
Company water distribution system in northern Fayette County.
This initial construction phase will eventually link the water
systems of Frankfort, Georgetown, Winchester, Paris,
Cynthiana, Mt. Sterling, Lancaster, Nicholasville, and Kentucky
Bluegrass Water Supply Commission Phase 1 Water Line Project WX21067003 American. SUBMITTED 20 20 15 20 16 91 1
Before construction can begin on a large regional water
treatment plant, master planning, land acquisition, and final
engineering must occur. This proposal is for assistance on
those preconstruction activities that will (by 2011) lead to the
construction of a large regional water treatment plant (probably
30 million gallons per day) OR for another suitable potable
water source alternative. Participants in this effort are
Lexington, KY-American Water, Frankfort, Nicholasville,
Georgetown, Cynthiana, Paris, Winchester, Lancaster, Mt.
Bluegrass Water Supply Commission Master Planning and Eng. WX21067004 Sterling or other creditable potable water supply source. SUBMITTED 20 20 15 10 13 78 4
The proposed project involves the upgrade of aprox. 9.1 miles
of waterlines along Ninevah and Green Wilson Roads and
Mills Lane to improve pressure and Flow in rural Franklin
Farmdale Water District-Waterline Upgrade Project WX21073005 County. SUBMITTED 15 10 15 0 20 10 70 27
Garrard County
Construction Projects
The Garrard County Water Association is proposing a
waterline extension project to provide first time potable water
service to 13 rural homes and farms. The waterline
construction would consist of approximately 8,600 feet of 3
inch and 4 inch PVC pipeline along Naylor and Edwards Roads
Garrard County Water Association-Extension 11 WX21079009 and Gooch Pike. FULLY FUNDED
Project consists of approx. 3,800 L.F. of 6-inch water line,
approximately 4,200 L.F. of 3-inch water line and replacing 20
City of Lancaster-Water System Improvement Project WX21079010 existing flush hydrants. FULLY FUNDED
Proposed is the construction of an 18-mile water line project, at
least 24 inches in diameter, to connect a potable water supply
in Franklin County with the Kentucky American Water
Company water distribution system in northern Fayette County.
This initial construction phase will eventually link the water
systems of Frankfort, Georgetown, Winchester, Paris,
Cynthiana, Mt. Sterling, Lancaster, Nicholasville, and Kentucky
Bluegrass Water Supply Commission Phase 1 Water Line Project WX21067003 American. SUBMITTED 20 20 15 20 20 95 1
Before construction can begin on a large regional water
treatment plant, master planning, land acquisition, and final
engineering must occur. This proposal is for assistance on
those preconstruction activities that will (by 2011) lead to the
construction of a large regional water treatment plant (probably
30 million gallons per day) OR for another suitable potable
water source alternative. Participants in this effort are
Lexington, KY-American Water, Frankfort, Nicholasville,
Georgetown, Cynthiana, Paris, Winchester, Lancaster, Mt.
Bluegrass Water Supply Commission Master Planning and Eng. WX21067004 Sterling or other creditable potable water supply source. SUBMITTED 20 20 15 10 16 81 4
The Garrard County Water Association is proposing a
waterline extension project to provide first time potable water
service to 25 rural homes and farms. The waterline
construction would consist of approximately 33,000 feet of 4
inch PVC pipeline along Back Creek, Long Branch and
Garrard County Water Association - Extension 10 WX21079008 Teatersville roads. FULLY FUNDED
The Garrard County Water Association is proposing a
waterline extension project to provide first time potable water
service to 40 rural homes and farms. The waterline
construction would consist of approximately 8,300 feet of 4 and
3 inch PVC pipeline along Ronclair Drive, Bill Layton Road,
Garrard County Water Association - Extension 9 WX21079007 and Mildred Lane. FULLY FUNDED
Harrison County
Construction Projects
Installation of 1,800 feet of 6 and 10-inch water main to
connect the City of Cynthiana water system to the Harrison
City of Cynthiana-Industrial Water Loop WX21097009 County Water Association near the Industrial Park. SUBMITTED 5 10 20 0 6 41 59
Replacement of 4,000 linear foot of 6-inch PVC water main,
City of Cynthiana-Water Line Improvements-Lola Drive WX21097010 valves and appurtenances. SUBMITTED 10 10 20 15 5 60 38
Installation of 3" and 4" PVC water main and appurtenances
along the County Infirmary Road and Airport Road, south of
Cynthiana, Kentucky. The first new pipe will begin at the
intersection of KY 982 and County Infirmary Road and end
6,950 feet west of the intersection. The first 3,055 feet will be
4" PVC and the last section of 3,895 feet will be 3" PVC. The
new pipe will connect to the existing 4" water main. There will
be a 130 foot bore under the CSX railroad tracks. The second
new pipe will begin at the intersection of County Infirmary Road
and Airport Road and end 2,700 feet north of the intersection.
The new pipe will connect to the new 4" PVC water main on
Harrison County Water Association-County Infirmary WX21097008 County Infirmary Road. SUBMITTED 10 10 20 20 4 64 33
The project consists of improvements to the existing
distribution system including a now 16 inch transmission main
to the east end and replacement of existing mains on Gasser,
Old Lair, Grandview and Somley Heights. Also included is a
2005 Water Distribution System Improvements WX21097006 new 500,000 Gallon elevation storage tank. SUBMITTED 20 10 20 10 16 76 15
The proposed project consists of the replacement/upgrade of
aging equipment at the WTP to assure future compliance with
2005 Water Treatment Plant Improvements WX21097007 water quality requirements. SUBMITTED 20 20 20 10 11 81 11
Proposed is the construction of an 18-mile water line project, at
least 24 inches in diameter, to connect a potable water supply
in Franklin County with the Kentucky American Water
Company water distribution system in northern Fayette County.
This initial construction phase will eventually link the water
systems of Frankfort, Georgetown, Winchester, Paris,
Cynthiana, Mt. Sterling, Lancaster, Nicholasville, and Kentucky
Bluegrass Water Supply Commission Phase 1 Water Line Project WX21067003 American. SUBMITTED 20 20 15 20 2 77 1
Before construction can begin on a large regional water
treatment plant, master planning, land acquisition, and final
engineering must occur. This proposal is for assistance on
those preconstruction activities that will (by 2011) lead to the
construction of a large regional water treatment plant (probably
30 million gallons per day) OR for another suitable potable
water source alternative. Participants in this effort are
Lexington, KY-American Water, Frankfort, Nicholasville,
Georgetown, Cynthiana, Paris, Winchester, Lancaster, Mt.
