					                                             AESO Connection Queue


Position Proj No Project Name                                   Phase   Queue Type   Planning Area          Gen MW   Load MW
1        519      Alberta Wind Energy Old Man River Wind Farm   1       Connection   53-Fort Macleod        47.0     1.0
2        513      Pteragen Peace Butte 116 MW Wind Farm         1       Connection   4-Medicine Hat         116.0    0.1
3        479      Naturener Wild Rose Wind Farm                 1       Connection   4-Medicine Hat         200.0    0.0
4        515      Benign Energy Heritage Wind Farm              2       Connection   53-Fort Macleod        250.0    0.0
5        515      Benign Energy Heritage Wind Farm              1       Connection   53-Fort Macleod        100.0    0.0
6        510      ENEL Alberta HWY 785 Wind Farm                1       Connection   53-Fort Macleod        235.0    1.0
7        482      Montana Alberta Tie (MATL)                    1       Unique       54-Lethbridge          0.0      0.0
8        524      Enel Alberta Riverview Wind Farm              1       Connection   53-Fort Macleod        115.0    1.0
9        559      Fortis North West Sturgeon Refinery           1       Connection   33-Fort Saskatchewan   0.0      115.0
10       580      Windy Point Wind Farm                         1       Connection   53-Fort Macleod        61.0     1.0
11       584      Fortis South Leduc New Sub                    1       Connection   60-Edmonton            0.0      28.0
12       614      Vindt Willowridge Wind Farm                   1       Connection   53-Fort Macleod        100.0    1.0
13       617      GlenRidge Wind Farm Phase 1                   1       Connection   48-Empress             100.0    1.0
14       635      Suncor Hand Hills Wind Energy Project         1       Connection   42-Hanna               80.0     0.0
15       678      Joss Wind Hand Hills Wind Project             1       Connection   42-Hanna               80.0     1.0
16       679      Acciona New Dayton Wind Energy Project        1       Connection   55-Glenwood            99.0     1.0
17       693      Naturener Wild Rose Wind Farm Phase 2         1       Connection   4-Medicine Hat         200.0    1.0
18       1136     ENMAX S01 Substation                          1       Contract     6-Calgary              0.0      6.6
19       715      Suncor - Schuler Wind Energy Project          1       Connection   4-Medicine Hat         80.0     1.0
20       1137     Capital Power Genesee #3 Substation 330P      1       Contract     40-Wabamun             16.0     0.0
21       719      ENMAX Shepard Energy Centre                   1       Connection   6-Calgary              0.0      21.0
22       719      ENMAX Shepard Energy Centre                   4       Connection   6-Calgary              0.0      0.0
23       719      ENMAX Shepard Energy Centre                   2       Connection   6-Calgary              800.0    0.0
24       719      ENMAX Shepard Energy Centre                   3       Connection   6-Calgary              800.0    21.0
25       723      Capital Power Halkirk Wind Project            1       Connection   42-Hanna               150.0    1.0
26       728      Greengate Blackspring Ridge I Wind Project    1       Connection   49-Stavely             300.0    1.0
27       1140     Fortis Bretona Substation 45S                 1       Contract     60-Edmonton            0.0      12.7
28       1145     Fortis North Calder Substation 37S            1       Contract     60-Edmonton            0.0      14.5
29       1146     Fortis North St. Albert Substation 99S        1       Contract     60-Edmonton            0.0      5.9
30       1147     Fortis Okotoks Substation 678S                1       Contract     46-High River          0.0      12.2
31       1151     Fortis Taber Substation 83S                   1       Contract     52-Vauxhall            0.0      10.5
32       1153     Fortis Warner Substation 344S                 1       Contract     55-Glenwood            0.0      1.6

                                                                                                                               Public
Transmission Project Delivery                                     1                                                  R1 - 2012-06-06
                                              AESO Connection Queue
33       744      TransCanada Saddlebrook Generating Station         1      Connection   46-High River          350.0   0.0
34       741      MEG Christina Lake SAGD/Cogen 2 Plant              1      BTF          61-Christina Lake      85.0    0.0
35       829      ENMAX No 54 Substation                             1      Connection   6-Calgary              0.0     20.0
36       831      FortisAlberta Fort Saskatchewan Area POD           1      Connection   33-Fort Saskatchewan   0.0     19.6
37       851      TransCanada Keystone KXL Pumpstation #2            2      Connection   37-Provost             0.0     25.0
