PBS_Metrics_20110909_2011SeptWGM

Document Sample
PBS_Metrics_20110909_2011SeptWGM Powered By Docstoc
					Tab Name
Report Card




Summary Report




Recirculation


Unpublished CMETs




Unpublished Ballots



Project Insight Metrics
Description
Provides a count of the number of infractions by Work Group
Green Items: No action needed
Red Items: View the Summary Report to find out more detail about what actions are needed.
For Project Insight red items, see info below in this Legend tab on what actions are needed.

A list of infractions sorted by Work Group. The source of the report are the other tabs to the right of the Summary
Report tab.
Use this report to help address Red Items for:
Recirculation
Unpublished CMETs
Unpublished Ballots

Lists items that Have passed Normative ballot but have outstanding negatives that will require a recirculation
Refer to Notes/Action Items cell for more information on what action needs to be taken.

Lists CMETs items that are Finished (passed by numbers and Recon is complete) but Unpublished (waiting for
For informational purposes be completd by Andy to be taken at Dave Hamill)
the CMET clean-up work to only. No action needs Stechison and this time (waiting for the CMET clean-up work to
be completed by Andy Stechison and Dave Hamill)

Lists items that Are Finished (passed by numbers and Recon is complete) but Unpublished (not in Normative
Edition or on HL7 Standards page)
Refer to Notes/Action Items cell for more information on what action needs to be taken.

Project statistics (by Work Group); source is Project Insight. Use the Searchable Project Database on
www.HL7.org to view your Work Group's project:
http://www.hl7.org/special/Committees/projman/searchableProjectIndex.cfm?ref=common
Send your corrections to Red items to pmo@HL7.org.
Take the following action if you have Red item:
Next Milestone Date Behind > 120 Days: Review project list and determine the next deliverable and Next Milestone Date (you c
Pjt Insight Items Status=Blank: Determine what the correct status is for those projects. Valid values are:Active Project (Resou
Nbr Of 3YP Items in Pjt Insight: If zero, create 3YP Items for your Work Group and email them to pmo@HL7.org
             Owner




             Lynn Laakso


             Lynn Laakso




             Lynn Laakso



             David Hamill




 ext Milestone Date (you can email this info to pmo@HL7.org)
are:Active Project (Resources assigned to pjt) 3-Year Plan Item On Hold (No resources assigned to pjt)Comment Only - Preparing Ballot C
omment Only - Preparing Ballot Comment Only - Balloting   Comment Only - Considering Comments   Informative - Preparing for Ballot
Informative - Preparing for Ballot   Informative - Balloting   Informative - Reconcile   Informative - Request Publication   DSTU - P
e - Request Publication   DSTU - Preparing Ballot   DSTU - Balloting   DSTU - Expired Test Period   DSTU - Reconcile   DSTU - R
DSTU - Reconcile   DSTU - Request Publication   DSTU - Test Period/Accepting Comments   ISO/JIC - Balloting   ISO/JIC - R
ISO/JIC - Balloting   ISO/JIC - Reconcile   Normative - Preparing Ballot   Normative - Balloting   Normative - Reconcile   Normative -
Normative - Reconcile   Normative - Notify   Normative - ANSI Approved   Archived
                                                                                          Pjt Insight
                                                                                                                               % of PI Items
                                                                                             Items       Nbr Of                  with Nxt
                                                                         Pjt Insight Nxt Status=Blank      3YP       Total       Milestone
                                                                           Milestone       (w/ NMD      Items in   Items in   Behind>120 vs.
                                    Steering          Unpub.    Unpub.    Behind >120 Behind<120            Pjt       Pjt      Total PI Items
Work Group                          Division  Recirc. Ballots   CMETs          Days          Days)       Insight    Insight   (Col. G / Col. K)
Anatomic Pathology Work Group DESD              0        0        0              1              0            0         1           100%
Architectural Review Work Group None            0        1        0              2              0            0         2           100%
Arden Syntax Work Group             SSD SD      0        0        0              3              0            0         3           100%
Attachments Work Group              DESD        0        4        0              8              0            0         8           100%
Board of Directors Work Group       None        0        0        0              7              0            0         7           100%
                                    Work Group 0
Clinical Context Object Workgroup SSD SD                 0        0              1              0            1         2            50%
Child Health Work Group             DESD        0        0        0              3              0            2         3           100%
Clinical Decision Support Work Group SD
                                    SSD         0        0        0              5              0            0         6            83%
Clinical Genomics Work Group        SSD SD      0        1        0             10              0            2        10           100%
Clinical Interoperability Council Work Group
                                    DESD        0        2        0              7              0            0         7           100%
Clinical Statement Work Group       SSD SD      0        0        0              1              0            0         1           100%
Community Based Collaborative Care Work Group 0
                                    DESD                 0        0              5              0            1         6            83%
Conformance & Guidance for Implementation/Testing Work Group
                                    FTSD        0        0        0              3              0            1         3           100%
Education Work Group                T3SD        0        0        0              9              0            5         9           100%
Electronic Health Records Work Group SD
                                    SSD         1        1        0             16              0            0        16           100%
Electronic Services Work Group      T3SD        0        0        0              5              0            4         7            71%
Emergency Care Work Group           DESD        0        0        0              3              0            1         3           100%
Financial Management Work Group     SSD SD      0        0        0              6              0            1         6           100%
Generation of Anesthesia Standards Work Group 0
                                    DESD                 0        0              3              0            1         3           100%
Government Projects Work Group DESD             0        0        0              1              0            0         1           100%
Health Care Devices Work Group DESD             0        0        0              1              0            1         1           100%
Imaging Integration Work Group DESD             0        0        1              4              0            3         4           100%
Implementable Technology Specifications Work Group
                                    FTSD        2        1        0             10              0            0        10           100%
Infrastructure and Messaging WorkFTSDGroup      0        0        0              3              0            0         3           100%
International Mentoring Committee Work Group 0
                                    T3SD                 0        0              0              0            0         0          #DIV/0!
Marketing Work Group                None        0        0        0              3              0            0         3           100%
Modeling and Methodology Work FTSD  Group       2        0        2              8              0            1         9            89%
Orders and Observations Work Group SD
                                    SSD         1        2        0             22              0            8        27            81%
Patient Administration Work GroupSSD SD         0        3        1              8              0            3         9            89%
Patient Care Work Group             DESD        0        1        0             16              0            6        17            94%
Patient Safety Work Group           DESD        0        0        0              5              0            1         5           100%
Pharmacy Work Group                 DESD        0        1        2             17              0            7        18            94%
Public Health and Emergency Response Work Group
                                    DESD        0        0        0              9              0            0         9           100%
Process Improvement Work Group T3SD            0          0     0         6         0    4     7      86%
Project Services Work Group       T3SD         0          0     0        11         0    9    11     100%
Publishing Work Group             T3SD         0          0     0         7         0    6     8      88%
Regulated Clinical Research Information Management Work Group
                                  DESD         0          5     0         9         0    6    14      64%
RIMBAA Work Group                 FTSD         0          0     0         1         0    0     1     100%
Security Work Group               FTSD         0          0     0         4         0    0     4     100%
Services Oriented Architecture Work Group
                                  FTSD         1          1     0         3         0    0     4      75%
Structured Documents Work Group   SSD SD       0          1     0        12         0    0    20      60%
Technical Steering Committee      None         0          0     0         9         0    1     9     100%
Templates Work Group              FTSD         0          0     0         3         0    0     3     100%
Tooling Work Group                T3SD         0          0     0         7         0    4     7     100%
Vocabulary Work Group             FTSD         0          0     0        13         0    2    13     100%

Total                                         7         24      6        290        2    81   320

Legend                                        =0        =0      =0   Per Column K   =0   =0           >66%
                                              >0        >0      >0   Per Column K   >0   >0         33%-66%
                                                                     Per Column K                     <33%
2011 May WGM Totals                           6         29      8         156       15   74   303
                                                     43-8=35
Infraction                                   Work Group
Pjt Insight Status=Blank                     Anatomic Pathology Work
                                             Group

Pjt Insight Next Milestone Behind>120 Days   Anatomic Pathology Work
                                             Group
Pjt Insight Next Milestone Behind>120 Days   Architectural Review Work
                                             Group
Unpublished Ballot                           Clinical Interoperability
                                             Council Work Group

Pjt Insight Status=Blank                     Arden Syntax Work Group
Pjt Insight Status=Blank                     Attachments Work Group
Pjt Insight Status=Blank                     Attachments Work Group




Pjt Insight Status=Blank                     Board of Directors Work
                                             Group
Pjt Insight Status=Blank                     Attachments Work Group



Pjt Insight Status=Blank                     Clinical Decision Support
                                             Work Group
Pjt Insight Status=Blank                     Attachments Work Group



Pjt Insight Status=Blank                     Modeling and Methodology
                                             Work Group
Pjt Insight Status=Blank                     Structured Documents Work
                                             Group
Pjt Insight Next Milestone Behind>120 Days   Attachments Work Group

Pjt Insight Next Milestone Behind>120 Days   Attachments Work Group

Pjt Insight Next Milestone Behind>120 Days   Attachments Work Group

Pjt Insight Next Milestone Behind>120 Days   Attachments Work Group

Pjt Insight Next Milestone Behind>120 Days   Attachments Work Group

Unpublished Ballot                           Regulated Clinical Research
                                             Information Management
                                             Work Group
Unpublished Ballot                           Services Oriented
                                             Architecture Work Group
Unpublished Ballot                           Structured Documents Work
                                             Group
Unpublished Ballot                           Architectural Review Work
                                             Group




Pjt Insight Status=Blank                     Attachments Work Group




Pjt Insight Next Milestone Behind>120 Days   Attachments Work Group

Pjt Insight Next Milestone Behind>120 Days   Board of Directors Work
                                             Group
Pjt Insight Next Milestone Behind>120 Days   Board of Directors Work
                                             Group
Pjt Insight Next Milestone Behind>120 Days   Child Health Work Group

Pjt Insight Next Milestone Behind>120 Days   Child Health Work Group

Pjt Insight Next Milestone Behind>120 Days   Clinical Context Object
                                             Workgroup Work Group
Pjt Insight Next Milestone Behind>120 Days   Clinical Decision Support
                                             Work Group
Pjt Insight Next Milestone Behind>120 Days   Clinical Decision Support
                                             Work Group
Pjt Insight Next Milestone Behind>120 Days   Clinical Genomics Work
                                             Group
Pjt Insight Next Milestone Behind>120 Days   Clinical Genomics Work
                                             Group
Pjt Insight Next Milestone Behind>120 Days   Clinical Interoperability
                                             Council Work Group
Pjt Insight Next Milestone Behind>120 Days   Clinical Interoperability
                                             Council Work Group
Unpublished Ballot                           Attachments Work Group

Pjt Insight Next Milestone Behind>120 Days   Clinical Genomics Work
                                             Group
Pjt Insight Next Milestone Behind>120 Days   Clinical Interoperability
                                             Council Work Group
Pjt Insight Next Milestone Behind>120 Days   Community Based
                                             Collaborative Care Work
                                             Group
Pjt Insight Next Milestone Behind>120 Days   Clinical Interoperability
                                             Council Work Group
Unpublished Ballot                           Attachments Work Group

Unpublished Ballot                           Clinical Genomics Work
                                             Group

Pjt Insight Next Milestone Behind>120 Days   Conformance & Guidance for
                                             Implementation/Testing
                                             Work Group
Pjt Insight Next Milestone Behind>120 Days   Education Work Group

Pjt Insight Next Milestone Behind>120 Days   Community Based
                                             Collaborative Care Work
                                             Group
Pjt Insight Next Milestone Behind>120 Days   Electronic Health Records
                                             Work Group
Pjt Insight Next Milestone Behind>120 Days   Conformance & Guidance for
                                             Implementation/Testing
                                             Work Group
Pjt Insight Next Milestone Behind>120 Days   Conformance & Guidance for
                                             Implementation/Testing
                                             Work Group
Pjt Insight Next Milestone Behind>120 Days   Electronic Health Records
                                             Work Group
Pjt Insight Next Milestone Behind>120 Days   Electronic Health Records
                                             Work Group
Pjt Insight Next Milestone Behind>120 Days   Electronic Health Records
                                             Work Group

Pjt Insight Next Milestone Behind>120 Days   Electronic Health Records
                                             Work Group
Pjt Insight Next Milestone Behind>120 Days   Electronic Health Records
                                             Work Group
Pjt Insight Next Milestone Behind>120 Days   Electronic Health Records
                                             Work Group
Pjt Insight Next Milestone Behind>120 Days   Emergency Care Work
                                             Group
Pjt Insight Next Milestone Behind>120 Days   Electronic Health Records
                                             Work Group
Pjt Insight Next Milestone Behind>120 Days   Financial Management Work
                                             Group
Pjt Insight Next Milestone Behind>120 Days   Electronic Health Records
                                             Work Group
Pjt Insight Next Milestone Behind>120 Days   Generation of Anesthesia
                                             Standards Work Group
Pjt Insight Next Milestone Behind>120 Days   Generation of Anesthesia
                                             Standards Work Group
Unpublished Ballot                           Attachments Work Group

Pjt Insight Next Milestone Behind>120 Days   Imaging Integration Work
                                             Group
Unpublished Ballot                           Attachments Work Group

Recirculation                                Electronic Health Records
                                             Work Group
Pjt Insight Next Milestone Behind>120 Days   Implementable Technology
                                             Specifications Work Group
Pjt Insight Next Milestone Behind>120 Days   Emergency Care Work
                                             Group
Pjt Insight Next Milestone Behind>120 Days   Implementable Technology
                                             Specifications Work Group
Pjt Insight Next Milestone Behind>120 Days   Implementable Technology
                                             Specifications Work Group
Pjt Insight Next Milestone Behind>120 Days   Marketing Work Group

Pjt Insight Next Milestone Behind>120 Days   Marketing Work Group

Unpub CMET                                   Imaging Integration Work
                                             Group

Pjt Insight Next Milestone Behind>120 Days   Implementable Technology
                                             Specifications Work Group
Pjt Insight Next Milestone Behind>120 Days   Modeling and Methodology
                                             Work Group
Pjt Insight Next Milestone Behind>120 Days   Implementable Technology
                                             Specifications Work Group
Pjt Insight Next Milestone Behind>120 Days   Orders and Observations
                                             Work Group
Unpublished Ballot                           Clinical Interoperability
                                             Council Work Group

Pjt Insight Next Milestone Behind>120 Days   Orders and Observations
                                             Work Group
Recirculation                                Implementable Technology
                                             Specifications Work Group


Pjt Insight Next Milestone Behind>120 Days   Orders and Observations
                                             Work Group
Recirculation                                Implementable Technology
                                             Specifications Work Group
Pjt Insight Next Milestone Behind>120 Days   Orders and Observations
                                             Work Group
Pjt Insight Next Milestone Behind>120 Days   Marketing Work Group

Pjt Insight Status=Blank                     Modeling and Methodology
                                             Work Group
Pjt Insight Next Milestone Behind>120 Days   Orders and Observations
                                             Work Group
Pjt Insight Next Milestone Behind>120 Days   Patient Administration Work
                                             Group
Pjt Insight Next Milestone Behind>120 Days   Patient Care Work Group
Pjt Insight Next Milestone Behind>120 Days   Modeling and Methodology
                                             Work Group
Pjt Insight Next Milestone Behind>120 Days   Modeling and Methodology
                                             Work Group
Unpub CMET                                   Modeling and Methodology
                                             Work Group
Unpub CMET                                   Modeling and Methodology
                                             Work Group
Pjt Insight Next Milestone Behind>120 Days   Patient Care Work Group

Recirculation                                Modeling and Methodology
                                             Work Group
Pjt Insight Next Milestone Behind>120 Days   Patient Safety Work Group

Recirculation                                Modeling and Methodology
                                             Work Group
Pjt Insight Next Milestone Behind>120 Days   Orders and Observations
                                             Work Group
Pjt Insight Next Milestone Behind>120 Days   Orders and Observations
                                             Work Group
Pjt Insight Next Milestone Behind>120 Days   Pharmacy Work Group

Pjt Insight Next Milestone Behind>120 Days   Orders and Observations
                                             Work Group
Pjt Insight Next Milestone Behind>120 Days   Pharmacy Work Group

Pjt Insight Next Milestone Behind>120 Days   Orders and Observations
                                             Work Group
Pjt Insight Next Milestone Behind>120 Days   Orders and Observations
                                             Work Group
Unpublished Ballot                           Implementable Technology
                                             Specifications Work Group

Pjt Insight Next Milestone Behind>120 Days   Process Improvement Work
                                             Group
Unpublished Ballot                           Orders and Observations
                                             Work Group
Unpublished Ballot                           Electronic Health Records
                                             Work Group
Pjt Insight Next Milestone Behind>120 Days   Public Health and
                                             Emergency Response Work
                                             Group
Recirculation                                Orders and Observations
                                             Work Group
Pjt Insight Next Milestone Behind>120 Days   Publishing Work Group

Unpublished Ballot                           Orders and Observations
                                             Work Group
Unpublished Ballot                           Patient Administration Work
                                             Group
Unpublished Ballot                           Regulated Clinical Research
                                             Information Management
                                             Work Group
Unpub CMET                                   Patient Administration Work
                                             Group



Pjt Insight Next Milestone Behind>120 Days   Patient Care Work Group

Pjt Insight Next Milestone Behind>120 Days   Regulated Clinical Research
                                             Information Management
                                             Work Group
Pjt Insight Next Milestone Behind>120 Days   Patient Care Work Group

Pjt Insight Next Milestone Behind>120 Days   Security Work Group

Pjt Insight Next Milestone Behind>120 Days   Security Work Group

Pjt Insight Next Milestone Behind>120 Days   Patient Care Work Group

Pjt Insight Next Milestone Behind>120 Days   Patient Care Work Group

Pjt Insight Next Milestone Behind>120 Days   Services Oriented
                                             Architecture Work Group
Unpublished Ballot                           Patient Administration Work
                                             Group

Pjt Insight Next Milestone Behind>120 Days   Patient Safety Work Group

Pjt Insight Next Milestone Behind>120 Days   Structured Documents Work
                                             Group
Pjt Insight Next Milestone Behind>120 Days   Structured Documents Work
                                             Group
Pjt Insight Next Milestone Behind>120 Days   Patient Safety Work Group

Pjt Insight Next Milestone Behind>120 Days   Pharmacy Work Group

Pjt Insight Next Milestone Behind>120 Days   Pharmacy Work Group

Pjt Insight Next Milestone Behind>120 Days   Structured Documents Work
                                             Group
Pjt Insight Next Milestone Behind>120 Days   Pharmacy Work Group

Pjt Insight Next Milestone Behind>120 Days   Technical Steering
                                             Committee
Pjt Insight Next Milestone Behind>120 Days   Technical Steering
                                             Committee
Pjt Insight Next Milestone Behind>120 Days   Pharmacy Work Group

Pjt Insight Next Milestone Behind>120 Days   Templates Work Group
Pjt Insight Next Milestone Behind>120 Days   Pharmacy Work Group

Pjt Insight Next Milestone Behind>120 Days   Pharmacy Work Group

Pjt Insight Next Milestone Behind>120 Days   Pharmacy Work Group

Unpub CMET                                   Pharmacy Work Group



Pjt Insight Next Milestone Behind>120 Days   Tooling Work Group

Unpub CMET                                   Pharmacy Work Group

Pjt Insight Next Milestone Behind>120 Days   Vocabulary Work Group


Pjt Insight Next Milestone Behind>120 Days   Process Improvement Work
                                             Group
Pjt Insight Next Milestone Behind>120 Days   Vocabulary Work Group

Pjt Insight Next Milestone Behind>120 Days   Vocabulary Work Group

Pjt Insight Next Milestone Behind>120 Days   Vocabulary Work Group

Pjt Insight Next Milestone Behind>120 Days   Vocabulary Work Group

Pjt Insight Next Milestone Behind>120 Days   Public Health and
                                             Emergency Response Work
                                             Group
Pjt Insight Next Milestone Behind>120 Days   Publishing Work Group

Pjt Insight Next Milestone Behind>120 Days   Publishing Work Group

Pjt Insight Next Milestone Behind>120 Days   Publishing Work Group

Unpublished Ballot                           Patient Administration Work
                                             Group

Unpublished Ballot                           Regulated Clinical Research
                                             Information Management
                                             Work Group
Unpublished Ballot                           Regulated Clinical Research
                                             Information Management
                                             Work Group
Pjt Insight Next Milestone Behind>120 Days   Security Work Group

Pjt Insight Next Milestone Behind>120 Days   Services Oriented
                                             Architecture Work Group
Pjt Insight Next Milestone Behind>120 Days   Services Oriented
                                             Architecture Work Group
Unpublished Ballot                           Patient Care Work Group




Recirculation                                Services Oriented
                                             Architecture Work Group


Pjt Insight Next Milestone Behind>120 Days   Structured Documents Work
                                             Group
Unpublished Ballot                           Regulated Clinical Research
                                             Information Management
                                             Work Group
Unpublished Ballot                           Pharmacy Work Group

Pjt Insight Next Milestone Behind>120 Days   Technical Steering
                                             Committee
Pjt Insight Next Milestone Behind>120 Days   Templates Work Group

Pjt Insight Next Milestone Behind>120 Days   Tooling Work Group

Pjt Insight Next Milestone Behind>120 Days   Vocabulary Work Group
Standard/Document Name                                            Pjt ID
Anatomic Pathology CDA Project                                             176


Anatomic Pathology CDA Project                                             176

HL7 Harmonization Framework and Exchange Architecture                      687
(HF&EA)
HL7 Version 3 Domain Analysis Model: Emergency Medical                     512
Services, Release 1 – US Realm

Arden Syntax for Medical Logic Systems, Version 3.0                        771
                                                                           (CDAR1AIS0007R010)
Children's Preventive Health Services Additional Information Specification 286
Additional Information Specifications 0011: Periodontal                    314
Attachment



July 2011 Harmonization V3 Repository update                               795

Additional Information Specification 0010: Pharmacy Prior                  281
Authorization Attachment (CDAR1AIS0010R010)


Order Set Publication Standard                                             259

Patient Information Unspecified Attachment                                 218



Common Message Element Types (COCT) Release 8                              221

CDA Modeling with UML                                                      487

Additional Information Specifications 0011: Periodontal                    314
Attachment
Children's Preventive Health Services Additional Information               286
Specification (CDAR1AIS0007R010)
Additional Information Specification 0008: Home Health                     282
Attachment (CDAR1AIS0008R010)
Additional Information Specification 0010: Pharmacy Prior                  281
Authorization Attachment (CDAR1AIS0010R010)
Patient Information Unspecified Attachment                                 218

HL7 Version 3 Standard: Regulated Studies; CDISC Content to                205
Message - Subject Data, Release 1

HL7 Version 3 Standard: Privacy, Access and Security Services -            200
Access Control, Release 1
HL7 Implementation Guide for CDA Release 2: Genetic Testing      460
Reports, Release 1
HL7 Services-Aware Interoperability Framework: Canonical         746
Version, Release 1




Additional Information Specification Documents Conversion from   135
CDA R1.0 to CDA R2.0



Additional Information Specification Documents Conversion from   135
CDA R1.0 to CDA R2.0
Gap Analysis of HL7 Standards Portfolio                          180

HL7 Business Plan contract                                       766

Annual Updates to Child Health 3-Year Plan                       572

Update EHR Child Health Functional Profile for Release 2         691

Consider extending CCOW to handle Authorizations                 624

Order Set Publication Standard                                   259

Infobutton URL-based implementation guide                        130

Connection with Decision Support                                 564

Specimen Handling CMET                                           565

Trauma Data Exchange Domain Analysis Model                       774

Emergency Medical Services Domain Analysis Model, V2             678

Additional Information Specifications 0000, 0001, 0003, 0004,    135
0005, 0006: Update to CDA Release 2
Gene Expression                                                  333

Clinical Content Development, Harmonization and Definition       329
(Roadmap Pjt #5,6,10)
Update V3 Privacy Message                                        577
Tuberculosis Domain Analysis Model, Release 2                       371

Additional Information Specifications 0011: Periodontal             314
Attachment
HL7 Version 3 Domain Analysis Model: Clinical Genomics; Gene        333
Expression, Release 1

DSTU Testing toolkit/project (Guidance of what is involved in       198
DSTU testing)

Education Curriculum Development (Ongoing effort)                   545

Privacy Policy Reference Catalogue                                  656


EPrescribing Functional Profile based on the EHR-S Functional       697
Model
Develop and publish Principles & guidelines to specify the syntax   630
for vocabulary binding in implementation guides

V2.8 Proposals - Improve conformance for better testing             629


Ambulatory Oncology EHR-S Functional Profile                        609

EHR Interoperability Model - EHR/IM                                 261

HL7 Personal Health Record System Functional Model - Promote        660
from DSTU to Normative and Promote to ISO TC215 under
ISO/HL7 Pilot Agreement
Dental Health Functional Profile                                    654

Electronic Health Record Lifecycle Model                            201

HL7 White Paper: 'Balancing the Integrity and Value of Personal     610
Health Records with...'
Emergency Care (EC) Domain Analyses Model, Release 1                368

Diabetes Data Strategy                                              509

Consumer Information Account                                        370

CDAr2 Reference Profile for EHR Interoperability                    202

Develop Implementation Guide (IG) for the use of HL7 messaging      543
within Anaesthesiology
Implementation Guide for CDA Release 3 - Anesthetic Record          513

AIS 0009: Patient Information Unspecific Content (PUIC)             218
Attachment, Release 2
CMET: A_DicomCompositeObjectReference minimal                       474
(COCT_RM830120UV05) R2
HL7 Implementation Guidance for Unique Object Identifiers       328
(OIDs), Release 1
Joint ISO Ballot – HL7 EHR System Functional Model, Release     480
1.1
V3 RIM Implementation Technology Specification for XML;         627
Release 1
Emergency Care DAM Version 2                                    573

XML ITS R2                                                      316

HL7 Web Services Profiles, Release 3                            301

University Outreach - Phase 1 (Pilot)                           596

CDA Product and Services Guide - Phase 3                        433

HL7 Version 3 Standard: Imaging Integration CMETs, Release 9    474


Neutral Mapping Notation                                        680

Common Message Element Types (COCT) Release 8                   221

Health informatics - Harmonized data types for information      484
interchange (ISO Ballot Project)
ACLA Test Compendium Framework Implementation Guide             653

HL7 Implementation Guide for CDA Release 2: Emergency           677
Medical Services Run Report, Release 1 – US Realm

O&O Domain Maintenance                                          618

HL7 Version 3 Standard: XML Implementation Technology           316
Specification - V3 Structures, Release 2


Harmonize Medication Order with Composite Order                 585

HL7 Version 3 Standard: Transport Specification - ebXML Using   759
ebMS 2.0, Release 1
Blood, Tissue, and Organ - Release 1                            312

Ambassador webinar program                                      599

HDF Phase III                                                   299

Order Domain - Order Pattern - Release 1                        110

Personnel Management CMETs                                      574

Care Provision: Adverse Reaction topic                          675
Complete Balloting of V3 Abstract Data Types R2                      455

HDF Phase III                                                        299

HL7 Version 3 Standard: Common Message Element Types
(Committee), Release 7
HL7 Version 3 Standard: Common Message Element Types
(Normative), Release 7
Care Provision: Care Transfer Topic (including Care Record,          667
Care Record Query)
HL7 Version 3 Standard: Core Principles and Properties of            219
Version 3 Models, Release 1
PSO Common Format CDA Project                                        620

HL7 Version 3 Standard: XML Implementation Technology                484
Specification R2; ISO-Harmonized Data Types, Release 1
Specimen CMET Second Release                                         682

Laboratory Related CMETs                                             349

HL7 V3 Std: Pharmacy, Release 1: Pharmacy Shared Messages            248

General Lab Order IG - R1                                            213

HL7 V3 Std: Pharmacy, Release 1: Generic Patient-Related             241
Pharmacy Query
HL7 Version 3 Standard: Laboratory, Release 1 Result Topic           113

Observation Request Template - Release 1                             111

HL7 Version 3 Standard: XML Implementation Technology                627
Specification for RIM Serializations, Release 1

2010 Co-Chair Handbook Maintenance                                   686

HL7 Version 3 Standard: Order Set Publication, Release 1             259

HL7 EHR-S Vital Records Functional Profile, Release 1 - US           223
Realm
Version 2.5.1 Implementation Guide for Immunization Messaging        458


HL7 Version 3 Standard: Common Clinical Product Model,               625
Release 1
Recurring maintenance of glossary and maintain ballot site and its   639
xhtml conformance
HL7 Version 3 Standard: Blood, Tissue, Organ; Donation,              312
Release 1
HL7 Version 3 Standard: Personnel Management; Provider               359
Registry, Release 2
HL7 Version 3 Implementation Guide: Regulated Studies; CDISC       205
Content to Message - Study Design R1

HL7 Version 3 Standard: Scheduling CMETs, Release 10               459




Care Provision DIM and Care Statement R2                           672

Laboratory Test Result Abnormality Assessment                      178


Care Provision Domain: evaluation of 2007 DSTU materials           671

Security Domain Analysis Model (DAM)                               529

Risk Assessment Framework Cookbook                                 226

Patient Care V2 revisions to Chapter 11 and 12                     670

Care Provision: Care Statement                                     669

Infrastructure: Resource Location and Updating Service             268
Functional Model
HL7 Version 3 Standard: Personnel Management; Organization         360
Registry, Release 2

Public Health Reporting Domain Analysis Model (PORR DAM)           494

CDA Modeling with UML                                              487

CDA R3                                                             477

HL7 Individual Case Safety Report Release 3 (JIC Ballot Project)   227

Medication Order Release 2                                         558

Medication CMETs Release 2                                         557

Structured Documents Architecture                                  172

Institutional Material                                             556

Innovations                                                        701

HL7 Product Quality Plan                                           647

Administration Event                                               555

Template Registry Pilot                                            611
HL7 V3 Std: Pharmacy, Release 1: Patient-Related Device Query      246

HL7 V3 Std: Pharmacy, Release 1: Dosage Instruction                240

HL7 V3 Std: Pharmacy, Release 1: Device Order                      238

HL7 Version 3 Standard: Pharmacy CMETs, Release 10                 501



MIF-based Publishing Project - Phase II                            665

HL7 Version 3 Standard: Common Product Model; Medication           249
CMETs, Release 11
HL7 Evaluation of the International Health Terminology Standards   644
Development Organisation (IHTSDO) Workbench Tool

First Time Attendee Process Improvement Project.                   643

Harmonize the V2 & V3 vocabulary                                   497

International SDO Glossary (was Health Informatics Harmonised      495
Glossary) (JIC project)
TermInfo - USING SNOMED CT in HL7 v3                               468

Vocabulary Conceptual Model                                        308

1-Complete PHER project list                                       454


Annual maintenance of V3 Guide & Backbone                          638

Annual Establishment of Publishing calendar(s)                     636

Annual Normative Editions                                          635

HL7 Version 3 Standard: Patient Administration R2; Patient         736
Encounter, Release 1

HL7 Version 3 Implementation Guide: Drug Stability Reporting       275
(eStability) R2, Release 2

HL7 Version 3 Implementation Guide: Regulated Studies; CDISC       205
Content to Message - Study Participation, R1

Privacy and Authorization Terminology                              224

Healthcare SOA Ontology Project                                    628

Privacy, Access and Security Services (PASS) Alpha Project         200
HL7 Version 3 Standard: Care Provision, Health Concern,          500
Release 1



HL7 Version 3 Standard: Identification Service (IS), Release 1   264



CDA Implementation Guide for Patient Assessments                 381

HL7 Version 3 Domain Analysis Model: Regulated Studies;          205
CDISC Content to Message - Study Participation, Release 1

HL7 Version 3 Standard: Identification of Medicinal Products –   501
Creation and Maintenance Messages, Release 1
TSC Product Visibility Project                                   478

HL7 Templates Registry Business Requirements Analysis            473

HL7 Static Model Designer Enhancement 1                          690

Guide for Best Practices for Implementation of Vocabulary        500
Notes/Action to be Taken
Sept. 2010 David Booker: This is likely no longer an active
project although a similar project is underway. I will discuss with
the group in Cambridge and let you know.
Next Milestone Date Is: - Select One -

Next Milestone Date Is: 2010 Sept WGM/Ballot

Needs submission of Informative Document publication request
form; passed by numbers, no negs, recon package posted


5/13/2008: Update: slow progress in converting to use CDA R2 and re-ballot, as of 5/7/2008 we have a champion to organize th
5/13/08: This passed unanimously on the first ballot but we are
currently (and actively) working on getting it to final publish state
- but - we have early indication that a substantive change may
occur, and if so, it will be re-balloted.



5/13/2008: Update: we no longer expect this to be published as
a CDA R1 document; it is on-hold except for applying existing
ballot comments in preparation for potential future movement to
CDA R2.
5/14/08 Update: James Campbell submitted a PSS to replace the one that was orginially submitted in May, 2006.

5/13/2008: Update: This project replaced project 285.
This CDA R2-based document passed unanimously on first
ballot in May 2008; mike cassidy currently applying ballot
comments for final publish, probably by July 2008.


2010July: updated project repository URLs




Next Milestone Date Is: - Select One -




Needs withdrawal; incorporate into CDA R3


This DSTU ballot has passed by the numbers, but reconciliation
is not quite complete and it has not yet been submitted for
publication. This item may or may not be included in the NE
2011 (per NE Review List Wiki page)
Needs DSTU publication request

passed by numbers, 30 negs; needs email to voters for
withdrawal and Informative document publication request;
Charlie Mead reports 2011-08-15 - we continue to work on the
SAIF Canonical Definition
document and hope/plan to have a publishable version (“V1 of
the SAIF CD”) to give to
the TSC at the start of the September meeting so that it can be
announced to the
membership. That version will address all of the May ballot
comments and will form the
core of the DSTU document that we will submit for the January
ballot".
5/13/2008: Update: These are the specifications needed for
HIPAA rulemaking, mike cassidy currently finalizing the
documents with much help from the ASIG in Phoenix.
 Promised the HIPAA rulemakers this would be done by end of
June 2008.


Next Milestone Date Is: - Select One -

Next Milestone Date Is: - Select One -

Next Milestone Date Is: 2011 Jan WGM/Ballot

Next Milestone Date Is: 2011 Jan WGM/Ballot

Next Milestone Date Is: 2010 Sept WGM/Ballot



Next Milestone Date Is: 2010 Jan WGM/Ballot

Next Milestone Date Is: 2010 September WGM

Next Milestone Date Is: 2010 Sept WGM/Ballot

Next Milestone Date Is: 2011 Jan WGM/Ballot

Next Milestone Date Is: 2011 Jan WGM/Ballot

needs Informative document publication request

Next Milestone Date Is: 2010 Sept WGM/Ballot

Next Milestone Date Is: 2010 Jan WGM/Ballot

Next Milestone Date Is: 2011 Jan WGM/Ballot
Next Milestone Date Is: 2010 Sept WGM/Ballot

needs Informative document publication request

Per NE Review List wiki page, This Informative document will
be re-balloted in the future. This item will not be included in the
NE 2011.
Next Milestone Date Is: 2010 May WGM/Ballot


Next Milestone Date Is: 2012 Jan WGM/Ballot

Next Milestone Date Is: 2010 Sept WGM/Ballot


Next Milestone Date Is: 2011 Jan WGM/Ballot

Next Milestone Date Is: 2010 Sept WGM/Ballot


Next Milestone Date Is: 2011 Jan WGM/Ballot


Next Milestone Date Is: 2010 Sept WGM/Ballot

Next Milestone Date Is: 2009 May WGM/Ballot

Next Milestone Date Is: 2011 Jan WGM/Ballot


Next Milestone Date Is: 2010 Sept WGM/Ballot

Next Milestone Date Is: 2010 Sept WGM/Ballot

Next Milestone Date Is: 2010 May WGM/Ballot

Next Milestone Date Is: 2010 Sept WGM/Ballot

Next Milestone Date Is: 2010 May WGM/Ballot

Next Milestone Date Is: 2010 Sept WGM/Ballot

Next Milestone Date Is: 2010 Sept WGM/Ballot

Next Milestone Date Is: 2010 Sept WGM/Ballot

Next Milestone Date Is: 2010 Sept WGM/Ballot

needs Informative document publication request

Next Milestone Date Is: - Select One -
Structured Documents submitted Informative document
publication request for TSC consideration on 8/29/2011
R1 is on the standards site as EHR-FM not EHR-S FM; Pat
VanDyke working on R1.1. incomplete recon package
Next Milestone Date Is: 2011 Jan WGM/Ballot

Next Milestone Date Is: - Select One -

Next Milestone Date Is: 2010 Sept WGM/Ballot

Next Milestone Date Is: 2010 May WGM/Ballot

Next Milestone Date Is: 2011 Jan WGM/Ballot

Next Milestone Date Is: - Select One -

This Normative ballot passes by the numbers, but the WG will
incorporate additional changes so this material will not be in the
NE2010 (per NE Review List wiki page)
Next Milestone Date Is: 2010 Sept WGM/Ballot



Next Milestone Date Is: 2011 Jan WGM/Ballot

Next Milestone Date Is: 2011 Jan WGM/Ballot

Needs submission of Informative Document publication request
form; passed by numbers, no negs, recon package posted

Next Milestone Date Is: - Select One -

This Normative ballot has passed by the numbers and has
completed reconciliation, but there are still several outstanding
negatives. This item was not included in the NE 2011

Next Milestone Date Is: 2010 Sept WGM/Ballot

This has passed by the numbers but 10 negatives remain

Next Milestone Date Is: 2010 Sept WGM/Ballot

Next Milestone Date Is: 2010 Sept WGM/Ballot



Next Milestone Date Is: 2011 Jan WGM/Ballot

Next Milestone Date Is: 2010 Sept WGM/Ballot

Next Milestone Date Is: 2010 Sept WGM/Ballot
Next Milestone Date Is: 2010 Jan WGM/Ballot

Next Milestone Date Is: - Select One -

Has recon pkg, and 0 negatives but NE10 has CMET R2-2009
revision of R1-2005
How to tell if a certain version is published?NE10 has CMET
R2-2009 revision of R1-2005
Next Milestone Date Is: 2010 Sept WGM/Ballot

This Normative document is still undergoing reconciliation Per
NE Review List wiki page
Next Milestone Date Is: 2011 Jan WGM/Ballot

This has passed by the numbers but 2 negatives remain

Next Milestone Date Is: 2010 Sept WGM/Ballot

Next Milestone Date Is: 2010 Sept WGM/Ballot

Next Milestone Date Is: 2011 Jan WGM/Ballot

Next Milestone Date Is: 2011 Jan WGM/Ballot

Next Milestone Date Is: 2010 September WGM

Next Milestone Date Is: 2010 Sept WGM/Ballot

Next Milestone Date Is: 2011 Jan WGM/Ballot

This DSTU has passed by the numbers although reconciliation
has not been completed. This item will not be included in the
NE 2011 per the NE Review List wiki page
Next Milestone Date Is: 2010 Sept WGM/Ballot

Passed by numbers, 14 negs remain, pkg posted; not on DSTU
site
needs Informative document publication request

Next Milestone Date Is: 2010 May WGM/Ballot


Outstanding negs; passed by numbers and recon package
posted. Not in NE2010
Next Milestone Date Is: 2010 Sept WGM/Ballot

Per an update from the O&O co-chairs, this item will not be
included in the NE 2011, Per NE Review List wiki page
While this DSTU ballot passed the WG determined there were
still technical issues that needed to be addressed and,
therefore, this material will not appear in NE 2010
Needs submission of Informative Document publication request
form; passed by numbers, 5 negs, recon package posted

This DSTU ballot has passed and reconciliation is complete, but
there is still one negative vote and the WG has not submitted
this for publication. This item may or may not be included in the
NE 2011 (per NE Review List Wiki page)

Next Milestone Date Is: 2011 Jan WGM/Ballot

Next Milestone Date Is: 2011 Jan WGM/Ballot


Next Milestone Date Is: 2010 Sept WGM/Ballot

Next Milestone Date Is: 2010 Sept WGM/Ballot

Next Milestone Date Is: 2010 Jan WGM/Ballot

Next Milestone Date Is: 2010 Sept WGM/Ballot

Next Milestone Date Is: 2011 Jan WGM/Ballot

Next Milestone Date Is: 2011 Jan WGM/Ballot

While this DSTU ballot passed the WG determined there were
still technical issues that needed to be addressed and,
therefore, this material will not appear in NE 2010
Next Milestone Date Is: 2010 Sept WGM/Ballot

Next Milestone Date Is: - Select One -

Next Milestone Date Is: 2010 Sept WGM/Ballot

Next Milestone Date Is: 2011 Jan WGM/Ballot

Next Milestone Date Is: 2010 May WGM

Next Milestone Date Is: 2010 May WGM/Ballot

Next Milestone Date Is: - Select One -

Next Milestone Date Is: 2010 May WGM

Next Milestone Date Is: 2010 Sept WGM/Ballot

Next Milestone Date Is: 2011 Jan WGM/Ballot

Next Milestone Date Is: 2010 January WGM

Next Milestone Date Is: 2010 Jan WGM/Ballot
Next Milestone Date Is: - Select One -

Next Milestone Date Is: - Select One -

Next Milestone Date Is: 2010 January WGM

Listed as HL7 Version 3 Standard: Orders; Substances CMETs
R10? This DSTU has not passed and has not completed
reconciliation. This item is not expected to be in the NE 2011
Per NE Review List wiki page
Next Milestone Date Is: 2010 Sept WGM/Ballot

just passed last cycle; negative voters not yet contacted.