Bluegrass Water Supply Commission Master Planning and Eng. WX21067004 Sterling or other creditable potable water supply source. SUBMITTED 20 20 15 10 1 66 4
The Friendship Rd., Dixon Rd. Coppage Pike, & Floyd Lair
Lane will provide a reliable source of potable water to existing
unserved customers. This project will consist of approximately
5 miles of 4" and 6" water mains that will provide a source of
HCWA Friendship Rd., Dixon Rd., Coppage Pike WX21097005 potable water to 22 unserved customers. SUBMITTED 15 10 20 0 20 10 75 19
The Contract 27 Telemetry Upgrade Project will involve
modifications and improvements to the existing radio telemetry
system. This project will replace outdated equipment and
software, improve reliability and redundancy throughout the
Harrison, Bourbon, Nicholas, & Scott Telemetry Upgrade WX21097003 entire four-county area. SUBMITTED 3 10 20 20 3 56 43
The proposed project will flood proof the existing water
treatment plant using a flood wall and earth levee. The project
also includes the installation of a backup pump and relocation
of the valve vault at the auxiliary raw water pump station
Phase II Water System Improvements WX21097002 located at the main Licking River near Claysville. SUBMITTED 20 10 20 0 9 59 40
Ardery Tank Pump Station NEED PROFILE NOT SUBMITTED NOT SUBMITTED 13 13 67
Automatic Meter Reading NEED PROFILE NOT SUBMITTED NOT SUBMITTED 7 7 70
Jessamine County
Construction Projects
Upgrade the existing 3 PVC water line Groggins Ferry Road to
an 8" PVC water line to improve available pressures and flows
Jessamine County Water District No. 1 - Groggins WX21113015 to the growing area and allow for fire protection. SUBMITTED 10 10 20 0 7 47 56
Project will replace aged and troublesome existing 3" water line
with new 6" PVC water line. Project will improve pressures and
Jessamine County Water District No. 1 - Baker Lane WX21113014 flows to 36 existing commercial and residential customers. SUBMITTED 15 10 20 0 11 56 44
The existing water treatment plant will be renovated to enable
compliance with the recent regulations of the USEPA. Process
improvements for control of microbials and
disinfectant/disinfection byproducts will be installed and
implemented. The facility will also be expanded from 6 MGD to
9 MGD capacity. Future scenarios will also involve
supplemental supply from the Bluegrass Water Supply
Commission (BWSC). An outline summary of the required
improvements to meet the current and proposed regulations of
Nicholasville Water Treatment Plant Renovation WX21113011 the USEPA is provided. SUBMITTED 20 10 15 15 20 10 90 5
Project will provide interconnection to KAWC to supplement
water supply in north end of system and improve service to
existing customers. Project will also provide water service and
fire protection to proposed large scale commercial and
residential developments. Project includes master meter and
3000 ft 24" line, 20,000 ft 10" line, and 6,000 ft 6" line into
Jessamine Co. WD #1 - Water System Improvements WX21113010 unserved area. SUBMITTED 20 20 20 0 4 64 34
This project involves construction of a new water storage tank
in the northern portion of the JCWD #1's service area. The
proposed tank is necessary to provide adequate pressure,
flows, and fire protection to proposed developments (currently
Jessamine County Water District #1-Water Tank Project WX21113012 underway) in the district. SUBMITTED 15 10 15 20 16 76 16
This project will create a connection between the City of
Wilmore's distribution system and the City of Nicholasville's on
Jessamine Station Rd. at Drake Lane. The connection will
enable the two cities to transmit water to each other via 6"
distribution mains during water shortages and water
Wilmore/Nicholasville Water Distribution Interconnection WX21113013 catastrophes. SUBMITTED 3 20 20 15 3 61 37
McGee Lane Water Main Extension. The project would
provide water service to an unsewered rural area of southern
Jessamine County. A total of 41 properties would be capable
of receiving water service upon project completion…The city
has been petitioned by 29 of the 41 property owners to extend
water service to their property. The project would include
approximately 6,600 linear feet of water main of varying
McGee Lane Water Main Extension WX21113009 diameters including necessary appurtenances. SUBMITTED 20 10 20 20 5 75 20
Proposed is the construction of an 18-mile water line project, at
least 24 inches in diameter, to connect a potable water supply
in Franklin County with the Kentucky American Water
Company water distribution system in northern Fayette County.
This initial construction phase will eventually link the water
systems of Frankfort, Georgetown, Winchester, Paris,
Cynthiana, Mt. Sterling, Lancaster, Nicholasville, and Kentucky
Bluegrass Water Supply Commission Phase 1 Water Line Project WX21067003 American. SUBMITTED 20 20 15 20 9 84 1
Before construction can begin on a large regional water
treatment plant, master planning, land acquisition, and final
engineering must occur. This proposal is for assistance on
those preconstruction activities that will (by 2011) lead to the
construction of a large regional water treatment plant (probably
30 million gallons per day) OR for another suitable potable
water source alternative. Participants in this effort are
Lexington, KY-American Water, Frankfort, Nicholasville,
Georgetown, Cynthiana, Paris, Winchester, Lancaster, Mt.
Bluegrass Water Supply Commission Master Planning and Eng. WX21067004 Sterling or other creditable potable water supply source. SUBMITTED 20 20 15 10 6 71 4
Jessamine South Elkhorn Water District proposes to construct
a 1.0 MG elevated storage tank on property which they own on
Catnip Hill Pike. The proposed site is in close proximity to the
District's existing elevated storage for the northwest service
area and will be constructed at the existing hydraulic gradient.
Catnip Hill Pike 1.0 MG Elevated Storage Tank WX21113016 Therefore, additional booster pumping will not be required. SUBMITTED 20 10 20 0 1 51 50
Jessamine South Elkhorn Water District is currently completing
the Southeast Rural Water Project, consisting of some 40 miles
of line, serving in excess of 350 homes. There are still several
unserved roads comprising some 80 homes that are yet
unserved in this area. This is due solely to availability of funds
Southeast Rural Jessamine Unserved Areas WX21113004 and feasibility. SUBMITTED 19 10 20 0 2 51 51
Keene is a small minority community dating from the Civil War
that is presently served by a 4" main installed at the onset
(1972) of the Jessamine South Elkhorn Water District. The
community consists, in most part, of older wood frame
structures situated close together on small lots. Situated in the
center is an historic wood frame two-story structure being
reconstructed under an ICTE Grant. This system is plagued
with numerous leaks and relatively low flow and pressure
problems. Ebenezer Church located on Ebenezer Road is an
18th Century stone church that is still active and does not have
potable water or fire protection. There are numerous other
road segments as shown on the attached map which are not
currently piped. This project will provide piping and loop
completion that will enhance the overall system pressure and
Keene Reconstruction & Northwest Hydraulic Reinforcement WX21113001 flow. SUBMITTED 18 10 10 0 13 51 52
Lincoln County
Construction Projects
Provide necessary public infrastructure to the now developing
Lincoln County First Southern Veterans Memorial Park WX21137019 recreational complex in Lincoln County. BID READY
Project is for extension of water mains on the following,
presently water-unserved, Lincoln County roads: Boone
Connector; Chancelor, Hawkins Branch, Henry Clay, Old
Ottenheim. Water service will be provided by the City of
Lincoln County/City of Stanford Waterline Extension WX21137021 Stanford. SUBMITTED 18 10 20 20 20 10 98 2
The project will connect the water systems of the City of
Hustonville and the McKinney Water District (MWD) together.
