The Viability of Commissioning in New School Construction
Document Sample


Building Commissioning for
Improved Performance
B
Brooks Energy & Sustainability Lab
Kristin Heinemeier, Ph.D., P.E.
Technical Director
Brooks Energy & Sustainability Lab
E
S
Texas Engineering Experiment Station
Texas A&M University System
San Antonio, Texas
Presentation ASHRAE Alamo Chapter
April 20, 2004 L
The Brooks Energy and
Sustainability Laboratory
Consortium between Texas Engineering
B
Experiment Station and the Georgia
Brooks Energy & Sustainability Lab
Tech Research Institute
Offices located at Brooks City Base
Technology Transfer in areas related
to Energy and Sustainability E
S
Demonstrations, deployment, technical
assistance, training, tool development
No fundamental research or education
L
Non-competitive with private sector
Continuum of Quality Control
Design the best machinery possible,
B
customers will return the ones that don’t
Brooks Energy & Sustainability Lab
work.
Measure the widgets at the end of the
E
assembly line, dump or fix the ones that
aren’t within specified tolerance.
Measure the defect rate and adjust the
machine if defects are too high.
Utilize quality control in the machine design
stage, engage the designer to re-engineer the
process, incorporate customers’ input in the S
L
machine design.
Continuum of Quality Control in
Buildings
Design the best building possible, hope that
B
the owner won’t sue if it doesn’t work.
Brooks Energy & Sustainability Lab
Do a walkthrough of the building at the end
of the construction, fix all the things that
E
don’t work.
Test the building systems throughout
construction and adjust them if they don’t
work.
Utilize quality control in the design stage,
engage the designer to incorporate lessons
learned in next building, incorporate S
L
customers’ input in the construction process,.
Buildings Are Not Widgets
A modern office building is VERY
B
complex.
Brooks Energy & Sustainability Lab
Each building is unique…each one HAS to
work.
No simple metrics or “tolerances”…how
do you know if it “works”? E
S
The team that designs and builds the
building is very diverse, there is little
feedback from operation to design.
L
Owner desires to move in immediately.
Cost competitiveness is intense.
Commissioning…of Battleships
Brooks Energy & Sustainability Lab
S
L
E
B
Building Commissioning
Cx is a quality oriented process for
B
Brooks Energy & Sustainability Lab
achieving, verifying, and documenting
E
that the performance of
facilities, systems, and assemblies
meets defined objectives and criteria.
ASHRAE Guideline 0
S
L
Commissioning Administrator
B
The owner’s champion for quality.
Brooks Energy & Sustainability Lab
Manages a quality assurance
process for the owner.
Does not have authority to accept
building or to direct contractors. E
Typically has the role of
communicator, coordinator,
documenter… S
L
Commissioning Process
B
Planning
Brooks Energy & Sustainability Lab
E
Design
Construction
Turnover
S
Occupancy
L
Planning Stage
Educate owner
B
PLANNING
Define Cx budget
Brooks Energy & Sustainability Lab
Design
Define CA scope of services
E
Develop Cx procedures and
draft Cx Plan
Construction
Define Cx Team
S
Document Owner’s Project
Turnover Requirements (Performance
Objectives)
L
Develop expectations for
Occupancy
process and communications…
set the tone for Cx
Design Stage
Insert contractor requirements
B
Planning
related to Cx in the Specs
Brooks Energy & Sustainability Lab
(included in existing divisions
DESIGN and/or separate division)
E
Develop construction
Construction checklists, acceptance criteria,
and test requirements
S
Develop initial systems manual
Turnover
Review design at different
levels of development
L
Occupancy Review specs
Identify training requirements
Construction Stage
Review submittals
B
Planning
Develop inspection procedures
Brooks Energy & Sustainability Lab
and forms
Design
Develop test procedures and
CONSTRUCTION
forms
Convene Cx Team meetings
Perform Field Installation
E
Turnover Verification
Witness/perform Operational
Performance Tests S
L
Occupancy
Turnover Stage
Witness Functional
B
Planning
Performance Tests
Brooks Energy & Sustainability Lab
Design Deliver Systems Manual
E
Verify training of O&M Staff
Construction Play some role in building
acceptance
TURNOVER
Complete Commissioning Report
S
L
Occupancy
Occupancy
Post-occupancy evaluation
B
Planning
Lessons Learned Workshop
Brooks Energy & Sustainability Lab
Design Recommend re-commissioning
E
schedule
Construction Inspection at 10-months (pre
warranty expiration)
Turnover
S
L
OCCUPANCY
Benefits of Commissioning
Reduces Energy Costs
Reduces O&M Costs
B
Brooks Energy & Sustainability Lab
Improves the Building
E
Improves the Design, Construction and
Turnover Processes
Can Reduce both Operating Costs and
First Costs S
L
Study of Costs and Benefits
Funded by SECO and a San Antonio
B
school district
Brooks Energy & Sustainability Lab
Side-by-side comparison of
commissioned and uncommissioned
schools
Detailed review of both construction E
S
processes and the resulting buildings
Nearing end of first year of occupancy
for baseline school, and starting
L
construction for commissioned school
Results in a format usable by others
Study Findings
Communication is the key!
early, often, clearly-defined procedures
B
Brooks Energy & Sustainability Lab
for communication
E
Time is your enemy!
start early and be nimble and persistent
Reassure everyone involved in the
process about their roles
every organization is different and the
roles will be different S
L
Study Findings (cont.)
There are a lot of toes to step on
be creative and considerate and persistent
B
Brooks Energy & Sustainability Lab
Performance Objectives should be
captured and communicated early
should form the basis of acceptance criteria,
which should be in the spec
Lessons Learned workshop from previous
E
project would be helpful
or review the one before that if the previous
project is still in progress S
L
ASHRAE
Technical Committee 7.9
Research
B
Programs
Brooks Energy & Sustainability Lab
ASHRAE Guideline 0: The Commissioning
Process (in public comment, coordinated with
E
NIBS)
ASHRAE Guideline 1: The HVAC&R
Commissioning Process (1996 & revision)
S
ASHRAE Guideline 1.1…1.10 (proposed)
Professional Development Course
Liaison with USGBC/LEED
L
Other Organizations
Building Commissioning
Association (bcxa.org)
B
Brooks Energy & Sustainability Lab
NEBB, AABC
Portland Energy Conservation, Inc.
(peci.org) E
National Building Commissioning
Conference (May 18-20, Atlanta) S
L
Thank you!
Questions?
Brooks Energy & Sustainability Lab
S
L