									        Beltana Development




ACARP Roadway Development Operators Workshop Sept. 2007
                                                          16
Beltana Hunter Valley
        NSW




                        17
Beltana




          18
Blakefield South




                   19
Blakefield South




                   20
    Beltana Development

Beltana Update.


Blakefield Update.


USA Systems Study.


Supporting a High Capacity Longwall.
                                       21
           Beltana

Total of 28 Million tonnes
mined to date.

Total of 80 km of roadway
driveage to date.


                             22
        Beltana 2007

Total of 5.5 Million tonnes
mined to date.

Total of 16.5 km of roadway
driveage to date.


                              23
            Single or Super

    Single Miner       V’s Super Unit
                MG7        MG8    MG9

Cut Rate m/hr   4.2        4.9    5.6

Metres/wk       340        389    373

Belt Moves      17.8       17.6   19.9
                                         24
             Single or Super

    Single Miner       V’s Super Unit
                MG7        MG8    MG9

Eng Avail.      91.8       93.8   88

Op Avail.       77.6       74.9   75.4

Op Time.         78        74.8   67
                                       25
           Single or Super

    Single Miner       V’s Super Unit
               MG7         MG8    MG9

Pillar Cycle   3.6         3.4     3.5

Total Metres   7,421      6,555   7,045

Days / Panel   159         114    132
                                         26
        Single or Super

Single Miner v’s Super Unit

Gains
– Cut Rate        112%

– Metres / Week   125%

– Pillar Cycles   103%

– Days / Panel    119%
                              27
        Single or Super
Single Miner v’s Super Unit

Losses
– Maint Quality

– Standards

– Belt Moves / Parallel Tasks

– Production Maintenance.

– Sustainability                28
      Changes at Beltana

Back into Mains Driveage

Starting a 2nd Crew
– Self Hired
– Integration of Crews
Change in Development Structure
– Addition to Development Management Team
– Each Crew self sufficient
– Maintain Single Panel Focus.
                                            29
   Single Miner What will
    it support at Beltana

Development at 340m per week

Equates to 144m LW retreat / wk

Equates to 165,600t / wk

6.95 Million Tonnes / yr

                                  30
               Strategies

Key Points to our Strategies
– Manning.
– Standards.
– Measurement.
– Continuous Improvement.
– Fit for purpose equipment.
– Communication.
                               31
       Blakefield South

173km of Driveage

44.6 million ROM tonnes

400m Longwall Face

6.7 million Tonnes / Year

9 year Life
                            32
        Blakefield South

Up to 10m3/t if insitu CH4

High volumetric capacity ventilation
system maximum 580m3/sec.

Force–exhaust (pressure balanced)
ventilation system.

7 heading mains / 3 heading gate
roads.
                                       33
Blakefield South




                   34
Blakefield South




                   35
    USA System Study

Review Strategies for future
Development systems.
– Review 3 Hdg Gate Road Development.

– Review Continuous Haulage.

– New Technology.


                                        36
          Mines Visited
Peabody Highland
– FCT in Room and Pillar Operation. (High Voltage
  Miners.)

Consol Loveridge
– 3 Hdg Development and changing from batch
  Haulage to FCT. (ABM’s.)

Cumberland
– 3 Hdg Development. (Miner Bolters and Mobile
  Bolters.)

                                                 37
         Mines Visited
Twenty Mile
– 3 Hdg Development (Place Changing.)
– High Producing Mine.

San Juan
– 3 Hdg Development (place Changing.)
– Good Technology.

Joy Franklin
– New Technology ED miners, Automatic Drill Rigs
  and FCT’s.

                                               38
San Juan Transport




                     39
         Specialise

The Americans Specialise
everything they do.

Whether it be in Motels,
Restaurants, Roadwork's and Coal
Mining.


                                   40
           Development

Place Changing
– Up to 8,200ft / mth = 2,500m / mth

Bolter Miners
– Up to 6000ft / mth = 1830m / mth

FCT Operation Room and Pillar
– Up to 700ft / shift = 210m / Shift
– 21m / hr (Approx 8,500m / mth)
                                       41
       3 hdg Development
          Opportunities
Design FCT Operation (Consol Loveridge)
 – ABM 14’s
 – Joy 4 FCT
 – Auxiliary Ventilation

To give a 50% improvement in Gate
Road Development.

Process Cost Saving

Up to 9000ft / Month = 2,750m / Month
                                          42
   Where we are at Now

Beltana Bolter Miner
– Joy 12CM12
– 2 Joy 10SC32 Shuttle Cars (16t)
– Breaker Feeder (18t bunker capacity at
  1700tphr)
– Auxiliary Ventilation
– 5.5m/hr


Up to 6200ft / mth = 1888m / mth
                                           43
        Development


Where does Development need to
be?

What maximum production can we
expect from a single Longwall?


                                 44
            Some Facts

7million tonne Longwall (400m face at
1740 t/m)
 – 2hdg Development       2.88m/hr
 – 3hdg Development       4.51m/hr


10million tonne Longwall
 – 2hdg Development       4.11m/hr
 – 3hdg Development       6.44m/hr

                                        45
          Some Facts

12million tonne Longwall
– 2hdg Development    4.93m/hr
– 3hdg Development    7.73m/hr


15million tonne Longwall
– 2hdg Development    6.17m/hr
– 3hdg Development    9.67m/hr


                                 46
    Low Hanging Fruit
        Obtained

Process Improvement
 Old          7.2 Day Pillar Cycle

New            3.6 Day Pillar Cycle

Total Process Improvement
               100 %
                                      47
     FCT Model For Beltana

From Data measured at Beltana a Cut Rate
after a belt move of 8.92 m/hr can be
achieved.

Joy FCT Modelled a rate 8.98 m/hr with a Joy
12CM12D.

Therefore we believe an average cut rate
with an FCT for a 100m pillar cycle would be
in the order of 8 to 9m/hr.

This would be a 70% increase in this part of
the Process.                                   48
          Opportunities
Bolter Miners
– 14ED25 being built in USA to go into
  Consol McElroy which commenced
  production 1st May 2007.

– ABM 25’s Used throughout QLD and NSW
Automated bolting
Self Drilling Bolt

                                         49
         Opportunities
Continuous Haulage Systems
– Joy4FCT

– Stamler Chain Haulage

– Prairie System

– Sandvik Continuous Haulage


                               50
FCT Stats




            51
          Summary

To Advance to the next step in
Longwall Production Development
has to do something different.

By 3 to 5 years time we need to
have developed a new system so
Longwall Coal is not restricted.


                               52
         Development

Can’t keep doing the same and
expect something different.

12 Million Tonne Longwalls being
supported by 500 people.

This is not sustainable.
                                   53
USA is BIG