Thus providing for the benefit of mutual supply and for giving
the MWD the option to purchase City of Danville water through
the City of Hustonville's system. Routing will most likely be
McCormack Church Rd. from Old US127 to Peyton Well Rd.,
including a connection to Frog Branch Rd. for future use and
reliability. Project also includes enlargement of the Hustonville
pump station at Hustonville's water storage tank located in
Lincoln Co. Fiscal Ct. Waterline Expansion-Hustonville WX21137020 Junction to provide necessary pressures for the expansion. SUBMITTED 20 20 20 20 6 86 8
Installation of approx. 8,000 LF of 6-inch water supply line
along Airport Road in Lincoln County. The owner and water
supplier of the line will be the City of Junction City. Project
construction will replace existing 3/4-inch, 1-inch and 2-inch
water supply line currently used by 50 water customers of the
Airport Road Waterline Extension for Lincoln County WX21137012 City of Junction City. SUBMITTED 20 10 15 15 16 76 17
The Water transmission line replacement involves the
replacement of a 12.0 mile deteriorated 6-inch asbestos
cement (AC) transmission main with an 8-inch PVC line. This
12.0 mile water line is the line that supplies all water to Crab
Orchard from its water source (the City of Lancaster). This
waterline replacement would allow Crab Orchard to avoid low
levels in its water tower, and ensure the ability for future
City of Crab Orchard-Transmission Waterline Replacement WX21137015 waterline tap-ons and fire protection. SUBMITTED 20 10 15 5 7 57 42
This project includes the installation of control valves and
telemetry needed to operate the existing three water storage
tanks in the downtown water distribution system. The current
operation does not allow the tanks to cycle fully and maintain
water quality. The City on occasion wastes the tanks' water to
City of Stanford Telemetry and Tank Control Project WX21137018 recycle them. SUBMITTED 3 10 20 10 9 52 49
This project consists of the construction of a raw water intake
on the City owned Buck Creek Lake in Lincoln County. Also
included in this project is the construction of the approximately
10 miles of 12" water line and pumping facilities to connect with
the City's existing system. The dam will be raised to increase
storage capacity of the lake and yield. The purpose of this
project is to increase the City's water supply, which currently
Buckcreek Lake Water Supply Project WX21137002 during drought conditions runs dangerously low. SUBMITTED 19 10 20 0 11 60 39
Project consists of approximately 9,000 ft of 4" 63000 ft of 6"
and 4800 prof 8 water mains along with a 100,000 gallon water
storage tank and booster pumping station to improve service to
Lincoln Co. / McKinney Water District Line Extensions and Upgrades WX21137016 existing customers and provide water to unserved areas. SUBMITTED 20 10 10 5 13 58 41
The project provides for the replace of undersized waterlines
along Skyline Drive and the installation of new lines along
Greasy Ridge Road and Goodpaster Road, all located in the
southern part of Lincoln County, south of the City of Stanford.
New service will be provided to app. 25 water customers. All
Lincoln Co. / City of Eubank Water Line Extensions/Upgrades WX21137022 lines will be owned and maintained by the City of Eubank. SUBMITTED 20 10 10 5 5 50 53
Project is to connect the water systems of the City of
Hustonville and the McKinney Water District. The most likely
route for this project at this time would be at McCormack
Church Rd from Old US 127 to Peyton Well Rd. also included
is a connection to Frog Branch Rd. for future use. Pump
Lincoln Co. / Hustonville McKinney Water System Interconnect WX21137023 upgrading for the City of Hustonville is also included. SUBMITTED 20 10 10 5 4 49 54
This project will increase the raw water supply for the Stanford
water system by increasing the raw water storage capacity of
Buck Creek which has recently been purchased by the City of
Stanford. Note that this project relates to Phase I
City of Stanford Water Commission -- Buck Creek Lake WX21137009 WX21137002. FULLY FUNDED
Construction of approximately 16,000 linear feet of 4 inch
diameter PVC water supply line and one hydropneumatic
pumping station. Project will replace 3 inch diameter existing
aged lines to 28 water customers and provide new water
service to 7 customers. The water provider will be the City of
Hustonville Water Upgrade and Expansion WX21137010 Hustonville. IN CONSTRUCTION
Madison County
Construction Projects
Extension of approximately 20,000 L.F. of 8" and 10" PVC
waterline, construction of two 600,000 water storage tanks, two
I-75 and KY 595 Water Extension Project WX21151003 water pump stations and all necessary appurtenances. SUBMITTED 20 10 20 5 13 68 28
The proposed project includes the extension of approximately
4,000 linear feet of 10 inch PVC water line and 16,000 linear
feet of 8 inch water line to serve the Bobtown area of Madison
County. the project will include the installation of a new
300,000 gallon water storage tank and a 400 gallon/per minute
water pump station. The project will reinforce and strengthen
the existing system and will allow for the addition of new
Southern Madison WD-Bobtown Area Water Extension Project WX21151016 customers in the Bobtown area. SUBMITTED 20 10 20 5 20 75 21
The proposed project includes the extension of approximately
4,000 linear feet of 4 inch PVC waterline, a new booster pump
station and a new 100,000 gallon water storage tank. The
project will strengthen and reinforce the existing system,
improve water service to the existing customers and allow for
the extension of water service to new customers in the Scaffold
Southern Madison WD-Scaffold Cane Area Waterline Extension WX21151017 Cane Area of Madison County. SUBMITTED 20 10 20 0 16 66 29
The plant will not be able to meet the new finished water
turbidity limit without this upgrade to its processes. The plant
will also be expanded from 9 MGD to 12 MGD to meet existing
Richmond Utilities Water Treatment Plant Expansion WX21151013 and near future demands. Old DWSRF #40. CONSTRUCTED
The intake was built in 1962. It has insufficient capacity and
needs upgrading to meet the existing and near future
demands. A new intake structure with expansion capability to
meet demands of at least 24 MGD is required. Old DWSRF
Richmond Utilities Upgrade Raw Water Intake WX21151011 number: 39. CONSTRUCTED
Install 10,500 feet of 12-inch d.i. strengthening main to correct
flow and low pressure problems. Old DWSRF number: 37.
This line enhances service to the Richmond Community
Church, the Mayfield Elementary School, the Madison County
Health Department, various tobacco warehouses and the
Richmond Utilities Boggs Lane Main Phase II WX21151012 eastern portion of the city. SUBMITTED 20 10 20 0 5 55 46
This project, 6,000 linear feet of 12" water main, will increase
water pressure to underserved customers in the Deer Creek,
Meadows, Summit, and the Woods subdivisions. This project
is needed in order to meet minimum pressure requirements of
30psi during high demand periods. In addition to the
residences, this line will serve four community churches; First
Alliance, White Oak Pond Christian, Unity Baptist, and St.
Richmond Utilities Barnes Mill Road Waterline Extension WX21151010 Thomas Lutheran. SUBMITTED 5 10 20 0 9 44 58
Install 12,500 feet of 16" Ductile Iron water line along bypass
from Four Mile Rd to US 25 interconnect. Water main will
supply water to the newly approved 500 student Madison Co.
Public Middle School. This main will also enhance domestic
and fire protection service to the major commercial area
contiguous to the northern I-75 interchange. Additionally,
service will be enhanced to the White Hall Elementary School,
Richmond Utilities Robert Martin Bypass Connector WX21151005 Victory Christian Church, and the Church of Latter Day Saints. SUBMITTED 19 10 20 0 7 56 45
Construction of a 500,000 gallon elevated water storage tank
near Highway 627 and Combs Ferry Road and pump station to
Boonesboro 500,000 Gallon Elevated Tank WX21151022 serve northern portion of utilities district. SUBMITTED 19 10 20 0 6 55 47
Construction of a 300,000 gallon elevated water storage tank
to replace an existing 100,000 gallon tank along Highway 25
South. Old tank replaced due to age and cost of repairs and
Hwy. 25 S. 300,000 Gallon Replacement Tank WX21151023 painting. SUBMITTED 19 10 20 0 4 53 48
Proposed project consists of 11.5 miles of 8 inch water line to
replace 4 inch water lines on Hwy. 627, Jacks Creek and Hwy.