Next Milestone Date Is: 2011 Jan WGM/Ballot


Next Milestone Date Is: 2010 May WGM/Ballot

Next Milestone Date Is: 2011 Jan WGM/Ballot

Next Milestone Date Is: 2010 Sept WGM/Ballot

Next Milestone Date Is: 2009 May WGM/Ballot

Next Milestone Date Is: - Select One -

Next Milestone Date Is: - Select One -


Next Milestone Date Is: 2010 Sept WGM/Ballot

Next Milestone Date Is: 2010 Sept WGM/Ballot

Next Milestone Date Is: 2010 Sept WGM/Ballot

Needs submission of Informative Document publication request
form; passed by numbers, 4 negs, recon package posted

Needs submission of Informative Document publication request
form; passed by numbers, no negs, recon package posted

Needs submission of Informative Document publication request
form; passed by numbers, 1 negs, recon package posted

Next Milestone Date Is: 2010 Jan WGM/Ballot

Next Milestone Date Is: 2011 Jan WGM/Ballot

Next Milestone Date Is: 2011 Jan WGM/Ballot
This DSTU has passed by the numbers and the WG has
indicated it should be included, but reconciliation has not been
completed. No paperwork has been submitted to request the
DSTU be published. (per NE Review List wiki page)

This Normative ballot has passed by the numbers, but it would
require a reballot or recirculation ballot to move forward and so
will not be in the NE 2010; DSTU EIS R1 expired Dec 2008

Next Milestone Date Is: 2011 May WGM/Ballot

passed by numbers, 0 negs; needs Informative document
publication request;

Passed by numbers, 22 negs remain, pkg posted;

Next Milestone Date Is: 2010 Sept WGM/Ballot

Next Milestone Date Is: 2010 Jan WGM/Ballot

Next Milestone Date Is: 2010 Sept WGM/Ballot

Next Milestone Date Is: 2010 May WGM/Ballot
ave a champion to organize the work (June Rosploch). We no longer plan to publish as a CDA R1 document.




d in May, 2006.
Infraction    Work Group                                    Name                              Pjt ID Type

            Electronic Health   Joint ISO Ballot – HL7 EHR System Functional Model, Release
Recirculation
            Records Work        1.1                                                             480   N
            Implementable       HL7 Version 3 Standard: XML Implementation Technology
Recirculation
            Technology          Specification - V3 Structures, Release 2                        316   N
            Modeling and        HL7 Version 3 Standard: Core Principles and Properties of
Recirculation
            Methodology         Version 3 Models, Release 1                                     219   N
            Orders and          HL7 Version 3 Standard: Common Clinical Product Model,
Recirculation
            Observations        Release 1                                                       625   N
            Services Oriented
            Architecture Work
Recirculation                HL7 Version 3 Standard: Identification Service (IS), Release 1     264   N
                             HL7 Version 3 Standard: XML Implementation Technology
                             Specification Group
            Modeling and Methodology Work R2; ISO-Harmonized Data Types, Release 1
Recirculation                                                                                   484   N
                             HL7 Version 3 Standard: Transport Specification - ebXML Using
Recirculation                ebMS 2.0, Release 1
            Implementable Technology Specifications Work Group                                  759   N
                    Notes                        Ballot Cycle Pkg. Lvl.Neg.    Q.    A.

R1 is on the standards site as EHR-FM not                          N1     8   75.23% 57
EHR-S FM; Pat VanDyke working on R1.1.          2009May      not complete
This Normative ballot has passed by the                            N2 13      85.86% 55
numbers and has completed reconciliation, but   2010May      Y
This Normative document is still undergoing                        N5     9   84.15% 38
reconciliation Per NE Review List wiki page     2011May      Y
Outstanding negs; passed by numbers and                            N1 11      92.00% 38
recon package posted. Not in NE2010             2009Jan      Y
This Normative ballot has passed by the                            N1 14      93.62% 51
numbers, but it would require a reballot or     2009Sept     Y
This has passed by the numbers but 2
negatives remain                                2009 Sept    Y     N1    2    92.16% 71
This has passed by the numbers but 10
negatives remain                                2011May      Y     N1   10    92.86% 42
Infraction     Work Group                                   Name                               Pjt ID

Unpub        Imaging
CMET         Integration Work   HL7 Version 3 Standard: Imaging Integration CMETs, Release 9        474
Unpub        Modeling and       HL7 Version 3 Standard: Common Message Element Types
CMET         Methodology        (Committee), Release 7                                         ??
Unpub        Modeling and       HL7 Version 3 Standard: Common Message Element Types
CMET         Methodology        (Normative), Release 7                                         ??
Unpub        Patient
CMET         Administration     HL7 Version 3 Standard: Scheduling CMETs, Release 10                459
Unpub        Pharmacy Work
CMET         Group              HL7 Version 3 Standard: Pharmacy CMETs, Release 10                  501
Unpub        Pharmacy Work      HL7 Version 3 Standard: Common Product Model; Medication
CMET         Group              CMETs, Release 11                                                   249
                     Notes                          Ballot Cycle Pkg. Lvl.Neg.    Q.    A.

This Normative ballot passes by the numbers,                          N1    3    95.06% 41
but the WG will incorporate additional changes      2009Sept    Y
Has recon pkg, and 0 negatives but NE10 has                           C3    0    89.47% 18
CMET R2-2009 revision of R1-2005                    2008Sept    Y
How to tell if a certain version is                                   N3   11    76.85% 33
published?NE10 has CMET R2-2009 revision            2008Sept    Y
This DSTU ballot has passed and reconciliation                        D1    1    83.12% 20
is complete, but there is still one negative vote   2010Jan     Y
Listed as HL7 Version 3 Standard: Orders;                             N3    2    84.29% 20
Substances CMETs R10? This DSTU has not             2010May     Y
just passed last cycle; negative voters not yet                       N2   10    82.72% 34
contacted.                                          2011Jan     Y
  Infraction     Work Group                                      Name                                 Pjt ID


Unpublished    Clinical             HL7 Implementation Guide for CDA Release 2: Emergency
Ballot         Interoperability     Medical Services Run Report, Release 1 – US Realm                   677
Unpublished    Implementable        HL7 Version 3 Standard: XML Implementation Technology
Ballot         Technology           Specification for RIM Serializations, Release 1                     627
Unpublished    Orders and
Ballot         Observations         HL7 Version 3 Standard: Order Set Publication, Release 1            259
Unpublished    Orders and           HL7 Version 3 Standard: Blood, Tissue, Organ; Donation,
Ballot         Observations         Release 1                                                           312
Unpublished    Patient              HL7 Version 3 Standard: Personnel Management; Provider
Ballot         Administration       Registry, Release 2                                                 359
Unpublished    Patient              HL7 Version 3 Standard: Personnel Management; Organization
Ballot         Administration       Registry, Release 2                                                 360
Unpublished    Patient              HL7 Version 3 Standard: Patient Administration R2; Patient
Ballot         Administration       Encounter, Release 1                                                736
Unpublished    Patient Care Work    HL7 Version 3 Standard: Care Provision, Health Concern,
Ballot         Group                Release 1                                                           500
Unpublished    Pharmacy Work        HL7 Version 3 Standard: Identification of Medicinal Products –
Ballot         Group                Creation and Maintenance Messages, Release 1                        501
Unpublished    Regulated Clinical   HL7 Version 3 Standard: Regulated Studies; CDISC Content to
Ballot         Research             Message - Subject Data, Release 1                                   205
Unpublished    Services Oriented    HL7 Version 3 Standard: Privacy, Access and Security Services -
Ballot         Architecture Work    Access Control, Release 1                                           200
Unpublished    Structured           HL7 Implementation Guide for CDA Release 2: Genetic Testing
Ballot         Documents Work       Reports, Release 1                                                  460
Unpublished    Architectural        HL7 Services-Aware Interoperability Framework: Canonical
Ballot         Review Work          Version, Release 1                                                  746
Unpublished    Attachments Work     Additional Information Specifications 0000, 0001, 0003, 0004,
Ballot         Group                0005, 0006: Update to CDA Release 2                                 135
Unpublished    Attachments Work     Additional Information Specifications 0011: Periodontal
Ballot         Group                Attachment                                                          314
Unpublished    Attachments Work     AIS 0009: Patient Information Unspecific Content (PUIC)
Ballot         Group                Attachment, Release 2                                               218
Unpublished    Attachments Work     HL7 Implementation Guidance for Unique Object Identifiers
Ballot         Group                (OIDs), Release 1                                                   328
               Clinical Genomics
               Work Group
Unpublished                         HL7 Version 3 Domain Analysis Model: Clinical Genomics; Gene
Ballot                              Expression, Release 1                                               333
               Clinical
               Interoperability
Unpublished    Council Work         HL7 Version 3 Domain Analysis Model: Emergency Medical
Ballot         Group                Services, Release 1 – US Realm                                      512
Unpublished    Electronic Health    HL7 EHR-S Vital Records Functional Profile, Release 1 - US
Ballot         Records Work         Realm                                                               223
               Regulated Clinical
               Research
               Information
Unpublished    Management           HL7 Version 3 Implementation Guide: Drug Stability Reporting
Ballot         Work Group           (eStability) R2, Release 2                                          275
Unpublished   Regulated Clinical   HL7 Version 3 Implementation Guide: Regulated Studies; CDISC
Ballot        Research             Content to Message - Study Design R1                           205
Unpublished   Regulated Clinical   HL7 Version 3 Implementation Guide: Regulated Studies; CDISC
Ballot        Research             Content to Message - Study Participation, R1                   205
Unpublished   Regulated Clinical   HL7 Version 3 Domain Analysis Model: Regulated Studies;
Ballot        Research             CDISC Content to Message - Study Participation, Release 1      205
 Type:                          Notes                           Ballot   Pkg. Lvl.Neg.    Q.    A.
D-DSTU,                                                         Cycle
I-Inform
           Needs submission of Informative Document
   D       publication request form; passed by numbers,        2011May Y      D1    1    84.95% 30
           This DSTU has passed by the numbers                                D2   27    90.08% 46
   D       although reconciliation has not been completed.     2010Sept Y
           Passed by numbers, 14 negs remain, pkg                             D1   14    91.46% 36
   D       posted; not on DSTU site                            2008Sept Y
           Per an update from the O&O co-chairs, this                         D2   12    85.87% 30
   D       item will not be included in the NE 2011, Per NE    2010May Y
           While this DSTU ballot passed the WG                               D1    4    93.51% 30
   D       determined there were still technical issues that   2009Jan   Y
           While this DSTU ballot passed the WG                               D1    1    93.24% 23
   D       determined there were still technical issues that   2009Jan   Y
           Needs submission of Informative Document
   D       publication request form; passed by numbers, 4      2011May Y      D1    4    84.38% 40
           This DSTU has passed by the numbers and the                        D2   12    96.63% 35
   D       WG has indicated it should be included, but         2009Sept Y
           Passed by numbers, 22 negs remain, pkg
   D       posted;                                             2011May Y      D1   22    85.22% 42
                                                                              D1   25    92.86% 51
   D       Needs withdrawal; incorporate into CDA R3           2009Sept Y
           This DSTU ballot has passed by the numbers,                        D1    2    86.54% 33
   D       but reconciliation is not quite complete and it     2010Jan   Y
                                                                              D1    6    91.67% 41
   D       Needs DSTU publication request                      2010Sept Y
           passed by numbers, 30 negs; needs email to
   I       voters for withdrawal and Informative document      2011May Y      I1   30    86.03% 55
           needs Informative document publication
   I       request                                             2007May Y      I2    2    90.77% 50
           needs Informative document publication
   I       request                                             2007Sep Y      I1    0    88.24% 31
           needs Informative document publication
   I       request                                             2008May Y      I2    0    93.59% 57
           Structured Documents submitted Informative
   I       document publication request for TSC                2009May Y      I2   28    88.97% 53
                                                                              I2   16    83.04% 28
           Per NE Review List wiki page, This Informative
           document will be re-balloted in the future. This
   I       item will not be included in the NE 2011.        2010May Y

           Needs submission of Informative Document
           publication request form; passed by numbers,
   I       no negs, recon package posted                       2011May Y      I3    0    87.50% 34
           needs Informative document publication                             I2    1    86.24% 41
   I       request                                             2011May Y