38       851      TransCanada Keystone KXL Pumpstation #2            1      Connection   37-Provost             0.0     0.0
39       855      FortisAlberta Spruce Grove Substation              1      Connection   60-Edmonton            0.0     23.0
40       859      ENMAX 5 Sub Capacity Upgrades                      1      Connection   6-Calgary              0.0     158.0
41       861      ENMAX No 6 Substation                              1      Connection   6-Calgary              0.0     26.0
42       863      TransCanada Keystone KXL Pumpstation #3            1      Connection   42-Hanna               0.0     25.0
43       864      TransCanada Keystone KXL Pumpstation #4            1      Connection   42-Hanna               0.0     25.0
44       865      TransCanada Keystone KXL Pumpstation #5            1      Connection   48-Empress             0.0     25.0
45       873      ENMAX No 36 Substation                             1      Connection   6-Calgary              0.0     48.0
46       895      ENMAX No. 24 Substation Capacity Upgrade           3      Connection   6-Calgary              0.0     43.0
47       901      Imperial Oil Cold Lake Expansion Nabiye Plant      2      Connection   28-Cold Lake           170.0   0.0
48       901      Imperial Oil Cold Lake Expansion Nabiye Plant      1      Connection   28-Cold Lake           0.0     10.0
49       561      Husky Green Stocking 925S                          2      Connection   59-Ruth Lake           0.0     0.0
50       921      ENMAX Bonnybrook Energy Centre                     1      Connection   6-Calgary              180.0   3.0
51       927                                                         1      Connection
                  Quigley 989S Substation and Area Transmission Line Development         61-Christina Lake      0.0     60.0
52       1156     City of Medicine Hat 41S                           1      Contract     4-Medicine Hat         0.0     19.0
53       944      EPCOR Poundmaker Edmonton West End Substation1            Connection   60-Edmonton            0.0     33.0
54       1046     ENMAX No 32 Substation Upgrades                    1      Connection   6-Calgary              0.0     50.0
55       1051                                                        1
                  ATCO Electric Brintnell POD Temporary Capacity Increase   Connection   58-Dover               0.0     40.0
56       1157     Capital Power Genesee Unit 1                       1      Contract     40-Wabamun             19.0    0.0
57       1158     Capital Power Genesee Unit 2                       1      Contract     40-Wabamun             19.0    0.0
58       1159     Fortis Baymag Substation 437S                      1      Contract     44-Seebe               0.0     0.8
59       1160     ENMAX S10 Substation                               1      Contract     6-Calgary              0.0     3.5
60       1161     ENMAX S03 Substation                               1      Contract     6-Calgary              0.0     3.0
61       1162     ENMAX S09 Substation                               1      Contract     6-Calgary              0.0     4.1
62       1163     ENMAX S20 Substation                               1      Contract     6-Calgary              0.0     2.0
63       1164     ENMAX S14 Substation                               1      Contract     6-Calgary              0.0     7.0
64       1165     ENMAX S30 Substation                               1      Contract     6-Calgary              0.0     2.5
65       1166     ENMAX S34 Substation                               1      Contract     6-Calgary              0.0     3.0
66       1170     ENMAX S16 Substation Capacity Reduction            1      Contract     6-Calgary              0.0     -7.0
67       1171     ENMAX S21 Substation Capacity Reduction            1      Contract     6-Calgary              0.0     -2.0
68       1172     ENMAX S27 Substation Capacity Reduction            1      Contract     6-Calgary              0.0     -6.0
69       1173     ENMAX S31 Substation Capacity Reduction            1      Contract     6-Calgary              0.0     -10.0


                                                                                                                                  Public
Transmission Project Delivery                                         1                                                 R1 - 2012-06-06
                                               AESO Connection Queue
70       1174     ENMAX S33 Substation Capacity Reduction                1     Contract     6-Calgary                   0.0     -2.5
71       1052     FortisAlberta New Hull 257S Substation                 1     Connection   52-Vauxhall                 0.0     16.0
72       1083     FortisAlberta Willesden Green 68S Upgrade              2     Connection   30-Drayton Valley           0.0     0.0
73       1083     FortisAlberta Willesden Green 68S Upgrade              1     Connection   30-Drayton Valley           0.0     11.7