52, construction of 16.5 miles of new water line to loop dead
end connections, construction of 500,000 gallon elevated water
storage tank, construction of water line extensions to connect
to Kirksville Water Assoc., and Southern Madison County
Water District and furnish and install telemetry panels to 4
Madison County Utilities Improvements, Phase II WX21151015 tanks, 9 master meters, and 5 pump stations. SUBMITTED 20 20 20 0 11 71 25
Install 4,000 ft of 8" PVC water line to facilitate increased
pressures and flows to the Meadows Subdivision. Tie in water
lines at the Meadows, Willis Branch Rd and Deacon Hills
Subdivision to eliminate dead-end water mains. This water
main will also serve the congregation of Jehovahs Witnesses
Richmond Utilities Deacon Hills - Meadows Connector WX21151004 Church. SUBMITTED 15 10 20 0 3 48 55
0.9 mile water line extension in Taylor Fork Road to serve nine
existing homes and a Madison County owned dock on Wil-O-
Kirksville Water Assoc. (Madison Co.)-Taylor Fork Water Line WX21151018 Green Lake. SUBMITTED 5 10 10 15 1 41 60
Replacement of 7,100 LF of 3 and 4 inch PVC pipe with 6 inch
PVC pipe of higher pressure rating which has a history of leaks
Kirksville Water (Madison Co.)-Hwy. 1295 Water Line Replacement WX21151019 and breaks. SUBMITTED 10 10 10 0 1 31 63
Construction of 2.1 miles of 12 inch and 2.1 miles of 8 inch
water line and new master meter to replace existing 4 inch
water line. Water line will allow gravity feed to a tank and
eliminate a pump station and provide a second master meter to
the system. The new water line will provide fire flow to area
Kirksville Water (Madison Co.)-Caleast Rd. Water Line Upgrade WX21151020 which anticipates growth due to new I-75 Exit. SUBMITTED 10 10 10 0 1 31 64
Construction of 2.0 miles of 6 inch water line to replace an
existing water line due to a history of leaks and breaks due to
Kirksville Water-Hwy. 595 Water Line Replacement WX21151025 use of class 160 pipe in higher pressure areas. SUBMITTED 10 10 10 0 1 31 65
Construction of 1.1 miles of water line to serve two new
Kirksville Water-Arbuckle Road WX21151027 customers and provide a loop in water line system. SUBMITTED 10 10 10 15 1 46 57
Construction of 4200 LF of 8 inch water line on Barnes Mill
Estates to supplement an existing 4 inch water main which will
lower the pressure drop when Taylor Fork pump station
Kirksville Water-Barns Mill Estates Water Line Replacement WX21151028 operates. SUBMITTED 15 10 10 0 1 36 61
Mercer County
Construction Projects
The proposed project will consist of system improvements to
increase the water supply and pressure into an area that is
marginally served at the present. It is propose to install a
214,000 gallon standpipe near the Dixville area in
southwestern Mercer Co. Approximately 1800LF of 6" line will
be installed to connect the proposed tank to the main supply
line. A new water line will be constructed along Russell Branch
North Mercer Water District-2004 Extensions and Improvements WX21167007 to close a dead end line. SUBMITTED 10 10 20 5 20 10 75 22
Expansion and Upgrade of existing Water Treatment Plant
Harrodsburg, KY Phase II Water System Improvements WX21167006 from 4.0 MGD to 6.0 MGD. SUBMITTED 20 20 20 10 13 83 9
Installation of 8 inch water main and appurtenances along
Hughley Ln., beginning at Shakertown Rd. (KY 33) and ending
east of the Robinson Rd. and Hughley Ln. Then 8 inch main
goes north cross-country to KY 152, intersecting new 6 inch
main. Installation of 6 inch PVC water main and
appurtenances along KY 152 to a point east of Burgin, then 6
inch main goes cross-country to a point where Curdsville Rd.
and KY 33 split, northeast of Burgin, then 6 inch main follows
Curdsville Rd. north until the main ends at Curdsville Ln. All
new main will be installed along existing main, which will be
Lake Village Water Assoc.-Contract 13, Water Main WX21167009 abandoned in place. FULLY FUNDED
Nicholas County
Construction Projects
This is the primary source of water for the City of Carlisle and
Nicholas County Water District. The Raw Water Intake
City of Carlisle Raw Water Intake Improvements WX21181004 structure draws from the Licking River where it crosses KY 32. SUBMITTED 20 20 20 0 20 10 90 6
The proposed project will include the replacement of
approximately 6,600 linear feet of existing 4" asbestos cement
water line. The project will include the replacement of 5,280
linear feet of inadequately sized water line and approximately
33,000 linear feet of water line to provide for existing dead end
water distribution mains. The project also will replace an
existing 50,000 gallon elevated water storage tank constructed
Nicholas County Water District-Phase IX Water System WX21181003 in 1967 with a 100,000 gallon elevated water storage tank. SUBMITTED 20 10 20 0 16 66 31
The proposed Phase VIII county wide extension project will
include approximately eight miles of new distribution lines,
three miles of upsized water lines, and a 100,000 gallon
ground storage tank with radio telemetry. This project will
serve approximately 53 new residences and approximately 500
existing residences with the additional water storage and
Nicholas County Water District Improvements WX21181002 upsized water lines. SUBMITTED 20 10 20 20 13 83 10
Expansion of the existing Carlisle water treatment plant to 2.0
MGD. Improvements include new raw water pump/intake
facilities, low service pump station, conventional treatment
units (rapid mix/flocculator-clarifiers/gravity filtration), clearwell
expansion, high service & backwash pumps, chemical feed
systems, together with all related site, structural, architectural,
Carlisle Water Treatment Plant Expansion WX21181001 mechanical/HVAC and electrical/I&C work. SUBMITTED 20 20 20 0 11 71 26
Powell County
Construction Projects
Construct a new 500,000 gallon storage tank to serve Stanton
and Bowen, replace the Pendleton Street Pump Station,
replace the Morris Creek Pump Station, add pressure reducing
valves to Hatton Creek tank lines, install new control valves in
Stanton Water System Improvement Project WX21197002 the system and other appurtenances. SUBMITTED 20 10 15 0 20 10 75 23
Replace approximately 29,000 feet of existing old and
undersized waterlines. These lines experience frequent leaks
and can only marginally meet the current flow demand. Natural
Bridge State Resort Park has committed to connect to the
system once the undersized lines have been replaced. In
addition, the project includes three line extensions to provide
Powells Valley Water District Improvements WX21197001 water to 46 unserved customers. SUBMITTED 20 10 20 0 16 10 76 18
Scott County
Construction Projects
This project includes the installation of an on-site sodium
hypochlorite generation system to replace the existing chlorine
gas disinfection process currently in use at the Georgetown
Water Treatment Plant. The new process equipment would be
contained in a new building to be constructed on the existing
City of Georgetown- WTP Disinfection Process Improvements WX21209006 site. SUBMITTED 20 10 20 0 13 63 35
Proposed is the construction of an 18-mile water line project, at
least 24 inches in diameter, to connect a potable water supply
in Franklin County with the Kentucky American Water
Company water distribution system in northern Fayette County.
This initial construction phase will eventually link the water
systems of Frankfort, Georgetown, Winchester, Paris,
Cynthiana, Mt. Sterling, Lancaster, Nicholasville, and Kentucky
Bluegrass Water Supply Commission Phase 1 Water Line Project WX21067003 American. SUBMITTED 20 20 20 20 11 91 1
Before construction can begin on a large regional water
treatment plant, master planning, land acquisition, and final
engineering must occur. This proposal is for assistance on
those preconstruction activities that will (by 2011) lead to the
construction of a large regional water treatment plant (probably
30 million gallons per day) OR for another suitable potable
water source alternative. Participants in this effort are
Lexington, KY-American Water, Frankfort, Nicholasville,
Georgetown, Cynthiana, Paris, Winchester, Lancaster, Mt.
Bluegrass Water Supply Commission Master Planning and Eng. WX21067004 Sterling or other creditable potable water supply source. SUBMITTED 20 20 20 20 9 89 4
This project includes construction of approximately 2600 LF of
16" ductile iron water main along with all appurtenant features.
