Erosion

Document Sample
Erosion Powered By Docstoc
					    Sustainable Stockton?
Erosion and sedimentation into
          wetlands
         February 2008
    Photos by Jamie Cromartie
NJ Pinelands CMP 7:50-6.84 Minimum
 standards for point and non-point
 source discharges
(4) There shall be no direct discharge of stormwater runoff from
   any point or nonpoint source to any *wetland, wetlands
   transition area or* surface waterbody.
  Runoff
from new,
 unpaved
  parking
  by A&S
Runoff from new, unpaved parking
Geothermal building – erosion into
          storm drain
Geothermal building – outflow
Effects of concentrated outflow
     Effects of increased runoff
headed for wetlands below Lake Fred
Sediment flowing into wetland
   Ponding at ATES site. This is the
“Stormwater Management” for the West
              Quad roof

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:0
posted:8/12/2012
language:
pages:10