74       1086     FortisAlberta Sunday Creek Substation                  1     Connection   61-Christina Lake           0.0     49.2
75       1049                                                            1
                  FortisAlberta Christina Lake New substation (Round Hill)     Connection   61-Christina Lake           0.0     12.3
76       683      Kirby In-Situ Oil Sands Plant                          1     Connection   27-Athabasca/Lac La Biche   0.0     65.0
77       1084     ATCO Electric Enbridge Leismer Pumpstation             1     Connection   61-Christina Lake           0.0     15.0
78       1091     FortisAlberta Winefred 818S Substation Upgrade         1     Connection   27-Athabasca/Lac La Biche   0.0     23.8
79       1053     ATCO Weasel Creek 947S Substation                      1     Connection   27-Athabasca/Lac La Biche   0.0     9.0
80       1068     Enbridge Abee 993S Substation                          1     Connection   27-Athabasca/Lac La Biche   0.0     11.0
81       1074                                                            CHL1) Connection
                  FortisAlberta Jackfish Substation (Christina Lake area 1                  61-Christina Lake           0.0     49.0
82       1042     FortisAlberta Lac La Biche (Thompson 140S) Substation  1     Connection   27-Athabasca/Lac La Biche   0.0     13.0
83       1229     Fortis Enmax S39 Substation                            1     Contract     6-Calgary                   0.0     1.5
84       1230     Fortis Enmax S24 Substation                            1     Contract     6-Calgary                   0.0     12.4
85       1045     ATCO Electric Edith Lake 739S Substation Upgrade 1           Connection   26-Swan Hills               0.0     32.0
86       1047     ATCO Electric Swan River 735S Substation Upgrade 1           Connection   26-Swan Hills               0.0     15.0
87       1094                                                            1
                  ATCO Electric Kinosis Substation 856S Breaker Addition P1094 Connection   61-Christina Lake           0.0     8.0
88       1126     ATCO Green Stocking S925 - Breaker Addition            1     Connection   59-Ruth Lake                0.0     10.0
89       1070     FortisAlberta Bruderheim 25 kV breaker add             1     Connection   33-Fort Saskatchewan        0.0     14.0
90       750      Renewable Energy Services Ltd PC006 Wind Farm 1              Connection   53-Fort Macleod             75.0    1.0
91       789      BluEarth Bull Creek Wind Project                       1     Connection   37-Provost                  115.0   2.0
92       766      Blood Tribe Wild Turnip Hill Wind Project              1     Connection   54-Lethbridge               150.0   1.0
93       1080     Old Elm & Pothole Creek Wind Farm                      1     Connection   55-Glenwood                 300.0   0.0
94       1194     Fortis Cynthia 178 S Upgrade                           1     Connection   30-Drayton Valley           0.0     9.6
95       776      Laricina Saleski SAG D Project                         1     Connection   58-Dover                    0.0     41.0
96       937      Wainwright Wind Project                                1     Connection   32-Wainwright               150.0   0.0
97       1107     ENMAX No. 47 Substation Transformer Addition           1     Connection   6-Calgary                   0.0     20.0
98       1184     Fortis Amelia Distribution Substation                  1     Connection   33-Fort Saskatchewan        0.0     42.7
99       1185     Fortis Sundre 575S Capacity increase                   1     Connection   38-Caroline                 0.0     2.5
100      1203     Fortis Rimbey 297S Upgrade                             1     Connection   35-Red Deer                 0.0     4.1
101      1193     Fortis Ponoka 331S Upgrade                             1     Connection   31-Wetaskiwin               0.0     0.2
102      1201     Fortis Lodgepole Upgrade- P1201                        1     Connection   30-Drayton Valley           0.0     10.6
103      1207     Fortis Willesden Green 68S Breaker Addition            1     Connection   30-Drayton Valley           0.0     1.7
104      1096     ATCO Electric Osum Taiga Central Process Facility 1          Connection   28-Cold Lake                0.0     23.0
105      948      MacKay Operating Corp. AMR02 Substation                1     Connection   58-Dover                    85.0    145.0
106      1202     Fortis Keystone 384S Upgrade                           1     Connection   30-Drayton Valley           0.0     1.6


                                                                                                                                          Public
Transmission Project Delivery                                           1                                                       R1 - 2012-06-06
                                              AESO Connection Queue
107      1018     ATCO Buchanan Creek New POD                        1      Connection     19-Peace River                0.0        9.0