There are currently two new schools in this area that have
questionable fire protection capacity due to connection to a
dead-end main. This extension will complete a 16" feed from a
newly installed 750,000 gallon storage tank to the north area of
the city and therefore provide a two-way feed with more flow for
City of Georgetown-Champion Way 16" Water Main Extension WX21209005 fire protection. SUBMITTED 20 10 20 0 16 66 32
285-acre water supply reservoir needed to supplement future
deficit to existing supply (Royal Springs) and as alternate
Scott County Reservoir WX21209003 source when Royal Springs is contaminated. SUBMITTED 20 20 20 10 20 90 7
Woodford County
Construction Projects
Replacement of approximately 1,600 ft of 6" waterline, 770 ft of
8" gravity sewer line, railroad crossings and associated
appurtenances along Main and Winter Streets in Midway.
Improvements are necessary to reduce water loss in existing
tuberculated cast iron and galvanized waterlines and to reduce
infiltration and inflow in existing gravity sewer lines. Completing
these improvements in conjunction with Midway's Downtown
Revitalization project will avoid the need to damage and repair
newly-paved streets and sidewalks after the revitalization
Midway Streetscape Utility Relocation WX21239007 project has been completed CONSTRUCTED
Construction of 250,000 gal elevated water storage tank with
booster station and approximately 34,000 linear feet of 4" pvc
South Woodford Water District Phase 4 Improvements WX21239006 watermain in nine main extensions as loop connections. FULLY FUNDED
.9 mile distribution system extension in Northeast Woodford
Sugar Hill Road Extension WX21239009 County, serving 3 unserved households. FULLY FUNDED
This project is needed to improve water pressure, water
quality, fire protection and to allow for continued growth in the
southeastern portion of the city. The project includes 2,000 LF
Water System Improvements - 24" Water Main Extension WX21239010 of 24" water main and a 100-foot highway bore. FULLY FUNDED
This project will bring potable drinking water to an unserved
portion of Woodford County. It will also provide fire protection
Versailles - Clifton / McCracken / Steele Rd. Water Line Extension WX21239011 and complete looping of some dead end sections of line. SUBMITTED 20 10 20 0 20 10 80 13
Frankfort - Clifton / McCracken Water Line Extension NEED PROFILE NOT SUBMITTED NOT SUBMITTED 16 16 66
Northeast Woodford Phase II Connection to Frankfort NEED PROFILE NOT SUBMITTED NOT SUBMITTED 13 13 68
Northeast Woodford Old Frankfort Pike Reconstruction NEED PROFILE NOT SUBMITTED NOT SUBMITTED 11 11 69
This project is anticipated to consist of approximately 23,150
linear feet of 24" and 16" water main, a new 75,000 gallon
elevated storage tank, a new booster pumping station and
improvements to Versailles existing connection to KY-American
Water Co. This project will create a new pressure zone in the
southwest portion of the Versailles system, thus increasing the
level of service provided. It will also ultimately be able to serve
an initial link in the "grid" for the Bluegrass Water Supply
Commission by improving the existing connection between
Versailles Water Distribution System Improvements WX21239008 Versailles and KAWC. FULLY FUNDED
Expansion of existing Water Treatment Plant from 4MGD to 10
MGD with an additional 900,000 gallons of new clearwell
storage, 23,000 LF of new 24" DIF transmission main and
Versailles Water Treatment Plant WX21239004 2,101 LF of new raw water intake main. FULLY FUNDED
Funding & Implementation Status Report for Wastewater Projects (0-2 yr.)
Project Status in
WRIS
WRIS Project System/Funding
Project Owner Number Status Funding Status
Feasibility Studies/Facilities Plans/Evaluations
City of North Middletown Facilities Plan and SSES SX21017002 SUBMITTED KIA Grant
Farmdale Sanitation District-Wastewater Facilities Plan SX21073015 SUBMITTED KIA Grant
Farmdale Sanitation District-SSES & Collection System SX21073014 SUBMITTED KIA Grant
Lancaster Wastewater Facilities Plan Update SX21079006 SUBMITTED KIA Grant
Lincoln Co. Sanitation District-Planning Project SX21137005 SUBMITTED KIA Grant/DOW 604-B
City of Carlisle, Nicholas County Wastewater Facilities Plan & Eval. SX21181004 SUBMITTED KIA Grant
201 Wastewater Facilities Plan - Jessamine County SX21113002 SUBMITTED KIA Grant
Clay City Sewer Study SX21197009 SUBMITTED KIA Grant
Stanton Sewer Study SX21197010 SUBMITTED KIA Grant
City of Sadieville Sewer System Evaluation and Repair SX21209005 SUBMITTED KIA Grant
Lancaster Sanitary Sewer Evaluation Survey SX21079005 SUBMITTED KIA Grant
Richmond Utilities SSES - Otter Creek Outfall Area SX21151007 SUBMITTED KIA Grant/KIA Loan
Wastewater System Improvements Study, City of Carlisle SX21181001 SUBMITTED KIA Grant
Anderson County
Construction Projects
Lawrenceburg Wastewater Treatment Plant Expansion SX21005002 SUBMITTED KIA Grant
City of Lawrenceburg-Stringtown Sewer System SX21005004 FULLY FUNDED Project has secured all necessary funding
South Lawrenceburg Sewer System Evaluation & Renovations SX21005001 SUBMITTED KIA Grant
Lawrenceburg Sewer Expansion to Bluegrass Parkway SX21005005 SUBMITTED KIA Grant
Bourbon County
Construction Projects
Bourbon County Fiscal Court - Centerville Sewer Project SX21017009 SUBMITTED KIA Grant
Paris-Bourbon Co. Industrial Park WW Expansion SX21017003 SUBMITTED KIA Grant/Local funds
City of North Middletown Wastewater Collection System SX21017001 SUBMITTED KIA Grant
City of Paris-Bourbon Hills Sanitary Sewer Collection SX21017006 FULLY FUNDED Project has secured all necessary funding
City of Paris-Horseshoe Sanitary Sewer Collection SX21017007 SUBMITTED KIA Grant
City of Paris-Bedford Acres Sanitary Sewer Project SX21017008 SUBMITTED KIA Grant
City of Paris-Mill Run Road & Cathy Drive Sanitary Sewer System SX21017005 SUBMITTED KIA Grant
Boyle County
Construction Projects
Danville East Main Sewer Force Main and Pump Station SX21021002 COMPLETED Project has secured all necessary funding
Upgrade of Clarks Run Pump Station, Danville SX21021003 SUBMITTED KIA Grant
City of Danville Sewer System Upgrade - Junction City SX21021001 FULLY FUNDED Project has secured all necessary funding
Danville-Burgin Rd Pump Station & Force Main NEED PROFILE NOT SUBMITTED KIA Grant
Boyle County Sewer System Improvements-Phylben Village SX21021008 SUBMITTED KIA Grant
Junction City Sewer System Improvements SX21021007 FULLY FUNDED Project has secured all necessary funding
Clark County
Construction Projects
WMU-Westchester Manor/Woodford Estates Sanitary Sewer SX21049018 SUBMITTED KIA Grant
Lower Howards Creek Backbone Interceptor/Pump Station SX21049004 SUBMITTED KIA Grant
Hoods Creek Sanitary Sewer Interceptor SX21049017 SUBMITTED KIA Grant
Hancock Creek Backbone Interceptor/Pump Station/Force Main SX21049007 SUBMITTED KIA Grant
Skylark Drive/Chickadee Lane/Redwing Drive Sanitary SX21049015 SUBMITTED KIA Grant
Wastewater Treatment Plant SX21049014 SUBMITTED KIA Grant/CDBG
WMU: Industrial Park Sanitary Sewer Improvements SX21049013 SUBMITTED KIA Grant
WMU: US60/EKP Sanitary Sewer SX21049012 SUBMITTED KIA Grant/Local Funds
South Main Street, Two Mile Road, Fair Avenue Sanitary Sewer SX21049016 SUBMITTED KIA Grant
Estill County
Construction Projects
City of Irvine, Kentucky Stormwater SX21065001 SUBMITTED KIA Grant
Irvine Municipal Utilities-Estill County Regional Wastewater Project SX21065005 SUBMITTED KIA Grant/KIA Loan/US EPA RD
Estill County Water District -- West Irvine Pump SX21065003 SUBMITTED KIA Grant
Fayette County
Construction Projects