           Needs submission of Informative Document
           publication request form; passed by numbers,
   I       no negs, recon package posted                       2011May Y      I2    0    89.58% 38
    Needs submission of Informative Document
I   publication request form; passed by numbers, 5 2011May Y   I2   5   87.72% 32
    Needs submission of Informative Document
I   publication request form; passed by numbers, 1 2011May Y   I2   1   88.60% 33
    passed by numbers, 0 negs; needs Informative
I   document publication request;                  2009Jan Y   I1   0   91.23% 32
Number Project Name-NEW Pjts in Blue                 Sponsor(s)                  Co-Sponsor(s)       Steering Division
    176 Anatomic Pathology CDA Project               Anatomic Pathology Work                         Domain Expert
    746 Preparation of SAIF Book for Informative     Group
                                                     Architectural Review Work                        None
                                                                                 Technical Steering Committee
    687 Ballot
        HL7 Harmonization Framework and              Group
                                                     Architectural Review Work                       None
    771 Exchange Architecture (HF&EA) Systems,
        Arden Syntax for Medical Logic               Group Syntax Work Group
                                                     Arden                                           Structure & Semantic
                                                                                 Arden Syntax Work Group
    734 Version 3.0 v2.9
        Arden Syntax                                 Arden Syntax Work Group     No Selection        Design & Semantic
                                                                                                     Structure
    733 Arden Syntax v2.8                            Arden Syntax Work Group     No Selection        Design & Semantic
                                                                                                     Structure
    805 HL7/Attachments using CDA Templates for Attachments Work Group           Structured DocumentsDesignGroup
                                                                                                      Work
                                                                                                     Domain Expert
        HL7 Implementation Guidance on Unique
    328 Implementation Guides (based for CCD)        Attachments Work Group                           Work Group
                                                                                 Structured DocumentsDomain Expert,
    314 Object Identifiers (OIDs)
        Additional Information Specifications 0011: Attachments Work Group                           Structure & Semantic
                                                                                                     Domain Expert
    286 Periodontal Attachment
        Children's Preventive Health Services        Attachments Work Group                          Domain Expert
    282 Additional Information Specification 0008:
        Additional Information Specification         Attachments Work Group                          Domain Expert
    281 Home Health Attachment
        Additional Information Specification 0010:   Attachments Work Group                          Domain Expert
    218 Pharmacy Prior Authorization Attachment
        Patient Information Unspecified              Attachments Work Group                          Domain Expert
    135 Attachment
        Additional Information Specification         Attachments Work Group                          Domain Expert
        July 2011 Harmonization V3 CDA R1.0
    795 Documents Conversion fromRepositoryto        Board of Directors Work     No Selection        None
    781 update
        OID Registry Support - 2011                  Group of Directors Work
                                                     Board                                           None
    780 Update the Beginners' Guide to HL7 Static    Group of Directors Work
                                                     Board                       No Selection        None
    779 Model Designer documentation
        HL7 Internal Tooling Structure, Metadata     Group of Directors Work
                                                     Board                       No Selection        None
    778 and Semantics documentation in DITA
        GForge Adminitrator's Guide                  Group of Directors Work
                                                     Board                       No Selection        None
    766 HL7 Business Plan contract                   Group of Directors Work
                                                     Board                       No Selection        None
    180 Gap Analysis of HL7 Standards Portfolio      Group of Directors Work
                                                     Board                                           None
    770 HL7 Child Health Neonatology Profile for     Group
                                                     Child Health Work Group                           Domain Expert
                                                                                 Electronic Health Records Work Group
    691 EHR Systems, v 1.0Health Functional Profile Child Health Work Group
        Update EHR Child                                                                             Domain Expert
    572 for Release 2
        Annual Updates to Child Health 3-Year Plan Child Health Work Group                           Domain Expert
    782 Lightweight CCOW                             Clinical Context Object                         Structure & Semantic
    624 Consider extending CCOW to handle            Workgroup Work Group
                                                     Clinical Context Object                         Design & Semantic
                                                                                                     Structure
    757 Authorizations Service (DSS) Project
        Decision Support                             Workgroup Work Group
                                                     Clinical Decision Support                         Design & Semantic
                                                                                                       Structure
                                                                                 Services Oriented Architecture Work Group
    507 Context Aware Information Retrieval          Work Group
                                                     Clinical Decision Support                       Design & Semantic
                                                                                                     Structure
    259 (Infobutton) SOA Implementation Guide.
        Order Set Publication Standard               Work Group
                                                     Clinical Decision Support                       Design & Semantic
                                                                                                     Structure
    229 HL7 GELLO v.2 Syntax Re-Ballot               Work Group
                                                     Clinical Decision Support                       Design & Semantic
                                                                                                     Structure
    184 Virtual Medical Record (vMR) for Clinical    Work Group
                                                     Clinical Decision Support                        Design & Semantic
                                                                                                      Structure
                                                                                 Public Health and Emergency Response Work Group
    130 Decision Support
        Infobutton URL-based implementation          Work Group
                                                     Clinical Decision Support                       Design & Semantic
                                                                                                     Structure
    729 guide
        Canonical Pedigree (Family History)          Work Group
                                                     Clinical Genomics Work      No Selection        Design & Semantic
                                                                                                     Structure
        HL7 CG-omics Implementation Guide
    705 InteroperabilityDomain Analysis Model        Group Genomics Work
                                                     Clinical                                        Design & Semantic
                                                                                                     Structure
    693 Clinical Genomics - Genetic Variation        Group Genomics Work
                                                     Clinical                                        Design & Semantic
                                                                                                     Structure
    692 (CMET) Genomics - Genetic Variation (Fully Group Genomics Work
        Clinical                                   Clinical                                           Design & Semantic
                                                                                                      Structure
                                                                                 Orders and Observations Work Group
        Cytogenetic Lab Genetic
    663 LOINC-Qualified Results Variation Model)     Group Genomics Work
                                                     Clinical                                        Design & Semantic
                                                                                                     Structure
    565 Specimen Handling CMET                       Group Genomics Work
                                                     Clinical                                        Design & Semantic
                                                                                                     Structure
    564 Connection with Decision Support             Group Genomics Work
                                                     Clinical                                        Design & Semantic
                                                                                                     Structure
    479 Health Informatics: Clinical Genomics        Group Genomics Work
                                                     Clinical                                        Design & Semantic
                                                                                                     Structure
    460 Pedigree Topic (ISO Ballot Project)
        CDA Implementation Guide for Genetic         Group Genomics Work
                                                     Clinical                                        Design & Semantic
                                                                                                     Structure
        Testing Reports                              Group                                           Design
333 Gene Expression                               Clinical Genomics Work                             Structure & Semantic
774 Trauma Data Exchange Domain Analysis          Group Interoperability
                                                  Clinical                     Emergency Care Work Design Patient Care Work Group
                                                                                                   Group,
                                                                                                   Domain Expert
    Cardiology Domain Analysis Model Release Council Interoperability
726 Model                                    Clinical Work Group               No Selection          Domain Expert
678 2
    Emergency Medical Services Domain             Clinical Work Group
                                                  Council Interoperability                         Group, Expert
                                                                               Emergency Care Work DomainPatient Care Work Group, Public Health and
677 Analysis Model, V2 Services Constrained
    Emergency Medical                             Clinical Work Group
                                                  Council Interoperability                         Group, Expert
                                                                               Emergency Care Work DomainPatient Care Work Group, Public Health and
    Emergency Model Services Domain
512 InformationMedical& Interoperability          Clinical Work Group
                                                  Council Interoperability                           Domain Expert
371 Analysis Model
    Tuberculosis Domain Analysis Model,           Clinical Work Group
                                                  Council Interoperability                           Domain Expert
    Clinical 2
329 Release Content Development,                  Council Interoperability
                                                  Clinical Work Group                                Domain Expert
                                              Clinical Work Group
266 Harmonization and Definition (Roadmap Pjt Council Statement Work
    Clinical Statement Pattern                                                                      Structure & Semantic
                                                                               Orders and Observations Work Group, Patient Care Work Group, Pharmac
798 Refactor HL7 Confidentiality Concept          Group
                                                  Community Based                                   Design Expert
                                                                                                    Domain
                                                                               Security Work Group, Vocabulary Work Group
    Semantic Health Information sets
724 Domain, code system & valuePerformance        Collaborative Care Work
                                                  Community Based                                    Domain Expert
                                                                               Electronic Health Records Work Group, Structured Documents Work Grou
656 and Privacy Standard (SHIPPS)
    Privacy Policy Reference Catalogue            Collaborative Care Work
                                                  Community Based                                   Domain Expert
                                                                               Security Work Group, Services Oriented Architecture Work Group
577 Update V3 Privacy Message                     Collaborative Care Work
                                                  Community Based                                    Domain Expert
553 Consent Directive CDA Implementation          Collaborative Care Work
                                                  Community Based                                    Domain Expert
373 Guide.
    Composite Privacy Consent Directive R2        Collaborative Care Work
                                                  Community Based                                    Domain Expert
630 Develop and publish Principles &              Collaborative Care Work
                                                  Conformance & Guidance                           Foundation &
                                                                               Vocabulary Work Group
629 guidelines to specify the syntax for
    V2.8 Proposals - Improve conformance for      for Implementation/Testing
                                                  Conformance & Guidance                             Technology &
                                                                                                     Foundation
    DSTU testing
198 better Testing toolkit/project (Guidance of   for Implementation/Testing
                                                  Conformance & Guidance                             Technology &
                                                                                                     Foundation
755 what is involved in DSTU testing)
    UPDATE OF CERTIFICATION TESTING TO            for Implementation/Testing No Selection
                                                  Education Work Group                               Technology Support
                                                                                                     Technical &
754 HL7 V2.7OF RIM TESTING TO HL7 RIM 2.34 Education Work Group
    UPDATE                                                                     No Selection          Services & Support
                                                                                                     Technical
753 Academia Engagement Project                   Education Work Group                            Services & Support
                                                                                                  Technical
                                                                               Marketing Work Group
708 HL7 Enterprise-Wide Education Strategic       Education Work Group                               Services & Support
                                                                                                     Technical
559 Plan
    Electronic outlets                            Education Work Group                               Services & Support
                                                                                                     Technical
548 Strengthen HL7 Education                      Education Work Group                               Services & Support
                                                                                                     Technical
547 Collaborative Education                       Education Work Group                               Services & Support
                                                                                                     Technical
546 Education Tutorial Offering Database          Education Work Group                               Services & Support
                                                                                                     Technical
545 Education Curriculum Development              Education Work Group                               Services & Support
                                                                                                     Technical
    HL7 EHR effort)
739 (OngoingFM Records Management and             Electronic Health Records    Structured DocumentsServices & Semantic
                                                                                                    Work Group
                                                                                                   Structure
    Electronic Nutrition Functional Profile
706 Evidentiary Support Care Process Record       Work Group
                                                  Electronic Health Records                          Design & Semantic
                                                                                                     Structure
704 System (ENCPRS) Functional Profile.
    Public Health Functional Profile (PHFP)       Work Group
                                                  Electronic Health Records                         Design & Semantic
                                                                                                    Structure
                                                                               Public Health and Emergency Response Work Group
698 Project
    Pharmacy/Pharmacist Provider Functional       Work Group
                                                  Electronic Health Records                          Design & Semantic
                                                                                                     Structure
    EPrescribing on the EHR-S Functional
697 Profile basedFunctional Profile based on      Work Group
                                                  Electronic Health Records                          Design & Semantic
                                                                                                     Structure
    EHR System Computationally-Independent Work Group
688 the EHR-S Functional Model             Electronic Health Records                                 Design & Semantic
                                                                                                     Structure
                                                                               Architectural Review Work Group, Clinical Decision Support Work Group, C
660 Information-Model (EHR-S CI-IM)
    HL7 Personal Health Record System             Work Group
                                                  Electronic Health Records                          Design & Semantic
                                                                                                     Structure
654 Functional Model - Promote from DSTU to Work Group
    Dental Health Functional Profile        Electronic Health Records                                Design & Semantic
                                                                                                     Structure
610 HL7 White Paper: 'Balancing the Integrity     Work Group
                                                  Electronic Health Records                          Design & Semantic
                                                                                                     Structure
    Ambulatory Personal EHR-S Records
609 and Value ofOncology Health Functional        Work Group
                                                  Electronic Health Records                          Design & Semantic
                                                                                                     Structure
551 Profile
    EHR System Functional Model Release 2.0       Work Group
                                                  Electronic Health Records                          Design & Semantic
                                                                                                     Structure
509 (ISO Project) Strategy
    Diabetes Data                                 Work Group
                                                  Electronic Health Records                            Design & Semantic
                                                                                                       Structure
                                                                               Clinical Interoperability Council Work Group, Patient Care Work Group, Re
261 EHR Interoperability Model - EHR/IM           Work Group
                                                  Electronic Health Records                          Design & Semantic
                                                                                                     Structure
223 EHR Vital Records Functional Profile          Work Group
                                                  Electronic Health Records                         Design & Semantic
                                                                                                    Structure
                                                                               Public Health and Emergency Response Work Group
    CDAr2 Reference #4 (one of many))
202 (Roadmap ProjectProfile for EHR               Work Group
                                                  Electronic Health Records                          Design & Semantic
                                                                                                     Structure
    Interoperability                              Work Group                                         Design
201 Electronic Health Record Lifecycle Model   Electronic Health Records                         Structure & Semantic
794 Workgroup Scratchpad Webspace              Work Group
                                               Electronic Services Work                        Design & Work Group
                                                                                               Technical
                                                                            Pharmacy Work Group, Publishing Support
786 HL7 Website Enhancments - Release 12       Group
                                               Electronic Services Work                          Services & Support
                                                                                                 Technical
    HL7 2013)
785 (Jan Website Enhancments - Release 11      Group
                                               Electronic Services Work                          Services & Support
                                                                                                 Technical
674 (Sept 2012) Enhancments - Release 10
    HL7 Website                                Group
                                               Electronic Services Work                          Services & Support
                                                                                                 Technical
    HL7 2012)
673 (MayWebsite Enhancements - Release 9       Group
                                               Electronic Services Work                          Services & Support
                                                                                                 Technical
    HL7 2012)
598 (Jan Website Enhancements - Release 8      Group
                                               Electronic Services Work                          Services & Support
                                                                                                 Technical
    New 2011)
150 (SeptHL7 Web Site - (Roadmap Pjt #3, 37)   Group
                                               Electronic Services Work                          Services & Support
                                                                                                 Technical
694 EDIS - Emergency Department Information Group
                                            Emergency Care Work                                   Services Expert
                                                                                                  Domain
                                                                            Electronic Health Records Work Group
573 System Functional Profile Version 2.0
    Emergency Care DAM Version 2               Group
                                               Emergency Care Work                               Domain Expert
368 Emergency Care (EC) Domain Analyses        Group
                                               Emergency Care Work                               Domain Expert
800 Model, Release 1
    Behavior Health Domain Analysis Model,     Group Management
                                               Financial                                        Structure Care Work
                                                                            Community Based Collaborative & SemanticGroup
    Financial Management Account Behavioral Financial Management
777 Messages, and CDA Profiles (akaand Billing Work Group                   No Selection         Design & Semantic
                                                                                                 Structure
776 Financial Management Claims and            Work Group
                                               Financial Management                              Design & Semantic
                                                                                                 Structure
775 Reimbursement Reaffirmation Ballot
    Create a three-workgroup DAM for claims    Work Group
                                               Financial Management                             Design & Semantic
                                                                                                Structure
                                                                            Attachments Work Group, Structured Documents Work Group
370 attachments
    Consumer Information Account               Work Group
                                               Financial Management                              Design & Semantic
                                                                                                 Structure
362 Account and Billing CMETs                  Work Group
                                               Financial Management                              Design & Semantic
                                                                                                 Structure
731 Preoperative Anesthesiology Domain         Work Group Anesthesia
                                               Generation of                                     Design Expert
                                                                                                 Domain
                                                                            Child Health Work Group, Clinical Interoperability Council Work Group
543 Analysis Model, Release 1Guide (IG) for the Standards Work Group
    Develop Implementation                      Generation of Anesthesia                         Domain Expert
513 use of HL7 messaging within Release 3 - Standards Work Group
    Implementation Guide for CDA            Generation of Anesthesia                             Domain Expert
                                                                            Health Care Devices Work Group, Structured Documents Work Group
    Healthcare SOA Reference Architecture (H- Standards Work Group
444 Anesthetic Record                                                                       Domain Expert
                                              Government Projects Work Public Health and Emergency Response Work Group
595 SOA-RA) V 2.0 and EHR System Design
    Implementation Guidance for the use of     Group Care Devices Work
                                               Health                                            Domain Expert
789 HL7 messaging related to Healthcare
    HL7 V2.x / DICOM Implementation Guide      Group Integration Work
                                               Imaging                                           Domain Expert
788 for Pathology Order Messages and Use of
    HL7 V2.x / DICOM Implementation Guide      Group Integration Work
                                               Imaging                                           Domain Expert
787 for Pathology Specimen Identifiers and
    SopInstance Reference minimal Update       Group Integration Work
                                               Imaging                                           Domain Expert
474 CMET: A_DicomCompositeObjectReference Group Integration Work
                                          Imaging                                                Domain Expert
760 minimal (COCT_RM830120UV05) R2
    Backwards compatible ITS (R2B)             Group
                                               Implementable Technology No Selection             Foundation &
759 HL7 Version 3 Standard: Transport          Specifications Work Group No Selection
                                               Implementable Technology                          Technology &
                                                                                                 Foundation
    HL7 Version - ebXML using ebMS
758 Specification3 Standard: Transport 2.0,    Specifications Work Group No Selection
                                               Implementable Technology                          Technology &
                                                                                                 Foundation
680 Specification - MLLP, Release 2
    Neutral Mapping Notation                                                                Technology &
                                               Specifications Work Group Conformance & Guidance for Implementation/Testing Work Group
                                               Implementable Technology                     Foundation
627 V3 RIM Implementation Technology           Specifications Work Group
                                               Implementable Technology                          Technology &
                                                                                                 Foundation
484 Specification for XML; Release 1 data types Specifications Work Group
    Health informatics - Harmonized             Implementable Technology                         Technology &
                                                                                                 Foundation
335 for information interchange (ISO Ballot
    XML ITS R1.1                               Specifications Work Group
                                               Implementable Technology                          Technology &
                                                                                                 Foundation
316 XML ITS R2                                 Specifications Work Group
                                               Implementable Technology                          Technology &
                                                                                                 Foundation
301 HL7 Web Services Profiles, Release 3       Specifications Work Group
                                               Implementable Technology                          Technology &
                                                                                                 Foundation
283 Transport Specification for ISO 9660-      Specifications Work Group
                                               Implementable Technology                          Technology &
                                                                                                 Foundation
                                            Infrastructure Work
772 compliant Removable Media determination Specifications and Group
    InM Wrappers requirements                                                                     Technology &
                                                                                                  Foundation
                                                                            Services Oriented Architecture Work Group
744 Masterfiles Re-affirmation                 Messaging Work Group
                                               Infrastructure and           No Selection         Technology &
                                                                                                 Foundation
619 HL7 Transmission Wrappers R1.1 Batch       Messaging Work Group
                                               Infrastructure and                                Technology &
                                                                                                 Foundation
599 Messaging webinar program
    Ambassador                                 Marketing Work Group
                                               MessagingWork Group                               Technology
                                                                                                 None
596 University Outreach - Phase 1 (Pilot)      Marketing Work Group                              None
433 CDA Product and Services Guide - Phase 3   Marketing Work Group                              None
761 Information Model Metadata                                                                Foundation &
                                                 Modeling and Methodology Vocabulary Work Group
750 Documentation
    Data Types R3                                Work Group Methodology
                                                 Modeling and                                  Technology &
                                                                                               Foundation
710 Reaffirmation of Previous Normative CMET Work Group Methodology
                                             Modeling and                                      Technology &
                                                                                               Foundation
578 Ballots
    HL7 Model Interchange Format (MIF)                                                      Technology &
                                                 Work Group Methodology Publishing Work Group, Tooling Work Group, Vocabulary Work Group
                                                 Modeling and                               Foundation
455 Informative Ballot of V3 Abstract Data
    Complete Balloting                           Work Group Methodology
                                                 Modeling and                                  Technology &
                                                                                               Foundation
363 Types R2
    Annual Balloting of HL7 Reference            Work Group Methodology
                                                 Modeling and                                  Technology &
                                                                                               Foundation
    HDF Phase Model
299 InformationIII                               Work Group Methodology
                                                 Modeling and                                  Technology &
                                                                                               Foundation
221 Common Message Element Types (COCT)          Work Group Methodology
                                                 Modeling and                                  Technology &
                                                                                               Foundation
219 Release 8
    Core Principles and Properties of HL7        Work Group Methodology
                                                 Modeling and                                  Technology &
                                                                                               Foundation
797 Version 3 Models
    Behavioral Framework                         Work Group
                                                 Orders and Observations                         Technology Semantic
                                                                                                 Structure &
                                                                           Architectural Review Work Group, Modeling and Methodology Work Grou
793 V2.7.1                                       Work Group
                                                 Orders and Observations                      Design & Semantic
                                                                                              Structure
                                                                           Conformance & Guidance for Implementation/Testing Work Group, Publis
792 Ambulatory Laboratory Results Reporting      Work Group
                                                 Orders and Observations                       Design & Semantic
                                                                                               Structure
    Diet and Nutrition Orders LRI, Release 1
738 Implementation Guide for Domain Analysis Work Group
                                             Orders and Observations                            Design & Semantic
                                                                                                Structure
                                                                           Patient Care Work Group, Pharmacy Work Group
682 Model
    Specimen CMET Second Release                 Work Group
                                                 Orders and Observations                       Design & Semantic
                                                                                               Structure
653 ACLA Test Compendium Framework               Work Group
                                                 Orders and Observations                       Design & Semantic
                                                                                               Structure
626 Implementation Guide
    Substances Model                             Work Group
                                                 Orders and Observations                      Design
                                                                           Pharmacy Work GroupStructure & Semantic
625 CPM DSTU R2 (Common Product Model)           Work Group
                                                 Orders and Observations                        Design & Semantic
                                                                                                Structure
                                                                           Health Care Devices Work Group, Patient Safety Work Group, Pharmacy W
618 O&O Domain Maintenance                       Work Group
                                                 Orders and Observations                       Design & Semantic
                                                                                               Structure
617 Laboratory Related CMETs - R2                Work Group
                                                 Orders and Observations                       Design & Semantic
                                                                                               Structure
587 Lab Order - Template                         Work Group
                                                 Orders and Observations   No Selection        Design & Semantic
                                                                                               Structure
586 Microbiology Antibiotic Sensitivity Result   Work Group
                                                 Orders and Observations                       Design & Semantic
                                                                                               Structure
585 Template Medication Order with
    Harmonize                                    Work Group
                                                 Orders and Observations                       Design & Semantic
                                                                                               Structure
    Specialzed Order
584 Composite clinical event models - may        Work Group
                                                 Orders and Observations                       Design & Semantic
                                                                                               Structure
583 overlap with detailed clinical model.
    Specialized order models - new or            Work Group
                                                 Orders and Observations                       Design & Semantic
                                                                                               Structure
582 harmonization with other work groups.
    Lab Result - R2                              Work Group
                                                 Orders and Observations                       Design & Semantic
                                                                                               Structure
521 Blood Center System to System Messaging Work Group
                                            Orders and Observations                            Design & Semantic
                                                                                               Structure
434 Common Observation Event Template - R1 Work Group
                                           Orders and Observations                             Design & Semantic
                                                                                               Structure
349 Laboratory Related CMETs                     Work Group
                                                 Orders and Observations                       Design Expert
                                                                                               Domain
312 Blood, Tissue, and Organ - Release 1         Work Group
                                                 Orders and Observations                       Structure & Semantic
256 Clinical Event Domain - R1                   Work Group
                                                 Orders and Observations                       Design & Semantic
                                                                                               Structure
213 General Lab Order IG - R1                    Work Group
                                                 Orders and Observations                       Design & Semantic
                                                                                               Structure
113 HL7 Version 3 Standard: Laboratory,          Work Group
                                                 Orders and Observations                       Design Expert
                                                                                               Domain
111 Release 1 Result Topic
    Observation Request Template - Release 1     Work Group
                                                 Orders and Observations                       Structure & Semantic
110 Order Domain - Order Pattern - Release 1     Work Group
                                                 Orders and Observations                        Design & Semantic
                                                                                                Structure
                                                                           Imaging Integration Work Group, Pharmacy Work Group
109 General Observation Related CMETs -          Work Group
                                                 Orders and Observations                       Design & Semantic
                                                                                               Structure
 38 Phase I
    Composite Order                              Work Group
                                                 Orders and Observations                       Design & Semantic
                                                                                               Structure
736 Patient Encounter Messaging                  Work Group
                                                 Patient Administration    No Selection        Design & Semantic
                                                                                               Structure
725 Interdependent Registries                    Work Group
                                                 Patient Administration                          Design & Semantic
                                                                                                 Structure
                                                                           Services Oriented Architecture Work Group
650 Service Delivery Location                    Work Group
                                                 Patient Administration                        Design & Semantic
                                                                                               Structure
576 Person Registry Enhancement                  Work Group
                                                 Patient Administration                        Design & Semantic
                                                                                               Structure
574 Personnel Management CMETs                   Work Group
                                                 Patient Administration                        Design & Semantic
                                                                                               Structure
459 Scheduling CMETs                             Work Group
                                                 Patient Administration                        Design & Semantic
                                                                                               Structure
                                                 Work Group                                    Design
360 V3 Organization Registries, Release 2 topic Patient Administration                             Structure & Semantic
    V3 Provider Registries, Release domain
359 within Personnel Management 2 topic          Work Group
                                                 Patient Administration                            Design & Semantic
                                                                                                   Structure
292 within Personnel Management domain
    Scheduling Release 2                         Work Group
                                                 Patient Administration                            Design & Semantic
                                                                                                   Structure
745 Pressure Ulcer Prevention Domain Analysis Work Group Work Group
                                              Patient Care                                         Design Expert
                                                                                                   Domain
675 Model
    Care Provision: Adverse Reaction topic       Patient Care Work Group                          Domain Expert
                                                                             Patient Safety Work Group, Pharmacy Work Group
672 Care Provision DIM and Care Statement R2 Patient Care Work Group                               Domain Expert
671 Care Provision Domain: evaluation of 2007 Patient Care Work Group                              Domain Expert
670 DSTU materials revisions to Chapter 11 and Patient Care Work Group
    Patient Care V2                                                                              Domain Expert
                                                                             Community Based Collaborative Care Work Group
669 12 Provision: Care Statement
    Care                                         Patient Care Work Group                           Domain Expert
668 Care Provision Domain: Care Structures       Patient Care Work Group                           Domain Expert
    Care (including Concern List, Vital
667 TopicProvision: Care Transfer Topic Signs,   Patient Care Work Group                           Domain Expert
    Care Provision: Record, Care Record
666 (including Care Health Concern TopicQuery) Patient Care Work Group                             Domain Expert
664 Care Provision: Assessment Scales Topic      Patient Care Work Group                           Domain Expert
661 Domain Analysis Model and Detailed           Patient Care Work Group                          Domain Expert
                                                                             Health Care Devices Work Group, Patient Safety Work Group
651 Clinical Models for Medical Devices
    Care Plan Topic; continuation of work        Patient Care Work Group                          Work Group
                                                                             Structured DocumentsDomain Expert
320 Detailed Clinical Models Release 1           Patient Care Work Group                          Domain Expert
                                                                             Child Health Work Group, Clinical Decision Support Work Group, Clinical In
284 Care Provision Domain                        Patient Care Work Group                           Domain Expert
174 Care Provision DSTU - Topic Allergy &        Patient Care Work Group                          Domain Expert
                                                                             Patient Safety Work Group, Pharmacy Work Group
106 Intolerances DSTU - Topic Care
    Care Provision                               Patient Care Work Group                           Domain Expert
103 Composition DSTU - Topic Professional
    Care Provision                               Patient Care Work Group                           Domain Expert
714 Services Safety Report
    Periodic                                     Patient Safety Work Group                         Domain Expert
713 Risk Management Plans                        Patient Safety Work Group                         Domain Expert
620 PSO Common Format CDA Project                Patient Safety Work Group                         Domain Expert
494 Public Health Reporting Domain Analysis      Patient Safety Work Group                        Domain Expert
                                                                             Public Health and Emergency Response Work Group
227 Model (PORR DAM) Safety Report Release 3 Patient Safety Work Group
    HL7 Individual Case                                                                            Domain Expert
558 (JIC Ballot Project) Release 2
    Medication Order                             Pharmacy Work Group                               Domain Expert
557 Medication CMETs Release 2                   Pharmacy Work Group                               Domain Expert
556 Institutional Material                       Pharmacy Work Group                               Domain Expert
555 Administration Event                         Pharmacy Work Group                               Domain Expert
501 IDMP Terminologies Project (JIC Project)     Pharmacy Work Group                               Domain Expert
249 HL7 V3 Std: Pharmacy, Release 1: Pharmacy Pharmacy Work Group                                  Domain Expert
248 CMETs Std: Pharmacy, Release 1: Pharmacy Pharmacy Work Group
    HL7 V3                                                                                         Domain Expert
246 Shared Messages
    HL7 V3 Std: Pharmacy, Release 1: Patient-    Pharmacy Work Group                               Domain Expert
    HL7 V3 Device Query
245 Related Std: Pharmacy, Release 1: Patient    Pharmacy Work Group                               Domain Expert
244 Medication Contraindication Query
    HL7 V3 Std: Pharmacy, Release 1:             Pharmacy Work Group                               Domain Expert
242 Medication Statement and Supply Event
    HL7 V3 Std: Pharmacy, Release 1:             Pharmacy Work Group                               Domain Expert
241 Medication Dispense and Supply Event
    HL7 V3 Std: Pharmacy, Release 1: Generic     Pharmacy Work Group                               Domain Expert
240 Patient-Related Pharmacy Query Dosage
    HL7 V3 Std: Pharmacy, Release 1:             Pharmacy Work Group                               Domain Expert
238 Instruction Pharmacy, Release 1: Device
    HL7 V3 Std:                                  Pharmacy Work Group                               Domain Expert
237 Order Std: Pharmacy, Release 1: Device
    HL7 V3                                       Pharmacy Work Group                               Domain Expert
236 Dispense and Supply Event
    HL7 V3 Std: Pharmacy, Release 1: Common Pharmacy Work Group                                    Domain Expert
235 Order Std: Pharmacy, Release 1: Common Pharmacy Work Group
    HL7 V3                                                                                         Domain Expert
    Dispense and Supply Event
189 HL7 V3 Std: Medication, Release 1: Drug     Pharmacy Work Group                                Domain Expert
791 Knowledge-Base Query
    Resource Directory Wiki                     Process Improvement Work                           Technical & Support
686 2010 Co-Chair Handbook Maintenance          Group Improvement Work
                                                Process                                            Services & Support
                                                                                                   Technical
643 First Time Attendee Process Improvement     Group Improvement Work
                                                Process                                            Services & Support
                                                                                                   Technical
593 Project.
    PIC Annual Maintenance: Communication       Group Improvement Work
                                                Process                                            Services & Support
                                                                                                   Technical
592 Strategy (Jan WGM)
    PIC Annual Maintenance: Decision Making     Group Improvement Work
                                                Process                                            Services & Support
                                                                                                   Technical
    PIC Annual Maintenance: (May WGM)
591 Practices (DMP) TemplateBest Practices      Group Improvement Work
                                                Process                                            Services & Support
                                                                                                   Technical
590 (January WGM)
    PIC Bi-Annual Maintenance: Co-Chair         Group Improvement Work
                                                Process                                            Services & Support
                                                                                                   Technical
765 Handbook (September WGM)
    Project Health Metrics                      Group Services Work
                                                Project                                            Services
                                                                                                   Technical
                                                                              Technical Steering Committee & Support
748 Work with Vocab re: process to publish      Group Services Work
                                                Project                                            Services & Support
                                                                                                   Technical
747 vocab changes 3x/year
    Create Education for Project Services       Group Services Work
                                                Project                                            Services & Support
                                                                                                   Technical
741 Related Topics Process Work by Project
    Harmonization                               Group Services Work
                                                Project                                            Services & Support
                                                                                                   Technical
740 Services WG for Project Services Work
    SWOT Work                                   Group Services Work
                                                Project                                            Services & Support
                                                                                                   Technical
676 Group Sound - Fast Track to Standard
    SAIF and                                    Group Services Work
                                                Project                                            Services & Support
                                                                                                   Technical
536 Development Dashboard / Project Health Group Services Work
    Develop Project                        Project                                                 Services & Support
                                                                                                   Technical
535 Metrics to needs of the Working Group as Group Services Work
    Respond                                  Project                                               Services & Support
                                                                                                   Technical
534 requested by the TSC (ongoing)
    Mentoring Project Facilitators              Group Services Work
                                                Project                                            Services & Support
                                                                                                   Technical
533 Annual Maintainance of Project Life Cycle   Group Services Work
                                                Project                                            Services & Support
                                                                                                   Technical
531 and GOM Updates the Project Scope
    Annual Updates to                           Group Services Work
                                                Project                                            Services & Support
                                                                                                   Technical
784 Statement Template and Project Approval
    Adding Public Health Reporting              Group Health and
                                                Public                        Structured DocumentsServices Expert
                                                                                                   Work Group
                                                                                                  Domain
737 Requirements to HQMF
    HL7 Version 2.5.1 Implementation Guide:     Emergency Response Work Orders and Observations WorkExpert
                                                Public Health and                            Domain Group
    HL7 Version 2.5.1 Implementation Public
735 Electronic Laboratory Reporting to Guide:   Emergency Response Work Orders and Observations WorkExpert
                                                Public Health and                            Domain Group
    Version 2.5.1 Death Reporting, Release
458 Vital Records Implementation Guide for 1    Emergency Response Work
                                                Public Health and                                  Domain Expert
454 Immunization Messaging list
    1-Complete PHER project                     Emergency Response Work
                                                Public Health and                                  Domain Expert
450 PHER WG Process and Outcomes:               Emergency Response Work
                                                Public Health and                                  Domain Expert
350 Continuous Improvement
    Public Health Related CMETs                 Emergency Response Work
                                                Public Health and                                  Domain Expert
310 Immunization Domain Analysis Model          Emergency Response Work
                                                Public Health and                                  Domain Expert
309 Immunization Administration                 Emergency Response Work
                                                Public Health and                                  Domain Expert
773 HL7 Version 2.9 Messaging Standard          EmergencyWork Group
                                                Publishing Response Work Financial ManagementTechnical & Support Care Devices Work Group, Infr
                                                                                              Work Group, Health
723 HL7 Version 2.8 Messaging Standard          Publishing Work Group         Financial ManagementServices & Support Care Devices Work Group, Infr
                                                                                                   Work Group, Health
                                                                                                  Technical
639 Recurring maintenance of glossary and       Publishing Work Group                              Services & Support
                                                                                                   Technical
    Annual maintenance of its Guide
638 maintain ballot site and V3 xhtml &         Publishing Work Group                              Services & Support
                                                                                                   Technical
637 Backbone
    Annual maintenance of Facilitators guide    Publishing Work Group                              Services & Support
                                                                                                   Technical
636 Annual Establishment of Publishing          Publishing Work Group                              Services & Support
                                                                                                   Technical
635 calendar(s)
    Annual Normative Editions                   Publishing Work Group                              Services & Support
                                                                                                   Technical
295 Version 3 Publishing Facilitator's Guide    Publishing Work Group                              Services & Support
                                                                                                   Technical
721 aECG r2 (Annotated ECG, Release 2)          Regulated Clinical Research                        Services Expert
                                                                                                   Domain
720 Regulatory Activity Submission Hierarchy    Information Management
                                                Regulated Clinical Research                        Domain Expert
719 (RASH) Data Validation Service Functional
    Subject                                     Information Management
                                                Regulated Clinical Research                        Domain Expert
718 Model Study Functional Profiles
    Clinical                                    Information Management
                                                Regulated Clinical Research                        Domain Expert
717 Notification to Physicians for marketed     Information Management
                                                Regulated Clinical Research                        Domain Expert
    Clinical information
716 productTrial Registration and Reporting R2 Information Management
                                               Regulated Clinical Research                         Domain Expert
    (CTR&R-R2)                                  Information Management
541 Clinical Research Filltered Query Service   Regulated Clinical Research                        Domain Expert
539 Funtion Model (CRFQ SFM)
    Regulated Product Submission Release 3      Information Management
                                                Regulated Clinical Research                        Domain Expert
538 (RPS R3)
    BRIDG (Biomedical Research Integrated       Information Management
                                                Regulated Clinical Research                        Domain Expert
372 Domain) Domain Analysis Model (DAM)
    Clinical Trial Registration and Results     Information Management
                                                Regulated Clinical Research                        Domain Expert
325 (CTR&R)Product Information (includes
    Medical                                     Information Management
                                                Regulated Clinical Research                        Domain Expert
217 Drugs, Devices, Biologics, Veterinary 2
    Regulated Product Submission Release        Information Management
                                                Regulated Clinical Research                        Domain Expert
205 CDISC Content to Message                    Information Management
                                                Regulated Clinical Research                        Domain Expert
178 Laboratory Test Result Abnormality          Information Management
                                                Regulated Clinical Research                        Domain Expert
550 Assessmenta set of RIMBAA whitepapers
    Creation of                                 Information Management
                                                RIMBAA Work Group                                  Foundation &
646 Security and Privacy Ontology               Security Work Group                                Technology &
                                                                                                   Foundation
529 Security Domain Analysis Model (DAM)        Security Work Group                               Technology
                                                                                                  Domain Expert
                                                                              Community Based Collaborative Care Work Group
226 Risk Assessment Framework Cookbook          Security Work Group                                Foundation &
224 Privacy and Authorization Terminology       Security Work Group                                Technology &
                                                                                                   Foundation
783 HL7 hData Record Format                     Services Oriented                                Technology &
                                                                                                 Foundation
                                                                              Implementable Technology Specifications Work Group
628 Healthcare SOA Ontology Project             Architecture Work Group
                                                Services Oriented                                  Technology &
                                                                                                   Foundation
268 Infrastructure: Resource Location and       Architecture Work Group
                                                Services Oriented                                  Technology &
                                                                                                   Foundation
    Privacy, Access and Security Model
200 Updating Service Functional Services (PASS) Architecture Work Group
                                                Services Oriented                                   Technology &
                                                                                                    Foundation
                                                                              Architectural Review Work Group, Community Based Collaborative Care W
796 Alpha Project
    Patient Education Summary CDA               Architecture Work Group
                                                Structured Documents                               Technology Semantic
                                                                                                   Structure &
                                                                              Patient Care Work Group
790 DocumentsRecords Reaffirmation Ballot
    v3 Medical                                  Work Group
                                                Structured Documents                               Design & Semantic
                                                                                                   Structure
756 Health Quality Measure Format (HQMF)        Work Group
                                                Structured Documents                                Design & Semantic
                                                                                                    Structure
                                                                              Clinical Decision Support Work Group
752 Implementation GuideTooling
    Publish CDA IGs from                        Work Group
                                                Structured Documents                               Design & Semantic
                                                                                                   Structure
                                                                              Clinical Genomics Work Group, Publishing Work Group, Tooling Work Gro
728 HL7/IHE Health Story Implementation         Work Group
                                                Structured Documents                              Design & Integration Work Group, Patient Care W
                                                                                                  Structure
                                                                              Attachments Work Group, ImagingSemantic
711 Guide Consolidation Documents
    Self-Displaying CDA                         Work Group
                                                Structured Documents                               Design & Semantic
                                                                                                   Structure
679 Implementation Guide for CDA Release 2:     Work Group
                                                Structured Documents                               Design & Semantic
                                                                                                   Structure
569 Progress Note Guide for CDA Release 2,
    Implementation                              Work Group
                                                Structured Documents                               Design & Semantic
                                                                                                   Structure
568 Unstructured Documents CDA Release 2:
    Implementation Guide for                    Work Group
                                                Structured Documents                               Design & Semantic
                                                                                                   Structure
567 Procedure Note Guide for CDA Release 2 - Work Group
    Implementation                           Structured Documents                                  Design & Semantic
                                                                                                   Structure
                                                                              Child Health Work Group
    Care 3, Neonatal Care Release
510 LevelRecord Summary, Report 2: Discharge Work Group
                                             Structured Documents                                  Design & Semantic
                                                                                                   Structure
508 Summary Quality Measure Specification,
    Electronic                                  Work Group
                                                Structured Documents                               Design & Semantic
                                                                                                   Structure
487 Release 1
    CDA Modeling with UML                       Work Group
                                                Structured Documents                               Design & Semantic
                                                                                                   Structure
477 CDA R3                                      Work Group
                                                Structured Documents                               Design & Semantic
                                                                                                   Structure
381 CDA Implementation Guide for Patient        Work Group
                                                Structured Documents                               Design & Semantic
                                                                                                   Structure
                                                                              Patient Care Work Group
    Implementation Guide for CDA Release 2 - Work Group
319 Assessments                              Structured Documents                                  Design & Semantic
                                                                                                   Structure
    Quality Reporting Associated Infection
210 Level 3 HealthcareDocument Architecture     Work Group
                                                Structured Documents                               Design & Semantic
                                                                                                   Structure
                                                                              Child Health Work Group
209 (Roadmap Project #4?? (one of many))
    IG for CDA R2 - Lvl 3 Personal Healthcare   Work Group
                                                Structured Documents                               Design & Semantic
                                                                                                   Structure
    Structured Reports, R1
172 MonitoringDocuments Architecture            Work Group
                                                Structured Documents                               Design & Semantic
                                                                                                   Structure
134 CDA Implementation Guides for Common        Work Group
                                                Structured Documents                               Design & Semantic
                                                                                                   Structure
    HL7 Strategic Initiatives Dashboard Project Work Group
799 Clinical Documents                          Technical Steering                                 Design
                                                                                                   None
                                                                              Board of Directors Work Group, Electronic Services Work Group
764 SAIF Pilot Coordination                     Committee
                                                Technical Steering                                  None
                                                                              Architectural Review Work Group, Project Services Work Group
763 HL7 SAIF Implementation Guide               Committee
                                                Technical Steering                                  None
                                                                              Architectural Review Work Group, Conformance & Guidance for Implemen
751 SAIF Architecture Program                   Committee
                                                Technical Steering                                  None
                                                                              Architectural Review Work Group
749 TSC Retrospective Self-Assessment Based     Committee
                                                Technical Steering                                 Domain Expert,
                                                                              Domain Experts Steering Division, Foundation and Technology Steering D
    on T3F Recommendations                      Committee                                          Foundation &
701 Innovations                                  Technical Steering                            None
647 HL7 Product Quality Plan                     Committee
                                                 Technical Steering                            None
631 TSC Work Group Visbility Maintenance         Committee
                                                 Technical Steering                            Domain Expert,
478 TSC Product Visibility Project               Committee
                                                 Technical Steering                            Foundation &
                                                                                               None
611 Template Registry Pilot                      CommitteeWork Group
                                                 Templates                                    Foundation &
                                                                         Patient Care Work Group, Structured Documents Work Group, Tooling Wo
473 HL7 Templates Registry Business              Templates Work Group                          Technology &
                                                                                               Foundation
272 Requirements Analysis
    Updated Template Interchange Format          Templates Work Group                         Technology &
                                                                                              Foundation
                                                                         Patient Care Work Group, Structured Documents Work Group
804 DSTU evaluation
    GForge                                       Tooling Work Group                            Technology Support
                                                                                               Technical &
803 Create Tooling Dashboard                     Tooling Work Group                            Services & Support
                                                                                               Technical
802 Develop Tooling Communications Plan          Tooling Work Group                            Services & Support
                                                                                               Technical
801 Process alignment for ES and Tooling         Tooling Work Group                            Services
                                                                                               Technical
                                                                         Electronic Services Work Group & Support
742 Model Automated Exchange (MAX) for           Tooling Work Group                              Services & Support
                                                                                                 Technical
                                                                         Clinical Interoperability Council Work Group
    HL7 Models
690 UMLStatic Model Designer Enhancement 1 Tooling Work Group                                  Services & Support
                                                                                               Technical
665 MIF-based Publishing Project - Phase II      Tooling Work Group                          Services & Support
                                                                                             Technical
                                                                         Publishing Work Group
806 Terms of reference and appointment of an Vocabulary Work Group       Tooling Work Group Services
                                                                                            Foundation &
    Guidance for the use of authority
743 HL7 central terminologyTerminology Post- Vocabulary Work Group                             Technology &
                                                                                               Foundation
644 Coordinated Expressions in HL7
    HL7 Evaluation of the International Health   Vocabulary Work Group                         Technology &
                                                                                               Foundation
634 Terminology Standards Development HL7
    Draft a policy for endorsement by the        Vocabulary Work Group                         Technology &
                                                                                               Foundation
    Develop Steering Committee on
615 Technicalvocabulary maintenance process      Vocabulary Work Group                         Technology &
                                                                                               Foundation
500 and tooling Practices for Implementation Vocabulary Work Group
    Guide for Best                                                                             Technology &
                                                                                               Foundation
499 of Vocabulary
    Develop and publish Principles &             Vocabulary Work Group   No Selection          Technology &
                                                                                               Foundation
497 guidelines of Terminology Maintenance
    Harmonize the V2 & V3 vocabulary             Vocabulary Work Group                         Technology &
                                                                                               Foundation
496 Develop and publish best practices for       Vocabulary Work Group                      Technology &
                                                                                            Foundation
                                                                         Conformance & Guidance for Implementation/Testing Work Group
495 vocabulary within Conformance profiles
    International SDO Glossary (was Health       Vocabulary Work Group                        Technology &
                                                                                              Foundation
                                                                         Patient Care Work Group, Publishing Work Group
    TermInfo - Harmonised Glossary) (JIC
468 InformaticsUSING SNOMED CT in HL7 v3         Vocabulary Work Group                         Technology &
                                                                                               Foundation
324 Common Terminology Services 2 (CTS2)         Vocabulary Work Group                         Technology &
                                                                                               Foundation
308 Vocabulary Conceptual Model                  Vocabulary Work Group                         Technology &
                                                                                               Foundation
                                                                                               Technology
Description                                                           Project Facilitator    Status                       SD Approval Date
Anatomic Pathology Reports are complex clinical documents that John Gilbertson                                                     5/22/2007
relate a patient's condition, oneBook, i.e. specimens and
A complete version of the SAIF or more the canonical definition       Charlie Mead           Normative - Balloting                 2/14/2011
This HL7 HF&EA Information, Conformance and HDF & ECCF
of the Behaviour,Informative-Reference will be anCompliance, and Charlie Mead, Steve         Active Project (Resources
implementation-guide, which is Systems, Version 3.0 - Adoption
Arden Syntax for Medical Logic intended to address the reuse or       Hufnagel. Nancy
                                                                      Arden Syntax Work      assigned to pjt)
of RIM-based v2.9 is a revision of v2.8 developed in part in-parallel Group Co-Chairs
Arden Syntax data interchange (fix curly-braces problem)              Robert A Jenders       Normative - Balloting                 2/21/2011
Arden to incorporate revision of v2.7 to incorporate a number
with it Syntax v2.8 is afuzzy logic formalisms and to expand the of Robert Jenders           Normative - Reconcile                 2/21/2011
new project will take a series of existing Additional Information
This operators pertinent to flow of control (an iteration break       Durwin Day, Jim        Active Project (Resources
Specificationsthis project is to CDA implementation guide for
The scope of and associated create an informative document            McKinley, Craig
                                                                      Rick Geimer            assigned to - Request
                                                                                             Informative pjt)                       6/6/2008
that project is to complete the necessary materials for the
This describes how to obtain and manage the OIDs used for             Mike Cassidy           Publication                           5/28/2007
Periodontal Attachment as an HL7 Additional Information
To define the standard content for an electronic Children's           Penny Sanchez                                                5/23/2005
The scope Health Services attachment that meets the is to: of
Preventive of the Home Health Attachment AIS projectneeds -           Penny Sanchez          On Hold                               9/26/2005
Define the of the Pharmacy Prior Authorization Attachment AIS
The scope data content necessary for the exchange of Home             Penny Sanchez                                                9/26/2005
project is to:upgradesthe data content necessary for the exchange Mike Cassidy
This project - Define a previously balloted implementation guide                                                                   2/29/2008
The current attachment specifications informative ballot. The
from using CDA R1 to CDA R2, for HL7were developed using CDA Penny Sanchez                                                         9/25/2006
R 1.0 as the base standard. As a result of numerous federal NPRM Karen Van
Contractors will analyze and apply the July 2011 harmonization
approved vocabulary content to theregistryVersion 3 repository
Wilfred Bonney to support the OID latest in 2011                      Hentenryck
                                                                      Karen                  Active Project (Resources
Wilfred Bonney to update current documentation to reflect             VanHentenryck;
                                                                      Karen Van              assigned to pjt)
                                                                                             Active Project (Resources
release 1.1.0 of theupdate existing documentation.
Wilfred Bonney to SMD tool                                            Hentenryck; Wilfred
                                                                      Karen Van              assigned to pjt)
                                                                                             Active Project (Resources             5/16/2011
Wilfred Bonney to document administrators' guide for creating         Hentenryck; Wilfred
                                                                      Karen Van              assigned to pjt)
                                                                                             Active Project (Resources              5/1/2011
new projects at the HL7 GForge site as described in HL7's
Contractor to develop a business plan                                 Hentenryck; Wilfred
                                                                      Virginia Riehl         assigned to pjt)
                                                                                             Active Project (Resources
request forof this project is September 8, 2010.Health Record is
The scope proposal dated to: Align Electronic The contractor          (virginia.riehl@verizo assigned to pjt)
                                                                      Freida Hall            On Hold                               10/1/2007
(EHR) functional requirements with HL7 technical interoperability Joy Kuhl, Andy
The Child Health Neonatology Profile for Electronic Health Record                            Active Project (Resources             3/28/2011
update to 1.0 HL7 Child Health Functional Profile the HL7 Child Child Health WG co- assigned to Item
Systems v the (Neonatology Profile) is a project of for EHR Systems Spooner         3-Year Plan pjt)
following an three-year the EHR Functionaltogether in person in
work on our update to plan when we get Model                          chairs
                                                                      Joy Kuhl               3-Year Plan Item
January. a new reference model for browser-based applications
Develop                                                               David Fusari           Active Project (Resources
that is integrated into the CCOW context leveraging Will consider CCOW WG
Consider extending CCOW to handle Authorizations.                                            3-Year Plan pjt)
                                                                                             assigned to Item
again at the Sept. 2010 WGM receives patient data as the input Kensaku Kawamoto, Normative - Notify
A decision support service (DSS)                                                                                                   8/19/2011
The returns patient-specific conclusions as the output. As such,
and SOA Implementation Guide for context-aware information it MD, PhD Del Fiol,
                                                                 Guilherme                   DSTU - Test                           6/15/2009
retrieval ('Infobutton') leverages the HL7Workgroup will develop a MD, PhD Campbell
In this project, Clinical decision Support Decision Support        James R.                  Period/Accepting                       6/2/2008
standard a guideline expression languageguidelines for the HL7 MD
GELLO is and associated implementation developed to query      Robert Dunlop                 Active Project (Resources              3/6/2008
RIM v.3 compliantRecord (vMR) for Clinical developed by the HL7
A Virtual Medical data. The language was Decision Support             Robert Dunlop;         assigned Ballot Levels-See
                                                                                             Multiple to pjt)                       3/1/2010
(CDS) is aof thismodel for representing clinical information inputs
The goal data infobutton implementation guide is to                   Kensaku Kawamoto
                                                                      Craig Parker           Ballot Cycle Info
                                                                                             Active Project (Resources             9/25/2006
recommend a URL-based implementation proposed and approved Scott Bolte
The Canonical Pedigree Project (CPP) was of the context-aware                                assigned to pjt)
                                                                                             Active Project (Resources            12/22/2010
This is the Phoenix meeting of the Clinical project. This model will
at the HL7 -OMICS Domain Analysis ModelGenomics work group Joyce Hernandez;                  assigned to pjt)
                                                                                             Active Project (Resources              2/4/2011
be used to develop our informational requirements for CMETs
The proposed project is intended to be a new Normative Topic          Philip M. Pochon
                                                                      Rick Haddorff          assigned to pjt)
                                                                                             Active Project (Resources              7/9/2010
To foster Clinical Genomics (CG) Domain in HL7 v2 V3 Ballot
under theearly utilization of genomic data of the HL7messaging        Rick Haddorff          assigned to - Balloting
                                                                                             Informative pjt)                       7/9/2010
The meet of chromosomes and their abnormalities is group as
and study clinical needs in this emerging field, the CG known will    Yan Heras              Comment Only - Balloting
cytogenetics. Chromosome analysis, or karyotype, refers to the
Specimen Handling CMET                                                Clinical Genomics      3-Year Plan Item
Definition of Decision Support Service                                WG Cochairs
                                                                      Clinical Genomics      3-Year Plan Item
This document contains the specifications for the representation      WG Cochairs Jill
                                                                      Ed Hammond;            Active Project (Resources             3/30/2009
and exchange of structured family health Structured Documents
In this project, the Clinical Genomics and history.                   Kaufman; Amnon
                                                                      Amnon Shabo            assigned to pjt)
                                                                                             DSTU - Balloting                      2/24/2009
Work Groups will jointly develop a CDA Implementation Guide
In this project, the Clinical Genomics Work Group will focus on the Joyce Hernandez         Informative - Reconcile         1/27/2009
development of create a data structure (e.g. CMET) for for the
This project will a static domain analysis model (DAM)               Jay Lyle               Active Project (Resources       5/31/2011
exchange ofScope Statement is a revisionThe primary use case is
This Project trauma registry information. to                         Brian McCourt          assigned to - Balloting
                                                                                            Informative pjt)               12/30/2010
PSS_CD_ACSDAM_R2_I1_revised10_10_08.doc approved by the
The intent of this project is to update the domain analysis model    Jay Lyle, Sarah Ryan   Informative - Reconcile          7/6/2010
for the Emergency Medical Services domain. For the purpose of
The goal of the project is to develop a DIM specific to emergency Jay Lyle, Sarah Ryan      Multiple Ballot Levels-See       7/6/2010
medical service project is to develop a Domain Analysis Model
The goal of the in the pre-hospital setting based on the DAM         Jay Lyle, Sarah Ryan   Informative Info
                                                                                            Ballot Cycle - Request          6/15/2009
(DAM) specific to project is tomedical the initial release of this
The scope of this emergency extend service in the pre-hospital       Anita Walden           Publication (Resources
                                                                                            Active Project                 10/16/2008
Domain Analyses project (DAM) (V3_RR_TBDAM_R1_I2_2008SEP)
The scope of this Model is to serve the clinical community with      Ed Hammond,            assigned to pjt)
                                                                                            Active Project (Resources        6/6/2008
education, processes and forum for collaborationprovide a
The Clinical Statement Pattern project intends to in the             Crystal Kallem,
                                                                     Hans Buitendijk        assigned to pjt)
                                                                                            DSTU - Test                     1/30/2006
pattern that can analysis Thevarious domains to propagate
1. Current State be used by project will provide a thorough          Serafina Versaggi      Period/Accepting
                                                                                            Active Project (Resources
analysis of the current confidentiality concept and the minimum
The SHIPPS project will identify the metadata domains, coding        Mary Ann Juurlink      assigned to pjt)
                                                                                            Active Project (Resources       2/14/2011
data qualityrepresentative privacy policy sets applicable in various Richard Thoreson
To develop requirements* required to enable: (1) data                                       assigned to pjt)
                                                                                            On Hold                          4/7/2010
healthcare information exchange scenarios in a structured natural CBCC WG Cochairs
CBBC balloted a V3 Privacy message a couple of years ago that                               3-Year Plan Item
resulted in ais intended to produce a structured documentthe
The project normative standard; they may update this in              Ioana Singureanu       DSTU - Test                    10/21/2009
In addition to the analysis of new requirements, this This
specification to exchange signed Consent Directives.project will     Ioana Singureanu       Period/Accepting
                                                                                            DSTU - Test                    10/16/2008
Develop and publish detected & guidelines 'Data Consent R1'
correct any problemsPrinciples in the currentto specify the syntax Ted Klein; Frank         Period/Accepting
                                                                                            Active Project (Resources        2/2/2010
for vocabulary binding in implementation guides. The intent of       Oemig
                                                                     ICWG                   assigned to Item
                                                                                            3-Year Plan pjt)
The HL7 development framework (HDF) provides guidance on             Jason Rock             Active Project (Resources        4/2/2007
Update the existing chapter 02 certification tests to not provide
how to develop a standard. However, the HDF does cover HL7           Ted Klein              assigned to pjt)
                                                                                            Active Project (Resources
v2.7 specificexistingin Chapter 2/2A tests to cover RIM v2.34
Update the topics RIM certification                                  Virginia Lorenzi       assigned to pjt)
                                                                                            On Hold
specific topics. engage with academia, create mechanisms for
Develop plan to                                                      AbdulMalik Shakir;     Active Project (Resources        3/6/2011
increased visibility of andamembership recruitment intorelated
This project will produce strategic plan for education HL7, and      Mollie Ullman-
                                                                     AbdulMalik Shakir      assigned to pjt)
                                                                                            Active Project (Resources       11/8/2010
activities throughout the entire world-wide HL7 International
Identification of these outlets (Elearning, Webinars, Podcast,       Gora Datta,            3-Year Plan pjt)
                                                                                            assigned to Item

Strengthen faculty is one of the tasks of the E-Learning topic),
Social networking) (skills, backup speakers, recruiting byProject,   Education WG
                                                                     Abdul-Malik Shakir,    3-Year Plan Item
leadership (interaction frequency, are encouraged toadditional
Develop policy by which affiliates evaluate need for advertise       Mike Henderson,
                                                                     Abdul-Malik Shakir     3-Year Plan Item
HL7-widedone some preliminarysuch as e-learning, as well as If
We have educational offerings work on a tutorial database.           Mike Henderson         3-Year Plan Item
workis an ongoing process embracing tutorial offerings at WGMs Virginia Lorenzi
This continues on a volunteer basis, populating the database                                3-Year Plan Item
and following summarizesas well as the evolving E-Learning
The Educational Summits the scope. The Project Scope                 Ioana Singureanu       Comment Only - Balloting        2/21/2011
Statement document contains all the scope detail. This project is
This project will create an Electronic Nutrition Care Process        Esther Myers           DSTU - Reconcile               11/18/2010
Record System (ENCPRS) Functional Profile based onFunctional
The project will develop an HL7 EHR-S Public Health the              Hetty Khan; Michelle Informative - Balloting          11/10/2010
Profile (PHFP) to identify functional Functional Profile will facilitate Williamson;Spiro;
The Pharmacist/Pharmacy Provider requirements and                        Rachelle F. Dr. Anna Normative - Reconcile          7/9/2010
EHR systems capture of medication and clinical related data at the Miranda Rochol
Prescribers and pharmacies (pharmacists) for several years have    Rachelle F. Spiro;       Informative - Reconcile          7/9/2010
been communicating electronic prescription information using
We propose developing an EHR-System Computationally-                 Miranda Rochol
                                                                     Steve Hufnagel         Comment Only - Balloting
Independent Information-Model (EHR-S needs of Personal Health John Ritter, Don
This standard will address the functional CI-IM) as a logical model                         Active Project (Resources       3/30/2010
Record system developersHL7 Functional Profile for the Electronic Mon, Gary Dickinson assigned to pjt)
This project will create an and users. PHR information is expected Pat Van Dyke, Mark Active Project (Resources             3/31/2010
Dental Record System (EDRS) based on the Electronic Healthof
HL7 White Paper full title: 'Balancing the Integrity and Value       Diehl Ritter
                                                                     John                   assigned to pjt)
                                                                                            Active Project (Resources      12/22/2009
Personal of a Functional Profile for an ambulatory oncology Health Paul Boyes
Delivery Health Records with Consumer Adoption, Current                                     assigned to pjt)
                                                                                            DSTU - Reconcile               12/22/2009
setting basedthe current joint ISO/HL7 EHR-S FM ReleaseJuneinto Pat Van Dyke; Don
a. Enhancing on, and conformant to, the ANSI approved 1.1                                   Comment Only -                  2/21/2011
Release 2.0for this project inputfocus on the minimum data set
The scope incorporating is to from functional profiles, CCHIT        Mon;Mon Ritter;
                                                                     Don John               Considering Comments
                                                                                            Active Project (Resources       6/12/2009
and data standards in EHR draft standard specifying, as
This project will produce a systems for diabetes assessment in       Gary Dickinson         assigned to pjt) Test Period
                                                                                            DSTU - Expired                  5/22/2006
requirements, the interoperabilityRecord System Vital Records
The goal of the Electronic Health characteristics of electronic      Hetty Khan, Michelle Informative - Reconcile            2/4/2008
The Functional Profile HL7's Clinical Document Architecture
(VR) Profile shows how Project is to create an HL7 EHR-S             Williamson
                                                                     Gary Dickinson         DSTU - Expired Test Period     11/12/2007
Release 2 (CDAr2) fulfills requirements of the Common EHR
The EHR Lifecycle Model (EHR/LM) is a supplement to the HL7          Gary Dickinson        DSTU - Expired Test Period     1/4/2008
EHR Interoperability HL7 workgroups and projects to deploy web Jean-Henri Duteau
Provide a means for Model DSTU (EHR/IM, published February                                 Active Project (Resources     7/18/2011
content in a way that allows appropriate access while respecting
Work to begin in Sept 2012. All to be completed by Jan 2013.         Electronic Services   3-Year Plan pjt)
                                                                                           assigned to Item
Internal (HQ) Facing - None identifiedcompleted by Sept 2012 .
Work to begin in May 2012. All to be External (Web) Facing: -        Work Group Co-
                                                                     Electronic Services   3-Year Plan Item
Internal (HQ) Facing: - Enhance Work Group Collaboration
Work to begin in Jan 2012. All to be completed by 2012 May           Work Group Co-
                                                                     Electronic Services   3-Year Plan Item
Internal (HQ) Facing: -2011.automated unit testing to theJan
Work to begin in Oct, Add All to be completed by 2012                Work Group Co-
                                                                     Electronic Services   3-Year Plan Item
Internal (HQ) Facing:byAdd automated unit(HQ) Facing: - Security Work Group Co-
All to be completed - 2011 Sept. Internal testing to the         Electronic Services       Active Project (Resources
Develop Encrypt the username and password stored in the
Update -a new hl7.org website. Release 1 was the Creative Look       Work Hamill Co-
                                                                     Dave Group            assigned to pjt)
                                                                                           Active Project (Resources     4/24/2007
and Feel.functional profile for the Emergency Department HL7
Create a Release 2 - Q Commerce - WGM Registration and               Peter Park            assigned to pjt)
                                                                                           Active Project (Resources
Emergency System based on 2
InformationCare DAM Versionthe EHR Functional Model Release 2 EC WG Cochairs               assigned to Item
                                                                                           3-Year Plan pjt)
The scope of this project is to create a Domain Analyses Model       Jim McClay            Active Project (Resources    10/28/2008
(DAM) for Emergency Care. The initial scope includeintended to
Project Scope The Behavioral Health CCD project is in-hospital       Kathleen Connor       assigned to pjt)
                                                                                           Active Project (Resources
evaluate the currency and comprehensiveness of3HL7 Behavioral
Reaffirm ANSI/HL7 V3 AB, R2-2008 HL7 Version Standard:               Kathleen Connor       assigned to pjt)
                                                                                           Active Project (Resources      7/6/2011
Accounting and Billing, Standard: Claims and Reimbursement,
Reaffirm HL7 Version 3 Release 2                                     Kathleen Connor       assigned to pjt)
                                                                                           Active Project (Resources      7/6/2011
Release 4. to create a three-workgroup DAM for claims
The plan is                                                          Financial             3-Year Plan pjt)
                                                                                           assigned to Item