108      1104                                                        1
                  AOSC Dover West Leduc Insitu Bitumen Extraction Facility  Connection     58-Dover                      0.0        120.0
109      1106     ATCO Electric Enbridge Janvier Pumpstation         1      Connection     61-Christina Lake             0.0        12.0
110      739      NRGreen Windfall Power Generating Station          1      Connection     26-Swan Hills                 16.0       2.0
111      1215     Millar Western Pulp                                1      BTF            26-Swan Hills                 0.0        66.6
112      1115                                                        1      Connection
                  ATCO Bear Trap Substation and Transmission Line Development              28-Cold Lake                  0.0        10.0
113      1128     ATCO ConocoPhilips Surmont 2 Stage II and III      2      Connection     61-Christina Lake             0.0        19.5
114      1128     ATCO ConocoPhilips Surmont 2 Stage II and III      1      Connection     61-Christina Lake             0.0        58.5
115      1218     Fortis Black Diamond Transformer Replacement       1      Connection     46-High River                 0.0        7.3
116      1232     Fortis Big Rock 295S Substation                    1      Connection     46-High River                 0.0        16.6
117      1102     ATCO Electric Enbridge Lynton Pumpstation          1      Connection     59-Ruth Lake                  0.0        20.0
118      1122     ATCO Stat Oil Corner SAGD Facility                 1      Connection     61-Christina Lake             0.0        60.0
119      1191     ATCO Norberg Cold Lake Pipeline Pumpstation        1      Connection     28-Cold Lake                  0.0        7.0
120      1095                                                        1
                  ATCO Electric Enbridge Vermilion Pumpstation Upgrades     Connection     13-Lloydminster               0.0        18.0
121      1114     Swanhills Synfuels Ltd. ISCG Facility              1      Connection     26-Swan Hills                 340.0      70.0
122      1082     ATCO Electric La Crete Substation                  1      Connection     17-Rainbow Lake               0.0        10.0
123      1241                                                        1      Connection
                  ATCO Electric P1241-Ksituan River Regulator Upgrade and Breaker Addition 20-Grande Prairie             0.0        6.0
124      1103     ATCO Electric Athabasca Dog Rib 2082S Substation 1        Connection     59-Ruth Lake                  0.0        7.5
125      1210     Fortis Onoway Transformer Replacement              1      Connection     40-Wabamun                    0.0        0.0
126      1251     FortisAlberta Buck Lake 454S Upgrade               1      Connection     30-Drayton Valley             0.0        8.1
127      1205     Fortis Whitecourt Industrial Upgrade               1      Connection     26-Swan Hills                 0.0        4.0
128      1208     Fortis Moon Lake Breaker Addition                  1      Connection     30-Drayton Valley             0.0        11.5
129      1223     FortisAlberta Cherhill 338S Transformer Addition   1      Connection     40-Wabamun                    0.0        0.0
130      1243     Fortis Harmattan Upgrade (BTF)                     1      BTF            39-Didsbury                   17.3       0.0
131      1264     Fortis Bruderheim 127S Substation Upgrade          1      Connection     33-Fort Saskatchewan          0.0        7.2
132      1219     Fortis Brazeau River Natural Gas Storage - P1219   1      Connection     30-Drayton Valley             0.0        30.0
133      1247                                                        1
                  Cope Creek Interconnection (prev. Shell Jumping Pound)    Connection     44-Seebe                      0.0        16.5
134      1213     MEG Christina Lake Cogen 3A                        1      BTF            61-Christina Lake             80.0       0.0
135      848      TransAlta Keephills 1 Uprate                       1      BTF            40-Wabamun                    23.0       0.0
136      1195     Fortis Pike Kirby Substation                       1      Connection     61-Christina Lake             0.0        34.0
137      1200     Fortis Vista Coal Mine- P1200                      1      Connection     29-Hinton/Edson               0.0        30.0
138      1260     Lethbridge Chinook NW POD                          1      Connection     54-Lethbridge                 0.0        30.0
139      1254     Fortis Tilley 498S Upgrade                         1      Connection     47-Brooks                     0.0        15.4
140      1265     Grande Prairie Harmattan Energy                    1      Connection     39-Didsbury                   95.0       1.5
                                                                BTF denotes a behind the fence project and is not governed by the Connection Process.