Blue Sky Wastewater Treatment Acquisition SX21067007 SUBMITTED KIA Grant/Local funds
Enhanced Solids Process - Town Branch Wastewater Treatment SX21067005 SUBMITTED KIA Grant/Local funds
South Elkhorn Pump Station and Force Main SX21067004 SUBMITTED KIA Grant/Local funds
Expansion Area Three Sanitary Sewer Infrastructure SX21067002 SUBMITTED KIA Grant/Local funds
North Elkhorn Diversion Pump Station and Force Main SX21067003 SUBMITTED KIA Grant/Local funds
Expansion Area 2A Class A Pump Station and Trunk Station SX21067006 SUBMITTED KIA Grant/Local funds
Comprehensive Sanitary Sewer Project - Remaining Areas SX21067001 FULLY FUNDED Project has secured all necessary funding
Comprehensive Sanitary Sewer Project - Remaining Areas-Phase 2 SX21067008 SUBMITTED KIA Grant/Local funds
Franklin County
Construction Projects
Choateville Sewer Project (Phase 2) SX21073003 SUBMITTED KIA Grant/Local Funds/CDBG
Farmdale Sewer System Improvements SX21073001 SUBMITTED KIA Grant
Shelby Street Sewers/City of Frankfort, Frankfort SX21073004 SUBMITTED KIA Grant
Allnut Drive Sewer Replacement SX21073005 SUBMITTED KIA Grant
Bon Air Pump Station & Force Main Replacement SX21073006 SUBMITTED KIA Grant
Cardinal Hills Pump Station & Force Main Replacement SX21073007 SUBMITTED KIA Grant
Industrial Park Pump Station & Force Main Replacement SX21073008 SUBMITTED KIA Grant
Miami Trail Pump Station Replacement SX21073009 SUBMITTED KIA Grant
Schenkel Lane Sewer Replacement SX21073011 SUBMITTED KIA Grant
Two Creeks #2 Pump Station & Force Main Replacement SX21073012 SUBMITTED KIA Grant
National Guard Sewer Extensions and Pump Station Replacement SX21073010 SUBMITTED KIA Grant
Benson Creek Sanitary Force Main Crossing SX21073013 SUBMITTED KIA Grant
City of Frankfort/Frankfort Sewer Department-Holmes Street SX21073002 SUBMITTED KIA Grant/Local Funds
Garrard County
Construction Projects
Lancaster Sanitary Sewer Rehabilitation SX21079004 SUBMITTED KIA Grant
Lancaster Wastewater Treatment Plant Improvements SX21079001 SUBMITTED KIA Grant
Lancaster - Sewer Line Extension - Merriwood Estate SX21079011 SUBMITTED KIA Grant
Lancaster - Sewer Line Extension - Glenmore Estate SX21079010 SUBMITTED KIA Grant
Lancaster - Sewer Line Extension - US 27 North SX21079009 SUBMITTED KIA Grant
Lancaster - Sewer Line Extension - Buckeye Street SX21079007 SUBMITTED KIA Grant
Harrison County
Construction Projects
Cynthiana Ball Park Pump Station and Force Main SX21097004 SUBMITTED KIA Grant
Cynthiana Wastewater System Improvements SX21097001 SUBMITTED KIA Grant
Jessamine County
Construction Projects
City of Nicholasville Wastewater Improvements SX21113007 SUBMITTED KIA Grant/STA Grant/US EPA
North End Sanitary Sewer Project, Nicholasville SX21113006 FULLY FUNDED KIA Grant/STA Grant/US EPA
North Jessamine Sanitary sewer Extension Project SX21113004 FULLY FUNDED KIA Grant/CDBG
Nicholasville-(dragstrip) Sanitary Sewer SX21113005 SUBMITTED KIA Grant/STA Grant/US EPA
City of Wilmore-Wilmore I/I NEED PROFILE NOT SUBMITTED KIA Grant
Keene Wastewater Pump Station and Collection System SX21113001 SUBMITTED KIA Grant
Lincoln County
Construction Projects
Lincoln County-Foster Lane/Ridgeway Dr. Sewer Extension SX21137008 SUBMITTED KIA Grant
City of Eubank-Eubank Sewer System Project SX21137007 SUBMITTED KIA Grant
City of Stanford - Sewer system Extensions Project SX21137002 SUBMITTED KIA Grant
Lincoln Co. Regional Wastewater Project (Crab Orchard) SX21137006 SUBMITTED KIA Grant/USDA RD
Lincoln County Regional Wastewater Project (Hustonville) SX21137001 SUBMITTED KIA Grant & Loan/ USDA RD/CDBG
City of Stanford-WWTP Sludge Improvements Project SX21137004 SUBMITTED KIA Grant
City of Stanford-WWTP Expansion Project SX21137003 SUBMITTED KIA Grant
Halls Gap Sewer Expansion NEED PROFILE NOT SUBMITTED KIA Grant
Madison County
Construction Projects
Madison County - Madison County Utilities-Terrill Sewer SX21151016 SUBMITTED KIA Grant/KIA Loan/CEGG Grant
Northern Madison County Sanitation District - I-75 SX21151001 SUBMITTED KIA Grant
Richmond Utilities Red House Road Relief Sewers SX21151005 SUBMITTED KIA Grant
Sugarville/Terrill Branch Interceptor, Berea SX21151014 SUBMITTED KIA Grant
West 595 Trunk Sewer, Pump Station, and Force Main SX21151012 SUBMITTED KIA Grant
Berea-New Biosolids Digester and Landfarming Equipment SX21151015 SUBMITTED KIA Grant
Berea-Dogwood Heights Collector Sewers SX21151013 SUBMITTED KIA Grant
US 25 North Sewer Extension Project, Berea SX21151011 SUBMITTED KIA Grant
Richmond Utilities Otter Creek Wastewater Treatment Plant SX21151004 SUBMITTED KIA Grant
J.C. Chambers WWTP Expansion Project SX21151010 CONSTRUCTED Project has secured all necessary funding
Mercer County
Construction Projects
Harrodsburg Anderson-Dean Pump Station Replacement SX21167007 FULLY FUNDED Project has secured all necessary funding
Harrodsburg South Interceptor Sewer Extension SX21167008 FULLY FUNDED Project has secured all necessary funding
Mercer Co. Fiscal Court-Wastewater Planning Project SX21167006 FULLY FUNDED Project has secured all necessary funding
Nicholas County
Construction Projects
Nicholas Sanitation District Lake Carnico Area Sanitation Sewer SX21181003 SUBMITTED KIA Grant
Carlisle Regional Wastewater Improvement Program SX21181002 SUBMITTED KIA Grant
Powell County
Construction Projects
Clay City-Sanitary Sewer Expansion, Phase I SX21197008 SUBMITTED KIA Grant
Clay City Stormwater Relief Project SX21197002 SUBMITTED KIA Grant
Powells Valley WD-Slade/Nada Sewer Line Extensions SX21197003 READY TO BID Project has secured all necessary funding
Clay City-Wastewater Treatment Plant Expansion SX21197004 SUBMITTED KIA Grant
Clay City-Sanitary Sewer Inflow/Infiltration Reduction SX21197005 SUBMITTED KIA Grant
Stanton-Sanitary Sewer Service Area Expansion SX21197006 SUBMITTED KIA Grant
Stanton Wastewater Treatment Plant Expansion SX21197007 SUBMITTED KIA Grant
Scott County
Projects
City of Georgetown - Etterwood Pump Station SX21209006 SUBMITTED KIA Grant
Sadieville Wastewater System Improvements SX21209001 SUBMITTED KIA Grant/State Solid Waste fund pool
City of Sadieville Wastewater System Improvements SX21209004 SUBMITTED KIA Grant/State Solid Waste fund pool
Georgetown WWTP#2-Northern Scott Co. Sewer Extension SX21209003 SUBMITTED KIA Grant
Georgetown-WWTP #1 RBC Demolition SX21209007 SUBMITTED KIA Grant
Stamping Ground System Improvements SX21209002 SUBMITTED KIA Grant
Woodford County
Projects
Versailles Wastewater System Improvements SX21239001 SUBMITTED KIA Grant/Local funds
Implementation
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Project is fully funded and in process of being implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Project is fully funded and in projcess of being implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Project has been implemented
Yet to be implemented
Project is fully funded and in process of being implemented
Yet to be implemented
Yet to be implemented
Project is fully funded and in process of being implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Project has been implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Project is in the process of being implemented
Project is in the process of being implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Project has been implemented
Project in progress of being implemented
Project in progress of being implemented
Project in progress of being implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Project is in projecess of being implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Yet to be implemented
Funding & Implementation Status Report for Water Projects (0-2 yr.)