This project with the premise that it would map LOINC into
attachmentswill tie HL7 models to information needed by CDA Management Co-
                                                            Craig Parker,                  On Hold                      10/13/2008
consumers' views of healthcare data. TheCMETs needed forbe
Development of a universal realm set of models can then              Kathleen Connor
                                                                     Kathleen Connor       Ready for CMET Publication   10/13/2008
pricing, including A_ValuedItem, A_Benefit, and
The goal of the Preoperative Anesthesiology Domain Analysis          Mead Walker ; Anita Informative - Balloting         1/10/2011
Model Project is to support the exchange and understanding of        WaldenHurrell:
                                                                     Martin                3-Year Plan Item
This project will develop an implementation guide constraining       Gunther Schadow       Active Project (Resources     6/29/2009
CDA project will The implementation guide will support an
This Release 3. mature the April 2008 Healthcare Services            Steve Hufnagel;       assigned to pjt)
                                                                                           Active Project (Resources     1/16/2009
Oriented and develop Implementation Guidance for the use of
Maintain Reference Architecture (H-SOA-RA) version 1.0 into H-       Nancy Orvis
                                                                     Melvin Reynolds       assigned to Item
                                                                                           3-Year Plan pjt)
HL7 messaging related to Healthcare Device communications -
HL7 V2.x / DICOM Implementation Guide for Pathology Order            Imaging Integration   3-Year Plan Item
HL7 V2.x DICOM of DICOM Image References
Messages/ and Use Implementation Guide for Pathology Specimen Work Group Co-
                                                              Imaging Integration          3-Year Plan Item
Identifiers and Labels (in cooperation with AP WG, OO WG, GS1)
SopInstance Reference minimal Update (Prerequisite: Release of       Work Group Co-
                                                                     Imaging Integration   3-Year Plan Item
HL7 project willR2)
The Datatypes produce an updated version of the DICOM object Work Group Co-
                                                             Helmut Koenig                 On Hold                       3/11/2009
reference CMET develop ITS specifications for HL7 v3 messages
This project will A_DicomCompositeObjectReference minimal            Dale Nelson           Informative - Reconcile        3/8/2011
To ballot the now expired ebXML DSTU unaltered as to existing
and documents, that are wire-backwards-compatible a normative Paul Knapp                   Normative - Reconcile          3/8/2011
standard. the current MLLP normative standard.
To refresh                                                           Paul Knapp            Normative - Reconcile          3/8/2011
The aim of the project is to define requirements for a neutral,      Robert Worden         On Hold                        7/6/2010
open notation for expressing semantic mappings; to produce
This project will produce a normative specification that describes   Grahame Grieve        DSTU - Reconcile               2/9/2010
a serialization of RIM graphs implemented as XML instances. The
To provide a globally harmonized (ISO/CEN/HL7) set of                Grahame Grieve        Normative - Reconcile         3/30/2009
representations deliver an update to presentation to include an
This project will for data used in the the XML ITS and               Dale Nelson           Normative - Reconcile         5/14/2007
improvedV3 ITS seeks to achieve: 1. Model-based serialization that Lloyd McKenzie
This HL7 informal extension mechanism similar to the one used                              Normative - Reconcile         1/29/2007
The purpose of Schema that are Profiles is to provide
produces i. XMLthe Web Services automatically always consistent Vassil Peytchev            On Hold                       6/21/2005
implementation guidelines specificationinteroperabilityfor use
The scope of this project is to promote of a transport between       Paul Knapp            On Hold                       9/26/2005
with project is to define the requirements for wrappers so and USB Anthony Julian
This ISO 9660-compliant removable media (common CD that a                                  Active Project (Resources     6/14/2011
The version of / Registry domain comprises the classes and
new Master Filewrappers may be defined.                              Anthony Julian        assigned to-pjt)
                                                                                           Normative Reconcile            2/8/2011
attributes needed to support Master Files to support batch does
Create the needed transmission artefacts and Registries. It          Rene Spronk           DSTU - Request Publication    2/23/2010
messaging for V3 messages, using the existingHQ will facilitate a
Provide HL7 HQ with the topics and speakers. draft content as        Jill Kaufmann;        Active Project (Resources
the webinars. Goal is to launch the first webinar by May,HL7
A) Increase the number of Universities/faculty teaching 2010         Catherine Chronaki
                                                                     Jill Kaufmann         assigned to pjt)
                                                                                           Active Project (Resources
Standards content as part of Healthcare Informatics programs,
1. Incorporate feedback received from the pilot 2. Products Guide: Jill Kaufman            assigned to pjt)
                                                                                           On Hold
a. Specify which Implementation Guide used (list one or more).
Will result in a supplement to Core Principles that defines, in      Lloyd McKenzie         Active Project (Resources
detail, the components of HL7 now, to collect comments, but will MnM Cochairs
Add project for Data Types R3 information models, particularly                              assigned to Item
                                                                                            3-Year Plan pjt)
This project seeks until adequate requirements are collected. As of
not bring forward to affirm the previous approval of 62 Common Woody Beeler                 Active Project (Resources     11/2/2010
Model Element Type (CMET) specifications that had previously
HL7 has developed and maintained a set of schemas called the         Lloyd McKenzie         assigned to pjt)
                                                                                            Ready for Normative          10/20/2009
Model Interchange Format Types since 2002. This set of schemas Grahame Grieve
Release 2 of Abstract Data (MIF) was originally proposed in 2005                            Edition Publication
                                                                                            Normative - Reconcile         1/27/2009
by InM with seeks toID# 200500060 (Projectof the primary Version G. Woody Beeler
This project project maintain the currency Insight ID #116). The                            Normative - Reconcile         9/30/2008
3 foundation the Health Level Seven Development Framework - as Ioana Singureanu
The scope of artifact - the Reference Information Model (RIM)                                                             1/25/2005
project includes: - Document and publish the HDF metamodel;
Creation of the HL7 Version 3 Common Message Element Type            Dale Nelson                                          2/14/2008
Release 8 normative standard. infrastructure standard that will
This project seeks to develop an                                     Woody Beeler           Normative - Reconcile         1/29/2008
supplement is intended to interface closely with the SAIF
This project the RIM, Data Types and Vocabulary documents.           Patrick Loyd           Active Project (Resources     8/19/2011
Architecture Coordination Program on thefields into one or more Hans Buitendijk
The scope of the project is to include new deployment of the                                assigned to-pjt)
                                                                                            Normative Balloting            7/1/2011
The scope of the the ORU message, address corresponding
segments used inproject is to ballot the Ambulatory Laboratory       Hans Buitendijk        Normative - Balloting          7/1/2011
Results Reporting ImplementationsaGuide for Analysis Model
The goal of the project is to create Domain LRI Release 1 that is Margaret Dittloff         Informative - Balloting       2/21/2011
(DAM) for diet and nutrition orders whichthe specimenmedical
Develop and ballot the second release of will describe related       Joyce Hernandez        Active Project (Resources
The Laboratory Test Compendium Framework contains CMETs
CMETs. This may include the following: - New specimenthe format Ken McCaslin                assigned to - Request
                                                                                            Informative pjt)              3/31/2010
to deliver the laboratory data elements, structures andsupport the Gunther Schadow
This project will develop order codes for systems that                                      Publication- Balloting
                                                                                            Normative                      2/9/2010
relationships between theDSTUelements required to uniquely
The objective of the CPM data R2 project is to establish a new       (O&O - modelling);
                                                                     Ed Tripp, Myron        DSTU - Request Publication     2/9/2010
DSTU release addressing theis to address general maintenance
The objective of this project following topics: - Incorporate        Finseth
                                                                     Hans Buitendijk        Active Project (Resources
efforts to ensure, e.g., that existingrelease of the necessary CMETs Austin Kreisler
The objective is to create the next materials not within                                    assigned to Item
                                                                                            3-Year Plan pjt)
This topic the Lab models.
to supportcovers exchanges of information between systems via        Patrick Loyd           Active Project (Resources     8/19/2011
messages and/or Microbiology Antibiotic Sensitivity Result
The creation of a services related to requesting laboratory          Patrick Loyd, Louise   assigned to pjt)
                                                                                            DSTU - Balloting              8/19/2010
Template which is a derivation of the existing Normative
(sync with Lab Template/CMET)                                        Brown cochair
                                                                     OO WG                  3-Year Plan Item
May have Clinical Statement, Clinical Event, and specialized model OO WG cochairs           3-Year Plan Item
component.Composite Order adjustment and specialized model
May have a                                                           OO WG cochairs         3-Year Plan Item
component.                                                           OO WG cochairs         3-Year Plan Item
Blood center and transfusion services software is considered a       Patti Larson;          Informative - Balloting       8/17/2009
Class II medical device by the U.S.Template projectAdministration Jonathan Harber;
The Common Observation Event Food and Drug focuses on the Patrick Loyd, Rob                 3-Year Plan Item             12/15/2008
creation of a common observationrelatedtemplate, patterned
Continue balloting the Laboratory event CMETs which are:             Hausam, Austin
                                                                     Ken McCaslin           Active Project (Resources     9/15/2008
R_SpecimenV3 messaging specifications for R_Specimen lite
To develop universal R_Specimen minimal the communication of Diana Perez, Patrick           assigned to pjt)
                                                                                            Active Project (Resources     1/24/2007
information regarding bloodObservations WorkThis willwill focus
In this project, the Orders & donation services. Group provide       E. Loyd Loyd, Hans
                                                                     Patrick                assigned to pjt)
                                                                                            On Hold                      12/15/2008
on development ofIG message model to createLaboratory (U.S.
General Lab Order a for Laboratory Orders to a Composite             Buitendijk, Gunther
                                                                     Ken McCaslin           3-Year Plan Item             11/12/2007
Realm the Laboratory Implementationrelease (IG) (Lab Order IG)
This is only) Message Result Topic. In Guide 1 this topic will have Austin Kreisler         Active Project (Resources     9/25/2006
In this project, the Orders & storyboards, Work events,
RMIM(s), HMD(s), messages, Observations triggerGroup will focus      Hans Buitendijk,       assigned to pjt)
                                                                                            On Hold                      12/15/2008
In the development of an Observation Request Group will focus
onthis project, the Orders & Observations Work Template to           Patrick Loyd, Gunther Active Project (Resources
                                                                     Hans Buitendijk,                                    12/15/2008
onthis project, the Orders & Observations Work Group will focus
In development of a message model to: - establish a common                                 3-Year Plan pjt)
                                                                     Patrick Loyd, Gunther assigned to Item
                                                                     Hans Buitendijk,                                     9/25/2006
on development of CMETs in support of various domains to via
This topic covers exchanges of information between systems           Patrick Loyd, Gunther Active Project (Resources
                                                                     Patrick Loyd                                         8/19/2011
messages and/or services relatedgroup began work onor V3
The Patient Administration work to requesting single the             Gregg Seppala          assigned to pjt)
                                                                                            DSTU - Reconcile              2/21/2011
Patient Encounter messaging standard nearly ten years ago.Define Gregg Seppala
- Collect a comprehensive set of use cases (requirements) - The                             Comment Only -               12/22/2010
the context will be to combine Provider Registry, interdependent Patient
a Domain Analysis Model (static and dynamic) forOrganization                                ConsideringItem
                                                                                            3-Year Plan Comments
Registry follow on to Delivery490 (Registry Enhancements for
This is a and Service Project Location to better reflect the real    Administration co-
                                                                     PA WG Cochairs         DSTU - Request Publication     2/9/2010
Social Services) that was CMETs
Personnel Management completed in January 2010. This project         PA WG Cochairs         3-Year Plan Item
In this project the Patient Administration work group will focus on Gregg Seppala           Ready for Normative           2/24/2009
making the Appointment CMETs more robust. The Release 1                                     Edition Publication
Personnel Management Release 1, consisting of the Provider and Gregg Seppala                Active Project (Resources      10/13/2008
Organization topics, became a normative standard on October 25, Gregg Seppala
Personnel Management Release 1, consisting of the Provider and                              assigned to pjt)
                                                                                            Active Project (Resources      10/13/2008
Organization topics, became a normative standard on October 25, A. Benson
The Scheduling project defines HL7 Version 3 messages for the                               assigned to Item
                                                                                            3-Year Plan pjt)                5/23/2005
purpose of communicating and supporting the various for
This project will create a domain analysis model (DAM) processes Jay Lyle                   Informative - Reconcile         2/22/2011
capturing and managing pressure ulcer prevention information,
This topic covers all interactions related to clinically recorded      Stephen Chu          3-Year Plan Item
adverse reactions, including: - Recording D-MIM and the Care
This project will move the Care Provision adverse reactions -          William Goosen       Active Project (Resources      10/13/2010
Statement R-MIM, including use cases, storyboards, interactions
Care Provision Domain: Setting up evaluation of 2007 DSTU              Patient Care Work    assigned to Item
                                                                                            3-Year Plan pjt)
materials: Finishing evaluation Sept 2010 2.5.1./ 2.6difficulties on
V2 Patient Care Provision Chapter 11 for Sort out / 2.7 / 2.8          Group Care Work
                                                                       Patient              3-Year Plan Item
Chapter 12 for 2.5.1./ 2.6 / 2.7Statementextension of the CH. 11 & Group Care WG
Care Statement is the Clinical / 2.8 This component of Care        Patient                  3-Year Plan Item
The Care domain. Domain addresses the information that is
Provision ProvisionIt is adapted to fit the specific needs.            dr. William TF       3-Year Plan Item
needed for the ongoing care of individuals, populations, and
The Care Provision Domain addresses the information that is            Goossen TF
                                                                       dr. William          3-Year Plan Item
needed for theballoted as DSTU individuals, populations, being
This topic was ongoing care of in 2009 September. It is and            Goossen,
                                                                       William Goossen      On Hold
split aim ofthe original Care Structures generic templatecovers all
The from this release is to provide a Topic. The topic based on        dr. William TF       DSTU - Request Publication      1/18/2010
The intent statement pattern create with almost one generic
the clinical of this project is to for use and maintainall scores      Goossen Goossen- Informative - Balloting
                                                                       PC: Anneke                                           7/14/2010
The Care Plan Topic is one of the roll outs of concepts of using
Detailed Clinical Model that defines the mainthe Care Provision        Baremans: Kennedy
                                                                       Rosemary ; DEV:      Active Project (Resources        4/5/2010
The DCM series of projects are as such a follow up Care DCM
Domain Message Information Model (D-MIM). Theof thePlan is a           Dr. William Goossen: assigned to pjt)
                                                                                            Active Project (Resources       1/18/2010
meeting in Boca Raton, led by Craig Parker and the DCM Brisbane Dan Russler
The Care Provision Domain addresses the information that is                                 assigned to pjt) Test Period
                                                                                            DSTU - Expired                  5/23/2005
neededand the ongoingobservations are some of the most
Allergy for Intolerance care of individuals, populations, and          Stephen Chu, Susan   DSTU - Test                     5/22/2007
commonlyincludes allreviewed andintended to record and update Matney Goossen
This topic recorded, interactions transmitted information in the William                    Period/Accepting Period
                                                                                            DSTU - Expired Test             9/25/2006
encounters, episodesdeals with the capturing e.g. gynaecological
Professional services of care and care events of information           William Goossen      DSTU - Expired Test Period      9/25/2006
about specific activities done "to" a patient such as training,safety Nick Halsey
To develop an electronic standard for periodic reporting of                                 Active Project (Resources       11/8/2010
This project is to develop a standardized in pre- and of the
updates in relation to medicinal productsspecificationpost data Nick Halsey                 assigned to pjt)
                                                                                            Active Project (Resources       11/8/2010
elements and exchange format for the transmission of
This will be developed as a standard for exchanging PSO                Patient Safety       assigned to Item
                                                                                            3-Year Plan pjt)
Common Format project is to create a Domain Analysis The initial Lise Stevens; Peter
The scope of the data provided by AHRQ (version 1.1). Model                                 Active Project (Resources        5/6/2009
The project scope harmonization existing HL7 V3 Individual Case Lise Stevens,
(DAM) to facilitate is to finalize theof new and existing messaging Goldschmidt ISO Co- assigned to-pjt)
                                                                                        Normative Notify                   10/23/2008
Safety Report (ICSR) Release 2 Draft Standard for Trial Use (DSTU) Chair: TBDWG
Medication Order Release 2                                         Pharmacy                 3-Year Plan Item
The scope is no different from that for the existing CMETs. The        Cochairs
                                                                       Hugh Glover          Active Project (Resources        2/1/2010
existing scope is to provide CMETs that represent medication for
Institutional Material                                                 Pharmacy WG          3-Year Plan pjt)
                                                                                            assigned to Item

Administration Event                                                   Cochairs Cochairs
                                                                       Pharmacy             3-Year Plan Item
To support an initial HL7 informative ballot as well as all            Garry Cruickshank,   DSTU - Balloting                6/29/2009
anticipated future work 1 of theincluding future ballots'Pharmacy' Julie James
The creation of Release efforts, HL7 version 3 domain that may Robert Hallowell             Normative - Reconcile           9/25/2006
(PORX) as Normative Standard. This standard will include support Robert Hallowell
The creation of Release 1 of the HL7 version 3 domain 'Pharmacy'                            3-Year Plan Item                9/25/2006
(PORX) as Normative Standard. This standard will include support Robert Hallowell
The creation of Release 1 of the HL7 version 3 domain 'Pharmacy'                            On Hold                         9/25/2006
(PORX) as Normative Standard. This standard will include support Robert Hallowell
The creation of Release 1 of the HL7 version 3 domain 'Pharmacy'                            3-Year Plan Item                9/25/2006
(PORX) as Normative Standard. This standard will include support Robert Hallowell
The creation of Release 1 of the HL7 version 3 domain 'Pharmacy'                            Normative - Balloting           9/25/2006
(PORX) as Normative Standard. This standard will include support Robert Hallowell
The creation of Release 1 of the HL7 version 3 domain 'Pharmacy'                            Normative - Reconcile           9/25/2006
(PORX) as Normative Standard. This standard will include support Robert Hallowell
The creation of Release 1 of the HL7 version 3 domain 'Pharmacy'                            Active Project (Resources       9/25/2006
(PORX) as Normative Standard. This standard will include support Robert Hallowell
The creation of Release 1 of the HL7 version 3 domain 'Pharmacy'                            assigned to pjt)
                                                                                            Active Project (Resources       9/25/2006
(PORX) as Normative Standard. This standard will include support Robert Hallowell
The creation of Release 1 of the HL7 version 3 domain 'Pharmacy'                            3-Year Plan pjt)
                                                                                            assigned to Item                9/25/2006
(PORX) as Normative Standard. This standard will include support Robert Hallowell
The creation of Release 1 of the HL7 version 3 domain 'Pharmacy'                            3-Year Plan Item                9/25/2006
(PORX) as Normative Standard. This standard will include support Robert Hallowell
The creation of Release 1 of the HL7 version 3 domain 'Pharmacy'                            Normative - Reconcile           9/25/2006
(PORX) as Normative Standard. This standard will include support Robert Hallowell
The creation of Release 1 of the HL7 version 3 domain 'Pharmacy'                            Normative - Reconcile           9/25/2006
(PORX) as Normative Standard. This standard will include support
The creation of Release 1 of the HL7 version 3 domain                 Robert Hallowell      Normative - Balloting           1/29/2007
'Medication'will establish a wiki siteStandard. This standard will
This project (POME) as Normative as a 'Resource Directory' for        Helen Stevens,        Active Project (Resources
HL7 volunteer for the bi-annual maintenance of the co-chair
This project is resources and available volunteer opportunities.' It Margie Kennedy
                                                                     Helen Stevens          assigned to pjt)
                                                                                            Active Project (Resources       8/16/2010
handbook. It Time Attendee programs -handbook based on for the Ken McCaslin
Update First will update the Co-Chairs Develop objectives input                             assigned to pjt)
                                                                                            Active Project (Resources        3/5/2010
FirstAnnual Maintenance: Communication Strategy, evaluation
PIC Time Attendees that can be used to evaluate all other             Process               3-Year Plan pjt)
                                                                                            assigned to Item
and Annualfor Jan WGM Decision Making Practices (DMP)
PIC refine Maintenance:                                               Improvement
                                                                      Process               3-Year Plan Item
Template (May WGM)
The intent is to collect/triage innovative best practices and         Improvement
                                                                      Process               3-Year Plan Item
publish for benefit of other groups who might want to adopt; PIC Improvement
Bi-annual maintenance of the co-chair handbook, review for each PIC Workgroup               3-Year Plan Item
September WGM work with the Technical Steering Committee
The HL7 PMO will                                                      David Hamill          Active Project (Resources       3/21/2011
(TSC) and Project re: process to publish to create a Project Health
Work with Vocab Services Work Group vocab changes 3x/year             Project Services      3-Year Plan pjt)
                                                                                            assigned to Item
[GForge #1588]
Develop education re: RIM version project requirements [GForge        Cochairs
                                                                      PS Cochairs, Dave     3-Year Plan Item
Finalize and Approve Tip Sheet on how to easily update
#1589] Create FAQ orrevised Harmonization Process (Tracker            Hamill Services
                                                                      Project               3-Year Plan Item
1587) Improve communications of harmonization processes and
SWOT Weakness Item - Deployment of Non-Balloted Products              Work Group Cochairs 3-Year Plan Item
                                                                      Project Services
(Tracker 1591) SWOT HL7 has shown Strtgy Item-Deployment of
In the past two years Weakness Mit. that it can initiate and track    Cochairs
                                                                      Rick Haddorff; Ioana Active Project (Resources         8/2/2010
projects using a well-defined target date vs.Project dateCycle for
Develop method to evaluate process - the actual Life in Project Singureanu Freida
                                                                   Dave Hamill,             3-Year Plan pjt)
                                                                                            assigned to Item
Insight (2011May) (Tracker 683) - DONE Investigate developing
TSC delegated work (Tracker 1107)                                     Hall Group
                                                                      Work                  3-Year Plan Item
Define Work for the SD PF's (Tracker 733) - DONE Develop              CoChairs
                                                                      Dave Hamill, Freida   3-Year Plan Item
Annual Edits to Project Life Cycle (Tracker 711) Review Project Life Hall Hamill, Freida
outreach to recruit project facilitators (Tracker 725) Verify        Dave                   3-Year Plan Item
Cycle for GOM reference updates (thrice per template will be
Work will begin in August of each year. New year) (Tracker 1052)      Hall Hamill, Project 3-Year Plan Item
                                                                      Dave
rolled outPHER/SD project is intended to extend andthe 2012
This joint at Jan WGMs Suggestions to be made for generalize          Anna Orlova; Group Active Project (Resources
                                                                      Services WorkLori                                      6/6/2011
the HQMF standard to v2.5.1 Electronic for specifying
Create release 2 of the include support Laboratory Reporting to       Reed-Fourquet
                                                                      Rita Altamore (WA     assigned to-pjt)
                                                                                            Normative Balloting             2/18/2011
Public Health implementationVital Records Death Reporting
Create release 1 of the v2.5.1 guide.                                 State DOH)
                                                                      Michelle Williamson   DSTU - Reconcile                2/17/2011
Implementation Guide. Thean Implementation Guide for have
This project seeks to ballot U.S. vital registration systems          Rob Savage            Comment Only -                  1/23/2009
immunization messages, using version 2.5.1 of the HL7 standard.
Create PI links to projects in which PHER is a co-                    Rita Altamore;        Considering Comments
                                                                                            Active Project (Resources
sponsor/interested party how PHER functions as a work group
Ongoing work to improve                                               Rita Altamore;        assigned to pjt)
                                                                                            Active Project (Resources
and to improve its effectiveness in supporting the development of Austin Kreisler
Continue balloting the Public Health related CMETs which are:                               assigned to pjt) Publication
                                                                                            Ready for CMET                 10/17/2008
R_ExposureAgentCarrier universal R_ExposureAgentFomite
This project will develop a Domain Analysis Model that represents Rob Savage                Active Project (Resources       3/14/2011
the structural and behavioral requirements of HL7 sponsored will Joginder Madra
In this project, the Public Health and Emergency Response SIG                               assigned to-pjt)
                                                                                            Normative Balloting             3/23/2009
focus on development of messages for communicating messages Jane Daus                       3-Year Plan Item
This project is to create the Version 2.8 standard from Version 2.7, Jane Daus              Normative - Balloting            5/2/2011
applying those proposals 1. Accepted by the end ballot site and its Publishing WG co-
Recurring maintenance of glossary and maintain of the May 2011                              3-Year Plan Item
Annual maintenance of V3 Guide & Backbone. Work occurs every chairs
xhtml conformance. This work occurs every WGM cycle.         Publishing WG co-              3-Year Plan Item
other WGM.
Annual maintenance of Facilitators guide. Work occurs every           chairs
                                                                      Publishing WG co-     3-Year Plan Item
other WGM.work occurs in September of each year.
This annual                                                           chairs
                                                                      Publishing WG co-     3-Year Plan Item
The annual work for this occurs from Sept WGM to Jan WGM.             chairs
                                                                      Publishing WG co-     3-Year Plan Item
The HL7 Version 3 Standards are a collection of related standards chairs
                                                                  Pete Gilbert              Active Project (Resources       5/23/2005
built upon a common Reference Information Model. Due to the           RCRIM WG              3-Year Plan pjt)
                                                                                            assigned to Item

                                                                      RCRIM WG              3-Year Plan Item
                                                                      RCRIM WG              3-Year Plan Item
Clinical Study Functional Profiles                                    RCRIM WG              3-Year Plan Item
Notification to Physicians for marketed product information           RCRIM WG              3-Year Plan Item
Further development of the Clinical Trial Registration and            RCRIM WG              3-Year Plan Item
Reporting for enhancements after initial normative ballot.
The CRFQ defines a single service with two service profiles: i) EHR Charlie Mead              DSTU - Test                     6/28/2010
service provider: service client provides CRFQ instance with
The RPS R3 project scopes builds on the scope defined in RPS R1 Geoff Williams                Period/Accepting
                                                                                              DSTU - Balloting                4/22/2011
and scope ofRPS R2 incorporated medical device and
The RPS R2. this project is to ballot the static components of the (EFPIA)
                                                                   Julie Evans; Edward        Informative - Reconcile         9/11/2009
This project The scope of on the development and maintenance Tripp
BRIDG DAM.will be focusedthe BRIDG model is Protocol-driven  Ed Helton; Tracy                 DSTU - Request Publication      12/8/2008
of an HL7 V3 message in support ofathe global data exchange of Beck; Scott Getzin
The original SPL project developed standardized specification  Myron Finseth                  Informative - Request           2/22/2010
the data elements is to exchange format for the V3 Regulated of
The project scope and extend the existing HL7 transmission             Ed Tripp               Publication
                                                                                              DSTU - Test                     3/28/2008
Product Submission to create with V3 messages from existing
The project scope is message HL7 new requirements. The project Jason Rock                     Period/Accepting
                                                                                              DSTU - Test                    11/30/2007
The scope of this project standard. This project will (CMETS,
content within the CDISCis to develop specificationsspecifically       Jennifer Neat          Period/Accepting
                                                                                              On Hold                         8/13/2007
Storyboards, Interactions, and Messages) to support the
The scope of the set of whitepapers is limited to those that           Rene Spronk            Active Project (Resources      10/18/2010
answer the following question: 'If one wishesencompassing the
This project will develop a domain ontology to create a RIM            Mike Davis             assigned to pjt)
                                                                                              DSTU - Reconcile                 3/1/2010
healthcare IT security and privacy and ballotprovidingHL7 Domain
This project is intended to create domains a single a single,          Suzanne Gonzales-      DSTU - Reconcile                10/6/2009
The scope of this project is to create a unified method control
Analysis Model (DAM) integrating both security access and              Webb
                                                                       WG Cochairs            Active Project (Resources       2/14/2008
process to of this project includes incorporation of standard and
The scope identify issues, categorize them using a additional          Suzanne Gonzales-      assigned to-pjt)
                                                                                              Normative Reconcile             1/29/2008
RBAC permission vocabulary (e.g., Healthcare Financial arbitrary
The hData Record Format describes how clinical data of                 Webb Beuchelt
                                                                       Gerald                 DSTU - Balloting                6/21/2011
media typeof this project is to in a hierarchical abstract format, and James Buckner
The scope can be organized develop a Health Interoperability                                  Active Project (Resources       3/24/2010
Service Ontology encompassing the descriptionaand classification Stefano Lotti
The Resource Location and Updating Service is Service Oriented                                assigned to pjt) Test Period
                                                                                              DSTU - Expired                  1/30/2006
Architecture Access and Security Services (PASS) project business
The Privacy, sub-project that attempts to elaborate the                Don Jorgenson          DSTU - Reconcile                8/20/2009
specifications define a set of encapsulated, loosely-coupled and
This project will create a CDA implementation guide to provide         Shawn Myers            Active Project (Resources       8/19/2011
for a standard,Ballot for the v3 Medical Records delivery of patient Pete Gilbert
Reaffirmation structured representation of the domain. This                                   assigned to pjt)
                                                                                              Active Project (Resources       8/19/2011
This project is originally balloted by the Medical Records to
document wasintended to create a domain analysis modelWork             Bob Dolin; Floyd       assigned to - Balloting
                                                                                              Informative pjt)                3/28/2011
describe the content required expand the CDA Template Tooling Eisenberg
The scope of this project is to within EHRs to measure quality and Pete Gilbert               Active Project (Resources      12/22/2010
Project to facilitate the seriesproduction CDA implementation
This project will take a easy of existing of quality CDA               Liora Alschuler, Dave assigned to pjt)
                                                                                             DSTU - Balloting                12/22/2010
guides for various types of clinical documents and consolidate
This project will create a CSS stylesheet that enables CDA             Carlson Boone
                                                                       Keith W.               DSTU - Reconcile               11/10/2010
documents to be displayed in a web browser without
This project will design a Progress Note in XML as a constraint on Liora Alschuler            DSTU - Test                      7/9/2010
HL7 v3 CDA will A Progress Note documents patient's clinical
This project r2. provide guidance for sending/receiving                Liora Alschuler        Period/Accepting
                                                                                              DSTU - Test                    10/29/2009
unstructured clinical documentsprocedure images, XML as a
This project is to design a basic including note in scanned            Liora Alschuler; Tom Period/Accepting
                                                                                            DSTU - Test                       9/21/2009
With cooperation v3 CDA Child note will be basic enough to be Liora
constraint on HL7 from ther2. TheHealth Corporation of America Carr Alschuler; Bob            Period/Accepting
                                                                                              DSTU - Test                     9/21/2009
(CHCA) and the Children's Hospitals Neonatal 2006, was the first
The Care Record Summary, issued in June 23, Consortium                 Dolin:Alschuler
                                                                       Liora                  Period/Accepting
                                                                                              DSTU - Test                     6/15/2009
balloted Implementation Guide for CDA R2. CRS covered CDA
The purpose of this project is to create a standard to                 Bob Dolin              Period/Accepting
                                                                                              DSTU - Test                     6/15/2009
unambiguously represent for modeling CDA implementation
- Provide a UML platform quality measure specifications,               Rich Rogers            Period/Accepting                 4/2/2009
guide specifications. - CreateRelease 3 of the Clinical Document
The project will produce the documentation on how to author            Robert Dolin           Active Project (Resources       3/13/2009
There is growing awareness correct known deficiencies and
Architecture (CDA R3). It willthat high quality and safe health and Jennie Harvell            assigned to pjt)
                                                                                              DSTU - Test                     11/6/2008
long-term care can onlyCDCdelivered when the right patient
With cooperation from be and Healthcare Associated Infections Dan Pollock                     Period/Accepting
                                                                                              DSTU - Test                      7/6/2011
(HAI) software vendors, routinely collectdevelop an performance
Health care institutions this project will and report                  Liora Alschuler, Joy   Period/Accepting
                                                                                              DSTU - Test                      2/4/2008
                                                                  Igor (Roadmap
measure data to improve the quality of care provided to patients. Kuhl,Gejdos
With cooperation from Continua Health Alliance member                                         Period/Accepting
                                                                                              DSTU - Test                      2/4/2008
companies and Electronic Medical Records software vendors, this Keith Boone
In this project the Structured Documents committee will focus on                              Period/Accepting
                                                                                              Normative - Reconcile           5/22/2007
the development of a document architecture usedor more (tbd)
1.This project will develop and bring to ballot one in reporting       Liora Alschuler        DSTU - Test                     9/25/2006
implementation guides that implement a dashboard showing of
The scope of this project to constrain CDA for common type the         TBD                    Period/Accepting
                                                                                              Active Project (Resources       8/15/2011
TSC progress on implementing the HL7 Strategic Initiatives a
Orders and Observations is undertaking a project to create that        Project Services       assigned to pjt)
                                                                                              Active Project (Resources       3/21/2011
Composite Order. Thisinto 3 phases: Phase A: Toto implement
The project is divided presents an opportunity formally define         Work Group: Rick
                                                                       Lloyd McKenzie         assigned to pjt)
                                                                                              Active Project (Resources       3/21/2011
all of the artifact types that will be developed, maintained and all Austin Kreisler
The purpose of the SAIF Architecture Program is to coordinate                                 assigned to pjt)
                                                                                              Active Project (Resources       2/21/2011
The Technical Steering to 'stand-up' HL7's Enterprise Architecture G W Beeler, Jr.
the activities necessary Committee (TSC) will undertake a                                     assigned to pjt)
                                                                                              Active Project (Resources       2/28/2011
retrospective review of itself (after three full years of operation)                          assigned to pjt)
The scope of this project is to provide a clear process for soliciting Ed Tripp, Ken Lunn   Active Project (Resources       8/23/2010
innovative of thisand approaches relative to theadesign,
The scope ideas project is aimed at providing clear HL7              Austin Kreisler        assigned to pjt)
                                                                                            Active Project (Resources
Maintenance project to obtain and for implementing that plan.
Product Quality Plan and a strategyupdate Work Groups' Mission Lynn Laakso                  assigned to Item
                                                                                            3-Year Plan pjt)
and Charterevaluate visibility of HL7 PRODUCTS
Create and statements, Decision Making Practices (DMPs), and         John Quinn, Lynn       Active Project (Resources
In this project we will create a pilot template registry based on the Laakso Boone/Mark assigned to pjt)
                                                                      Keith W.          Active Project (Resources          12/15/2009
business Requirementsestablished by the Template Workgroup
Business requirements Analysis sufficient to ensure template         Shafarman
                                                                     Mark Shafarman         assigned to pjt)
                                                                                            Active Project (Resources       3/10/2009
artifacts can Templates DSTU needs to accessed and reflect the
The existing be successfully registered be revised to maintained     John Roberts, Mark     assigned to pjt)
                                                                                            Active Project (Resources       8/23/2011
lessons learned from current approaches to definingappropriate
The Gforge hosting service has not being providing and                                  3-Year Plan pjt)
                                                                     Shafarman cochairs assigned to Item
                                                                     Tooling WG
customer service. The Tooling Work group is recommending that Jane Curry
Tooling WG wishes to create a visual summary in the form of a                               3-Year Plan Item
Tooling WG will review provides a snapshot of what tools are
“dash board―  that current communications, create a              Jane Curry             3-Year Plan Item
communication plan to ensure interested to align can be fully
Tooling will work with Electronic Services parties the               Andy Stechishin        3-Year Plan Item
requirements gathering and tool selection processes to between
Develop a tool to facilitate the exchange of model data ensure       Stacy Berger           Active Project (Resources        2/4/2011
UML modeling tools used to develop DAMs and DCMssupport
Enhance the HL7 Static Model Designer (SMD) tool to such as          Jane Curry             assigned to pjt)
                                                                                            Active Project (Resources
Universal conventions and enable complete Modelfully MIF-based Andy Stechishin
The project will complete the implementation of a Interchange                               assigned to pjt)
                                                                                            Active Project (Resources       5/25/2010
Establish a central HL7 Terminology Authority were focus on
publishing process. Initial stages of the projectwith alaccomplished Jim Case               assigned to pjt)
                                                                                            Active Project (Resources
establishing will create surrounding vocabulary review and
This project processes and document a set of policies and            Ted Klein, Jim Case,   assigned to pjt)
                                                                                            Active Project (Resources       2/14/2011
recommended procedures for the HL7 community relative to post- Beverly Knight
Evaluate and map (technical alignment) between the IHTSDO      Russ Hamm                    assigned to pjt)
                                                                                            On Hold                         3/23/2010
workbench information model and the policy between HL7 andas Russell Hamm
This project will be a jointly developed HL7 vocabulary model,                              Active Project (Resources        4/6/2010
the IHTSDO to develop a policy vocabulary maintenance that
Determine a formal process for and process whereby HL7               Vocabulary WG          assigned to Item
                                                                                            3-Year Plan pjt)
includes timelines, allows for interdependencies, andwhich
This work builds upon the core principles document leverages         Beverly Knight;        3-Year Plan Item
identifies the principles of vocabulary when– Principles &
Coordinate with a work item at ISO TC 215 developing HL7             HeatherKnight Stan
                                                                     Beverly Grain;         Active Project (Resources       4/19/2011
guidelines of Terminology Maintenance The focus of this
Harmonize the V2 & V3 vocabulary                                     Dave Shaver            assigned to pjt)
                                                                                            On Hold
Coordinate with a work item at ISO TC 215 – Conformance Best Beverly Knight, Frank Active Project (Resources              4/19/2011
Practices The this document is to contribute to review this ISO
The intent of focus of this proposed item is actively to the         Oemig Grain
                                                                     Heather                assigned to pjt)
                                                                                            Active Project (Resources      10/19/2010
development, of implementation guidance to support the
The provision and inclusion of HL7 glossary material to the          Ian Townend; Ed        assigned to pjt) Test Period
                                                                                            DSTU - Expired                  1/15/2005
communication of SNOMED CT functions necessary to manage,
Terminology services represent terminology content in HL7            Cheetham
                                                                     Russell Hamm, Craig DSTU - Test                        6/16/2008
The goal of access terminology content. Terminology services
search, and this project is to enhance support for this key          Stancl Knight
                                                                     Beverly                Period/Accepting
                                                                                            On Hold                          4/8/2008
document to support HL7 v3 terminology implementations.
TSC Approval Date Type                     Objectives/Deliverables                                              Next Milestone Date
        5/22/2007 Ballot - DSTU            As part of this project, the Anatomic Pathology SIG will:            - Select One -
        2/14/2011 Ballot - DSTU            Complete SAIF Book for Informational Ballot submission - Target: 2011 Sept WGM/Ballot
                    Ballot - Informative       May 2011 - DONE
                                           1) Identification of key HL7 Terms, products and Processes.          2010 Sept WGM/Ballot
                                           Target: Oct for Medical Logic Systems, Version 3.0
                                           Arden Syntax 2010 (Year 1 task-1)                                    2011 Sept WGM/Ballot
        2/28/2011 Ballot - Normative       - Adoption of RIM-basedSyntax v2.9 documentcurly-braces
                                           Finalization of the Arden data interchange (fix - Target: 2011       2011 Sept WGM/Ballot
        2/28/2011 Ballot - Normative       September Ballot Arden Syntax v2.8 document - Target: 2011
                                           Finalization of the                                                  2011 Sept WGM/Ballot
                    Ballot - Informative   May Ballot
                                           1st Ballot attachments - Target: Jan, 2012                           2012 Jan WGM/Ballot
        6/16/2008 Ballot - Informative     2nd Ballot for attachments, if necessary - Target: May, 2012
                                           An informative document (Implementation Guide) with the              2011 Sept WGM/Ballot
        5/28/2007                          tentative title:
                                           Create and ballot an HL7 Informative document using the ADA
        5/23/2005                          specification for a periodontal attachment, in a manner consistent
                                           - Create an Additional Information Specification for Children's
        9/26/2005                          Preventive Healththis project both Human Decision Variants and a - Select One -
                                           The objectives of Services in are to:
        9/26/2005                          - Adequately of this project are to: for the home health
                                           The objectives define an attachment
         3/3/2008                          - Adequately define an attachment for the Pharmacy Prior
                                           Upgrade narrative and content of existing CDA R1-based
        9/25/2006                          specificationnew versionto incorporate CDA R2-based concepts
                                           - Create a document of the HL7 Additional Information
                    Vendor Contract        Specification Implementationand apply incorporate CDA R2
                                           July 16 - contractors analyze Guide to the July 2011                 - Select One -
                    Vendor Contract        harmonization approved vocabulary content to the latest Version 2012 Jan WGM/Ballot
                                           Wilfred Bonney to support the OID registry in 2011
                    Vendor Contract        September 30, 2011 - list of areas in existing documents that        2011 Sept WGM/Ballot
        5/16/2011 Vendor Contract          need to 2011 - list ofdeliveredexisting document that need to be
                                           July 15, be updated areas in to tooling committee                    2011 Sept WGM/Ballot
         5/1/2011 Vendor Contract          updated and-verified by tools smith delivered to cooling
                                           May 5, 2011 Outline delivered to Tooling Committee                   2011 Sept WGM/Ballot
                                           --HL7 business plan: The plan should contain standard business       - Select One -
        10/1/2007 - Other -                plan components, such as:
                                           Using the HL7 EHRS Functional Model, map existing HL7 products - Select One -
        4/11/2011 Ballot - DSTU            to the EHR-S identified -HL7 'Products' to 2011 clinical story
                                           Project team functions. Target: January include                      2011 Sept WGM/Ballot
                    Ballot - Normative     Child Health approval of Health Functional Profile - Target:Systems 2011 Jan WGM/Ballot
                                           update to the HL7 Child project scope statement for EHR
                                           Complete Child Health the EHR Functional Model
                                           following an update to 3-Year Plan                                   2011 Jan WGM/Ballot
                    Ballot - Normative     Updated CCOW standard - Target: 2012 Sept WGM                        2012 Sept WGM/Ballot
                                           Project End Date - Target: 2012 Sept WGM
                                           Consider extending CCOW to handle Authorizations.                    2010 Sept WGM/Ballot
        8/29/2011 Ballot - Normative       Ballot release 1 of normative HL7 DSS standard - Target: May         2011 Sept WGM/Ballot
        6/22/2009 Ballot - DSTU            2011 -ballotable draft of Infobutton SOA Implentation Guide (for
                                           Initial DONE                                                         2013 May WGM/Ballot
         7/6/2008 Ballot - DSTU            comment) of the use case requirements within the domain
                                           refinement
        12/8/2008 Ballot - DSTU            analysis modelfollowing set of project deliverables in the order
                                           To deliver the - Target: May 2006 (Done)                             2011 May WGM/Ballot
         3/8/2010 Ballot - Normative       presented:the following set of project deliverables in the order
                                           To deliver                                                           2011 Sept WGM/Ballot
        9/25/2006 Ballot - Informative     presented:
                                           Rules to convert an XML context-aware information retrieval          2010 Jan WGM/Ballot
         1/8/2011 Ballot - Informative     ('infobutton')IG balloted for a URL
                                           First draft of message into comment only - Target: 2011 Sep          2011 Sept WGM/Ballot
        2/14/2011 Ballot - Informative     WGM Initiation - Target: Jan, 2011
                                           Project                                                              2011 Sept WGM/Ballot
         8/2/2010 Ballot - Normative       Reconcile negative comments on the Genetic Variation CMET            2011 Sept WGM/Ballot
         8/2/2010 Ballot - Informative     (which passed normative review - Target: August 2010 - Target:
                                           Complete modeling and ballot) preferably using SMD COMPLETE 2011 Sept WGM/Ballot
                    Ballot - Normative     Extension first draft of release 2 implementation guide Model
                                           Complete of the Clinical Genomics Domain Informationfor ballot       2011 Sept WGM/Ballot
                                           and consequently ofCMET
                                           Specimen Handling the Genetic Variation Model to support             2010 Sept WGM/Ballot
                                           Joint with Decision Support group Ken K. - CG responsible for        2010 September WGM
        3/30/2009 ISO JIC Ballot Project   CMET and extensions plus a output WSDLa universal format for
                                           The purpose of this standard is to specify                           2011 Sept WGM/Ballot
         6/1/2009 Ballot - DSTU            expressingdetailed requirements history. Thiscollecting
                                           - Perform an individual's family analysis by standard                2011 Sept WGM/Ballot
                                           requirements from all stakeholders.
  2/9/2009 Ballot - Normative         - Domain Analysis Model for CMET (DSTU) September 2009                 2010 Sept WGM/Ballot
 6/13/2011 Ballot - Informative       Submit DAM to specification CMET (DSTU) January 2010
                                      - New message ballot - Target: November 2011                           2011 Jan WGM/Ballot
  2/7/2011 Ballot - Informative       Resolve DAM comments - Target:
                                      Develop set of DAM artefacts definedJanuary 2012
                                                                           in HDF Requirements               2011 Sept WGM/Ballot
 7/26/2010 Ballot - Informative       Publish the UML with obtain project sponsorNational Cancer 2010 2011 Jan WGM/Ballot
                                      1. Define project and data elements via the approval - June
 11/1/2010 Ballot - DSTU              1. Define SD and TSC approval - June 2010
                                      2. Obtain project and obtain project sponsor approval - June 2010 2011 Sept WGM/Ballot

 6/29/2009 Ballot - Informative       - COMPLETED the first in a series of planned activities intended to 2011 Sept WGM/Ballot
                                      This project is
10/24/2008 Ballot - Informative       transform the uniform pre-hospital emergency medical services
                                      Develop set of DAM artifacts defined in HDF Requirements. In           2010 Sept WGM/Ballot
 6/16/2008 Ballot - Informative       addition, publish the UML with data elementscontent National
                                      1. Identify and create reference list of clinical via the definition   2010 Jan WGM/Ballot
 1/30/2006 Ballot - DSTU              efforts being developed.
                                      - Provide a Clinical Statement Pattern and select CMETs that can       2012 Jan WGM/Ballot
             Ballot - Comment Only    be used by other domains to HL7 WGs a common and consistent
                                      Draft Use Cases available for establish Peer Review - Target: Aug      2011 Sept WGM/Ballot
 3/14/2011 Ballot - DSTU              2011
                                      Analyze Quality Measurement Data Reporting requirements (e.g.          2011 Sept WGM/Ballot
 4/19/2010 Ballot - DSTU              HEDIS, GPRA, NOMS, NQF) - privacy policies - Target: 2010 Sept
                                      DSTU Catalogue of reference Target: January 15th, 2011                 2010 Sept WGM/Ballot
                                      WGM V3 Privacy Message
                                      Update                                                                 2011 Jan WGM/Ballot
 11/9/2009 Ballot - DSTU              The project will produce templates and a standard structured           2012 Sept WGM/Ballot
10/28/2008 Ballot - DSTU              document structure to represent the patientpolicies directive for 2012 May WGM/Ballot
                                      Domain Analysis for consumer consent and consent
 7/26/2010 Ballot - Informative       Target: Jan 2009
                                      Currently, implementation guides have to provide some kind of          2010 Sept WGM/Ballot
                                      V2.8 Proposals - Improve conformance vocabulary. As there is no 2011 Jan WGM/Ballot
                                      binding of the static model to the used for better testing