                                                   DTS and STS project types denote active contract change requests and are not governed by the Connection Proces



                                                                                                                                              Public
Transmission Project Delivery                                          1                                                            R1 - 2012-06-06
                                               AESO Connection Queue


MW Type             Stage   Planned ISD    Received       Gate 2 Date
Wind                4       May 31, 2013   Jan 25, 2006   Aug 31, 2010
Wind                3       Jul 26, 2013   Oct 14, 2005   Aug 31, 2010
Wind                4       Jul 31, 2013   May 12, 2005   Aug 31, 2010
Wind                3       Sep 30, 2015   Sep 22, 2005   Aug 31, 2010
Wind                3       Sep 30, 2014   Sep 22, 2005   Aug 31, 2010
Wind                3       Nov 7, 2014    Oct 18, 2005   Aug 31, 2010
Merchant Tie Line   6       Oct 1, 2012    Nov 3, 2005    Aug 31, 2010
Wind                3       Oct 24, 2014   Jan 25, 2006   Aug 31, 2010
Load                4       Oct 1, 2013    Apr 20, 2006   Aug 31, 2010
Wind                3       Apr 10, 2015   May 12, 2006   Aug 31, 2010
Load                5       Feb 13, 2013   Jun 30, 2006   Aug 31, 2010
Wind                3       Jul 31, 2013   Jul 11, 2006   Aug 31, 2010
Wind                3       Sep 25, 2015   Jul 27, 2006   Aug 31, 2010
Wind                3       Dec 13, 2013   Oct 6, 2006    Aug 31, 2010
Wind                3       Oct 9, 2013    Jan 15, 2007   Aug 31, 2010
Wind                3       Dec 31, 2014   Feb 26, 2007   Aug 31, 2010
Wind                4       Jul 31, 2013   May 3, 2007    Aug 31, 2010
DTS                 3       May 9, 2012    Jun 1, 2007    Aug 31, 2010
Wind                3       Jan 16, 2015   Jul 30, 2007   Aug 31, 2010
STS                 3       Oct 1, 2014    Jul 30, 2007   Aug 31, 2010
Gas                 4       Nov 18, 2013   Aug 13, 2007   Aug 31, 2010
Gas                 4       Nov 18, 2013   Aug 13, 2007   Aug 31, 2010
Gas                 4       Jun 1, 2015    Aug 13, 2007   Aug 31, 2010
Gas                 4       Jun 1, 2015    Aug 13, 2007   Aug 31, 2010
Wind                4       Oct 4, 2012    Aug 23, 2007   Aug 31, 2010
Wind                4       Dec 20, 2012   Sep 12, 2007   Aug 31, 2010
DTS                 3       Mar 2, 2015    Oct 18, 2007   Aug 31, 2010
DTS                 3       Dec 26, 2014   Oct 18, 2007   Aug 31, 2010
DTS                 3       Mar 16, 2015   Oct 18, 2007   Aug 31, 2010
DTS                 3       Dec 13, 2013   Oct 18, 2007   Aug 31, 2010
DTS                 3       Nov 1, 2013    Oct 18, 2007   Aug 31, 2010
DTS                 3       Dec 1, 2016    Oct 18, 2007   Aug 31, 2010

                                                                                       Public
Transmission Project Delivery                                            1   R1 - 2012-06-06
                                               AESO Connection Queue
Gas                 3       Apr 8, 2014    Oct 25, 2007   Aug 31, 2010
Cogen               3       Mar 20, 2013   Oct 28, 2007   Aug 31, 2010
Load                5       Apr 1, 2013    May 27, 2008   Aug 31, 2010
Load                5       Oct 31, 2012   Jun 2, 2008    Aug 31, 2010
Load                5       Nov 30, 2012   Aug 22, 2008   Aug 31, 2010
Load                5       Nov 30, 2012   Aug 22, 2008   Aug 31, 2010
Load                4       Oct 1, 2012    Sep 15, 2008   Aug 31, 2010
Load                5       Dec 5, 2014    Sep 30, 2008   Aug 31, 2010
Load                5       Jul 31, 2012   Oct 8, 2008    Aug 31, 2010
Load                4       Jun 30, 2014   Oct 8, 2008    Aug 31, 2010
Load                4       Jun 30, 2014   Oct 8, 2008    Aug 31, 2010
Load                5       Nov 30, 2012   Oct 8, 2008    Aug 31, 2010