Project Status in
WRIS
WRIS Project System/Funding
Project Owner Number Status
Feasibility Studies
City of Eubank Water System Hydraulic Study WX21137024 SUBMITTED
Lake Village Water Association-Contract 14 Water Main WX21167010 SUBMITTED
Anderson County
Construction Projects
South Anderson Phase VII Expansions WX21005004 SUBMITTED
Bourbon County
Construction Projects
Bourbon Co. Fiscal Court/City of Paris-Various Waterline Ext. WX21017002 SUBMITTED
Bluegrass Water Supply Commission Phase 1 Water Line Project WX21067003 SUBMITTED
Bluegrass Water Supply Commission Master Planning and Eng. WX21067004 SUBMITTED
Paris-Bourbon Co. Industrial Park Water Expansion WX21017006 SUBMITTED
City of North Middletown Waterline Replacement Project WX21017005 SUBMITTED
Boyle County
Construction Projects
Danville WTP Improvements for Regulatory Compliance WX21021003 SUBMITTED
Clark County
Construction Projects
Winchester Elevated Pressure Zone - Nos. 1 and 2 WX21049011 SUBMITTED
Colby Road/Lexington Road Waterline Connector WX21049009 SUBMITTED
Bluegrass Water Supply Commission Phase 1 Water Line Project WX21067003 SUBMITTED
Bluegrass Water Supply Commission Master Planning and Eng. WX21067004 SUBMITTED
Clark Co. Fiscal Court-Lisletown Road Main Ext. NEED PROFILE SUBMITTED
Industrial Park Waterline Connector WX21049003 SUBMITTED
East Clark Co. Water District-Coal Road Tank & Pump WX21049013 FULLY FUNDED
Estill County
Construction Projects
Irvine Municipal Utilities Mount Scratchum Water Extension WX21065003 SUBMITTED
Phase 9 Water Expansion Project WX21065002 SUBMITTED
Fayette County
Construction Projects
Preconstruction Activities Related to the Bluegrass Region WX21067002 FULLY FUNDED
Bluegrass Water Supply Commission Phase 1 Water Line Project WX21067003 SUBMITTED
Bluegrass Water Supply Commission Master Planning and Eng. WX21067004 SUBMITTED
Franklin County
Construction Projects
Bluegrass Water Supply Commission Phase 1 Water Line Project WX21067003 SUBMITTED
Bluegrass Water Supply Commission Master Planning and Eng. WX21067004 SUBMITTED
Farmdale Water District-Waterline Upgrade Project WX21073005 SUBMITTED
Garrard County
Construction Projects
Garrard County Water Association-Extension 11 WX21079009 SUBMITTED
City of Lancaster-Water System Improvement Project WX21079010 SUBMITTED
Bluegrass Water Supply Commission Phase 1 Water Line Project WX21067003 SUBMITTED
Bluegrass Water Supply Commission Master Planning and Eng. WX21067004 SUBMITTED
Garrard County Water Association - Extension 10 WX21079008 SUBMITTED
Garrard County Water Association - Extension 9 WX21079007 SUBMITTED
Harrison County
Construction Projects
City of Cynthiana-Industrial Water Loop WX21097009 SUBMITTED
City of Cynthiana-Water Line Improvements-Lola Drive WX21097010 SUBMITTED
Harrison County Water Association-County Infirmary WX21097008 SUBMITTED
2005 Water Distribution System Improvements WX21097006 SUBMITTED
2005 Water Treatment Plant Improvements WX21097007 SUBMITTED
Bluegrass Water Supply Commission Phase 1 Water Line Project WX21067003 SUBMITTED
Bluegrass Water Supply Commission Master Planning and Eng. WX21067004 SUBMITTED
HCWA Friendship Rd., Dixon Rd., Coppage Pike WX21097005 SUBMITTED
Harrison, Bourbon, Nicholas, & Scott Telemetry Upgrade WX21097003 SUBMITTED
Phase II Water System Improvements WX21097002 SUBMITTED
Artery Tank Pump Station-KY 1893 WX21097011 SUBMITTED
Automatic Meter Reading WX21097012 SUBMITTED
Jessamine County
Construction Projects
Jessamine County Water District No. 1 - Groggins WX21113015 SUBMITTED
Jessamine County Water District No. 1 - Baker Lane WX21113014 SUBMITTED
Nicholasville Water Treatment Plant Renovation WX21113011 SUBMITTED
Jessamine Co. WD #1 - Water System Improvements WX21113010 SUBMITTED
Jessamine County Water District #1-Water Tank Project WX21113012 SUBMITTED
Wilmore/Nicholasville Water Distribution Interconnection WX21113013 SUBMITTED
McGee Lane Water Main Extension WX21113009 SUBMITTED
Bluegrass Water Supply Commission Phase 1 Water Line Project WX21067003 SUBMITTED
Bluegrass Water Supply Commission Master Planning and Eng. WX21067004 SUBMITTED
Catnip Hill Pike 1.0 MG Elevated Storage Tank WX21113016 SUBMITTED
Southeast Rural Jessamine Unserved Areas WX21113004 SUBMITTED
Keene Reconstruction & Northwest Hydraulic Reinforcement WX21113001 SUBMITTED
Lincoln County
Construction Projects
Lincoln County First Southern Veterans Memorial Park WX21137019 SUBMITTED
Lincoln County/City of Stanford Waterline Extension WX21137021 SUBMITTED
Lincoln Co. Fiscal Ct. Waterline Expansion-Hustonville WX21137020 SUBMITTED
Airport Road Waterline Extension for Lincoln County WX21137012 SUBMITTED
City of Crab Orchard-Transmission Waterline Replacement WX21137015 SUBMITTED
City of Stanford Telemetry and Tank Control Project WX21137018 SUBMITTED
Buckcreek Lake Water Supply Project WX21137002 SUBMITTED
Lincoln Co. / McKinney Water District Line Extensions and Upgrades WX21137016 SUBMITTED
Lincoln Co. / City of Eubank Water Line Extensions/Upgrades WX21137022 SUBMITTED
Lincoln Co. / Hustonville McKinney Water System Interconnect WX21137023 SUBMITTED
City of Stanford Water Commission -- Buck Creek Lake WX21137009 SUBMITTED
Hustonville Water Upgrade and Expansion WX21137010 SUBMITTED
Madison County
Construction Projects
I-75 and KY 595 Water Extension Project WX21151003 SUBMITTED
Southern Madison WD-Bobtown Area Water Extension Project WX21151016 FULLY FUNDED
Southern Madison WD-Scaffold Cane Area Waterline Extension WX21151017 FULLY FUNDED