  4/2/2007                            -   Provide guidance and documentation to prove that a HL7 V3 2010 May WGM/Ballot
             - Other -                Original fit for purpose
                                      standardtarget dates: and stable enough for implementers               2011 Sept WGM/Ballot
                                      First draft of the new HL7 V2.7 cert. test - Target: 03/01/11
                                      First draft of the new RIM 2.34 CH02 cert. test - Target: 03/01/11     2011 May WGM/Ballot
 3/21/2011 - Other -                  Update Initiation - Target:for precert - Target: 05/01/11
                                      Project of the RIM slides March 2011                                   2011 May WGM/Ballot
11/15/2010 - Other -                  Analysis state analysisMechanisms for Scholarly Recognition -
                                      Current of Common and strategic vision specification - Target:         2011 Sept WGM/Ballot
                                      November 2010 -DONE into repeatable and manageable
                                      - E-learning (Mature pilots                                            2012 Jan WGM/Ballot
             - Other -                content and process) (AMS)
                                      1) Strengthen faculty (DK)                                             2012 Jan WGM/Ballot
             - Other -                Collaborative education                                                2012 Jan WGM/Ballot
             - Other -                - Affiliates
                                      We have done some preliminary work on a tutorial database.             2011 Sept WGM/Ballot
             - Other -                Intent is populating the database with baseline and historical
                                      - Curriculum Development                                               2012 Jan WGM/Ballot
 2/28/2011 Ballot - Informative         - Catalog - Begin in 2009; target end: 2010JanWMG
                                      RM-ES concepts and Environmental Scan/summary of relevant              2011 Sept WGM/Ballot
11/22/2010 Ballot - DSTU              Work Groups and - Target: -January 2011 2011 WGM
                                      DSTU Level Ballot Projects Target: May ballot                          2011 May WGM/Ballot
11/29/2010 Ballot - Informative       Normative Level Ballot - Target:Health Recordballot Public
                                      The objective for the Electronic January 2013 System                   2011 Sept WGM/Ballot
 8/16/2010 Ballot - Informative       Informative Ballot - August 2010 - to develop an
                                      Health Functional Profile Project is COMPLETED HL7 Electronic          2011 Sept WGM/Ballot
 8/16/2010 Ballot - Informative       Normative Ballot --August 2011
                                      Informative Ballot August 2010                                         2011 Jan WGM/Ballot
             Ballot - Informative     Normative– Informal Peer Review Prototype using Diabetes
                                      May 2011 Ballot - August 2011                                          2011 Sept WGM/Ballot
 4/19/2010 ISO JIC Ballot Project     Project [STATUS: completed] ballot (Target: September 2010)
                                      PHR System Functional Model                                            2011 Jan WGM/Ballot
 4/12/2010 Ballot - Normative         Reconciliation of of Profile for Informative Level Ballotthe
                                      1. Development PHR-S FM ballots and publishing of - Target:            2010 Sept WGM/Ballot
  1/4/2010 Ballot - Comment Only      8/2010 Work Group will:
                                      The PHR                                                                2010 May WGM/Ballot
  1/4/2010 Ballot - Normative         - Initiallyof Functional Realm-oriented White criteriathat will list
                                      Delivery create a U.S. Profile document and Paper draft for            2010 Sept WGM/Ballot
             ISO JIC Ballot Project   comment (Target: January 2010)
                                      HL7 Normative Ballot - Target: April, 2011 Ballot                      2011 Sept WGM/Ballot
 6/22/2009 - Other -                  Joint HL7/ISO ballotfrom USF September 2011 BallotSelect a
                                      1. Review the DAMs - Target: and The Netherlands.                      2010 May WGM/Ballot
 5/22/2006 Ballot - DSTU              common set of T1D diabetes assessment data elements to be
                                      Target: July 2006 DSTU ballot; July 2008 Membership ballot             2009 May WGM/Ballot
 2/11/2008 Ballot - Informative       - Establish a commonElectronic Health Record System Vital
                                      The objective for the reference for EHR Record Interoperability        2011 Sept WGM/Ballot
10/28/2008 Ballot - DSTU              - To develop a Profile Profile Project is to develop an HL7
                                      Records (VR) Functional showing how attributes of HL7 CDAr2            2010 Sept WGM/Ballot
                                      fulfill Common EHR Record Unit requirements, per the HL7 EHR
11/12/2007 Ballot - DSTU            -   To specify the events occurring in an EHR record lifecycle,     2010 Sept WGM/Ballot
 7/25/2011 - Other -                focused on the lifecycle of the Common EHR Record Unit that are 2011 Sept WGM/Ballot
                                    One workgroup can post material. - Target: July 2011
                                    Project announced to all workgroups/projects - Target: Sept 2011 2012 Sept WGM/Ballot
                                    Work to begin in Sept 2012. All to be completed by Jan 2013.
                                    Internal (HQ) Facing 2012. All to be completed by Sept 2012 .
                                    Work to begin in May                                                2012 May WGM/Ballot
             - Other -              Internal (HQ) Facing: 2012. All to be completed by 2012 May
                                    Work to begin in Jan                                                2012 Jan WGM/Ballot
             - Other -              Internal (HQ) Facing: 2011. All to be completed by 2012 Jan
                                    Work to begin in Oct,                                               2011 Sept WGM/Ballot
             - Other -              Internal (HQ) Facing:by 2011 Sept.
                                    All to be completed                                                 2011 May WGM/Ballot
 4/24/2007 Vendor Contract          Internal (HQ) Facing: non-showstopper requirements by Jan 2011. 2011 May WGM/Ballot
                                    Implment remaining
             Ballot - Normative     Balloted EDIS FP version facing) Membership 2011 Sept WGM
                                    Implement External (web2 document - Target: by July 2010 -          2011 Sept WGM/Ballot
                                    Reconciliation of DAM Version 2 - Target:
                                    Emergency Care Ballot comments                  2012 Jan WGM        - Select One -
 11/3/2008 Ballot - Informative     Develop set of DAM artifacts defined in HDF Requirements.           2010 Sept WGM/Ballot
             Ballot - DSTU          Targeting 2010 Sept. Ballot Cycle Model submitted for January
                                    Draft Assessment Domain Analysis                                    2012 Jan WGM/Ballot
 7/18/2011 Ballot - Normative       2012 Ballot matter, add 2011
                                    Update front November reaffirmation notes to reader, check          2011 Sept WGM/Ballot
 7/18/2011 Ballot - Normative       links, and make any technical corrections required - Target:
                                    Update front matter, add reaffirmation notes to reader, check       2011 Sept WGM/Ballot
                                    The plan make any a three-workgroup DAM for claims
                                    links, andis to createtechnical corrections require - Target: August 2011 Sept WGM/Ballot

10/28/2008                          attachments with the premise that it would map LOINC into CDA 2010 Sept WGM/Ballot
                                    Consumer Information Account DAM (informative track)
10/28/2008 Ballot - Normative       Target: January 2010
                                    A_ValuedItem universal, basic, informational, definitional and      2012 Jan WGM/Ballot
 1/31/2011 Ballot - Informative     identified variants, A_Benefit universal and basic and A_Provider
                                    We will create a Domain Analysis Model which will include the       2011 Sept WGM/Ballot
                                    following:
                                    Develop Implementation Guide (IG) for the use of HL7 messaging 2010 Sept WGM/Ballot
  7/6/2009 Ballot - Informative     within Anaesthesiology
                                    This project will develop:                                          2010 Sept WGM/Ballot
 2/19/2009 Ballot - Comment Only    - Prose implementation guide deliver:
                                    As of Jan 2010, this project will                                   2011 Sept WGM/Ballot
                                    Maintain and develop Implementation Guidance for the use of         2011 Sept WGM/Ballot
                                    HL7 messaging related to Healthcare Device communications -
                                    HL7 V2.x / DICOM Implementation Guide for Pathology Order           2011 Sept WGM/Ballot
                                    Messages/ and Use Implementation Guide for Pathology Specimen 2011 Sept WGM/Ballot
                                    HL7 V2.x DICOM of DICOM Image References
                                    Identifiers and Labels (in cooperation with AP WG, OO WG, GS1)
                                    SopInstance Reference minimal Update                                2012 Jan WGM/Ballot
 3/16/2009 Ballot - Normative       Update COCT_RM830120UV05 to synchronize it with the changes - Select One -
 3/21/2011 Ballot - Normative       in the successfully balloted CDA Diagnostic Imaging Report 2011 2011 Sept WGM/Ballot
                                    normative standard ITS R2B structures - Target: Ballot 1, May
 3/14/2011 Ballot - Normative       normative standard ITS R2B data types - Target: Ballot 1, May
                                    normative standard - Target: Ballot 1, May 2011                     2011 Sept WGM/Ballot
 3/14/2011 Ballot - Normative       normative standard - Target: Ballot 1, May 2011                     2011 Sept WGM/Ballot
             Ballot - DSTU          Write set of requirements for the notation - May 2010               2010 Sept WGM/Ballot
 2/22/2010 Ballot - Normative       Receive feedback on requirements and refine them as necessary - 2011 Jan WGM/Ballot
                                    Initial normative ballot : May 2010
 3/30/2009 ISO JIC Ballot Project   Project End for and the supply of healthcare software systems is
                                    The market Date (all objectives have been met): Jan 2011            2011 Jan WGM/Ballot
 5/14/2007 Ballot - Normative       global. There isITS Structures document be able to communicate 2011 May WGM/Ballot
                                    - Revised XML an increasing demand to
 1/29/2007 Ballot - Normative       - Section forwill produce thecovering rationale for the new
                                    This project XML ITS Guide following work products:                 2010 Sept WGM/Ballot
 6/21/2005 Ballot - Normative       The The product of the (including
                                    1. workITS specificationproject is: rationale), including:          2010 May WGM/Ballot
 9/26/2005                          - A normative DSTU that details the requirements of web
                                    Publish the specification, to include                               2011 May WGM/Ballot
 7/11/2011 - Other -                - Story boards
                                    Project Scope approved by InM - Target: May, 2011                   2011 Sept WGM/Ballot
 2/14/2011 Ballot - Normative       Project Scope approved by FTSD & TSC - Target: June 2011
                                    Ballot - Target: March, 2011                                        2011 Sept WGM/Ballot
  3/8/2010 Ballot - DSTU            Reconciliation2010 MayApril, 2011
                                    Initial Ballot - - Target: WGM                                      2011 May WGM/Ballot
             - Other -              Complete DSTUAmbassador the material - 2010 Sept WGM
                                    First topic:- the balloting of presentations                        2010 Sept WGM/Ballot
             - Other -              Next Step: Determine additions to the lecture slides; complete      2011 Jan WGM/Ballot
             - Other -              additional material forproject2010. Continue be sign up additional - Select One -
                                    The following are the Sept. deliverables to to provided to HL7
                                    HQ for review and approval:
             Ballot - Informative   Draft of document for review - Target: Nov. 1, 2011                   2012 Jan WGM/Ballot
             Ballot - Normative     Add project for Data Types R3 now, to collect ballot comments -
                                    Consideration of feedback on draft, and an CPcomments, but will 2011 May WGM/Ballot

 11/8/2010 Ballot - Normative       not bring forward until adequate requirements are collected.
                                    First Ballot open - Target: November 2010                             2011 May WGM/Ballot
 11/2/2009 Ballot - Informative     Project End Date (allof the MIF and requirements. Target: June
                                    Publishable version objectives have been met) - Target: Nov.          2012 Sept WGM/Ballot
 2/23/2009 Ballot - Normative       30, 2009 balloting of 'HL7 Version 3 Standard: Data Types -
                                    Complete                                                              2010 Jan WGM/Ballot
10/28/2008 Ballot - Normative       AbstractaSpecification, Release 2 (V3_DT_R2_N2_2008MAY)' end 2011 Sept WGM/Ballot
                                    Provide fully Normative Reference Information Model at the
 1/25/2005                          of each calendar year to be the anchor into the ballot package
                                    HDF Maintenance - Integrate the HDF of the following year's           - Select One -
             Ballot - Normative     HDF Maintenance - Update the artifacts developed byfor inclusion
                                    Publish COCT Release 8 as a Membership level ballot, HL7
 3/20/2008 Ballot - Normative       in Normative Edition 2009. General existing work documented in:
                                    Create a Normative Standard from work products are R-MIMs             2011 Sept WGM/Ballot
 8/29/2011 Ballot - Normative       - Message Development Framework (1999)2011
                                    Requirements documentation - Target: Sept                             2011 Sept WGM/Ballot
 7/11/2011 Ballot - Normative       Definition of Target:   Jan and
                                    DSTU Ballot -proposed fields2012 conformance usage indicator -        2011 Sept WGM/Ballot
 7/11/2011                          Target: June 30, for balloting - Target: July 31
                                    Receipt draft IG 2011                                                 2011 Sept WGM/Ballot
 2/28/2011 Ballot - Informative     Define project and obtain Target:       August 1 and
                                    First Ballot (out-of-cycle) -project approval (SD 2011TSC) - Target: 2011 Sept WGM/Ballot

             Ballot - Normative     Jan 2011of COMPLETE
                                    Dispose - Change Requests - June 24, 2010                             2010 Sept WGM/Ballot
 4/12/2010 Ballot - Informative     First normative ballot -to HL7 Orders/Observations Work Group 2011 Jan WGM/Ballot
                                    ACLA Turn over of eDOS October 2010 Ballot
 2/22/2010 Ballot - DSTU                         May 2010
                                    - Target: a CMET and schema for exchange of information on
                                    Develop                                                               2011 Sept WGM/Ballot
 2/22/2010 Ballot - DSTU            substances -and specified2010
                                    First ballot target May substances. Target: May 2010                  2011 Sept WGM/Ballot
             - Other -              Second ballot (if needed) - target September 2010
                                    To be completed.                                                      - Select One -
             Ballot - DSTU          To be provided later.                                                 2013 Jan WGM/Ballot
 8/29/2011 Ballot - Normative       Development of Ballot Materials - Target: Sept 2011                   2011 Sept WGM/Ballot
 9/20/2010 Ballot - DSTU            Development of Analysis between two existing templates. - Prior
                                    Preliminary Gap Technical Artifacts - Target: Jan 2012                2011 Sept WGM/Ballot
                                    to Oct 2010Medication Order with Composite Order (sync with
                                    Harmonize WGM                                                         2010 Sept WGM/Ballot
                                    Lab Template/CMET)
                                    Specialzed clinical event models - may overlap with detailed          2013 Jan WGM/Ballot
                                    clinical model.
                                    Specialized order models - new or harmonization with other work 2013 Jan WGM/Ballot
                                    groups.
                                    Lab Result Release 2                                                  2014 Jan WGM/Ballot
 8/24/2009 Ballot - Comment Only    The objectives for the initial scope of the project include the       2011 Sept WGM/Ballot
             Ballot - DSTU          following:
                                    The objective of the project is to create a common observation        2012 Sept WGM/Ballot
 10/6/2008 Ballot - Normative       event template.
                                    Normative CMETs:                                                      2010 Sept WGM/Ballot
 1/24/2007 Ballot - Normative       R_Specimen universal
                                    - Incorporate Blood Order Template into the Composite Order           2010 Sept WGM/Ballot
 5/22/2006 Ballot - DSTU            model to include informationto enable specific templates to be
                                    Create the composite model necessary for blood product orders, 2011 Sept WGM/Ballot
  1/4/2008                          plugged is forrather then multiple differentclinical lab order data
                                    - This IG into the purpose of defining the approaches.                2011 Jan WGM/Ballot
 9/25/2006                          message. Topic will provide:
                                    The Result                                                            2010 Sept WGM/Ballot
 9/25/2006 Ballot - DSTU            The following artifacts the work the creation of messages
                                    - Model andis a list ofspecific toproducts expected to be             2011 Jan WGM/Ballot
 9/25/2006 Ballot - DSTU            produced by this project: work products expected to be
                                    The following is a list of the                                        2011 Jan WGM/Ballot
 9/25/2006 Ballot - DSTU            produced by this project: work products expected to be
                                    The following is a list of the                                        2012 Jan WGM/Ballot
 8/29/2011 Ballot - Normative       produced by thisBallot Materials - Target: Sept 2011
                                    Development of project:                                               2011 Sept WGM/Ballot
 2/28/2011 Ballot - DSTU            Development of scope statement - Target: 2011 2012
                                    Approve project Technical Artifacts - Target: Jan Jan WGM             2011 May WGM/Ballot
  1/8/2011 Ballot - DSTU            Ballot DAM and requirements for Target: 2011 Jan - 2011
                                    Complete simplification analysis - comment: Target WGM May            2011 Sept WGM/Ballot
             Ballot - DSTU          Ballot
                                    the context will be to combine Provider Registry, Organization        2011 Sept WGM/Ballot
 2/22/2010 Ballot - DSTU            Registry and ServiceJan WGMLocation to better reflect the real
                                    Begin work at 2010 Delivery - COMPLETED                               2011 Sept WGM/Ballot
                                    Complete DSTU Ballot inCMETs May ballot cycle - COMPLETED 2010 Sept WGM/Ballot
                                    Personnel Management the 2010
  3/2/2009 Ballot - DSTU            Begin work at Sept 2010 and documentation for A_Appointment
                                    New information model WGM                                             2013 Sept WGM/Ballot
                                    [universal], A_Appoointment [identified confirmable] CMETs.
10/28/2008 Ballot - DSTU            - Finalize requirements for changes and additions to the            2011 Sept WGM/Ballot
10/28/2008 Ballot - DSTU            Finalize requirements topic within the additions Management
                                    Organization Registry for changes and Personnel to the Provider     2011 Sept WGM/Ballot
 5/23/2005 Ballot - DSTU            Registry topic within the Personnel Managementdeveloped in a
                                    Due to resource constraints, Scheduling is being domain             2011 Sept WGM/Ballot
 2/28/2011 Ballot - Informative     series of releases. Each new release will build upon the last and
                                    Submit DAM to ballot      - Target: March 2011                      2011 Sept WGM/Ballot
            Ballot - Normative      Resolve DAM comments - will include objectives to request
                                    The new scope statement Target: June 2011                           2010 Sept WGM/Ballot
10/18/2010 Ballot - Normative       extension as DSTU of the Adverse-Reaction topic for two/ more
                                    PSS approval by patient care WG Target:     May 2010                2011 Jan WGM/Ballot
            Ballot - Normative      reconfirmed October 2010
                                    Care Provision Domain: Setting up evaluation of 2007 DSTU           2010 Sept WGM/Ballot
            Ballot - Normative      materials: V2 revisions to Chapter 11 and 12
                                    Patient Care                                                        2010 Sept WGM/Ballot
            Ballot - Normative      Update with concern class                                           2011 Jan WGM/Ballot
            Ballot - Normative      Keep consistent with CS pattern will act as an umbrella project
                                    The Care Structures 'super topic'                                   2011 Sept WGM/Ballot
            Ballot - Normative      Starting 2011 Sep, overdefinitions or updates:
                                    Start May 2011 - Topic three Care Provision Topics:                 2010 Sept WGM/Ballot
            Ballot - Normative       - Care Record (DSTU): This topic covers the summary and
                                    This topic covers all interactions related to health concerns, record 2011 Sept WGM/Ballot
  2/8/2010 Ballot - DSTU            including: is a sub-project of # 320, Detailed Clinical Models.
                                    This project                                                        2011 Sept WGM/Ballot
 7/26/2010 Ballot - Informative     - TopicAugust 2010 for the following:
                                    Target definitions   2009SepWGM                                     2011 Sept WGM/Ballot
 4/19/2010 Ballot - DSTU            Create draft Domain Analysis Model to support a Medical Devices 2011 Sept WGM/Ballot
                                    Target: End of 2010:
  2/8/2010 Ballot - DSTU            1. Domain analysis Model with the following deliverables
                                    DCM Release 1 will support the following goals:                     2011 Sept WGM/Ballot
 5/23/2005 Ballot - DSTU            - Domain methods (next ballot August, 2005)
                                    - Develop definition and tools requirements for binding of clinical 2011 May WGM/Ballot

 5/22/2007 Ballot - DSTU            - Storyboard Narratives, Activity Diagrams, and Glossaries
                                    Produce ANSI-approved v3 standards for capturing, maintaining       2012 Sept WGM/Ballot
 9/25/2006 Ballot - Normative       and retrieving allergy & intolerance information, about aand
                                    Produce ANSI-approved v3 standards in order to record patient.      2011 May WGM/Ballot
 9/25/2006 Ballot - DSTU            update encounters, episodes of care. for capturing, maintaining
                                    Produce ANSI-approved v3 standards                                  2011 May WGM/Ballot
11/15/2010 Ballot - DSTU            DSTU ballot submission - Target: the professional services
                                    and retrieving information about January 2012                       2012 Jan WGM/Ballot
11/15/2010 Ballot - DSTU            Normative ballot submission - Target: September 2012
                                    DSTU ballot submission - Target: September 2011                     2011 Sept WGM/Ballot
                                    Normative ballot submission - Target: May 2012
                                    This will be developed as a standard for exchanging PSO             2011 Jan WGM/Ballot
  6/1/2009 Ballot - Informative     - The DAM will assist developers with the (version 1.1).
                                    Common Format data provided by AHRQ creation and The initial 2010 Sept WGM/Ballot

10/28/2008 ISO JIC Ballot Project   reconciliation of HL7 V3 content in the PORR and POPH domains 2011 Jan WGM/Ballot
                                    The ICSR Release 3 Normative Standard will support the following
                                    goals:
                                    Medication Order Release 2                                          2010 May WGM
  2/8/2010 Ballot - Normative       Medication CMETs - Target: May 2010 Ballot                          2010 May WGM/Ballot
                                    Institutional Material                                              2010 May WGM
                                    Administration Event                                                2010 January WGM
  7/6/2009 ISO JIC Ballot Project   Informative Ballot comments. Target Date: September WGM             2011 Sept WGM/Ballot
 9/25/2006 Ballot - Normative       2009 Release 1 of the Pharmacy v3 Domain for Committee
                                    Publish                                                             2011 May WGM/Ballot
 9/25/2006 Ballot - Normative       Ballot, including1 of the Pharmacy v3 Domain for Committee
                                    Publish Release storyboards, interactions, message models and       2011 Jan WGM/Ballot
 9/25/2006 Ballot - Normative       Ballot, including1 of the Pharmacy v3 Domain for Committee
                                    Publish Release storyboards, interactions, message models and       - Select One -
 9/25/2006 Ballot - Normative       Ballot, including1 of the Pharmacy v3 Domain for Committee
                                    Publish Release storyboards, interactions, message models and       2012 May WGM
 9/25/2006 Ballot - Normative       Ballot, including1 of the Pharmacy v3 Domain for Committee
                                    Publish Release storyboards, interactions, message models and       2011 Sept WGM/Ballot
 9/25/2006 Ballot - Normative       The creation of storyboards, interactions, message models and
                                    Ballot, includingRelease 1 of the HL7 version 3 domain 'Pharmacy' 2011 May WGM/Ballot

 9/25/2006 Ballot - Normative       (PORX) as Normativethe Pharmacy v3 standardfor Committee
                                    Publish Release 1 of Standard. This Domain will include             2010 September WGM
 9/25/2006 Ballot - Normative       Ballot, including1 of the Pharmacy v3 Domain for Committee
                                    Publish Release storyboards, interactions, message models and       - Select One -
 9/25/2006 Ballot - Normative       Ballot, including1 of the Pharmacy v3 Domain for Committee
                                    Publish Release storyboards, interactions, message models and       2010 January WGM
 9/25/2006 Ballot - Normative       Ballot, including1 of the Pharmacy v3 Domain for Committee
                                    Publish Release storyboards, interactions, message models and       2011 May WGM
 9/25/2006 Ballot - Normative       Publish Release storyboards, interactions, message models and
                                    Ballot, including1 of the Pharmacy v3 Domain for Committee          2011 May WGM/Ballot
 9/25/2006 Ballot - Normative       Ballot, including1 of the Pharmacy v3 Domain for Committee
                                    Publish Release storyboards, interactions, message models and       2011 May WGM/Ballot
                                    Ballot, including storyboards, interactions, message models and
 1/29/2007 Ballot - Normative     Publish Release 1 of the Medication v3 Domain for Committee         2011 Sept WGM/Ballot
                                  Develop wiki pages - Target: interactions,
                                  Ballot, including storyboards, August 2011 message models and       2011 Sept WGM/Ballot
 8/23/2010 - Other -              Establish procedures andchanges/enhancements from co-
                                  Solicitation of additional policies for use of the wiki - Target:   2010 Sept WGM/Ballot
 3/22/2010 - Other -              chairs May 2010 WGM: 2010
                                  Target: June 2010-Aug                                               2010 May WGM/Ballot
            - Other -             Define the objectives for the First Time Attendee process
                                  PIC Annual Maintenance: Develop, evaluate, enhance and              2012 Jan WGM/Ballot
            - Other -             maintain PIC Communication Strategy for each Jan WGM
                                  PIC Annual Maintenance: Decision Making Practices (DMP)             2011 May WGM/Ballot
            - Other -             Template (May WGM) Best Practices, for release at January
                                  PIC Yearly Maintenance:                                             2012 Jan WGM/Ballot
            - Other -             WGM)
                                  Bi-annual maintenance of the co-chair handbook, review for each 2012 Sept WGM/Ballot
 3/28/2011 - Other -              September WGM; reconcile the Excel report generated from
                                  Project Metrics accompany comments during September WGM;            2011 May WGM/Ballot
                                  Project Insight - Target: Oct 2010 thru Sept 2011 WGM 3x/year
                                  Work with Vocab re: process to publish vocab changes                2011 Sept WGM/Ballot
            - Other -             Develop education #1588]
                                  (2011May) [GForgere: RIM version project requirements [GForge       2011 Sept WGM/Ballot
                                  #1589] and Approve revised Harmonization Process (Tracker
                                  Finalize                                                            2011 Sept WGM/Ballot
                                  1587) Weakness Item - Deployment of Non-Balloted Products
                                  SWOT                                                                2011 Sept WGM/Ballot
 9/27/2010 - Other -              (Tracker 1591)
                                  Initial draft proposal presentation - Target:    2010May            2011 Sept WGM/Ballot
            - Other -             Identify changes to PLCPD - Target: date vs. actual date in Project 2011 Sept WGM/Ballot
                                  Develop method to evaluate target 2011 Jan
            - Other -             TSC delegated work - DONE
                                  Insight (Tracker 683)(Tracker 1107)                                 2011 Sept WGM/Ballot
            - Other -             Define Work for the SD PF's (Tracker 733) - DONE                    2011 Sept WGM/Ballot
            - Other -             Develop outreach to recruitCycle (Tracker 711) (Tracker 725)
                                  Annual Edits to Project Life project facilitators                   2011 Sept WGM/Ballot
            - Other -             Review Project LifeAugust of GOM year. Newupdates (Tracker
                                  Work will begin in Cycle for each reference template will be        2012 Jan WGM/Ballot
 6/13/2011 Ballot - DSTU          rolled initial ballot - Target: January 2012
                                  DSTU out at Jan WGMs                                                2012 Jan WGM/Ballot
            Ballot - DSTU         Draft Ballot Reconciliation - Target: March 2012
                                  DSTUcreated for WG review - Target: February 28, 2011               2011 May WGM/Ballot
 3/14/2011 Ballot - DSTU          Ballotable IG R2 to HL7 HQ --Target: March 27, 2011
                                  Draft created for WG review Target: March 15, 2011                  2011 Sept WGM/Ballot
 2/27/2009 Ballot - Informative   Ballotable IG R1 to HL7 is an-implementation guide for
                                  The project deliverable HQ Target: March 27, 2011                   2010 May WGM/Ballot
            - Other -             immunization messages.to date by creating links to co-sponsored - Select One -
                                  Bring PI list for PHER up This Implementation Guide will address
            - Other -             projects list
                                  See task                                                            2011 May WGM/Ballot
10/28/2008 Ballot - Normative     Normative CMETs:                                                    2012 Jan WGM/Ballot
 3/28/2011 Ballot - Informative   R_ExposureAgentCarrier-universal3/20/11 - COMPLETED
                                  Complete draft of DAM Target:                                       2011 Sept WGM/Ballot
 3/23/2009 Ballot - DSTU          Submit for comment only ballot -products expectedCOMPLETED
                                  The following is a list of the work Target: 3/27/11 - to be         2011 Sept WGM/Ballot
            Ballot - Normative    produced v2.9 submitted proposals, the objectives of this project
                                  Based on by this project:                                           2013 May WGM/Ballot
  5/9/2011 Ballot - Normative     areproposals have been gathered and discussed - Target: 2011
                                  All to:                                                             2011 Sept WGM/Ballot
            - Other -             May WGMmaintenance of glossary and maintain ballot site and its 2010 Sept WGM/Ballot
                                  Recurring - COMPLETE
                                  xhtml occurs every other WGM.
                                  Work conformance.                                                   2010 Sept WGM/Ballot
                                  Targeting Sept. 2010 andWGM.
                                  Work occurs every other May 2011                                    2011 Sept WGM/Ballot
                                  Targeting May 2010, Jan PublishingSept 2011
                                  Annual Establishment of 2011 and calendar(s)                        2010 Sept WGM/Ballot
                                  Annual Normative Editions. The annual work for this occurs from 2010 Sept WGM/Ballot
 5/23/2005 Ballot - Informative   Sept WGM Publishing Process
                                  Document to Jan WGM.                                                2012 Jan WGM/Ballot
            Ballot - DSTU         aECG r2 (Annotated ECG, Release 2)                                  2011 May WGM/Ballot
            Ballot - DSTU         Regulatory Activity Submission Hierarchy (RASH)                     2012 Jan WGM/Ballot
            Ballot - DSTU         Subject Data Validation Service Functional Model                    2011 May WGM/Ballot
            Ballot - DSTU         Clinical Study Functional Profiles                                  2011 May WGM/Ballot
            Ballot - DSTU         Notification to Physicians for marketed product information         2012 Sept WGM/Ballot
            Ballot - DSTU         Update CTR&R                                                        2012 May WGM/Ballot
 7/14/2010 Ballot - DSTU            Calendar 2011 - implementation of CRFQ within NCI and IMI            2012 May WGM/Ballot
  5/2/2011 Ballot - DSTU            projects R3 normative standard - Target: June 2012
                                    The RPS                                                              2011 Sept WGM/Ballot
 9/22/2009 Ballot - Informative     An implementation guide for thestatic components of-DAM
                                    This ballot will include the set of normative standard Target:       2011 May WGM/Ballot
12/15/2008 Ballot - Normative       artifacts as defined in HDF Requirements.
                                    1. Utilize the RCRIM BRIDG model in the analysis process and         2011 May WGM/Ballot
  3/1/2010 Ballot - Informative     extend, Target: 2010 May Ballot registry and result database
                                    DSTU - as needed, to meet trial                                      2011 May WGM/Ballot
 4/21/2008 Ballot - Normative       RPS Release 2 will Target: the following goals:
                                    Normative Ballot - support 2011 May Ballot                           2012 Sept WGM/Ballot
11/30/2007 Ballot - DSTU            - Extend the capability of foursecurestreams, V3single point will
                                    At the end of this project the work electronic messages, of          2013 Sept WGM/Ballot
 8/13/2007                          support FDA requirements to receive and store clinical study and 2011 Jan WGM/Ballot
                                    The objective of this project is to conduct an assessment of the CT
 11/8/2010 - Other -                Laboratory Message (PORT_RM030001), develop a storyboard to
                                    At a high level the deliverable consists of a series of harmonized   2011 Sept WGM/Ballot
 3/29/2010 Ballot - DSTU            whitepapers. These whitepapers will each have a target date; the
                                    Target Jan 2011:                                                     2011 Sept WGM/Ballot
10/26/2009 Ballot - Informative     Identify and analyze vocabularies and ontologies associated with
                                    Analyze ASTM, PMAC, ANSI 359-2004 RBAC, OASIS SAML Profile           2010 Sept WGM/Ballot
 2/25/2008 - Other -                and HL7 Security Awarenessconcepts - Target: May 2009
                                    Goal 1 - RBAC Engineering and Security Consistency                   2010 Jan WGM/Ballot
 2/11/2008 Ballot - Normative       Objective A and submit a final Permission Catalog vocabulary
                                    To produce - Submit draft of Security Cookbook Documentation         2010 Jan WGM/Ballot
 7/11/2011 Ballot - DSTU            Joint session SOA/ITS - Target: May 2011 Neumann-Strembeck
                                    update to ballot. The update will execute - COMPLETE                 2011 Sept WGM/Ballot
 4/19/2010 Ballot - Informative     Document ready for committee review - Target: of theJune 2011 - 2011 Jan WGM/Ballot
                                    Collect candidate use-cases to scope the usage Early Healthcare
 1/30/2006 Ballot - Normative       SOARLUS project will - Target: 15-MAY-2010 Functional Model.
                                    The Ontology effort deliver the RLUS Service                         2011 Jan WGM/Ballot
 8/24/2009 Ballot - DSTU            A Service Functional Model is project document enumerating
                                    Key objectives targeted by thisa textualin being designated and      2011 Jan WGM/Ballot
 8/29/2011 Ballot - Informative     operating as a SAEAF - Target: July 2011
                                    Detailed project plan / EA Alpha initiative:                         2012 Jan WGM/Ballot
 8/29/2011 Ballot - Normative       Ballot Informative Implementation Guide - Target: Jan 20122011
                                    Reaffirm Ballot of v3 Medical Records Domain - Target:               2011 Sept WGM/Ballot
 3/28/2011 Ballot - DSTU            Sept Ballot
                                    Domain Analysis Model / Implementation Guide for HQMF -              2011 Sept WGM/Ballot
  1/8/2011 - Other -                Better 2011 May Ballot
                                    Target:tooling to support the publishing of CDA IGs - Target: May 2011 May WGM/Ballot

  1/8/2011 Ballot - DSTU            2011 WGM
                                    Ballot for DSTU - Target: May, 2011                                  2011 Sept WGM/Ballot
11/15/2010 Ballot - DSTU            PublishDate for Target: July, 2011 is 2010 Jan Ballot
                                    Target DSTU - all of the following                                   2011 May WGM/Ballot
  8/9/2010 Ballot - DSTU            Implementation Guide
                                    Review developing design with HL7 Structured Documents Work          2013 May WGM/Ballot
 11/9/2009 Ballot - DSTU            Implementation June for CDA Release 2,
                                    Group (SDWG) - Guide2010 - August 2010 Unstructured                  2012 Sept WGM/Ballot
10/26/2009 Ballot - DSTU            Documents.
                                    - Sample endoscopy note in XML as a constraint on HL7 v3 CDA         2012 Sept WGM/Ballot
10/26/2009 Ballot - DSTU            r2. project will develop:
                                    This                                                                 2012 Sept WGM/Ballot
 6/22/2009 Ballot - DSTU            - A prose implementation guide:
                                    CRS Release 2.0: Discharge Summary                                   2012 Jan WGM/Ballot
 6/22/2009 Ballot - DSTU            Electronic Quality Measure Specification, release ballot, August,
                                    Development June, 2009; draft review July, 2009; 1                   2012 May WGM/Ballot
 4/13/2009                          Target: September, 2009
                                    - Provide a UML based formalization approach for constraining        - Select One -
 3/30/2009 Ballot - Normative       CDA.
                                    Delivery of a new updated release of the CDA standard: Clinical      2010 Sept WGM/Ballot
11/10/2008 Ballot - DSTU            Documentdetailed requirements 3 (CDA R3), including updated
                                    - Perform Architecture, Release analysis. Be consistent with work 2011 May WGM/Ballot
 7/18/2011 Ballot - DSTU            of Patient Care and Detailed Clinical Models. Coordinate with IHE 2013 May WGM/Ballot
                                    This project will develop:
  3/3/2008 Ballot - DSTU             - goal implementation guide
                                    TheProse of the project will be to develop HL7 Version 3             2012 Sept WGM/Ballot
 2/11/2008 Ballot - DSTU            structured document specifications for quality measurement.
                                    This project will develop:                                           2013 Jan WGM/Ballot
 5/22/2007 Ballot - Normative       - Prose implementation guide
                                    - Develop Requirements for Reporting with inputs from                - Select One -
 9/25/2006 Ballot - DSTU            o Pediatric SIG Project
                                    This project will develop:                                           2012 Jan WGM/Ballot
 8/22/2011 - Other -                - Prose implementation guide budget and securing EC approval 2011 Sept WGM/Ballot
                                    Initial Project planning including
 3/28/2011 - Other -                of a budget -to TSC and ArB prior 2011 WGM - Target: Before
                                    Initial report Target: September, to May                             2011 May WGM/Ballot
             Ballot - Informative   2011 May 'alpha' artifact definitions - Target: WGM May 2011
                                    Complete                                                             2011 May WGM/Ballot
 2/28/2011 - Other -                Complete 'alpha' methodology defined - Target: WGM Sep 2011
                                    Goal: Canonical SAIF Book                                            2011 May WGM/Ballot
             - Other -              Goal: Draft HL7 SAIF IG for use on T3F report) 3/15/11
                                    Establish review criteria (based with pilot projects                 2011 May WGM/Ballot
                                    Conduct initial assessment polls      End May 11 WGM
9/20/2010 - Other -                Process Approved - Target: Oct 2010                                   2010 Sept WGM/Ballot
 8/2/2010 - Other -                Tracking System established and published2011 WGM 2010
                                   HL7 Product Quality Plan - Target: January - Target: Nov              2011 Jan WGM/Ballot
            - Other -              Project End Date (all objectives have been met) - Target: May
                                   Work Group Visibility Maintenance:                                    2011 May WGM/Ballot
 8/3/2009 - Other -                1) Create workable definitions and update Work Groups' Mission 2010 Sept WGM/Ballot
                                   Maintenance project to obtain of HL7 PRODUCTS
                                   - Develop Product matrix for TSC review
 1/4/2010 - Other -                Technical Requirements (Target: Jan 2010)                      2010 Jan WGM/Ballot
3/16/2009 - Other -                - Inventory and Requirements available 'work-in-progress' and a 2010 Jan WGM/Ballot
                                   - User Interface gap analysis ofand Design

8/29/2011 Ballot - DSTU            gap analysis draft ballot whatcomment)and what SeptemberThe
                                   First revised describing (for is similar - Target: is missing. 2011   2011 Sept WGM/Ballot
            - Other -              The revised draft ballot - Target: Jan 2012
                                   First Gforge hosting service has not being providing appropriate      2011 Sept WGM/Ballot
            - Other -              customer service. The a visual summary in therecommending that 2011 Sept WGM/Ballot
                                   Tooling WG to create Tooling Work group is form of a “dash
            - Other -              board―that provides a snapshot of what tools are available and 2011 Sept WGM/Ballot
                                   Tooling WG will review current communications, create a
            - Other -              communication plan to ensure interested to align can be fully
                                   Tooling will work with Electronic Services parties the                2011 Sept WGM/Ballot
            - Other -              requirements gathering and tool selection2011 WGM to ensure
                                   Obtain Project approval - Target: January processes                   2011 Sept WGM/Ballot
            - Other -              Release package initiation HL7 - Target: 2010 October - Target:
                                   Complete projectfor use by (Charter, Project team,WBS) WG             2010 Sept WGM/Ballot
 6/7/2010 - Other -                Meeting the Sept (Oct) 2010 Ballot package using MIF publishing. 2010 Sept WGM/Ballot
                                   Produce
            - Other -              Terminology Oct Ballot
                                   Target: 2010 Authority makeup and terms of reference (i.e.            2012 Jan WGM/Ballot
2/28/2011 Ballot - Informative     operating procedures) - Target: January 2012
                                   Draft for Workgroup Review - Target: September 2011 WGM               2011 Sept WGM/Ballot
4/12/2010 Ballot - Informative     Initial ballotand enhanced functionality of the cycle Workbench
                                   Assess new document - Target: January 2012 latest                     2011 Jan WGM/Ballot
4/19/2010 - Other -                release - Target: May 2010
                                   Draft Policy Document - Target: April 30, 2010                        2011 May WGM/Ballot
            - Other -              Review andaapproval and acceptance of policy by Vocabulary -
                                   Determine formal process for vocabulary maintenance that              2012 Jan WGM/Ballot
            Ballot - Informative   includes timelines, allows for interdependencies, and leverages
                                   The project is intended to produce a guideline.                       2010 May WGM/Ballot
 6/6/2011                          Target: 18 months after successful ballot of ISO technical report
                                   The objective of this project is to review the core principles        2012 Jan WGM/Ballot
            Ballot - Informative   and provide input for the purposes of separately. To improve and 2011 Jan WGM/Ballot
                                   V2 and V3 vocabulary are maintained ensuring alignment and
 6/6/2011 Ballot - Informative     The objective of this project is both V2 the implementers, and
                                   provide consistent support for to review& V3ISO technical report      2012 Jan WGM/Ballot
11/1/2010 ISO JIC Ballot Project   and provide processesthe purposes of ensuring alignment HL7
                                   Write set of input for and issues for consideration of the and        2010 Sept WGM/Ballot
1/15/2005 Ballot - DSTU            community. Target: August 2010
                                   Implementation guide.                                                 2009 May WGM/Ballot
6/30/2008                          The goal of the Common Terminology Services 2 (CTS 2)                 2012 Jan WGM/Ballot
 4/8/2008                          Specificationexisting documentation regarding code systems,
                                   - Aggregate is to expand on the original functionality developed - Select One -
                                   concept domains, value sets, and binding syntax
Project End Date     Project Intent                   Project Need
2009 January WGM     Create New Standard
2012 January WGM     Create New Standard              The balloting of the SAIF Book establishes
2011 May WGM                                          HL7's commitment to separating the
                                                      HL7 documents are targeted to HL7
2012 September WGMRevise Current Standard             members, stakeholders and users, which