Load                5       Oct 1, 2012    Oct 30, 2008   Aug 31, 2010
Load                5       Jun 29, 2012   Dec 18, 2008   Aug 31, 2010
Cogen Gas Turbine   5       Jan 28, 2014   Jan 29, 2009   Aug 31, 2010
Cogen Gas Turbine   5       Jan 1, 2013    Jan 29, 2009   Aug 31, 2010
Load                6       Jul 31, 2012   Mar 17, 2009   Aug 31, 2010
Cogen Gas Turbine   3       Jan 14, 2014   Apr 14, 2009   Aug 31, 2010
Load                6       Jun 15, 2012   May 7, 2009    Aug 31, 2010
DTS                 3       May 31, 2014   May 14, 2009   Aug 31, 2010
Load                5       Sep 6, 2012    Jul 23, 2009   Aug 31, 2010
Load                5       Feb 8, 2013    Nov 9, 2009    Aug 31, 2010
Load                5       Sep 1, 2012    Nov 9, 2009    Aug 31, 2010
STS                 3       Nov 11, 2014   May 4, 2010    Aug 31, 2010
STS                 3       Oct 1, 2014    May 4, 2010    Aug 31, 2010
DTS                 3       Sep 1, 2011    Jul 17, 2010   Aug 31, 2010
DTS                 3       Feb 1, 2015    Oct 1, 2010    Oct 1, 2010
DTS                 3       Feb 1, 2015    Oct 1, 2010    Oct 1, 2010
DTS                 3       Feb 1, 2015    Oct 1, 2010    Oct 1, 2010
DTS                 3       Feb 1, 2015    Oct 1, 2010    Oct 1, 2010
DTS                 3       Feb 1, 2015    Oct 1, 2010    Oct 1, 2010
DTS                 3       Feb 1, 2015    Oct 1, 2010    Oct 1, 2010
DTS                 3       Feb 1, 2015    Oct 1, 2010    Oct 1, 2010
DTS                 3       Feb 1, 2015    Oct 1, 2010    Oct 1, 2010
DTS                 3       Feb 1, 2015    Oct 1, 2010    Oct 1, 2010
DTS                 3       Feb 1, 2015    Oct 1, 2010    Oct 1, 2010
DTS                 3       Feb 1, 2015    Oct 1, 2010    Oct 1, 2010


                                                                                       Public
Transmission Project Delivery                                            1   R1 - 2012-06-06
                                               AESO Connection Queue
DTS                 3       Feb 1, 2015    Oct 1, 2010    Oct 1, 2010
Load                3       Nov 29, 2013   Nov 23, 2009   Nov 23, 2010
Load                5       May 31, 2013   May 3, 2010    Jan 12, 2011
Load                5       Aug 31, 2012   May 3, 2010    Jan 12, 2011
Load                4       Jun 28, 2013   May 13, 2010   Jan 13, 2011
Load                5       Aug 15, 2012   Nov 16, 2009   Jan 20, 2011
Load                5       Jan 15, 2013   Mar 14, 2007   Jan 28, 2011
Load                5       Oct 1, 2012    May 3, 2010    Feb 7, 2011
Load                5       Sep 14, 2012   Jun 7, 2010    Feb 8, 2011
Load                4       Jan 18, 2013   Nov 30, 2009   Feb 28, 2011
Load                4       Jan 18, 2013   Jan 29, 2010   Feb 28, 2011
Load                4       Feb 28, 2013   Mar 22, 2010   Mar 3, 2011
Load                5       Nov 8, 2012    Nov 5, 2009    Mar 11, 2011
DTS                 3       Feb 1, 2015    Mar 11, 2011   Mar 11, 2011
DTS                 3       Feb 1, 2015    Mar 11, 2011   Mar 11, 2011
Load                4       Mar 1, 2013    Nov 5, 2009    Mar 21, 2011
Load                4       Mar 1, 2013    Nov 9, 2009    Mar 22, 2011
Load                4       Oct 2, 2012    Jul 8, 2010    Apr 5, 2011
Load                4       Jul 31, 2012   Nov 30, 2010   Apr 5, 2011
Load                5       Jul 1, 2012    Mar 2, 2010    May 4, 2011
Wind                3       Jul 5, 2013    Oct 31, 2007   May 30, 2011
Wind                3       Dec 2, 2013    Feb 7, 2008    May 31, 2011
Wind                3       Jun 1, 2015    Dec 14, 2007   Jun 2, 2011
Wind                3       Dec 23, 2016   Apr 29, 2010   Jun 2, 2011
Load                4       Aug 30, 2012   Mar 1, 2011    Jun 27, 2011
Load                3       May 1, 2014    Jan 15, 2008   Jun 30, 2011
Wind                3       Jun 9, 2014    Jun 11, 2009   Jun 30, 2011
Load                3       Mar 11, 2014   Sep 7, 2010    Jun 30, 2011