Richmond Utilities Water Treatment Plant Expansion WX21151013 SUBMITTED
Richmond Utilities Upgrade Raw Water Intake WX21151011 SUBMITTED
Richmond Utilities Boggs Lane Main Phase II WX21151012 SUBMITTED
Richmond Utilities Barnes Mill Road Waterline Extension WX21151010 SUBMITTED
Richmond Utilities Robert Martin Bypass Connector WX21151005 SUBMITTED
Boonesboro 500,000 Gallon Elevated Tank WX21151022 SUBMITTED
Hwy. 25 S. 300,000 Gallon Replacement Tank WX21151023 SUBMITTED
Madison County Utilities Improvements, Phase II WX21151015 SUBMITTED
Richmond Utilities Deacon Hills - Meadows Connector WX21151004 SUBMITTED
Kirksville Water Assoc. (Madison Co.)-Taylor Fork Water Line WX21151018 SUBMITTED
Kirksville Water (Madison Co.)-Hwy. 1295 Water Line Replacement WX21151019 SUBMITTED
Kirksville Water (Madison Co.)-Caleast Rd. Water Line Upgrade WX21151020 SUBMITTED
Kirksville Water-Hwy. 595 Water Line Replacement WX21151025 SUBMITTED
Kirksville Water-Arbuckle Road WX21151027 SUBMITTED
Kirksville Water-Barns Mill Estates Water Line Replacement WX21151028 SUBMITTED
Mercer County
Construction Projects
North Mercer Water District-2004 Extensions and Improvements WX21167007 SUBMITTED
Harrodsburg, KY Phase II Water System Improvements WX21167006 SUBMITTED
Lake Village Water Assoc.-Contract 13, Water Main WX21167009 SUBMITTED
Nicholas County
Construction Projects
City of Carlisle Raw Water Intake Improvements WX21181004 SUBMITTED
Nicholas County Water District-Phase IX Water System WX21181003 SUBMITTED
Nicholas County Water District Improvements WX21181002 CONSTRUCTED
Carlisle Water Treatment Plant Expansion WX21181001 SUBMITTED
Powell County
Construction Projects
Stanton Water System Improvement Project WX21197002 FULLY FUNDED
Powells Valley Water District Improvements WX21197001 FULLY FUNDED
Scott County
Construction Projects
City of Georgetown- WTP Disinfection Process Improvements WX21209006 SUBMITTED
Bluegrass Water Supply Commission Phase 1 Water Line Project WX21067003 SUBMITTED
Bluegrass Water Supply Commission Master Planning and Eng. WX21067004 SUBMITTED
City of Georgetown-Champion Way 16" Water Main Extension WX21209005 SUBMITTED
Scott County Reservoir WX21209003 SUBMITTED
Woodford County
Construction Projects
Midway Streetscape Utility Relocation WX21239007 SUBMITTED
South Woodford Water District Phase 4 Improvements WX21239006 SUBMITTED
Sugar Hill Road Extension WX21239009 SUBMITTED
Water System Improvements - 24" Water Main Extension WX21239010 SUBMITTED
Versailles - Clifton / McCracken / Steele Rd. Water Line Extension WX21239011 SUBMITTED
Woodford Co.-Frankfort - Clifton / McCracken Water Line Extension WX21239014 SUBMITTED
Northeast Woodford Phase II Connection to Frankfort WX21239013 SUBMITTED
Northeast Woodford Old Frankfort Pike Reconstruction WX21239012 SUBMITTED
Versailles Water Distribution System Improvements WX21239008 SUBMITTED
Versailles Water Treatment Plant WX21239004 SUBMITTED
s (0-2 yr.)
Funding Status
KIA Grant
KIA Grant
KIA Grant
KIA Grant
KIA Grant/KIA Loan (Fund F)/CEGG Grant/Local Funds/Other Borowed funds
KIA Grant
KIA Grant
KIA Grant/CDBG
KIA Grant
KIA Grant
KIA Grant
KIA Grant/KIA Loan (Fund F)/CEGG Grant/Local Funds/Other Borowed funds
KIA Grant
KIA Grant
KIA Grant
KIA Grant
KIA Grant
KIA Grant
All necessary funds have been succured for project
KIA Grant
KIA Grant
KIA Grant/KIA Loan (Fund F)/CEGG Grant/Local Funds/Other Borowed funds
KIA Grant
KIA Grant
KIA Grant/KIA Loan
KIA Grant
KIA Grant/KIA Loan (Fund F)/CEGG Grant/Local Funds/Other Borowed funds
KIA Grant
KIA Grant/KIA Loan
KIA Grant/KIA Loan
KIA Grant
KIA Grant
KIA Grant
KIA Grant
KIA Grant
KIA Grant/KIA Loan (Fund F)/CEGG Grant/Local Funds/Other Borowed funds
KIA Grant
KIA Grant
KIA Grant
KIA Grant
KIA Grant
KIA Grant
KIA Grant/KIA Loan
KIA Grant
KIA Grant
KIA Grant
KIA Grant
KIA Grant
KIA Grant/KIA Loan
KIA Grant/KIA Loan (Fund F)/CEGG Grant/Local Funds/Other Borowed funds
KIA Grant
KIA Grant
KIA Grant/KIA Loan/Local Funds
KIA Grant
KIA Grant/CEGG Grant
KIA Grant
KIA Grant/USDA RD Funds
KIA Grant
KIA Grant
KIA Grant
KIA Grant
KIA Grant
KIA Grant
KIA Grant
KIA Grant
KIA Grant
KIA Grant/CDBG
All necessary funds have been sucured for project
All necessary funds have been sucured for project
KIA Grant
KIA Grant
KIA Grant
KIA Grant
KIA Grant
KIA Grant
KIA Grant
KIA Grant
KIA Grant
KIA Grant
KIA Grant
KIA Grant
KIA Grant
KIA Grant
KIA Grant
KIA Grant
KIA Grant
KIA Grant
KIA Grant
KIA Grant
Project has been constructed-all necessary funds have been secured
KIA Grant
All necessary fundst have been secured
All necessary fundst have been secured
KIA Grant
KIA Grant/KIA Loan (Fund F)/CEGG Grant/Local Funds/Other Borowed funds
KIA Grant
KIA Grant
KIA Grant/Local funds/US EPA
Project has secured all necessary funding
KIA Grant
KIA Grant
KIA Grant
KIA Grant
KIA Grant
KIA Grant
KIA Grant
KIA Grant
KIA Grant/Local funds
Implementation
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Soon to be implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Project has been implemented
Project has been implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Project has been implemented
Not yet implemented
Project has been implemented
Project has been implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
In the process of being implemented
Project is Bid Ready-ready to be implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Not yet implemented
Project is Bid Ready-ready to be implemented
Get documents about "