2011 September WGMRevise Current Standard             Fuzzy logic will allow direct representation
2011 September WGMRevise Current Standard             of reasoning that isoperators in clinical
                                                      The proposed new common will preserve
2013 January WGM     Create New Standard, Revise      backward compatibility while offering new
                                                      The project will provide standards in
2011 September WGMCurrent Standard,
                  Implementation Guide                compliance with the ACA provisions for

2009 January WGM     Supplement to a Current
2009 January WGM     Standard

2009 January WGM     Create New Standard
2009 January WGM     Create New Standard
2009 January WGM
2009 January WGM
- Select One -       N/A (Project not directly related Apply updates to V3 repository
2012 January WGM     to an HL7 Standard)

2012 January WGM     N/A (Project not directly related The existing document needs to be
                  to (Project not directly related updated to reflect version of SMD tool
2011 September WGM an HL7 Standard)
                  N/A                              The existing document needs to be
                  to (Project not directly related updated.
2011 September WGM an HL7 Standard)
                  N/A                              HL7 organization needs documentation on
- Select One -       to an HL7 Standard)
                     N/A (Project not directly related how to create projects in GForge new
                                                       Board approved development of
- Select One -       to an HL7 Standard)              business model

2011 January WGM     Create New Standard              The HL7 functional standards for EHR
2013 January WGM     Revise Current Standard          systems do not currently provide guidance

2014 January WGM
2012 September WGMRevise Current Standard             The current reference model is no longer
2010 September WGM                                    desirable because it leverages the use of

2013 September WGMRevise Current Standard             One of the most promising strategies
2013 May WGM         Supplement to a Current          available for improving care quality and

2009 January WGM     Standard Standard
                     Create New
2011 September WGM
2014 January WGM     Create New Standard,             Within the clinical decision support (CDS)
2010 May WGM         Supplement to a Current          community, it has been recognized for

2012 January WGM     Supplement to a Current          The adoption of the HL7 Pedigree standard
2012 January WGM                                    Our initial inhibited by a lack of
                     Standard, Implementation Guide message isDAM was part of the Gene
                     Supplement to a Current
2012 May WGM         Standard
                     Revise Current Standard          Expression CMET project. During our initial
                                                      Clinical genomics is a rapidly emerging field
2012 January WGM     Supplement to a Current          with increasing use in rapidly emerging field
                                                      Clinical genomics is a patient care and
2011 September WGM                               The increasing use in implementation
                  Standard, Implementation Guide with'Genetic Variation'patient care and
                  Create New Standard,
2010 September WGMImplementation Guide                guide covers genetic mutations (i.e. variants

2011 January WGM
2012 January WGM
2012 January WGM     Create New Standard,
                     Implementation Guide
2011 May WGM        Create New Standard
2012 May WGM        Create New Standard               Traumatic injury is the leading cause of
                                                      death in the first four decades of life,
2012 January WGM    Create New Standard               While significant progress has been made
2011 January WGM    Revise Current Standard           in data exchange there is not yetEMS
                                                      The US Sponsor desires to bring adequate
2014 May WGM        Create New Standard               communication into lineto bring EMS
                                                      The US Sponsor desires with HITSP and
2011 September WGM                                    communication into line with HITSP and

2011 January WGM
2011 January WGM
2012 January WGM    Create New Standard
2012 September WGMRevise Current Standard,            Changes to the current vocabulary are
2011 September WGMSupplement to Standard,
                  Revise Current a Current            The HITECH Act of 2009 use a specific
                                                      required. This project will adds new
                    Supplement Standard               requirements concerning privacy and
2013 January WGM    Create New to a Current           A catalogue of reference privacy policies is
2011 January WGM                                      required to support the CDA R2 Consent

2012 September WGMCreate New Standard,
2012 May WGM        Implementation GuideRevise
                    Create New Standard,
2011 May WGM        Current Standard,
                    N/A (Project not directly related The intent of this work is to provide rules
2011 January WGM    to an HL7 Standard)
                    Supplement to a Current           for associating value sets (implementable

2010 May WGM        Standard

2012 January WGM    N/A (Project not directly related After releasing a new version of the HL7
                  to (Project not directly related v2.x family of standards, HL7 needs to V3
2011 September WGM an HL7 Standard)
                  N/A                              After releasing a new version of the HL7
2012 January WGM    to an HL7 Standard)               HL7 has standards, HL7 richly to update
                    N/A (Project not directly related family ofinterest in more needs engaging
2012 January WGM    to an HL7 Standard)               The and for this project is in response
                    N/A (Project not directly related withneedparticipating in the academic to
2013 January WGM    to an HL7 Standard)               ever increasing interest in HL7 Education as

- Select One -
- Select One -
- Select One -
- Select One -
2012 January WGM    Supplement to a Current           There is the need for EHR System Vendors
2013 January WGM    Standard Standard
                    Create New                        and Implementers to readily understand
                                                      Approval of the Nutrition Functional Profile
2011 September WGMCreate New Standard                 will ensure capability for inclusion of
                                                      Public health can benefit from defined
2012 September WGMCreate New Standard                 According to information provided to
                                                      functional requirements and criteriaby the

2012 September WGMCreate New Standard                 Pharmacist Service Technical Advisory the
                                                      The project was initially started to meet
2014 January WGM    Create New Standard               needs EHR-S Function Profiles and Data
                                                      Using of CCHIT. On September 25, 2008
2011 January WGM    Revise Current Standard           Profiles within the HL7 Servicehealth
                                                      Semantic interoperability and Aware
2011 September WGMCreate New Standard                 information reuse is enhanced when
                                                      Development of a Dental Health Functional
2010 September WGM                                    Profile based on the EHR-S FM.

2011 January WGM    Create New Standard
2012 May WGM        Revise Current Standard           Many ISO member national bodies/HL7
2010 May WGM                                          realms have already begun using the HL7

2009 May WGM        Create New Standard
2011 September WGMCreate New Standard
2010 September WGMCreate New Standard
2010 September WGM
2012 January WGM    N/A (Project not directly related For some workgroups and projects, there is
2013 January WGM    to an HL7 Standard)                 the need to pre-publish material to allow

2012 September WGM
2012 May WGM        N/A (Project not directly related
2012 January WGM    to an HL7 Standard)
                    N/A (Project not directly related
                  to
2011 September WGM an HL7 Standard)
2012 January WGM
2012 January WGM    Revise Current Standard             Certification of EDIS module, requirements
- Select One -                                          for vendors of EDIS modules, inform

2011 January WGM
2012 September WGMCreate New Standard,                  HL7 has several standards that support the
2011 September WGMReaffirmation of Current
                  Supplement to a a standard            Conduct reaffirmation ballot of the
                                                        interoperability requirementstimely.

2011 September WGMReaffirmation of a standard           Conduct reaffirmation ballot timely.
- Select One -
- Select One -      Create New Standard,
2012 January WGM    Implementation Guide
                    - OTHER -
2011 September WGMCreate New Standard                   In addition to clinicians, this standardization
- Select One -      Supplement to a Current             will also be beneficial to such groups as

2011 January WGM    Standard
                    Supplement to a Current
2011 September WGMStandard Standard,
                  Create New
2012 September WGMSupplement to aGuide
                  Implementation Current
2013 January WGM
2013 January WGM
2013 January WGM
- Select One -      Revise Current Standard
2011 September WGMRevise Current Standard               The need for this project has been raised by
2011 September WGMRevise Current Standard               existing HL7 v3 implementers including be
                                                        The standard is in use and continues to
2011 September WGMReaffirmation of a standard           relevant to the implementers who operate
                                                        The standard is in use and continues to be
2011 January WGM    Create New Standard                 relevant.
                                                        To encourage takeup of HL7 standards,
2011 January WGM    Create New Standard                 there need toserialisationeasily
                                                        A RIM graph be simple, is suitable for use
2011 January WGM                                        where ever RIM based data is transferred.

2011 May WGM        Revise Current Standard
2011 May WGM        Create New Standard, Revise
2010 September WGMCurrent Standard
                  Implementation Guide
- Select One -
2011 January WGM    Revise Current Standard             Many HL7 members have commented on
2011 September WGMReaffirmation of a standard           This project is to of the current wrappers,
                                                        the inadequacies re-affirm the ballot of V3 -

2013 January WGM    Create New Standard                 Master File/Registry, R1
                                                        Support those parties who are interested in
2012 January WGM                                        providing a batch capability for V3

2011 September WGM
- Select One -      - OTHER -
2013 January WGM   Supplement to a Current         Core Principles defines HL7 artifacts at a
2013 January WGM   Standard
                   Revise Current Standard         high level, but does not provide guidance

2012 January WGM   Reaffirmation of a standard     The previously approved CMETs were
                                                   balloted under the auspices of Modeling
2012 September WGM
- Select One -     Revise Current Standard
2015 September WGMRevise Current Standard
2009 January WGM   Create New Standard
2009 January WGM
2011 September WGMCreate New Standard
2013 January WGM   Create New Standard             The old dynamic model methodology is
2012 January WGM   Revise Current Standard         insufficient to initiated to support the US
                                                   The project is describe and define sufficient
2012 January WGM   Supplement to a Current         S&I project is initiated to support the US
                                                   The Framework Laboratory Results Initiative
2012 January WGM   Standard, Implementation Guide S&I Framework Laboratory Results Initiative
                   Create New Standard            Computerized Nutrition Services/Diet
2012 January WGM   Create New Standard, Revise     The first release of the dietetics CMETs
                                                   Office Systems used bySpecimen and

2011 January WGM   Current Standard
                   Implementation Guide            focused on requirements for general
                                                   HITSP has defined the lack of a reliable
2013 September WGMCreate New Standard              process to deliver inproject is to provide
                                                   The purpose of this an electronic process
2013 September WGMRevise Current Standard          more specific definition to substances in
                                                   To further satisfy regulatory requirements
- Select One -     - OTHER -                       and practical experience based on use of

- Select One -     Revise Current Standard
2013 September WGMCreate New Standard              We need to have a way to order lab tests
2011 September WGMSupplement to a Current          using V3 to support various stakeholder
                                                   Although both existing realm-localized
2011 January WGM   Standard                        templates are a derivation of the existing

2014 January WGM
2014 January WGM
2014 September WGM
2011 September WGMRevise Current Standard
2012 September WGMCreate New Standard
2010 September WGMCreate New Standard
2012 January WGM   Create New Standard
2012 January WGM   Create New Standard
- Select One -     Implementation Guide
2010 September WGM
2011 January WGM   Create New Standard
2010 September WGMCreate New Standard
2012 January WGM   Create New Standard
2013 September WGMCreate New Standard              For efficiency, many times protocols or
2012 September WGM                                 order sets are developed by providers by
                                                   A core part of HL7 V2, Chapter 3 - Patient
2012 September WGMRevise Current Standard          Administration, defines messages for
                                                   Industry experience found that real world
2013 September WGM                                 applications require different types of

2011 September WGMRevise Current Standard          The HL7 Patient Administration work group
2012 May WGM                                       received an extensive use case on behalf of

2013 September WGMRevise Current Standard
2012 January WGM   Revise Current Standard
2012 January WGM   Revise Current Standard
2012 September WGM
2012 January WGM   Create New Standard           Pressure ulcers are one of the most
2013 January WGM   Revise Current Standard       common 'never events' identified by the

2012 January WGM   Revise Current Standard       The different implementations in the past
- Select One -     Revise Current Standard       and the request to extend the DSTU prove

- Select One -     Revise Current Standard       Australian input and from other users
2011 May WGM       Revise Current Standard
2014 May WGM       Create New Standard, Revise   Need to redefine the new scope of each
2014 January WGM   Current Standard,
                   Revise Current Standard,      topic as it would significantly change the

2012 September WGMImplementation Guide
                  Revise Current Standard
2013 September WGMRevise Current Standard        Need to redefine the new scope of each
2011 September WGMCreate New Standard,           topic as it would significantly change the
                                                 There is an increase use of Health Care
2014 January WGM   Supplement to a Current
                   Supplement to a Current       Devices across healthcare settings from the
                                                 Items about Care Planning to be discussed
2011 September WGMStandard Standard,
                  Create New                     towards a future round of DSTU include:a
                                                 - To create and maintain in a repository
2011 May WGM       Supplement to a Current       set of detailed clinical models that can be

2012 September WGMCreate New Standard
2013 January WGM   Create New Standard
2011 May WGM
2013 January WGM   Create New Standard           Legislative requirements to provide
2012 September WGMCreate New Standard            electronichas implemented risk
                                                 The EMA format and transmission of
2011 September WGMSupplement to a Current        management plans for all Centrally

2010 September WGMStandard Standard
                  Create New
2011 May WGM       Revise Current Standard
2011 May WGM
2010 May WGM       Revise Current Standard       This makes the representation of
2011 May WGM                                     medication within the Pharmacy domain

2011 January WGM
2011 September WGMSupplement to a Current
2011 September WGMStandard Standard
                  Create New
2011 January WGM   Create New Standard
- Select One -     Create New Standard
2014 September WGMCreate New Standard
2011 September WGMCreate New Standard
2011 May WGM       Create New Standard
2010 September WGMCreate New Standard
- Select One -     Create New Standard
2012 May WGM
2012 September WGMCreate New Standard
2011 September WGMCreate New Standard
2011 September WGMCreate New Standard
2011 September WGMCreate New Standard
2012 May WGM         N/A (Project not directly related Many Workgroups are looking to attract
                  to (Project not directly related volunteer resources to support projectsfor
2010 September WGM an HL7 Standard)
                  N/A                              There has been numerous suggestions or
                  to (Project not directly related improvements and updates to theto the
2010 September WGM an HL7 Standard)
                  N/A                              There have been limited changes co-chair
2015 January WGM     to an HL7 Standard)
                     - OTHER -                        First Time Attendee programs and recently

2014 May WGM
2015 January WGM
2014 September WGM
2011 September WGMN/A (Project not directly related Identifies projects and standards that are at
2015 May WGM         to an HL7 Standard)              risk or stagnant.

2012 January WGM
2011 September WGM
2012 January WGM
2012 May WGM         N/A (Project not directly related 1) HL7 members are interested in
                  to
2011 September WGM an HL7 Standard)                   understanding how the introduction of

2015 September WGM
2012 September WGM
2015 May WGM
2015 January WGM
2012 September WGM                                    Public health requires both routine and
2011 September WGMSupplement to a Current        selected reporting by healthcare providers
                                                 Developers and PH agencies are currently

2011 September WGM
                                                 building to release
                  Standard, Implementation Guide Specified in project1 of the IG. As
                  Supplement to a Current                             scope.
- Select One -       Standard, Implementation Guide
                     Supplement to a Current
2009 January WGM     Standard, Implementation Guide

2015 May WGM
2012 January WGM     Create New Standard
2012 January WGM     Supplement to a Current          Immunization is an important part of
2012 January WGM     Standard Standard
                     Create New                       preventive health care that is captured in a

2014 September WGMRevise Current Standard
2012 September WGMRevise Current Standard             New version of the standard required to
2014 September WGM                                    incorporate changes required by work

2011 September WGM
2012 May WGM
2014 September WGMN/A (Project not directly related
2011 January WGM     to an HL7 Standard)

2012 May WGM
2013 September WGMRevise Current Standard
2014 September WGMCreate New Standard
2013 January WGM     Create New Standard
2014 May WGM         Supplement to a Current
2014 September WGMStandard Standard
                  Create New
2013 May WGM         Revise Current Standard
2013 January WGM   Reaffirmation of a standard         By virtue of its ability to efficiently and
2013 May WGM       Revise Current Standard,            effectively pair subject- or protocol-based
                                                       Several healthcare regulatory agencies are
2014 September WGMSupplement to a Current              seeking a single electronic message

2012 May WGM       Create New Standard
2013 May WGM       Revise Current Standard,            The FDA has implemented Structured
2013 January WGM   Implementation Guide                Product Labeling for Pharmaceutical

2013 September WGMCreate New Standard
2011 January WGM   Create New Standard
2013 January WGM   N/A (Project not directly related
                  to
2011 September WGM an HL7 Standard)
                  Create New Standard                  Providing security and protecting the
2010 September WGMRevise Current Standard              privacy of electronic health records is a

2010 January WGM   Create New Standard
2010 May WGM
2012 January WGM   Create New Standard                 This specification creates a simple
2011 September WGMSupplement to a Current              packaging model, with supportbusiness
                                                       In order to effectively manage for meta
2011 September WGMStandard Standard
                  Create New                           transactions and to search the service

2011 January WGM   Create New Standard
2012 May WGM       Supplement to a Current             Consumers will soon regularly receive
2012 January WGM   Standard, Implementation Guide 'Patient Specific Education Resources' via
                   Reaffirmation of a standard    ANSI Requirement.
2011 September WGMImplementation Guide                 Quality and performance measurement of
2011 May WGM       N/A (Project not directly related healthcare has been complex. Much of the
                                                     The current CDA IGs are published
                  to
2011 September WGM an HL7 Standard)
                  Implementation Guide                 The consolidation Documents. will resolve
                                                       manually as Word of the guidesThe project

2011 September WGMSupplement to a Current              ballot comments made on access to large
                                                       Consumers will soon have individual
2013 May WGM                                      No CDA of CDA documents as a result for
                   Standard, Implementation Guide volumes guidance is currently available of
                   Implementation Guide
2012 September WGMCreate New Standard,                 sending a Progress Note.

2012 September WGMImplementation Guide
                  Create New Standard,
2012 September WGMImplementation Guide
                  Implementation Guide
2012 January WGM   Revise Current Standard
2012 May WGM       Create New Standard
- Select One -
2011 January WGM   Revise Current Standard
2011 May WGM       Create New Standard,
2013 May WGM       Implementation Guide
                   Implementation Guide                22 states require that Healthcare
2012 May WGM                                           Associated Infection data be submitted

2013 January WGM   Create New Standard
- Select One -     Create New Standard
2012 January WGM
- Select One -     N/A (Project not directly related
- Select One -     to an HL7 Standard)
                   N/A (Project not directly related The TSC and ArB are interested in moving
2013 January WGM   to an HL7 Standard)                 SAIF from the conceptualImplementation
                                                       Creation of the HL7 SAIF phase to the
- Select One -                                       Implementing a major step in SAIF
                   N/A (Project not directly related Guide is the nextSAIF based architecture for
2012 January WGM   to an HL7 Standard)               Every going to involve a number of
                   N/A (Project not directly related HL7 isgood organization should undertake
                   to an HL7 Standard)                 a retrospective self-assessment in order to
2011 September WGMN/A (Project not directly related Work Groups routinely encounter issues
2011 May WGM         to an HL7 Standard)               Current known issues to the development
                     N/A (Project not directly related and problems related with HL7 product
                  to (Project not directly related quality include:
2015 September WGM an HL7 Standard)
                  N/A
2011 May WGM         to an HL7 Standard)

2010 September WGM
2010 May WGM
2012 May WGM                                             Part of the V3 vision has included the idea
2012 September WGMN/A (Project not directly related of being able to register static model
                  to
2012 September WGM an HL7 Standard)
2012 January WGM     N/A (Project not directly related
                  to (Project not directly related
2012 September WGM an HL7 Standard)
                  N/A
2012 January WGM     to an HL7 Standard)
                     N/A (Project not directly related Many HL7 Work Groups use a UML
2011 January WGM     to an HL7 Standard)               The HL7 SMD to produce Domain NHS
                     N/A (Project not directly related modeling tool as sponsored by the Analysis
2011 January WGM     N/A (Project not directly related does not include some design and the
                     to an HL7 Standard)               The project is necessary to complete
2012 May WGM         to an HL7 Standard)               Need a process and structure common file
                     N/A (Project not directly related conversion to utilizing a singleto triage and
                  to
2012 September WGM an HL7 Standard)
                  Implementation Guide                   route terminology requests to IHTSDO.
                                                         Increasingly the HL7 community is asking
2011 January WGM     N/A (Project not directly related for guidance for post-coordination, of
                                                       It will allow us to gain understanding
2011 May WGM         to an HL7 Standard)
                     N/A (Project not directly related how to represent the HL7 vocabulary assets
                                                       Currently, change requests for SNOMED-CT
2013 January WGM     to an HL7 Standard)
                     - OTHER -                           content changes are coordinated and

- Select One -       - OTHER - , Create New
2012 January WGM     Standard
                     N/A (Project not directly related There is little documentation that exists on
2011 January WGM     to an HL7 Standard)                 this topic

2012 January WGM     - OTHER -                           No terminology guidance regarding
2012 January WGM                                       National and exists.
                     N/A (Project not directly related conformance International efforts to write
- Select One -       to an HL7 Standard)
                     Create New Standard,                and use clear standards to support the

2012 January WGM     Implementation Guide
                     Revise Current Standard
2009 January WGM     Supplement to a Current
                     Standard
Success Criteria                               Dependancies            Collaboration Efforts
                                               HL-7 Specimen           Members of the AP SIG working on this
Complete SAIF Book for information ballot Model (being
                                          None                         project include members of College of
                                                                       NCI, DoD, NeHTA, CHI
submission                                     HL7 SAIF and HDF        Federal Health Architecture (FHA) - FHA
                                                                       members are participating on project team

Incorporation of fuzzy logic operators and     None
revision of theof new control, string, list the None
Incorporation XML representation into and                              None
Standard operators into Rules are Syntax
temporal and Operating the Arden adopted - Facilitators and            CMS / OESS for regulatory guidance.
in Regulations for use in the US.   Finalize   consulting support
                                               None
                                               -   Successful ballot   American Dental Association Standards
                                               of the Additional
                                               HL7 Additional          Committee on Dental Informatics (ADA-
                                               Information
                                               None
                                               None                    NCPDP
                                               None - Project is       X12 X12
                                                                       ASC
                                               managed within
                                               None                    Structured Documents 2005
                                                                       MOU Signed, renewed Technical

Apply updates to repostiroy                                            Committee




                                               Project is dependent N/A
Set of neonatology functional requirements on funding from HL7 The Child Health Work Group and this
                                           While there are no
for EHR systems and related conformance        dependencies(551)
                                               EHR-S FM R2 for this project receive strong support from the


The completion of an updated reference         Security review.        http://gforge.hl7.org/gf/project/ccow/docma
model that improves adoption of browser-                               n/?subdir=264

Success criteria for this project              None                    Object Management Group (OMG). This
are(i)adoption of a both a technically
IG which describes normative HL7 DSS           Infobutton Standard project is collaborating with OMG as a part
correct and clinically usable                  (Project 265)
                                               Structured              Work with the Patient Care, Structured
                                               Document timing will Documents, and Orders and Observations
                                               - Project            Since the 1st ballot of HL7 GELLO was
The following will be the primary project      be dependent on
                                               The HL vMR project      Project work Object Constraint with other
                                                                       based on thewill be coordinatedLanguage
success criteria:                              will be dependent on HL7 work groups, including:
                                               This
There are ongoing family history               recommendation is       Family history stakeholders who have
implementationAnalysis Model as
-omics Domain projects in various                                   Oxford University include Hughes Risk
                                               Enter name and ID of expressed interest(New Collaborator) -
InformativeGenetic Variation Topic and/or
Normative standard.                            project(s) that this    Modeling

Release 2 CMETs defined by 2
additionalof the HL7 Version the domain (a
Implementation Guide:the HL7 Genomics;
Successful balloting of Clinical 2.5.1         Successful extension ARUP Laboratories, Salt Lake City, Utah
Implementation Guide: Clinical Genomics;       of the Clinical



Pass ISO ballot.                                                       ISO Work Group 2 : Data Interchange;
Completion of deliverables                     As a CDA IG it          Structured Docs, Orders and Observation
                                               obviously depends
Completion of deliverables                     In order to perform     Collaborating with:
Success will consist in the affirmative        DSTU testing within
                                               None                    RCRIM - Reviewer on work by the
                                                                       This project is based
Success will be domain analysis model.
balloting of thedetermined by producing a                              American College of Surgeons Committee
                                                                       Continued contribution from resources
single set ofwill have succeeded when the
The project consensus based work               None                    involved with EMS Information System
                                                                       The National Release 1 is expected.
revised DAM is approved.
The project will have succeeded when a         Continued funding       The National EMS Information is providing
                                                                       office at the University of Utah System
DIM is approved, specifications are
Successful balloting of an informative         from NEMSIS (no         office at contributor to of Utah is providing
                                                                       A major the University this effort is the
domain analysis model for the emergency        None                    United StatesInterchange Standards
                                                                       Clinical Data Department of
                                               Medical                 Consortium (CDISC) societies
                                                                       Medical professional
                                               Specialty/Professiona
                                               - Dependent on
This project will have succeeded if it         other Security Work
                                               529 - Domain            Possible collaboration includes:
establishes consistent sets of required
1. The pre-requisites/properties for data      Domain Analysis
                                               None                    SNOMED/IHTSDO, ISO
segmentation (i.e., minimum data quality
A Normative Catalogue of Reference             Privacy view of the
Privacy Policies                               unified Security &

Successful ballot in Jan, 2010.                                        Security, Structured Documents, Child Care
                                               Privacy and             HITSP Consumer Preferences. Don/Tom

Develop and publish Principles & Rules to      Authorization           NHS LRA project -Nicholas Oughtbridge
specify the syntax for vocabulary binding in

                                               We need other           N/A
Having an HL7 V2.7 cert. test ready for        projects to evaluate
Sept.2011 WGM
Having an HL7 RIM cert updated to RIM
Develop common WGM
2.34 for Sept.2011 mechanisms for              None
improving supportof success for this project None
A critical measure of academia, increasing                             Co-sponosor: Marketing Committee;
is publication of an actionable education      Project 708 (HL7        International Council
                                               Enterprise-Wide
                                               Project 708 (HL7
                                               Enterprise-Wide
                                               Project 708 (HL7
                                               Enterprise-Wide

                                               Project 708 (HL7
- The RM-ES concepts are validated,            Enterprise-Wide
                                               EHR-S Functional
illustrative examples andmustwords are
The project deliverables key be specific       Model (Archived
                                               N/A                     American Dietetic Association (ADA,
enough to accurately reflect be successful
The project deliverables will the Nutrition    Project 223: EHR-S      Centers for Disease Control of Dietetic
                                                                       International Confederation and
when at least two public health domains        Vital project is not
                                               This Records            Prevention/National Center for Health
                                                                       EHR WG Team members, Members of
                                               dependent upon any Pharmacist Services Technical Advisory
                                               This project is not EHR WG Team members, Members of
                                               dependent upon any Pharmacist Services Technical Advisory
                                               HL7 SAIF, RIM, EHR-S Federal Health Architecture (FHA) - FHA
Creation of a functional model that            FM
                                               Subject-matter          members are participating on project team
                                                                       ISO TC/215 Working Group 8
includes a list of PHR functions, a            expertise on Personal American Dental Associateion - MOU

Publication of the White Paper.                                        Additional interested parties include:

Approval of Ambulatory Oncology
Functional Profile through HL7 ballotingEHR-
This project will be successful when the
S FM Release how clinical content can be
Demonstrate 2.0 has completed normative                                Clinical Interoperability Council, Patient
defined in the EHR in a collect once,          HL7 EHR System          CareTC215 WGs1,2,8
                                                                       ISO WG, RCRIM, Interoperability WG
                                               Functional Model
                                               None                    Centers for Disease Control and
                                               HL7 Clinical            Prevention/National Center for Health
                                                                       - HL7 EHR Technical Committee
                                               Document                (developers of the EHR Interoperability
                                                HL7 Electronic Health N/A
When each workgroup or project has the          Record System
                                                N/A                      N/A
means to request web space and can post




                                                None                     GoMembers, ISite, Ascentium software and
Adoption of the EDIS FP V2 by vendors and 1) EHR WG progress vendor contractors.
                                                             Department of Defense Directorate Of
regulators.                                     on EHR FM R2             Clinical Informatics

                                                Detailed clinical
This project will have succeeded if it          models
                                                Availability of
completes development and timely. of
Conduct reaffirmation ballot balloting          resources and

Conduct reaffirmation ballot timely.            N/A


                                                None


Package 1 of the project has been               None                     - Anesthesia Patient Safety Foundation
successfully balloted                           Note to TSC: Reason (APSF)
                                                for non-availablity of
                                                None
                                                                         EHR, HSSP, Service Oriented Architecture
                                                                         (SOA), Structured Documents, InM,




                                                Prerequisite: Release
Pass ballot                                     of HL7 Datatypes R2 DICOM WG20 (Agreement Status: Joint
                                                CDA Diagnostic
- normative standard ITS R2B structures                              FDA, Group based on MoU between HL7
                                                Imaging Report (DIR) WorkSPL Working Group, possibly NCPDP,
                                                The following
- normative standard ITS R2B data types
normative standard passes ballot                projects are sources. possibly US DHHS ONC to make CDA R2

normative standard refresh passes ballot        None
- A set of requirements for a neutral           Projects (Green CDA, The NHS Logical Record Architecture (LRA)
mapping notation is agreed (balloted?)
Normative specification of a RIM based          Micro-ITS, types R2
                                                RIM, Data etc) to        project has defined a semantic model of
                                                                         RIMBAA, Structured Documents, MnM,
XML ISO ballot.
Pass ITS.                                                                SOAWork Group ???
                                                                         ISO
                                                None                     Relationship of project to activities of other
                                                                         INM Work Group.
                                                This project depends OMG, ISO, CEN
                                                on ITS
                                                XML                      Control Query TC
                                                Abstract Transport
                                                None
Sufficient requirements produced to             Dependent on the         There is no external collaboration
describe the scope of the new Wrappers
Successful reaffirmation ballot                 SAIF implementation anticipated.
                                                None                None
The project will be successful if HL7 is able
to provide a standard way of doing batch

                                                                         - Columbia University- Virginia
                                                Completion of the        - Northwestern University- Harry
                                                CDA Product and
HL7 modelers follow the identified          This will be
guidelines when constructing models.        influenced by the

Conformation of a set of CMETs that had     None
previously completed Normative balloting
Pass Informative ballot                     N/A
Final Normative Status for said document.   Relinquishment of
                                            'ITS and Data Types
                                            RIM Harmonization
                                            and Maintenance
                                            None                    HL7 ArB
                                            This project has        None
                                            dependencies on
                                            I&M Data Types          supported by Vocabulary and Infrastructure
Normative Standards                         Specifications, RIM
                                            This project is         & Messaging Technical Committees

Successful balloting of the proposed        intended to interface This project is closely tied to the US S&I
                                            External
changes. balloting of the implementation dependencies
Successful                               External                   Framework Laboratory Reporting initiative.
                                                                    This project is generated by the US based
Success Informative to be informs others The EHR Work
guide aswill be a DAM that used by the S&I dependencies             S&I Framework Laboratory Results Interface
                                                                    This project will be a joint project between
about diet and nutritionrelease of specimen Group's Electronic
Inclusion of the second orders such that it Participation by        HL7 and the American Dietetic Association
                                                                    None
CMETS as normative Document that the US resources from over
Balloted Informative artifacts in a     Successful turn             American Clinical Laboratory Association.
HHS ONC will adopt as a valid solution to
Forms that allow the interchange of         by ACLA of the eDOS Informal collaboration.
                                            Common product
defining elements ready to be implemented model (project 456?) SPL (Structured Product Labeling) Work
A standard that is for substances and     Substances Project to
by medical product oversight agencies to  provide CMET(s) to Group, external to HL7, at http://spl-work-



Normative Ballot                            We need to align
Ability to harmonize the Canadian and UK    with the template
                                            None                    Canada Health Infoway, NHS (To be
realm-localized templates.                                          confirmed)




The success of the project would be the     None                    Clinical Interoperability Council (CIC) Work
acceptance of both the informative and      Advanced level of       Group work with Lab, Pharmacy,
                                                                    OO will
                                            completeness of the Integrated Imaging, and Patient Care to

                                            Composite Order         Laboratory Work Group
                                            topic must be
                                            Clinical Statement      Patient Safety Work Group Care, Laboratory,
                                                                    Clinical Statement, Patient
                                            Pattern from Clinical Pharmacy, Image Integration, Clinical
                                            None                  HL7 Orders/Observations is the Sponsoring
                                            The Result Topic is a Committee
                                            constraint on the
                                            The General             Laboratory, Image Integration, and Patient
                                            Observation Domain Carework will be performed in collaboration
                                            The Composite Order The
                                            model is dependent
                                            The orders CMETs        with key Work Groups, in particular:

The successful balloting of Composite       are used in many
                                            The composite order
Order as a Normative Standard. ballot
Pass DSTU ballot in the May 2011            project is the pilot-
                                            Close project 489       None
cycle
Resulting standards will:                   Patient Encounters
                                            An indirect             1. Need to coordinate with Integrating the
- Address industry use cases                dependency is the       Healthcare Enterprise IT Infrastructure

Complete DSTU Ballot in the 2010 May
ballot cycle.                                                       August 2010: G. Seppala: I believe we will
                                                                    bring the project proposal forward for work
                                                                    Orders and Observations
                                             ITS and Data Types
                                             R2 - Project ID 316
                                             ITS and Data Types
                                             Scheduling ID no
                                             R2 - Projecthas316

Success will consist in the affirmative      unique dependencies This project is based on work by the
                                             None
balloting of the domain analysis model.      Previously part of     Veteran's Health Administration in concert

- PC decision on how to relate the current   Care Provision
D-MIM and Care Statement R-MIM to the




                                             Clinical Statement
                                             interaction on
                                             Patient Care,
                                             Concern topic

This document tries to address two kinds of CMET's from Patient
- In addition to creating the define
requirements. First, it shouldDomainwhich    Administration WG
                                             Depence on project     Collaborating with / Agreement Status /
Analysis Model, thisCare Plan and
Clear definitions of project will produce    320 DCM. was the Comments Docs WG; IMIA-NI; IHE.
                                             Project #105     Structured
components, harmonized with CEN Contsys original Care Plan
                                        - Semantic                  CEN, ISO,. MOU with
                                                                    Under the OpenEHR CEN, there have been
                                             interoperability the
                                             Will need to get
                                             exact project names
                                             determined at          N/A
                                             2010May WGM, A&I
                                             None
                                             None
Becomes a Normative HL7 standard             Common Product         EMA, EFPIA
Becomes a Normative HL7 standard             Model - #625
                                             Common Product         EMA, EFPIA
                                             Model - #625

Concurrence and/or adoption of DAM as        HL7 Individual Case    Federal Health Architecture (TBD)
modeling artefact by groups specified in     Safety Report (ICSR) NPSA/NHS (TBD)
                                             This project will strive ISO TC 215.
                                             to maintain            Work is being managed under the SDO

CMETs are revised and pass ballot.           456 - Common
                                             Product Model



Successful completion of the ISO Standards None in HL7;             ISO TC215 WG6
development process, with full HL7           coordinate with ISO
                                             None                   JIC project

                                             None
                                             None
                                             None
                                             None
                                             None
                                             None
                                             None
                                             None
                                             None
                                             None
                                             None
                                             None                     OO TC
The following will help define if this project Bandwidth of
has completed the efforts intended:          participants
                                             Bandwidth of             N/A
The following will help define if this project participants
                                               Bandwidth of
has completed the efforts intended:          participants




A project Report Card is created; the        None
Project Approval process is incorporates




-Input from key Work Groups (ARB, MnM,       Input from key Work Other interested parties: ArB, SAIF Alpha
Vocabulary)                                  Groups (ARB, MnM,        Projects (Marc Koehn)




This project should result in the availability None                   IHE Quality, Research and Public Health
of a standardized expression of public in
Successful completion of a DSTU ballot       None                     Committee (IHE QRPH). CSTE and other PH
                                                                      Collaborating with CDC, IHE and HL7 have
May 2011. completion of a DSTU ballot in
Successful                                   Consistency in           Collaborating Members the National
                                                                      stakeholders. with CDC, of the CSTE-CDC
May 2011 for Vital Records Death             following the
                                             This project is          Association for Public Health Statistics and
                                             dependent on the



                                             None
This effort will develop a Immunization      None
Domain Analysis Model. Success will be       At this time there are
                                             no known

Successful ballot of the standard            None




                                             HDF, V3
                                             Substantivity




                                             CTR&R, Project ID
                                             372
Successful deployment of the CRFQ service Specifically excluded
assumes the following:will have been
In general, the project                          from - but, in many
                                                 #217 - Regulated        ICH (ICH is made up of six parties
deemed to have been successful if the
Successfully completed informative ballot.       Product Submission
                                                 - ISO JIC Ballot of     representing the human pharmaceuticals
                                                                         CDISC
                                                 BRIDG: The BRIDG
                                                 Partnership with ISO National Cancer Institute (John Speakman /
SPLr5 is intended to have backward                                    The project - Agreed to participate.
                                                 for global alignment Ed Helton) team will collaborate with FDA,
                                                 Project #625,
compatibility with SPLr4                         Common Product
                                                 - Semantic              This will be a Group and will attempt to
                                                                         the SPL Workcollaborative effort sponsored
                                                 interoperability with
                                                 This long term          by FDA/ and co-sponsored by PhRMA. It is
                                                                         CDISC FDA are cosponsoring this project.
                                                 success of this
                                                 CT Laboratory           Collaborating with industry, bio-
                                                                         bio-pharmaceutics AACI, caBIG

The objective will be reached if a) the          Message DSTU
whitepaperswill be considered successful if This project is
This project are known to be read and b)                                 Development of the domain ontology will
1. The The DSTU has been accepted SME
after 1) domain research incorporates by         associated with the
                                                 Project 373             be coordinated with any similar ISO
expert input from the sponsoring project         Composite Privacy - TBD
                                                 ISO Risk Framework
                                                 Not yet delivered
                                                 HL7 RBAC Role           Community Based Collaborative Care
This project will be successful, when the        This project Process,
                                                 Engineering realizes
current HL7 hData Record Format draft
Establish terminology capable of describing the RLUS SFM, and is Indeterminant at this time. May involve
                                            Healthcare SOA
healthcare SOA services.                         Ontology work will
                                                 None                    collaboration with OMG Ontology SIG

1.4.   Project Completion Statement              1.5.   Project          HL7 ArB, Security, CBCC, SOA
To accomplish Phase 1 objectives, PASS-
The project will demonstrate the ability to      Constraints
                                                 Request and
comprehensivelythe v3 Medical Records
Reaffirmation of describe patient                approval of LOINC
Domain.
This project should result in the availability                           US Health Information Technology
A an Implementation Guide that can
ofnumber of criteria will be evaluated to                                Standards Committee Quality Workgroup.
                                                                         Open Health Tools, Connecting for Health.
determine the DSTU inof published CDA IGs:
Publication as format time for recognition                               Health Story (Associate Charter Agreement)
under the next stage of Meaningful Use of None
The project will demonstrate the viability                               Integrating the Healthcare Enterprise (IHE)

Successful development and browsers, and
the technique in several web reconciliation None                         Health Story
of a Progress Note implementation guide
Timely development of a balloted                                         Health Story Project - Associate Charter (as
implementation guide.
Production of the deliverables with                                      CDA4CDT) (invited); Clinical Interoperabily
                                                                         Patient Care
Adoption completion of the balloting
successfulof Clinical Document Architecture None                         Council (invited)
                                                                         CHCA and the CHNC are sponsoring this
(CDA) for Neonatal Data Reporting by
Timely development of a balloted                                         Health and Project Associate Charter (as
                                                                         project Storyhave recruited neonatology
implementation guide. a balloted
Timely development of                            None                    CDA4CDT)
                                                                         National Quality Forum
specification. organizations, Structured
Implementer                                                              Clinical Decision SupportSponsor and
                                                                         Structured Documents -
Documents work group, and others have            HL7 V3 Datatypes,       collaborator Statement
                                                                         PHER; Clinical
                                                 Release 2
                                                 None                    OO; ArB (SAEAF) Services Technologies
                                                                         - Center for Aging
Successful balloting and publication of one None                         (CAST) (Quality Reporting Document
                                                                         QRDA
or more releases of the HAI                      None                    Architecture), CMS Group (formerly named
                                                                         Child Health Work (Center for Medicare
                                                 None                    Pediatric Data Standards Special Interest
                                                                         Continua Health Alliance
                                                 N/A                     The ContinuaProjects Alliance has decided
                                                                         Government Health SIG, Pediatric Data
                                                 None                    Standards SIG

 - Dashboard for Strategic Initiatives has       Dependent on the
been set up and is visible to the general
- Successful completion of the Composite         BOD delivery of
                                                 - Ongoing working
Order project
An HL7 SAIF Implementation Guide that            relationship with the
                                                 A related project
has been endorsed by the membership and under the TSCtrack of
Remaining to be addressed are definitions - Do we keep is
of success the report and have it formallybe projects which are
Complete criteria by which progress will
adopted by the TSC and endorsed by the
Established process, Regularly Scheduled     None
Innovation the HL7 Product Quality Plan
Delivery of sessions at WGM and              SAIF Governance
and Implementation Plan                      combined 3-year
Target audiences are defined                 planning project #
                                             Document the            Marketing Council
Target audiences are able to obtain the
We will have demonstrated the                various HL7
                                             Templates Registry      IHE PCC and QRPH      Agreement Status:
Full participation template registry by
effectiveness of afrom interested parties    Business from this
                                             - Output                Signed
                                                                     Structured Documents, Patient Care,
The project will be successful when there is project will be input
                                             SAIF:                   Tooling, Vocabulary
a consensus on:                              SAIF Pilot




The tool is developed and adopted by HL7 None
working groups for their use in importing A parallel HL7
A successfully completed testing cycle and                           This project is being conducted in
release package including sourceballot is
Successful production of an HL7 code         Generator               collaboration with the NHS.
package and its resulting products using
Appointment of Terminology Authority         With the                HL7 currently has an agreement with
Approval and the development guidance
Members and publication of the of the        establishment of an
                                             None                    The US for use of Disease Control
                                                                     IHTSDOCenters forboth tooling andand
as an informative HL7 document. effort are: This project is
The potential outcomes from this                                     Prevention wish to collaborate on this, as
                                                                     There will be collaboration with the IHTSDO
a) clear policy and has an appropriate home dependent on the
A the workbench process outlining how                                This artefact who have related Workbench
                                                                     and affiliates will be a jointly developed
HL7 members can develop, vet, package        We acknowledge the policy between HL7 and the IHTSDO. This
Best Practice Guide available                requirement for
                                             Core Principles         IHTSDO
1. Completion of the review.                 Document must
                                             None                    IHTSDO, Regenstrief, & ISO TC 215
2. Identify further projects that would                              InM WG
1. Completion of the review.
2.Process document developed would
- Identify further projects that             None - though this      Cosponsors: Joint Initiative Council
- Trial undertaken                           project does relate to ISO Joint Initiative Council approved
                                             Some dependencies SNOMED International
                                             on projects will make IHTSDO (International Health Terminology
                                             CTS 2 itself external SOA Work Group
                                             use of the Security
                                             None                    Per B. Knight 2010-01-13 a scope
                                                                     statement from MnM underway that may
Ballot Cycle Info.                                                 Misc. Notes
                                                                   Sept. 2010 David Booker: This is likely no longer an active project
2011 Sept Ballot Cycle Info: DSTU                                  although a CMead:project is underway. I will discuss is to add
                                                                   May 2011: similar SAIF Canonical guide - The plan with the
Ballot results:
Leave blank until NIB is submitted                                 Performance Statements to the Informative balloted guide and

Leave blank until NIB is submitted
2011 Sept Ballot Cycle Info: NORMATIVE
BallotMay Ballot Cycle Info: NORMATIVE
2011 results:
Ballot results: MetNIB is submitted
Leave blank until basic vote requirements. 7 Negatives to          The deliverable will be a PUBLIC DOCUMENT. Hence, the PSS
                                                                   needs to go to the EC after the publication of an Informative
                                                                   August 2011: a request for TSC approval.
                                                                   Document that will be coming to the TSC first ballot but we are
                                                                   5/13/08: This passed unanimously on the at their 2011-08-29
                                                                   5/13/2008: Update: slow progress getting it to to use CDA state -
                                                                   currently (and actively) working onin converting final publishR2
                                                                   and re-ballot, as of 5/7/2008 until we have a champion for the the
                                                                   5/13/2008: Update: On-hold we have a champion to organize
                                                                   domain content, need to update to use CDA R2,be published as a I
                                                                   5/13/2008: Update: we no longer expect this to and at that time
                                                                   5/13/2008: Update: This project except for applying existing ballot
                                                                   CDA R1 document; it is on-hold replaced project 285.
                                                                   This CDA R2-based document the specifications needed for ballot
                                                                   5/13/2008: Update: These are passed unanimously on first HIPAA
Leave blank until NIB is submitted                                 rulemaking, mike cassidy currently finalizing the documents with

Leave blank until NIB is submitted
Leave blank until NIB is submitted
Leave blank until NIB is submitted
Leave blank until NIB is submitted
Leave blank until NIB is submitted
                                                                   Dec. 2009 Frieda Hall: This project is currently on hold. A portion
Leave blank until NIB is submitted                                 of this project is being worked on via project 444 led by the

Leave blank until NIB is submitted
Leave blank until NIB is submitted
                                                                   Other Stakeholders: Stakeholders providing, using, or
Leave blank until NIB is submitted                                 implementing CCOW compliant clinical technology.