Load                4       Mar 1, 2013    Jan 11, 2011   Jul 11, 2011
Load                4       Oct 1, 2012    Jan 21, 2011   Jul 28, 2011
Load                4       Nov 8, 2012    Mar 17, 2011   Aug 4, 2011
Load                3       Jun 1, 2013    Mar 1, 2011    Aug 5, 2011
Load                4       Nov 30, 2012   Mar 11, 2011   Aug 10, 2011
Load                5       Aug 1, 2012    Mar 29, 2011   Aug 10, 2011
Load                3       Jun 17, 2013   Jul 13, 2010   Aug 16, 2011
Other               3       Apr 8, 2014    Aug 10, 2009   Aug 18, 2011
Load                4       Nov 30, 2012   Mar 14, 2011   Aug 24, 2011


                                                                                       Public
Transmission Project Delivery                                            1   R1 - 2012-06-06
                                                            AESO Connection Queue
             Load                  3     Nov 13, 2013   Sep 17, 2009   Aug 30, 2011
             Combined Cycle        3     Apr 25, 2014   Aug 31, 2010   Aug 30, 2011
             Load                  3     Oct 1, 2013    Sep 2, 2010    Sep 1, 2011
             Gas                   4     Dec 4, 2012    Oct 13, 2007   Sep 9, 2011
             Load                  3     May 15, 2013   Apr 20, 2011   Sep 19, 2011
             Load                  3     Oct 1, 2013    Nov 2, 2010    Sep 20, 2011
             Load                  3     Jun 17, 2014   Dec 2, 2010    Sep 28, 2011
             Load                  3     May 14, 2013   Dec 2, 2010    Sep 28, 2011
             Load                  3     Dec 13, 2013   Apr 26, 2011   Sep 29, 2011
             Load                  3     Dec 13, 2013   Jun 2, 2011    Sep 29, 2011
             Load                  3     Aug 1, 2013    Aug 20, 2010   Sep 30, 2011
             Load                  3     Aug 27, 2014   Nov 15, 2010   Oct 7, 2011
             Load                  3     Aug 1, 2013    Feb 14, 2011   Oct 7, 2011
             Load                  4     Mar 15, 2013   Jul 13, 2010   Oct 19, 2011
             Combined Cycle        3     Jul 1, 2014    Oct 26, 2010   Oct 22, 2011
             Load                  3     Mar 24, 2014   Apr 30, 2010   Oct 28, 2011
             Load                  3     Sep 26, 2013   Jul 15, 2011   Nov 8, 2011
             Load                  4     Apr 1, 2013    Aug 20, 2010   Nov 9, 2011
             Load                  3     Sep 1, 2013    Apr 8, 2011    Nov 17, 2011
             Load                  3     Dec 2, 2013    Aug 2, 2011    Dec 1, 2011
             Load                  3     Nov 1, 2013    Mar 23, 2011   Dec 9, 2011
             Load                  3     Dec 2, 2013    Mar 30, 2011   Dec 22, 2011
             Load                  3     Nov 1, 2013    May 10, 2011   Jan 9, 2012
             Cogen                 5     May 30, 2012   Jul 27, 2011   Jan 23, 2012
             Load                  3     Mar 1, 2013    Sep 20, 2011   Feb 16, 2012
             Load                  3     Jan 8, 2014    May 11, 2011   Feb 21, 2012
             Load                  3     Jan 31, 2013   Jul 28, 2011   Mar 5, 2012
             Cogen                 3     May 1, 2015    Apr 4, 2011    Mar 20, 2012
             Coal                  5     May 12, 2012   Aug 11, 2008   Mar 21, 2012
             Load                  3     Dec 22, 2014   Mar 1, 2011    Apr 4, 2012
             Load                  3     Aug 1, 2014    Mar 8, 2011    Apr 26, 2012
             Load                  3     Apr 10, 2015   Sep 8, 2011    May 9, 2012
             Load                  3     Aug 27, 2013   Aug 19, 2011   May 24, 2012
             Gas                   3     Dec 31, 2013   Oct 10, 2011   May 24, 2012
onnection Process.
erned by the Connection Process.



                                                                                                    Public
             Transmission Project Delivery                                            1   R1 - 2012-06-06

				