2011 May Ballot Cycle Info: NORMATIVE                              August 2011: Received ANSI Notification of approval for HL7 V3
BallotJan Ballot Cycle Info: DSTU
2011 results: Met basic vote requirements. 0 Negatives to          DSS, R1-2011. Comments thru Mar 24, 2013 via HL7 Version 3
                                                                   DSTU-Accepting
Ballot results: Met basic vote requirements. 1 Negative votes to   Implementation Guide: Context-Aware Knowledge to replace the
                                                                   5/14/08 Update: James Campbell submitted a PSS Retrieval
                                                                   one that was orginially submitted in May, 2006.
                                                                   Oct 2010: Robert Dunlop reactivated this project. Per Robert,
2011 Sept Ballot Cycle Info: INFORMATIVE                           "we 2010: Robert Dunlop reactivated the GELLO project, which is
                                                                   Oct had to suspend the GELLO v2 because of problems with the
Ballot results:
11/29/2010: TSC approved the publication request for the           closely related to this project.
following Informative is submitted
Leave blank until NIB Document:                                    Ballot type notes: The intent is to provide guidance on the
Leave blank until NIB is submitted                                 creation, comparison, transformation, and exchange of pedigree

Leave blank until NIB is submitted                                 Created by splitting Project #196 into two projects for better
2011 Sept Ballot Cycle Info: INFORMATIVE                           tracking by deliverables.
                                                                   Created of splitting Project #196 into two projects for better
BallotSept Ballot Cycle Info: COMMENT ONLY
2011 results:                                                      tracking of deliverables..
                                                                   2011-08-08 TSC Call: Cytogenetics in current ballot without scope
Ballot results:
Leave blank until NIB is submitted                                 August 2010: From Mukesh Sharma: We are Division and TSC?
                                                                   statement having been approved by Steeringworking on the

Leave blank until NIB is submitted                                 project requirements in order to fill out the scope statement. We

                                                                   May 2011 - ISO ballot needs to be reconciled and accepted
2011 Sept Ballot Cycle Info: DSTU                                  changes introduced into the documentation and model. Strategy
                                                                   Sept. 2009: Updated per project review.
Ballot results:
2010 May Ballot Cycle Info: INFORMATIVE                             2010July: updated project repository URL
Ballot results: Ballot results: Met basic vote requirements for
Leave blank until NIB is submitted                                  Sept 2009: There are multiple deliverables within this project

2011 Sept Ballot Cycle Info: INFORMATIVE                            Public Document: Partial project support provided by National
BallotSept Ballot Cycle Info: INFORMATIVE
2010 results:                                                       Heart, Lung Per Anita Walden, EMS DAM R2 will expand on the
                                                                    June 2010: and Blood Institute grant 1RC2HL101512-01 and
BallotSept Ballot Cycle Info: DSTU
2011 results: Met basic vote requirements. 3 Negative votes to      R1 2010: Anita Walden reactivated this changes that were
                                                                    Oct DAM and will implement substantiveproject. PMO moved the
BallotMay Ballot Cycle Info: INFORMATIVE
2011 results:                                                       project from the Archived status and folder into the CIC folder.
                                                                    Sep 2010: updated project repository URL
Ballot results: Met basic vote requirements. 0 Negatives to         July 2010: Per Anita Walden, the EMS project team does not want
                                                                    PHER Workgroup voted to submit this to CIC.
                                                                    Jan2010 not balloting until September 2010 Crystal Kallem.
                                                                    Dec. 2009: Set project status to 'Active' per
2011 Sept Ballot Cycle Info: DSTU                                    Crystal updated the project schedule. Crystal's 7, 2011 I updated
                                                                    Jan 2011: DSTU-Accepting Comments thru Dec. update: for HL7
Ballot results:
Leave blank until NIB is submitted                                  Version 3 Standard: Clinical Statement Pattern, Release 1 Agencies
                                                                    Other Providers: National and International Government
2011 May Ballot Cycle Info: DSTU                                    (Australia, Germany, Japan, Spain, Canada, New Zealand, US,is
                                                                    The conclusion regarding discussion about why this project
Ballot results: Did not meet basic vote requirements for approval   marked Universal' and not Realm Specific:
                                                                    2010July: updated project respository URLs
Leave blank until NIB is submitted                                  LL per Ioana update April 2010, waiting for tooling issues to be
2010 May Ballot Cycle Info: DSTU                                    resolved. Updated for Jan 2011 completion DSTU for publication:
                                                                    Feb 2011: The TSC approved the following date
BallotSept Ballot Cycle Info: DSTU
2009 results: Met basic vote requirements for approval. 18          Consent Directive CDA Implementation Guide: for the Community
                                                                    DSTU - Accepting comments thru Feb 04, 2012 for HL7 Version 3
Ballot results: MetNIB is submitted
Leave blank until basic vote requirements for approval. 19          Domain Analysis Model: Medical Records; Composite Privacy
                                                                    Sep 2010: updated project repository URL
Leave blank until NIB is submitted
                                                                    See project page at
                                                                    http://wiki.hl7.org/index.php?title=HL7_DSTU_testing_toolkit
                                                                    June 2011: Per Ted Klein: The exam materials will be ready for
                                                                    review by Sept Educ WG Call: Education will add an agenda item
                                                                    June 2011: Per 2011 WGM.
                                                                    to discuss certificationWG will reviewdiscussion may adjust the
                                                                    June 2011: Education testing. This dates at an upcoming Educ.
Leave blank until NIB is submitted                                  Meeting
                                                                    June 2011: Changed target dates to reflect Sept. 2011 and Jan
N/A                                                                 2012 2011: Project 708 (HL7 Enterprise-Wide Education Strategic
                                                                    June dates.
Leave blank until NIB is submitted                                  June will determine Education’s 3YP.  Changed NMD to be Jan
                                                                    Plan) 2011: June 2011: Project 708 (HL7 Enterprise-Wide Education

Leave blank until NIB is submitted                                  Strategic Plan) will determine Education’s 3YP.  Changed NMD
                                                                    June 2011: June 2011: Project 708 (HL7 Enterprise-Wide Education
Leave blank until NIB is submitted                                  Strategic Plan) will determine Education’s 3YP.  Changed NMD
                                                                    June 2011: Education WG does want to do this; they are seeking
N/A                                                                 resources; will reach out to Electronic Services for resources as
                                                                    June 2011: Project 708 (HL7 Enterprise-Wide Education Strategic
2011 Sept Ballot Cycle Info: COMMENT ONLY                           Plan) will determine Professional associations: AHIMA
                                                                    Other Stakeholder: Education’s 3YP.  Changed NMD to be Jan
BallotJan Ballot Cycle Info: DSTU
2011 results:                                                       Backwards Compatibility notes: The Nutritional Functional Profile
2011 results: Met basic vote requirements.
BallotSept Ballot Cycle Info: INFORMATIVE 12 Negative votes to      could identify revisions to the HL7 artefactswill the a publically to
                                                                    NOTE TO THE TSC: The project deliverable in be functionality
BallotMay Ballot Cycle Info: NORMATIVE
2011 results:                                                       available document. When a deliverable is specified as a Public

2010 results: Met basic vote requirements.
BallotSept Ballot Cycle Info: INFORMATIVE 2 Negatives to
Ballot results: Met basic vote requirements. 3 Negative votes to
Ballot strategy:                                                    2011 Sept Ballot Cycle Info: COMMENT ONLY
- first ballot as comment only white paper in order to socialize the Ballot results: DSTU Expired for: HL7 Personal Health Record
Leave blank until NIB is submitted                                   Dec 10, 2010
Leave blank until NIB is submitted                                  System Functional Model, Release 1

Leave blank until NIB is submitted                                  Jan 2009: TSC approved; refer to TSC Tracker #1376 for
2010 May Ballot Cycle Info: DSTU                                    discussion regarding approval.
                                                                    July2010: updated project repository URL
2011 results: Met basic vote requirements for
BallotMay Ballot Cycle Info: COMMENT ONLY approval. 16              March 2010 JRitter: from EHR WG votedan Activeapproved) a NIB
                                                                    Feb 2011: Changed The a 3YP item to on (and project as EHR
Ballot results: Met basic vote requirements. 27 Negatives to        submittedP. VanDyke: the project.
                                                                    Oct. 2009 the PSS for Changed target dates to Feb. 2010
                                                                    Aug 2009 P. VanDyke: We are planning to foldsee model into
                                                                    Oct. 2009: Don Mon provided status updates; this
2011 May Ballot Cycle Info: INFORMATIVE                             Roadmap Project HER-S FM many)
                                                                    the Joint Intiative #4 (one of R2. PMO changed project status to
Ballot results: Met basic vote requirements. 1 Negatives to         Oct 2009: received word from John Ritter that PHER WG wasfor
                                                                    Sep 30, 2010: DSTU Expired for: HL7 Implementation Guide
                                                                    CDA Release 2: Reference Profile for EHR Interoperability, Release
                                                                   Sep 30, 2010: DSTU Expired for: HL7 EHR Lifecycle Model
Leave blank until NIB is submitted                                 (EHR/LM), Release 1

Leave blank until NIB is submitted
Leave blank until NIB is submitted
Leave blank until NIB is submitted
Leave blank until NIB is submitted
Leave blank until NIB is submitted
                                                                   Aug 2010: Moving some items from this project to #580 Online
Leave blank until NIB is submitted                                 Presence Project.

Leave blank until NIB is submitted
                                                                   2010July: updated project repository URL
                                                                   Other Providers: National and International Government Agencies




Leave blank until NIB is submitted
                                                                   May 2011: K. Conner: still on hold waiting for resources as well as
                                                                   the go-ahead from constituents project and set the status to
                                                                   June 2011: PMO unarchived this
2011 Sept Ballot Cycle Info: INFORMATIVE                           "Ready for CMET Publication". No further work is needed by the
Ballot results:
Leave blank until NIB is submitted                                 August 2010 Martin Hurrell: At the 2010 Oct WGM in Cambridge,
                                                                   the WG 2010 Martinwhether At the 2010 Oct WGM inshould be
                                                                   August will discuss Hurrell: projects #513 and #543 Cambridge,
                                                                   April 2011: discuss whether projects 2010. Ongoing
                                                                   the WG will PHER Update : Draft May #513 and #543 should be
                                                                   coordination.

Leave blank until NIB is submitted
Leave blank until NIB is submitted
Leave blank until NIB is submitted
Sept 2010 HKoenig: This project is an update to an existing CMET
A_DicomCompositeObjectReference minimal R1. The updated
2011 May Ballot Cycle Info: INFORMATIVE                            Other Stakeholders: All HL7 v3 implementers.
2011 results: Ballot results: Met basic vote
BallotMay Ballot Cycle Info: NORMATIVE requirements. 1             Other Stakeholders: All HL7 v2 and v3 implementers.
BallotMay Ballot Cycle Info: NORMATIVE 12 Negatives to
2011 results: Met basic vote requirements.                         Other Stakeholders: All HL7 v3 implementers.
Leave blank until basic vote requirements. 8 Negatives to
Ballot results: MetNIB is submitted                                Product Type: V3 Foundation - Implementable Technology
2010 Sept Ballot Cycle Info: DSTU                                  Specifications
                                                                   2010July: updated project repository URLs
2009 results: Met basic vote requirements.
BallotSept Ballot Cycle Info: NORMATIVE 27 Negative votes to       New2010: updated project repository URL Technology
                                                                   Sep Product Definition: V3 Implementation
BallotSept Ballot Cycle Info: NORMATIVE for approval. 3
2009 results: Met basic vote requirements                          August 2010: Audrey Dickerson: Just checked the Submission
                                                                   Sep2010: updated project repository URL
BallotMay Ballot Cycle Info: NORMATIVE
2010 Postponed                                                   Jun2010: Based Charlie 2010 ballot not think that out Milestone
                                                                 August 2010: Per on May McCay: I doresults, movedthere is any
                                                                 and Pjt End dates one cycle.
BallotJan Ballot Cycle Info: NORMATIVE
2010 results: Did not meet basic vote requirements for approval. Sept 2009: going from DSTU to Normative on Release 3
Ballot results: Postponed
Last balloted: May, 2006.                                          R2 passed Andy Stechison: We will be reviewing shutting this
                                                                   Feb 2011: ballot but normative changes needed so was not
Leave blank until NIB is submitted                                 down in Orlando. Please leave status on may be interaction with
                                                                   Synchronization with other SDOs: There hold for moment.
2011 May Ballot Cycle Info: NORMATIVE                              Providers (other): All domains in V3 WG.
                                                                   OMG, to be determined by the SOAusing messaging.
BallotSept Ballot Cycle Info: DSTU
2010 results: Met basic vote requirements. 8 Negatives to          Feb 2011: TSC approved the following DSTU for publication: HL7
Ballot results: Ballot results: Met basic vote requirements. 14
Leave blank until NIB is submitted                                 Version 3 Standard: Transmission Infrastructure, Release 2 at TSC
                                                                   Sept 2010: Ambassador Webinars held to date:
Leave blank until NIB is submitted                                 June 8, 2010 conducted: HL7 Ambassador Series: The HL7
                                                                   Sept. 2010 JKaufman: For the rest of 2010, we are now focused on
                                                                   getting more universities to use this material. In 2011, plan to
                                                                   Jan 2009:
                                                                   Dec. 2009: JKaufman: The Product and Services guide is on hold
Leave blank until NIB is submitted                                 Aug 2010: Per L. McKenzie: We'll probably start looking at it more
2011 Jan Ballot Cycle Info: NORMATIVE                              seriously in 6-9 months. At the moment, we're stillEnd Datefor
                                                                   Jan 2011: Moved next milestone date and Project waiting out
2011 results: Postponed
BallotJan Ballot Cycle Info: INFORMATIVE                           one trimester Per Don, To Go in NEpostponed.now published on
                                                                   August 2011: given the ballot was 2012, but
Ballot results: Met basic vote requirements. 1 Negative votes to   Standards page as NE update.
                                                                   2009 Sept Ballot Cycle Info: NORMATIVE
2011 May Ballot Cycle Info: NORMATIVE                              This project is ongoing maintenance, requirements for approval.
                                                                   Ballot results: Did not meet basic voteapplicable annually. Each
Ballot results: Ballot results: Met basic vote requirements. 2     year, the PMO can close the project upon completion and open a



2011 May Ballot Cycle Info: NORMATIVE                              Oct 2010: Based on Sept 2010 ballot results, moved Next
Leave blank until basic vote requirements. 11 Negatives to
Ballot results: MetNIB is submitted                                Milestone and Pjt End Date up one cycle.

2011 Sept Ballot Cycle Info: NORMATIVE (Out of Cycle)              Other SDO/Profilers: United States DHHS ONC S&I Framework
2011 results:
BallotSept Ballot Cycle Info: NORMATIVE (Out of Cycle)             Other SDO/Profilers: United States DHHS ONC S&I Framework
BallotSept Ballot Cycle Info: INFORMATIVE
2011 results:                                                      Other Stakeholders and Vendors:
Ballot results:
Leave blank until NIB is submitted                                 The American Dietetic Association

2010 Sept Ballot Cycle Info: INFORMATIVE                           June 2011: PMO working with Ken in regards to the Submission to
BallotSept Ballot Cycle Info: NORMATIVE 25 Negative votes to
2011 results: Met basic vote requirements.                         ANSI deliverable.
Ballot results:#456 - Common Product:
Copied from                                                        May 2011: Have requested the TSC to approve DSTU publication
2010 May Ballot Cycleis submitted
Leave blank until NIB Info: DSTU                                   of HL7 Version 3 Standard: Common Product Model CMETs, DSTU

Leave blank until NIB is submitted
Leave blank until NIB is submitted                                 SDO/Profiler Notes: Although no direct coordination is required,
2011 Sept Ballot Cycle Info: DSTU                                  final outcome needs to be clearly communicated toProject.
                                                                   May 2010: Moved from 3-Year Plan item to Active IHE profilers
Ballot results:
Leave blank until NIB is submitted
Leave blank until NIB is submitted
Leave blank until NIB is submitted
Leave blank until NIB is submitted
2011 Sept Ballot Cycle Info: INFORMATIVE                           Jan 2010: We do not have anything ready to go to ballot in
Ballot results:                                                    January - in fact thatper Project Review and Cleanup our first face
                                                                   Oct 2009: Updated working group meeting will be
                                                                   Sep 2010: updated project repository URL
2010 May Ballot Cycle Info: DSTU                                   Oct 2009: update project repository URL Cleanup. Active
                                                                   Sep 2010: Updated per Project Review and
Ballot results: Did not meet basic vote requirements for approval. Jan 2010: re-open 312, Blood, Tissue, and Organ R1; Since it is
                                                                   Oct 2009: Updated per Project Review and Cleanup. Waiting for
                                                                   resoruces and driver. Need to sync with Detailed Clinical Model
                                                                   Oct 2009: Updated per Project Review and Cleanup. Leave it
                                                                   Sept. until - Added URL to the Project Document Repository
                                                                   open 2010 HITSP/IHE clearly identifies what is needed and then
                                                                   Dec.2009: Updated per RE: Notification andFinal ActionAfter Lab
                                                                   Oct 2009: From ANSI: Project Review on Cleanup. on:
                                                                   Order Template is complete.
                                                                   2010July: updated project repository URL
                                                                   Oct 2009: Updated per Project Review and Cleanup. Changed
                                                                   Oct 2009: Updated per Project Review and Cleanup. After
                                                                   CompositeDisappeared from Project Insight. to ensure be re-
                                                                   Oct 2009: Order or Clinical Event are in play Needs to we know
2011 May Ballot Cycle Info: DSTU                                   instated. Adjust title to Order Domain - Composite Order - name.
                                                                   Note that this project will replace project #489 of the same
2011 results: Met basic vote requirements. 4
BallotMay Ballot Cycle Info: COMMENT ONLY Negatives to             The new project signals a significant departure from that previous
                                                                   Other Stakeholders: National bodies that foster and accelerate
Ballot results: Ballot results: Met basic vote requirements. 10
Leave blank until NIB is submitted                                 the development and adoption of electronic healthprojects(EHR)
                                                                   Dec. 2010: G. Seppala: #725 may encompass other record such
May 2011: Don is working with Gregg Seppala and Alex Henkat        as 650 (Service Delivery Location), 360 (Organization Registries)
                                                                   2010July: updated project repository URLs
towards getting this on submitted site. PMO to change NMD to
Leave blank until NIB is our DSTU                                  2010July: Changed from a 3YP to Active per
                                                                   Jan 2010: updated project repository URL the PSS submitted.

2010 Jan Ballot Cycle Info: DSTU                                   August 2011: Did not go into NE 2011; Per Don Lloyd: Did not
Ballot results: Met basic vote requirements for approval. 3        receive final content on these; will follow up with WG.
                                                                   Dec. 2010: G. Seppala: #725 may encompass other projects such
                                                                   as 650 (Service Delivery Location), 360 (Organization Registries)
                                                                   Dec. 2010: G. Seppala: #725 may encompass other projects such
                                                                   as 650 (Service DeliveryFrom Project Rvw/Cleanup, changed to 3-
                                                                   Sept 2009 G. Seppala: Location), 360 (Organization Registries)
2011 May Ballot Cycle Info: INFORMATIVE                            Year Plan item. Updated Objectives/Deliverables
                                                                   Other Stakeholder/Vendor/Provider: IHE (Integrating the Health
Ballot results: MetNIB is submitted
Leave blank until basic vote requirements. 15 Negatives to         Enterprise)

Leave blank until NIB is submitted                                 Backward Compatibility notes: There is potential for not backward
Leave blank until NIB is submitted                                 compatible implementations. However, to go to normative in

Leave blank until NIB is submitted                                 Identified 2010MayWGM
Leave blank until NIB is submitted                                 created planning item based on May2010 WGM discussions:
Leave blank until NIB is submitted                                    Needs a new project scope statement as it needs update with

Leave blank until NIB is submitted
Balloted Sept 2009, awaiting request to publish in time for 2010   May 2011: Placed project 'On Hold' since there are no resources
Sept WGM Ballot Cycle
January 2009                                                       July 2011: TSC work:
                                                                   available for this approved the request for the publication of a
2009JAN, Dec 03, 2008Info: INFORMATIVE                             DSTU for 24 months at their 2011-07-11 teleconference via TSC
2011 Sept Ballot Cycle - Jan 05, 2009                              2010July: updated project repository URL
Ballot results:                                                    2010July: Updated URLs for project repository
2010 Sept Ballot Cycle Info: INFORMATIVE                           2010May: per discussion at WGM, DSTU considering comments 5
                                                                   May 2011: WGoosen: Expect to finish before Sept en ballot 1 of
Ballotpart of first DSTU package Care Provision
Core results: Did not meet basic vote requirements for approval    DSTU - Accepting Comments ballot one example.
                                                                   separately and then each nextthru May 23, 2011 HL7 Version 3
HL7 CP, R1 July 2009
DSTU, R2, Sept 2007                                                Standard: Care Provisions, Release Jun 09 2012 for HL7 Version 3
                                                                   DSTU - Accepting Comments thru 1
June 2010 The TSC approved the following DSTU for publication:     DSTU - Accepting Comments thru May 23, 2011 Release 1
                                                                   Standard: Care Provision; Allergy and Intolerance,HL7 Version 3
 HL7 Version 3 Standard: depending publication
Test Period till 2011/2012Care Provision: Care Composition Topic   DSTU - Accepting Comments thru 1
                                                                   Standard: Care Provisions, Release May 23, 2011 for HL7 Version 3
Releases: HL7 CP CP, R1 July 2009 (DSTU)                           Standard: Care Provisions, Release 1



Leave blank until NIB is submitted                                 1/21/2010: current status - Beginning work of the development of
                                                                   CDA s for updated cosponsor and from three year plan document
                                                                   2010July: PSO Common Format, document repository URL (LL)
2010 Sept Ballot Cycle Info: NORMATIVE                             Oct 2010: Based on Sept 2010 ballot results, moved Next
Ballot results: MetNIB is submitted
Leave blank until basic vote requirements. 0 Negative votes to     Milestone and Pjt End Date up one cycle. Release 2 doesn't
                                                                   Sept. 2009 R. Hallowell: Medication Order
Existing CMETs will be revised to be constraints on the Common     2010July: updated project repository we
                                                                   currently have a target start date but URLexpect that it would
Product Model NIB is submitted
Leave blank until
Leave blank until NIB is submitted
2011 Sept Ballot Cycle Info: DSTU                                  Feb 2010: Updated the objectives/deliverables based on Hugh
BallotJan Ballot Cycle Info: NORMATIVE                             Glover email.
2011 results:                                                      Oct 2010: Based on Sept 2010 ballot results, moved Next
Ballot results: Did not meet basic vote requirements. 13 Negative Milestone and Pjt End Date up one cycle.
                                                                  Sept 2009: Changed to a 3-Year Plan item.
                                                                   Sept. 2009: Project 'inactive' per Rob Hallowell
                                                                   Sept 2009: Changed to a 3-Year Plan item.
2011 Sept Ballot Cycle Info: NORMATIVE                             Oct 2010: Based on Sept 2010 ballot results, moved Next
2011 results:
BallotJan Ballot Cycle Info: NORMATIVE                             MilestoneR. Hallowell: Datediscuss next steps on one of our next
                                                                   Jan 2011: and Pjt End Will up one cycle.
Ballot results: Met basic vote requirements. 1 Negative votes to   conference Updated per Projectthat we will bring effort close
                                                                   Sept. 2009: calls. My instinct is Review/Cleanup forward,
                                                                   Sept. 2009 R. Hallowell: Regarding this project, the Pharm WG
                                                                   needs to check as we to a 3-Year Plan item.
                                                                   Sept 2009: Changed believe it may have already passed a ballot
                                                                   Sept 2009: Changed to a 3-Year Plan item.
2011 Jan Ballot Cycle Info: NORMATIVE                              Oct 2010: Based on Sept 2010 ballot results, moved Next
2011 results: Did not meet basic vote requirements. 9 Negative
BallotJan Ballot Cycle Info: NORMATIVE                             Milestone Based on Sept 2010 ballot results, moved Next
                                                                   Oct 2010: and Pjt End Date up one cycle.
Ballot results: Did not meet basic vote requirements. 8 Negative   Milestone and Pjt End Date up one cycle.
2011 Sept Ballot Cycle Info: NORMATIVE                         Oct 2010: Based on Sept 2010 ballot results, moved Next
Ballot results:
Leave blank until NIB is submitted                             Milestone and Pjt End Date up and co-chairs
                                                               Other Stakeholders: HL7 Staff one cycle.
Leave blank until NIB is submitted                             Public document to be created. NOTE: When a deliverable is
                                                               specified as a Public Document, the TSC must make a
                                                               July2010:UPdated project repository URLs
                                                               Public document will be created.

                                                               Aug 2010: The TSC approved an updated Decision Making
                                                               Practices Template, which provides an example for documenting

                                                               Sept 2010 work is covered under project #686.


Leave blank until NIB is submitted
Leave blank until NIB is submitted
Leave blank until NIB is submitted
Leave blank until NIB is submitted
Leave blank until NIB is submitted                             May 2011: The SAIF AP team agreed that it's best to defer
N/A                                                            publication of theto predict ballot schedules fromof this until the
                                                               Develop method White Paper defer publication Insight
Leave blank until NIB is submitted                             (2010Jan) (Tracker agreedCOMPLETED
                                                               Nov 2010: PSWG 722) - to close Tracker 1093 - Consider use of
N/A                                                            May 2011: Have uploaded Group projects, hence removing
                                                               RASCI chart for cross Work the recorded PMO webinar to it
                                                               www.HL7.org > Resources > Tools and Resources > Project
N/A                                                            Jan 2009: Rick Haddorff waiting on some SAEAF decisions prior
N/A                                                            to beginning work on this item. in HL7 V3 ballot section 5.4.1
                                                               Update Project Scope Definition
Leave blank until NIB is submitted                             (Tracker 1049). - COMPLETED
                                                               Work Group approval dates: PHER: 5/19/11; SD: 5/18/11.
2011 Sept Ballot Cycle Info: NORMATIVE (Out of Cycle)          Other stakeholders and providers: Public Health Information
                                                               March 2011 PHER Update: Indefinite hold of R2. Creating errata
BallotMay Ballot Cycle Info: DSTU
2011 results:                                                  and clarifications docs. PHER willdeath reporting stakeholders.
                                                               Other Stakeholder: Vital records review and vote on the Errata
2010 results: Met basic vote requirements. 2 Negatives to
BallotJan Ballot Cycle Info: COMMENT                           3/30/2011:LL updated TSC approval date the project: the CDC
                                                               April 2011: TSC recommends withdrawing
Ballot results: Met basic vote requirements for approval. 0    decided to not move forward with publishing the IG through HL7.
                                                               2010Sep: updated project URL
                                                               Feb 2010: This is ongoing work within PHER.
                                                               July 2011: PMO set the satus to 'Ready for CMET Publication'.
2011 May Ballot Cycle Info: COMMENT ONLY                        The work Placed project 'on hold'. Will work CMET Master list
                                                               Feb 2010: from this project should go into theon ballot
2011 results: Ballot results: NORMATIVE
BallotSept Ballot Cycle Info: Met basic vote requirements. 0   preperation PHER Will consider requesting hasextension of the
                                                               April 2011: as soon as Abdul Malik Shakir an bandwith to assist.
Ballot results:
Leave blank until NIB is submitted                             DSTU.

2011 Sept Ballot Cycle Info: NORMATIVE
Ballot results:
Leave blank until NIB is submitted                             Andy Stechishin will discuss with Publishing WG at the 2010
Leave blank until NIB is submitted                             October WGM will discuss with Publishing WG at the 2010
                                                               Andy Stechishin
Leave blank until NIB is submitted                             October WGM remain on the list; Andy Stechishin will update
                                                               Aug. 2010: Will
Leave blank until NIB is submitted                             dates2010: Will remain on the list; Andy Stechishin will update
                                                               Aug.
Leave blank until NIB is submitted                             dates

                                                               Aug 2010 Andy S: Hope to bring it up at current ballot cycle.
Leave blank until NIB is submitted                             Comment only ballot for Jan 2011 ballot cycle.
                                                               2010Nov(LL): added per RCRIM Three-year plan
Leave blank until NIB is submitted                             2010Nov(LL): added per RCRIM THree-year plan.
Leave blank until NIB is submitted                             2010Nov:(LL):added per RCRIM Three-year plan
Leave blank until NIB is submitted                             2010Nov(LL): added per RCRIM Three-year plan
Leave blank until NIB is submitted                             2010Nov(LL): added per RCRIM Three-year plan.
Leave blank until NIB is submitted                             2010Nov: added per RCRIM three-year plan (LL)
January 2008 Ballot Cycle Info: DSTU                               DSTU-Accepting Comments thru May 18, 2012 HL7 Version 3
Document Ballot Cycle Info: DSTU Standard: Regulated Studies;
2011 Sept Name: HL7 Version 3                                      Standard: Regulated Studies;and RCRIM sent modified PSS
                                                                   April, 2011: Scope changed Clinical Research Filtered Query
2010 results:
BallotMay Ballot Cycle Info: INFORMATIVE                           through SD and TSC Approval. RCRIM three-year plan. cyclical
                                                                   2010Nov(LL): updated dates per
BallotMay Ballot Cycle Info: DSTU
2010 results: Met basic vote requirements for approval. 24         development indicative of the request for publication of Jan
                                                                   May 2011: TSC approved informative ballot developemnt
2010 results: Met basic vote requirements
BallotSept Ballot Cycle Info: INFORMATIVE for approval. 9          informative document HL7 Version 3 Domain Analysis Model:
                                                                   May 2, 2011: TSC approved the request for publication of
BallotJan Ballot Cycle Info: DSTU basic vote requirements. 0
2010 results: Ballot results: Met                                  Informative Document: HL7 Version 3 25, 2012 for Version 3
                                                                   DSTU-Accepting Comments thru Aug Implementation Guide:
2011 results: Met basic vote requirements
BallotMay Ballot Cycle Info: INFORMATIVE for approval. 33          Standard: Regulated Product Submission Release 2, document
                                                                   DSTU - Accepting comments thru Sep 09, 2013 via DSTU Release
Ballot results: Met basic vote requirements. 7 Negatives to        HL7 V3 Standard: Regulated Studies; CDISC Content to Message -
                                                                   2010Nov (LL): updated project status to "on hold" per RCRIM
Leave blank until NIB is submitted                                 three-year Submitting PSS to FTSD for review/approval. Updated
                                                                   2010 Oct: planning document
2011 May Ballot Cycle Info: DSTU                                   project deliverablesrepository Insight based on info gathered
                                                                   2010 July: updated in Project URLs
BallotMay Ballot Cycle Info: DSTU
2010 results: Met basic vote requirements. 9 Negatives to          2010 July: updated repository URL
Ballot results: Met basic vote requirements for approval. 4        2010 2009: Per CBCC project review/clean up, change sponsor
                                                                   Sept. July added repository URL

2009 Sept Ballot Cycle Info: NORMATIVE                             Sep 2009 submitted for comment to steering division, plan to
                                                                   2010 July updated repository URLs
BallotSept Ballot Cycle Info: DSTU
2011 results: Met basic vote requirements for approval. 10         2009 Sept update: balloting this cycle with vocabulary harmonized

Initial results:
Ballot plans are to produce the document as HL7 internal, with the 2010Aug (LL per Jim Buckner): planning to ballot the draft
potential to ballot-for-comment depending upon input from          ontology for comment for the 2011Jan cycle, and then ballot
                                                                   2010 July added repository URL
2010 Sept Ballot Cycle Info: DSTU                                  June2010: updated repository URL
                                                                   July 15,2010: Stefano states We expect to go to ballot in the next
Leave blank until basic vote requirements. 17 Negative votes to
Ballot results: MetNIB is submitted                                June 2010: Based on May 2010consumers/patients Next
                                                                   Other Stakeholder: Healthcare ballot results, moved
Leave blank until NIB is submitted
2011 Sept Ballot Cycle Info: INFORMATIVE                           Other Stakeholders: Quality, Safety and Performance Registries,
Ballot results:                                                    Public Health Information Systems, Health Information Exchanges
                                                                   This was originally project #727.
2011 Sept Ballot Cycle Info: DSTU                                  Feb 2011: SD WG has requested a 1 year extension of the
BallotJan Ballot Cycle Info: DSTU
2011 results:                                                      following DSTU: HL7 Implementation Guide for CDA Release 2:

2010 results: Met basic vote requirements. 23 Negative votes to
BallotSept Ballot Cycle Info: DSTU                                 DSTU - Accepting Comments thru Feb 05, 2013 for HL7
BallotJan Ballot Cycle Info: DSTU
2010 results: Met basic vote requirements. 4 Negative votes to     Implementation Guide for ClinicalSep. 3, 2012Architecture,
                                                                   DSTU-Accepting Comments thru Document for HL7 for
Ballot results: Did not meet basic vote requirements for approval. Implementation Guide for Clinical Document Architecture, 12
July 2010: TSC approved the following DSTUs for publication or     11/23/2009: The TSC approved the alternate ballot date of
extensionBallot Cycle Info: DSTU
2010 Jan for 24 months via GForge #1595.                           December 2009 for the following: of the documentationGuide for
                                                                   2010July: Lynn updated the URLs HL7 Implementation
Ballot results: Met basic vote requirements for approval. 10
Dec 2009: request to publish DSTU (Gforge tracker #1367)           repositories
                                                                   DSTU-Accepting Comments thru Dec. 17, 2011 for HL7
2009 Sept Ballot Cycle Info: DSTU
2009 Sept Ballot Cycle Info: DSTU                                  DSTU-Accepting Comments thru Mar. 10, Care for HL7 Version 3
                                                                   Implementation Guide for CDA Release 2: 2012 Record Summary,
Ballot results: Met basic vote requirements for approval. 24       2010July: Representation repository URLs
                                                                   Standard: updated project of the Health Quality Measures Format



Feb 2011: SD WG has requested a 1 year extension of the
following DSTU: HL7 Implementation Guide for CDA Release 2:
2011 Sept Ballot Cycle Info: DSTU                                  June 2011: SD WG submitted a revised PSS for informative ballot
BallotSept Ballot Cycle Info: DSTU
2008 results:                                                      work.
                                                                   May 2011: From Bob Dolin - RE: The DSTU item that was balloted
Document Ballot Cycle Info: DSTU CDA Release 2: Quality
2008 Sept Name: HL7 Standard for                                   in Sept 2008:
                                                                   DSTU-Accepting Comments thru Oct. 19, 2012 for HL7
DocumentBallot Cycle Info: Normative Guide for CDA Release 2 - Implementation Guide for CDA Releasereconciliation, hence this
2009 May Name: HL7 Implementation                              June 2010: SD WG has not completed 2: Personal Healthcare
                                                              DSTU - Accepting comments thru Jan. post a via HL7
Document Name: HL7 Version 3 Standard: Structured Documents project cannot be closed. They need to2, 2012 recon package and
[#1383] For 20100111: Request for publication of DSTU for HL7
Implementation Guide for CDA Release 2: History and Physical
Leave blank until NIB is submitted                                 Implementation Guide for CDA Release 2: History and Physical

                                                                   April 2011 Rick H. and Dave H. estimated the initial target dates.
Leave blank until NIB is submitted                                 These dates will change as – An OMG projects create their
                                                                   Other SDO/Profilers:  OMG the individualrepresentative will
Leave blank until NIB is submitted                                 monitor the discussion ofbe based on the various schedules for
                                                                   Next Milestone Date will artifact and methodology definitions
Leave blank until NIB is submitted                                 the projects under the SAIF AP umbrella.
Leave blank until NIB is submitted                           Other Stakeholders/Vendors/Providers: HL7 Affiliates, HL7
                                                             members, anyone producing/using HL7 standards facilitators
                                                             Other Stakeholder/Vendor/Providers: HL7 co-chairs,
Leave blank until NIB is submitted                           (modeling, planning project for TSC, replaces #570 (2009HL7
                                                             three-year vocab, project, publishing, etc.), workgroups, TSC
                                                             Work Group Visibility project) and #645 (TSC Communications
                                                             See also Roadmap Task #48, project #413
Leave blank until NIB is submitted                           7 Jan 2010: Product List onrepository Web site development for
                                                             2010July: updated project HL7 wiki. URLs
                                                             2010July: updated project repository URL
                                                             August 2011: Templates submitted the updated project scope
Leave blank until NIB is submitted                           statement.

Leave blank until NIB is submitted
Leave blank until NIB is submitted
Leave blank until NIB is submitted
Leave blank until NIB is submitted                           Other Stakeholders: HL7 Work Groups
                                                             Sept 2010 - updated project repository with URLs
                                                             Backwards Compatibility: The project will allow for the conversion
Leave blank until NIB is submitted                           of existing Pub XML artefacts to MIF so that the current PubDb
                                                             Other SDO/Profilers: IHTSDO, LOINC
Leave blank until NIB is submitted                           Backwards Compatibility Notes: Every attempt will be made to
Leave blank until NIB is submitted                           ensure that the guidance doesn't conflict with previously balloted
                                                             13Aug2010(LL): per vocab concall Aug 12th, putting project on
                                                             April can not find volunteers to work on the project and Russ
                                                             hold; 2011: FTSD approved the document "Use of SNOMED CT

Leave blank until NIB is submitted                           identifiers and descriptions in Health Level Seven messages and

                                                             2010-01-13; not yet started. Setting next milestone date for May
                                                             WGM SDO/Profilers: IHTSDO, Regenstrief
                                                             Other
                                                             2010-01-13 project scope statement was developed but not sent
                                                             to SD for approval; B.IHTSDOsent to Woody today.
                                                             Other SDO/Profilers: Knight & Regenstrief
                                                             June 2010: project scope has been updated and circulated to
per B. Knight 2010-01-13 coming to ballot updated DSTU May   Vocab for approval there is not going to be any further work on
                                                             June 2011: BKnight:
2010                                                         this so please close. However,goes to Normative ballot, the PMO
                                                             June 2011: When this project prior to closing, the Vocab WG is
                                                             wants the project ID pending development ofwas during DSTU.
                                                             2010-01-13 on hold to remain the same as it MnM project
Product Type                               Backwards        Stakeholders
                        Project Document Repository Compatibility                  Vendors               Providers


SAIF Program            ArB Wiki:               N/A         Standards              Other (specify in     Healthcare
                        http://wiki.hl7.org/ind             Development            Misc. Notes below)    Institutions
                        http://hssp.wikispace
                        s.com/HF%26EA
Arden Syntax
Arden Syntax            http://wiki.hl7.org/ind Yes         Quality Reporting      EHR, PHR, Health      Healthcare
                        ex.php?title=Arden_                 Agencies               Care IT, Clinical     Institutions
Arden Syntax            http://wiki.hl7.org/ind Yes         Quality Reporting      EHR, PHR, Health      Healthcare
                        ex.php?title=Arden_                 Agencies Public        Care HISClinical
V3 Documents-           Attachment WG wiki N/A              Clinical and           Lab, IT,              Institutions Public
                                                                                                         Clinical and
Clinical (e.g. CDA)
V3 Foundation-          and/or workgroup                    Health Laboratories,                         Health Laboratories,
Vocab Domains &




V3 Documents-
Clinical (e.g. CDA)
- Non Product
Project -

- Non Product                                 N/A           N/A                    N/A                   N/A
Project -
- Non Product                                 N/A           Other (specify in      N/A                   N/A
Project -
- Non Product                                               Misc. Notes below)
                                                            Other (specify in      N/A                   N/A
Project -
- Non Product                                 N/A           Misc. Notes below)
                                                            N/A                    N/A                   N/A
Project -
- Non Product
Project - Health
Electronic              Work Group’s        N/A           Standards              Clinical Decision     Healthcare
Record Health
Electronic              web page on
                        http://www.hl7.org/S Yes            Development            Support Systems       Institutions
Record                  pecial/committees/p

CCOW                                          Yes           Other (specify in      Health Care IT        Healthcare
                                                            Misc. Notes below)                           Institutions

V3 Services-Web         http://hssp-        N/A             Immunization           EHR, PHR, Health      Healthcare
Services (OMG)          dss.wikispaces.com/                 Registries, Quality    Care IT, Clinical     Institutions
V3 Messages-Clinical,
V3 Services-Web
V3 Documents-
Knowledge
V3 Rules-GELLO
Domain Analysis      Project                                Clinical and Public    EHR, PHR, Health      Clinical and Public
Model (DAM), V2      documentation will                     Health Laboratories, Care IT, Clinical       Health Laboratories,
                     http://www.hl7.org/ds
                     tucomments/
V3 Messages-Clinical http://wiki.hl7.org/ind N/A            N/A                    EHR, PHR, Clinical    Healthcare
                     ex.php?title=Canonic                                          Decision Support
Domain Analysis      Models will be          N/A            Clinical and Public    Pharmaceutical, EHR, Institutions
                                                                                                        Healthcare
V3 Messages-Clinical located in HL7
Model (DAM)           http://wiki.hl7.org/ind Yes                                EHR, Health Care
                                                            Health Laboratories, PHR, PHR, Health IT
                                                            Clinical and Public                          Institutions Public
                                                                                                         Clinical and
                      ex.php?title=CG                       Health Laboratories, Care IT, Lab, HIS       Health Laboratories,
V2 Messages-Clinical http://www.hl7.org/S Yes               Clinical and Public  EHR, PHR, Health        Clinical and Public
                      pecial/committees/cli                 Health Laboratories    Care IT, Lab, HIS     Health Laboratories,
V2 Messages-Clinical, http://wiki.hl7.org/ind               Clinical and Public    EHR, PHR, Clinical    Clinical and Public
V3 Messages-Clinical ex.php?title=CG                        Health Laboratories    Decision Support      Health Laboratories,



- New Product
Definition -
V3 Documents-
Clinical (e.g. CDA)
V3 Messages-Clinical http://wiki.hl7.org/ind
                     ex.php?title=Gene_E
Domain Analysis      Project materials will N/A              Quality Reporting      EHR, PHR, Health      Emergency Services,
Model (DAM)          be kept on the HL7                      Agencies, Regulatory Care IT, Clinical       Local and State
Domain Analysis      HL7 Wiki:               Yes             Regulatory Agency,
Model (DAM)
Domain Analysis         http://wiki.hl7.org/in N/A
                        http://wiki.hl7.org/ind              Standards
                                                             Quality Reporting      EHR, PHR,             Emergency Services,
Model (DAM)             ex.php?title=EMS_D                   Agencies, Other        Equipment , Other     Local and State
V3 Documents-           HL7 Wiki                N/A          Quality Reporting      EHR, PHR,             Emergency Services,
Clinical (e.g. CDA), V3 http://wiki.hl7.org/ind
Domain Analysis                                              Agencies, Other        Equipment , Other     Local and State
Model (DAM)             ex.php?title=EMS_D
Domain Analysis
Model Product
- New (DAM)
Definition -            http://wiki.hl7.org/ind
                        ex.php?title=Clinical
V3 Foundation-          HL7 GForge              Don't Know   Clinical and Public    Pharmaceutical, EHR, Clinical and Public
Vocab Domains &
Domain Analysis         [http://gforge.hl7.org Yes
                        GForge:                                                   EHR, Equipment
                                                             Health Laboratories, PHR, PHR, Health,
                                                             Clinical and Public                          Health Laboratories,
                                                                                                          Local and State
Model (DAM),
V3 Foundation-          http://gforge.hl7.org/ N/A
                        http://gforge.hl7.org/               Health Laboratories, Care IT, Clinical
                                                                                  EHR, PHR, Health        Departments of
                                                                                                          Clinical and Public
Vocab Domains &         gf/project/cbcc/scms                                        Care IT               Health Laboratories,

V3 Documents-
Administrative (e.g.
Domain Analysis
Model (DAM), V3
V3 Documents-           http://wiki.hl7.org/ind
Knowledge, V3           ex.php?title=Binding
- Non Product
Project -
- Non Product           http://wiki.hl7.org/ind
Project -               ex.php?title=HL7_D
- Non Product                                     No         N/A                    N/A                   N/A
Project -
- Non Product                                     No         N/A                    N/A                   N/A
Project -
- Non Product           http://wiki.hl7.org/ind N/A          N/A                    N/A                   N/A
Project -               ex.php?title=Educati
- Non Product           HL7 Wiki - Under        N/A          Other (specify in      N/A                   N/A
Project -               Education                            Misc. Notes below)

- Non Product
Project -
- Non Product
Project -
- Non Product
Project -
- Non Product
Project - Health
Electronic              GForge:                   N/A        Quality Reporting      EHR, PHR              Healthcare
Record Health
Electronic              http://gforge.hl7.org/ N/A
                        http://wiki.hl7.org/ind              Agencies, Regulatory Pharmaceutical, EHR, Institutions Public
                                                             Clinical and Public                       Clinical and
Record Health           ex.php?title=EHR                     Health Laboratories, PHR, PHR, Health,
Electronic              http://wiki.hl7.org/in N/A           N/A                  EHR, Equipment          Health Laboratories,
                                                                                                          Local and State
Record Health
Electronic              dex.php?title=Main_ N/A
                        http://wiki.hl7.org/ind              Standards              Care IT, Other EHR, Departments of
                                                                                    Pharmaceutical,     Healthcare
Record Health           ex.php?title=EHR_N                   Development
Electronic              http://wiki.hl7.org/ind N/A          Standards              PHR
                                                                                    Pharmaceutical, EHR, Institutions
                                                                                                         Healthcare
Record Health           ex.php?title=EHR_N                   Development            PHR                   Institutions
Electronic                                      N/A
Record Health
Electronic              http://wiki.hl7.org/ind Yes          Clinical and Public    Pharmaceutical, EHR, Clinical and Public
Record Health           ex.php?title=ehr                     Health Laboratories, PHR, Equipment ,        Health Laboratories,
Electronic                                      N/A
Record
- Non Product
Project - Health
Electronic              http://wiki.hl7.org/ind
Record Health           ex.php?title=Oncolog
Electronic              www.hl7.org/wiki/ehr/ No             Quality Reporting      EHR, PHR              Local and State
Record, SAIF            ehrR2                                Agencies, Regulatory                         Departments of
Domain Analysis         http://wiki.hl7.org/ind
Model (DAM),            ex.php?title=EHR_Di
Electronic Health
Record Health
Electronic              http://wiki.hl7.org/in
Record Health
Electronic              dex.php?title=PHER_
                        http://wiki.hl7.org/in
Record                  dex.php?title=EHR_In
Electronic Health
Record
- Non Product          N/A                       N/A          N/A                     N/A                   N/A
Project -                                                     N/A                     N/A                   N/A


- Non Product                                    N/A
Project -
- Non Product
Project -
- Non Product                                                 N/A                     N/A                   N/A
Project -
- Non Product
Project - Health
Electronic             HL7 ECWG wiki             No           ------------------------ EHR, PHR, Health     Emergency Services,
Record                 HL7 ECWG website                       ------- Select all that Care IT, Clinical     Healthcare

Domain Analysis        http://www.hl7.org/S
Model (DAM)            pecial/committees/e
Domain Analysis        HL7 GForge           Yes               Clinical and Public     Pharmaceutical, EHR, Clinical and Public
Model (DAM), V3
V3 Documents-          [http://gforge.hl7.org N/A
                       http://www.hl7.org/S                   Health Laboratories, PHR, Equipment ,
                                                              N/A                  N/A                      Health Laboratories,
                                                                                                            N/A
Administrative (e.g.   pecial/committees/f
V3 Documents-          http://www.hl7.org/S N/A               Payors                  Health Care IT        N/A
Administrative (e.g.   pecial/committees/f

Domain Analysis
Model (DAM), V3
V3 Messages-
Administrative
Domain Analysis        Project Insight, the                   Quality Reporting       EHR, PHR, Clinical    Healthcare
Model (DAM)            GAS WG web page                        Agencies, Payors        Decision Support      Institutions

V3 Documents-
Clinical (e.g. CDA)
Electronic Health     http://hssp.wikispace
Record                s.com/Reference+Ar
V2 Messages-Clinical,
V3 Messages-Clinical




V3 Messages-           http://wiki.hl7.org/ind   Yes          Other (specify in       N/A                   N/A
Infrastructure         ex.php?title=ITS_W                     Misc. Notes below)
V3 Messages-           http://wiki.hl7.org/ind   Yes          Other (specify in       N/A                   N/A
Infrastructure         ex.php?title=ITS_W                     Misc. Notes below)
V3 Messages-           http://wiki.hl7.org/ind   Yes          Other (specify in       N/A                   N/A
Infrastructure         ex.php?title=ITS_W                     Misc. Notes below)
- New Product          http://wiki.hl7.org/ind   N/A          Standards               Health Care IT        Local and State
Definition -           ex.php?title=Neutral                   Development in                                Departments of
- New Product          http://wiki.hl7.org/ind   N/A          Other (specify          Other (specify in     Other (specify in
Definition -           ex.php?title=RIM_IT                    Misc. Notes below)      Misc. Notes below)    Misc. Notes below)
- New Product          http://wiki.hl7.org/in
Definition -           dex.php?title=ISO_D
                       http://wiki.hl7.org/ind
                       ex.php?title=XML_IT




SAIF Program, V3       Project formal            Don't Know   Clinical and Public     Pharmaceutical,       Clinical and Public
Messages-
V3 Messages-           Documents:
                       http://wiki.hl7.org/ind Yes            Health Laboratories, Equipment , Health
                                                              N/A                  N/A                      Other Laboratories,
                                                                                                            Health(specify in
Infrastructure V3      ex.php?title=V3_%E                                                                   Misc. Notes below)
SAIF Program,          http://wiki.hl7.org/ind                Regulatory Agency       Pharmaceutical
Messages-              ex.php?title=MCCI_

- Non Product
Project -
- Non Product
Project -
V3 Documents-          MnM Project Wiki:       N/A         N/A                   N/A                    N/A
Knowledge              http://wiki.hl7.org/ind
V3 Foundation-RIM
V3 Messages-           http://wiki.hl7.org/ind Yes         Clinical and Public   Pharmaceutical, Lab, Clinical and Public
Infrastructure         ex.php?title=CMET_                  Health Laboratories, HIS                     Health Laboratories,
- New Product
Definition -
- New Product
Definition -
V3 Foundation-RIM      http://gforge.hl7.org/
                       gf/project/mnm-



V3 Messages-           http://gforge.hl7.org/
Infrastructure V3
SAIF Program,        gf/project/mnm-
                     http://gforge.hl7.org/ No             Clinical and Public   Pharmaceutical, EHR, Medical Imaging
Messages-            gf/project/orders/scm                 Health Laboratories   PHR, PHR, Health IT,
V2 Messages-Clinical The document to be Yes                Clinical and Public   EHR, Health Care       Clinical Healthcare
                                                                                                        Service, and Public

                     The document kept
V2 Messages-Clinical balloted will beto be N/A             Health Laboratories, Care IT, Lab, HIS
                                                           Clinical and Public  EHR, PHR, Health        Health Laboratories,
                                                                                                        Clinical and Public
Domain Analysis       HL7 Wiki or be kept N/A
                      balloted will other                  Health Laboratories, Care IT, Lab, HIS EHR, Health Laboratories,
                                                           Quality Reporting    Pharmaceutical,        Local and State
Model (DAM)           location per Orders                  Agencies, Regulatory PHR, PHR, Health
V3 Messages-Clinical, HL7 Wiki (Orders and Yes             Clinical and Public  EHR, Clinical           Departments of
                                                                                                        Clinical and Public
V3 Messages-
V2 Messages-Clinical Observations) -
                     Appropriate                 Yes       Health Laboratories, Care IT, Lab, HIS
                                                           Clinical and Public  EHR, PHR, Lab, HIS      Health Laboratories,
                                                                                                        Clinical and Public
V3 Documents-          locations defined by N/A
                       http://gforge.hl7.org/              Health Laboratories, Pharmaceutical, EHR, Health Laboratories,
                                                           Clinical and Public                       Clinical and Public
Administrative (e.g.   gf/project/pharmacys                Health Laboratories, PHR, Equipment EHR, Health Laboratories,
V3 Documents-          http://wiki.hl7.org/in Yes          Clinical and Public  Pharmaceutical, ,   Clinical and Public
Administrative (e.g.
V3 Documents-          dex.php?title=Comm                  Health Laboratories, PHR, Equipment ,        Health Laboratories,
Clinical (e.g. CDA)
V3 Documents-
Clinical (e.g. CDA)
SAIF Program, V3     http://wiki.hl7.org/ind No            Clinical and Public   , Pharmaceutical,      , Clinical and Public
                     ex.php?title=SAIF_Al
Documents-Clinical HL7 Wiki, GForge,                       Health Laboratories, EHR, PHR, Health        Health Laboratories,
V3 Messages-Clinical                                       Clinical and Public  EHR, PHR,               Clinical and Public
                       Project Insight, the                Health Laboratories   Care IT, Clinical      Health Laboratories,




V2 Messages-Clinical http://wiki.hl7.org/ind
                     ex.php?title=BTO_v2
V3 Messages-Clinical
V3 Documents-           http://svn.hl7.nscee.
Clinical (e.g. CDA), V3 edu/svn/hl7v3/labsig/
V3 Messages-Clinical http://wiki.hl7.org/ind
                        ex.php?title=BTO
V3 Messages-Clinical
V2 Messages-Clinical
                       http://svn.hl7.nscee.
                       edu/svn/hl7v3/labsig/

V3 Messages-Clinical http://wiki.hl7.org/ind
                     ex.php?title=Orders_

SAIF Program, V3       http://wiki.hl7.org/ind             Clinical and Public   Pharmaceutical, EHR, Clinical and Public
Documents-Clinical     ex.php?title=SAIF_Al                Health Laboratories, PHR, Equipment ,        Health Laboratories,
                       Project documents: Yes              Payors               Health Care IT, HIS     Healthcare
Domain Analysis        http://gforge.hl7.org/ Don't Know
                       Discussions:                        Standards             EHR, PHR, Health       Institutions
                                                                                                        Healthcare
Model (DAM), V3        http://wiki.hl7.org/in              Development           Care IT, HIS           Institutions

                       http://wiki.hl7.org/in Yes          Other (specify in     Health Care IT         N/A
                       dex.php?title=Propos
                       http://gforge.hl7.org/              Misc. Notes below)
                       gf/project/patient-
V2 Messages-           http://wiki.hl7.org/ind
Administrative         ex.php?title=Appoint
V3 Messages-
Administrative
V3 Messages-
Administrative

Domain Analysis      Project materials will N/A                Quality Reporting     EHR, PHR, Health    Local and State
Model (DAM)          be kept on the HL7                        Agencies, Regulatory Care IT, Clinical    Departments of
V3 Messages-Clinical                        Yes
V3 Messages-Clinical Patient Care                 Don't Know   Immunization          EHR, PHR, Health    Local and State
V2 Messages-Clinical document section on                       Registries, Quality   Care IT, Clinical   Departments of

V2 Messages-Clinical                                                                                     Healthcare
V3 Messages-Clinical                                                                                     Institutions

V3 Documents-        http://wiki.hl7.org/ind Yes                                                         Healthcare
Clinical (e.g. CDA)  ex.php?title=Patient_                                                               Institutions
V3 Messages-Clinical http://wiki.hl7.org/ind Yes                                                         Healthcare
                     ex.php?title=Patient_                                                               Institutions
V3 Messages-Clinical http://wiki.hl7.org/ind
                     ex.php?title=Health_
V3 Messages-Clinical http://wiki.hl7.org/in Yes                                                          Healthcare
Domain Analysis         dex.php?title=Patient N/A
                        http://gforge.hl7.org/                 Standards             EHR, PHR,           Institutions
                                                                                                         Healthcare
Model (DAM)
V3 Documents-           gf/project/dcmmd/; N/A
                        HL7 PC Wiki page for                   Development
                                                               Quality Reporting     Equipment
                                                                                     EHR, PHR            Institutions
                                                                                                         Healthcare
Clinical (e.g. CDA), V3 discussion and work
Domain Analysis         http://wiki.hl7.org/ind                Agencies, Standards                       Institutions
Model (DAM),            ex.php?title=Detailed
                        http://www.hl7.org/d
                        stucomments/showd
                        http://wiki.hl7.org/in
                        dex.php?title=Allergy
                        http://wiki.hl7.org/ind
                        ex.php?title=Care_C
                        http://www.hl7.org/ds
                        tucomments/showde
V3 Documents-           HL7 Wiki                N/A            Regulatory Agency     Pharmaceutical      N/A
Administrative (e.g.
V3 Documents-           HL7 Wiki                  N/A          Regulatory Agency     Pharmaceutical      N/A
Administrative (e.g.
V3 Documents-
Clinical (e.g. CDA)
Domain Analysis         http://gforge.hl7.org/
Model (DAM)             gf/project/pher/scms
V3 Messages-
Administrative

                        http://gforge.hl7.org/ No              Standards             Pharmaceutical, EHR, Healthcare
                        gf/project/pharmacys                   Development           PHR                 Institutions



V3 Foundation-
Vocab Domains &




                        http://wiki.hl7.org/in
                        dex.php?title=Docu
- Non Product           All documents             N/A          Other (specify in     N/A                   N/A
Project -
- Non Product           should be stored on N/A
                        http://wiki.hl7.org/in                 Misc. Notes below)
                                                               N/A
Project -
- Non Product           dex.php?title=PIC:CO N/A
                        http://www.hl7.org/S                   Other (specify in     N/A                   N/A
Project -
- Non Product           pecial/committees/pi                   Misc. Notes below)
Project -
- Non Product
Project -

- Non Product
Project -
- Non Product           Suggestions for           N/A          N/A                   N/A                   N/A
Project -               Project Health




- Non Product           http://gforge.hl7.org/ N/A                                                         Other (specify in
Project -               gf/project/psc/                                                                    Misc. Notes below)
- Non Product
Project -
- Non Product
Project -
- Non Product
Project -
- Non Product
Project -
- Non Product
Project -            HL7 Project Insight Yes                   Clinical and Public   EHR, PHR, Health      Clinical and Public
                     and the PHER Work                         Health Laboratories, Care IT, Clinical      Health Laboratories,
V2 Messages-Clinical CR page: HL7 Wiki   Yes                   Clinical and Public  EHR, PHR, Lab          Clinical and Public
V2 Messages-Clinical http://wiki.hl7.org/in N/A
                     http://wiki.hl7.org/in                    Health(specify in
                                                               Other Laboratories, EHR, PHR                Health Laboratories,
                                                                                                           Local and State
V2 Messages-Clinical dex.php?title=PHER_
                     http://gforge.hl7.org/                    Misc. Notes below)                          Departments of
                     gf/project/pher/scms
- Non Product        http://wiki.hl7.org/ind
Project -            ex.php?title=PHER_
- Non Product
Project -
V3 Documents-           http://gforge.hl7.org/
Clinical (e.g. CDA), V3 gf/project/pher/scms
Domain Analysis         http://wiki.hl7.org/ind                Immunization          EHR, PHR, Health      Local and State
Model (DAM), V3         ex.php?title=Immuni                    Registries            Care IT               Departments of
V3 Messages-Clinical http://wiki.hl7.org/in
V2 Messages-            dex.php?title=Immu Don't Know
Administrative, V2
V2 Messages-            Balloted Chapters         Don't Know   Clinical and Public   Pharmaceutical, EHR, Clinical and Public
Administrative, V2      that are in                            Health Laboratories, PHR, Equipment ,       Health Laboratories,




- Non Product
Project -

                        http://wiki.hl7.org/in
V3 Messages-Clinical dex.php?title=Publis
- New Product
Definition -
V3 Services-Web
Services (OMG)
Electronic Health
Record
V3 Messages-
Administrative
V3 Messages-Clinical
V3 Services-Web        https://wiki.nci.nih.go                Other (specify in      Other (specify in    Other (specify in
Services (OMG)
V3 Documents-          v/display/caEHR/caE Yes
                       HL7 RPS Wiki:                          Misc. NotesAgency,
                                                              Regulatory below)      Misc. Notes below)
                                                                                     Other (specify in    Misc. Notes below)
Administrative (e.g.
Domain Analysis      http://wiki.hl7.org/in
                     http://wiki.hl7.org/ind                  Other (specify in      Misc. Notes below)
Model (DAM)          ex.php?title=BRIDG_
V3 Messages-Clinical http://wiki.hl7.org/ind
                     ex.php?title=Clinical
V3 Documents-        http://wiki.hl7.org/in Yes               Regulatory Agency      Pharmaceutical       N/A
Administrative (e.g.   dex.php?title=Medic
                       http://wiki.hl7.org/in
V3 Messages-Clinical dex.php?title=Regula
                     http://wiki.hl7.org/ind
                     ex.php?title=Study_
                     http://wiki.hl7.org/ind
                     ex.php?title=Laborat
- New Product        http://wiki.hl7.org/in
Definition -
V3 Messages-           dex.php?title=Creati No
                       http://gforge.hl7.org/                 Standards              EHR, PHR, Health     Clinical and Public
Infrastructure
Domain Analysis        gf/project/security/d
                       http://gforge.hl7.org/                 Development            Care IT, Clinical    Health Laboratories,
Model (DAM)            gf/project/security/do
SAIF Program           http://wiki.hl7.org/ind
                       ex.php?title=Cookbo
                       http://gforge.hl7.org/
V3 Services-Web        gf/project/security/d N/A
                       http://wiki.hl7.org/ind                N/A                    N/A                  N/A
Services (OMG)         ex.php?title=HData
- Non Product          http://wiki.hl7.org/in                 Clinical and Public    Pharmaceutical,      Clinical and Public
Project -, V3 Services- dex.php?title=Service
                        The document                          Health Laboratories, Health Care IT         Health Laboratories,
                        repository will be in
V2 Messages-            http://hssp-
Infrastructure, V3      security.wikispaces.c
V3 Documents-           HL7 Wiki              N/A             Quality Reporting      EHR, PHR, Health     Local and State
Clinical (e.g. CDA)
V3 Messages-Clinical The supporting              N/A          Agencies, Standards Care IT, Clinical       Departments of

Domain Analysis        documents will bebe N/A
                       Draft material will on                 Quality Reporting      Pharmaceutical, EHR, Local and State
ModelProduct V3
- Non (DAM),           circulated via list
                       Tools and support         N/A          Agencies, Regulatory PHR, Health Care IT,
                                                              N/A                  N/A                    Departments of
                                                                                                          N/A
Project -
V3 Documents-          documentation will
                       www.cdatools.org;         Don't Know   Clinical and Public    EHR, PHR, Health     Clinical and Public
V3 Messages-Clinical http://wiki.hl7.org/in N/A
Clinical (e.g. CDA)  http://wiki.hl7.org/ind                  Health Laboratories, Care IT, Clinical
                                                              Standards            EHR, PHR, Health       Health Laboratories,
                                                                                                          Healthcare
                     ex.php?title=Self_Dis                    Development            Care IT              Institutions
V3 Documents-        http://wiki.hl7.org/ind N/A                                     Other (specify in
Clinical (e.g. CDA)  ex.php?title=Structur                                           Misc. Notes below)
V3 Documents-        http://wiki.hl7.org/ind
Clinical (e.g. CDA)  ex.php?title=Health_
V3 Documents-        http://wiki.hl7.org/ind
Clinical (e.g. CDA)  ex.php?title=Health_
V3 Documents-        http://wiki.hl7.org/in
Clinical (e.g. CDA)
V3 Documents-          dex.php?title=Neona
                       http://wiki.hl7.org/ind
Clinical (e.g. CDA)    ex.php?title=Health_
V3 Documents-          http://wiki.hl7.org/in
Knowledge
- Non Product          dex.php?title=HQMF;
                       http://wiki.hl7.org/in
Project -
SAIF Program, V3       dex.php?title=Struct
                       http://wiki.hl7.org/ind
Documents-Clinical     ex.php?title=Categor
V3 Documents-
Clinical (e.g. CDA)
V3 Documents-          http://wiki.hl7.org/ind Yes            Quality Reporting      Health Care IT       Healthcare
Clinical (e.g. CDA)    ex.php?title=Healthc                   Agencies, Regulatory                        Institutions
                       http://wiki.hl7.org/in
V3 Documents-          dex.php?title=Qualit
Clinical (e.g. CDA)
V3 Documents-          http://wiki.hl7.org/ind
Clinical (e.g. CDA)    ex.php?title=Structur
V3 Documents-          http://wiki.hl7.org/ind
Clinical (e.g. CDA)    ex.php?title=CDA_R
- Non Product          TBD                     N/A
Project -
SAIF Program           http://gforge.hl7.org/ N/A             N/A                    N/A                  Other (specify in
                       gf/project/psc/                                                                    Misc. Notes below)
SAIF Program           http://wiki.hl7.org/ind N/A            Standards              N/A                  N/A
                       ex.php?title=Categor                   Development
SAIF Program           Add link to wiki:       N/A
- Non Product          SAIF AP list server:
                       http://gforge.hl7.org/ N/A             Standards
Project -              gf/project/tsc/                        Development
- Non Product          http://hl7tsc.org/wiki/i N/A          Other (specify in     Other (specify in     Other (specify in
Project -              ndex.php?title=Main                   Misc. Notes below)    Misc. Notes below)    Misc. Notes below)
SAIF Program           http://hl7t3f.org/wiki N/A            Other (specify in     Other (specify in     Other (specify in
- Non Product          /index.php?title=Mai                  Misc. Notes below)    Misc. Notes below)    Misc. Notes below)
Project -
- Non Product          http://wiki.hl7.org/ind
Project -              ex.php?title=Product
- Non Product          http://gforge.hl7.org/
Project -              gf/project/templatesr
                       http://hl7projects.hl7
                       .nscee.edu/projects/t Don't Know
                       gForge
- Non Product
Project -

- Non Product
Project -
- Non Product
Project -
- Non Product          TBD, Presence to be        N/A        Other (specify in     N/A                   N/A
Project -
- Non Product          specified by tooling N/A
                       HL7 Tooling WG wiki                   Misc. Notes below)
                                                             N/A                   N/A                   N/A
Project -
- Non Product          will be the source of Don't Know
                       http://www.hl7.org/v                  N/A                   N/A                   N/A
Project -
- Non Product          3preview/html/welco N/A               Clinical and Public   Pharmaceutical, EHR, Clinical and Public
Project -
V2 Messages-            http://wiki.hl7.org/ind Don't Know   Health Laboratories, PHR, Equipment ,
                                                             Regulatory Agency, Health Care IT           Health Laboratories,
                                                                                                         Local and State
Infrastructure, V3      ex.php?title=Vocabul                 Standards                                   Departments of
- Non Product           http://gforge.hl7.org/ N/A           Standards             N/A                   N/A
Project -               gf/project/ihtsdo-                   Development
V3 Documents-           http://wiki.hl7.org/ind N/A          Standards             N/A                   N/A
Knowledge               ex.php?title=HL7_pr                  Development
- Non Product
Project -
V3 Foundation-
Vocab Domains &
V3 Foundation-          http://wiki.hl7.org/ind              Regulatory Agency,    , Health Care IT      , Local and State
Vocab Product &         ex.php?title=Vocabul
- Non Domains                                                Standards                                   Departments of
Project -
V3 Foundation-          http://wiki.hl7.org/ind              N/A                   N/A
                        ex.php?title=Vocabul
Vocab Product &
- Non Domains                                                Regulatory Agency,    Health Care IT        Local and State
Project -
V3 Documents-                                                Standards                                   Departments of
Clinical (e.g. CDA), V3 http://wiki.hl7.org/in
V3 Foundation-
Vocab Domains &        dex.php?title=CTS2;
SDO/Profilers         Realm                 HL7 Affiliate         Roadmap Reference                             Start Date
                      - Choose One -                                                                                     5/14/2007 8:00
                        Notes below)
Other (specify in Misc. Universal                                 A. Lead the development of global                      2/11/2011 8:00
                      Universal                                   technical and functional health informatics            6/23/2010 8:00
                      - Choose One -                                                                                         4/1/2011 8:00
N/A                   Universal                                   C. Facilitate HL7 standards adoption and               1/21/2011 8:00
                      Universal                                   implementation. standards adoption and
                                                                  C. Facilitate HL7                                      1/21/2011 8:00
                      Realm Specific - Enter U.S. or name of HL7 implementation.
                                             "U.S."              Affiliate below
                                                                 A. Lead the development of global                           9/8/2011 8:00
                      Realm Specific - Enter USA or name of HL7 technical and functional health informatics
                                             "U.S."             Affiliate below                                              5/8/2008 8:00
                      - Choose One -                                                                                     5/29/2007 8:00
                      - Choose One -                                                                                         4/1/2002 8:00
                      - Choose One -                                                                                     1/25/2001 8:00
                      - Choose One -                                                                                         1/3/2005 8:00
                      - Choose One -                                                                                     1/28/2008 8:00
                      - Choose One -                                                                                     9/25/2006 8:00
                      - Choose One -                                                                                     7/15/2011 8:00
                      - Choose One -                                                                                         7/1/2011 8:00
N/A                   Universal                                   G. None of the above                                       9/1/2011 8:00
                      Universal                                   G. None of the above                                   5/16/2011 8:00
N/A                   Universal                                   G. None of the above                                       5/2/2011 8:00
N/A                   Universal                                                                                          3/14/2011 8:00
                      - Choose One -                                                                                     10/1/2007 8:00
N/A                   Universal                                   A. Lead the development of global                      3/29/2011 8:00
                      - Choose One -                              technical and functional health informatics           11/29/2010 8:00
                      - Choose One -                                                                                    10/16/2009 8:00
N/A                   Universal                                   C. Facilitate HL7 standards adoption and                   6/6/2011 8:00
                      - Choose One -                              implementation.                                        1/28/2010 8:00
                        Notes below)
Other (specify in Misc. Universal                                 A. Lead the development of global                      2/25/2011 8:00
                      - Choose One -                              technical and functional health informatics            5/18/2009 8:00
                      Universal                                                                                          5/15/2008 8:00
                      - Choose One -                                                                                     9/18/2000 8:00
                      Universal                                   A. Lead the development of global                      5/14/2007 8:00
                      - Choose One -                              technical and functional health informatics            9/25/2006 8:00
N/A                                          "U.S."              Affiliate below
                      Realm Specific - Enter U.S. or name of HL7 C. Facilitate HL7 standards adoption and                10/5/2010 8:00
                      Universal                                   implementation.
                                                                  D. Define an overarching and internally               10/18/2010 8:00
                      Universal             U.S.                  A. Lead the development framework., E.
                                                                  consistent interoperabilityof global                   6/30/2010 8:00
                      Realm Specific - Enter U.S. or name of HL7 technical and functional health informatics
                                             "U.S."              Affiliate below
                                                                 A. Lead the development of global                           6/2/2010 6:30
                      Realm Specific - Enter U.S. or name of HL7 technical and functional health informatics
                                             "U.S."              Affiliate below
                                                                 A. Lead the development of global                       4/27/2010 8:00
                      - Choose One -                              technical and functional health informatics            9/28/2009 8:00
                      - Choose One -                                                                                     9/28/2009 8:00
                      - Choose One -                                                                                     3/30/2009 8:00
                      - Choose One -                                                                                     1/22/2009 8:00
                                  "U.S."
           Realm Specific - Enter USA or name of HL7 Affiliate below                                    7/1/2008 8:00
                                  "U.S."              Affiliate below
           Realm Specific - Enter U.S. or name of HL7 A. Lead the development of global                5/27/2011 8:00
           Universal                                    technical and functional health informatics
                                                        A. Lead the development of global              12/7/2010 8:00
                                  "U.S." or name of HL7 technical and functional health informatics
           Realm Specific - Enter US                    Affiliate below
                                                        A. Lead the development of global              6/14/2010 8:00
           Universal                                    technical and functional health informatics
                                                        A. Lead the development of global              6/14/2010 8:00
           - Choose One -                               technical and functional health informatics    6/15/2009 8:00
           Universal                                                                                    9/8/2008 8:00
           - Choose One -                                                                               8/1/2008 8:00
           Universal                                                                                   1/30/2004 8:00
ISO, IHE   Universal                                    C. Facilitate HL7 standards adoption and       8/12/2011 8:00
           Universal                                    implementation., D. Define an overarching
                                                        A. Lead the development of global             11/15/2010 8:00
           Universal                                    technical and functional health informatics
                                                        A. Lead the development of global              3/23/2010 8:00
           - Choose One -                               technical and functional health informatics   10/16/2009 8:00
           - Choose One -                                                                              9/25/2009 8:00
           - Choose One -                                                                               9/8/2008 8:00
           Universal                                    B. Streamline the HL7 standards                5/15/2010 8:00
           - Choose One -                               development process.                           2/10/2010 8:00
           - Choose One -                                                                               4/2/2007 8:00
N/A        Universal                                    C. Facilitate HL7 standards adoption and       1/26/2011 8:00
N/A        Universal                                    implementation. standards adoption and
                                                        C. Facilitate HL7                              1/26/2011 8:00
N/A        - Choose One -                               implementation.
                                                        G. None of the above                           1/26/2011 8:00
           Universal                                    C. Facilitate HL7 standards adoption and      10/28/2010 8:00
           - Choose One -                               implementation.                                9/28/2009 8:00
           - Choose One -                                                                              9/17/2009 8:00
           - Choose One -                                                                              9/17/2009 8:00
           - Choose One -                                                                              9/17/2009 8:00
           - Choose One -                                                                              9/17/2009 8:00
           Universal                                    C. Facilitate HL7 standards adoption and        2/3/2011 8:00
           Universal                                    implementation.,standards adoption and
                                                        C. Facilitate HL7 D. Define an overarching    10/18/2010 8:00
           Realm Specific - Enter U.S. or name of HL7 implementation.
                                  "U.S."              Affiliate below
                                                      A. Lead the development of global               10/18/2010 8:00
           Realm Specific - Enter U.S. or name of HL7 technical and functional health informatics
                                  "U.S."              Affiliate below
                                                      A. Lead the development of global                7/16/2010 8:00
           Realm Specific - Enter U.S. or name of HL7 technical and functional health informatics
                                  "U.S."              Affiliate below
                                                      A. Lead the development of global                7/16/2010 8:00
           Universal                                    technical and functional health informatics    6/23/2010 8:00
           Universal                                    A. Lead the development of global              3/16/2010 8:00
           Realm Specific - Enter U.S. or name of HL7 technical and functional health informatics
                                  "U.S."              Affiliate below
                                                      A. Lead the development of global                3/23/2010 8:00
           Realm Specific - Enter USA or name of HL7 technical and functional health informatics
                                  "U.S."             Affiliate below                                  12/23/2009 8:00
           - Choose One -                                                                             12/22/2009 8:00
           Universal                                    A. Lead the development of global              2/10/2011 8:00
           Realm Specific - Enter USA, Thename of HL7 technical and functional health informatics
                                  "U.S." or Netherlands Affiliate below                                 4/1/2009 8:00
           Universal                                                                                   5/22/2006 8:00
                                  "U.S."
           Realm Specific - Enter USA or name of HL7 Affiliate below                                   1/28/2008 8:00
           - Choose One -                                                                              5/14/2007 8:00
                      Universal                                                                                 5/14/2007 8:00
N/A                   Universal                                  B. Streamline the HL7 standards                6/28/2011 8:00
N/A                   Universal                                  development process.                           9/17/2012 8:00
                      Universal                                                                                 5/15/2012 8:00
                      - Choose One -                             G. None of the above                            6/4/2012 8:00
                      Universal                                  G. None of the above                           10/3/2011 8:00
N/A                   Universal                                  G. None of the above                            6/1/2011 8:00
                      Universal                                  G. None of the above                           9/22/2008 8:00
                                             "U.S."              Affiliate below
                      Realm Specific - Enter U.S. or name of HL7 A. Lead the development of global               7/1/2010 8:00
                      - Choose One -                             technical and functional health informatics   10/16/2009 8:00
                                             "U.S."
                      Realm Specific - Enter USA or name of HL7 Affiliate below                                  9/8/2008 8:00
ISO                   Universal                                  C. Facilitate HL7 standards adoption and      8/12/2011 11:00
N/A                   Universal                                  implementation.,standards adoption and
                                                                 C. Facilitate HL7 D. Define an overarching     5/31/2011 8:00
N/A                   Universal                                  implementation. standards adoption and
                                                                 C. Facilitate HL7                              5/31/2011 8:00
                      - Choose One -                             implementation.                                5/27/2011 8:00
                      - Choose One -                                                                             9/8/2008 8:00
                      Universal                                                                                  9/8/2008 8:00
N/A                   Universal                                  C. Facilitate HL7 standards adoption and       1/10/2011 8:00
                      - Choose One -                             implementation.                                9/14/2010 8:00
                      - Choose One -                                                                            6/30/2009 8:00
                                             "U.S."
                      Realm Specific - Enter USA or name of HL7 Affiliate below                                 12/4/2008 8:00
                      - Choose One -                                                                             6/1/2010 8:00
                      - Choose One -                                                                            6/15/2011 8:00
                      - Choose One -                                                                            6/15/2011 8:00
                      - Choose One -                                                                            6/15/2011 8:00
                      - Choose One -                                                                            9/14/2009 8:00
N/A                   Universal                                  C. Facilitate HL7 standards adoption and       2/28/2011 8:00
N/A                   Universal                                  implementation. standards adoption and
                                                                 C. Facilitate HL7                              2/28/2011 8:00
N/A                   Universal                                  implementation. standards adoption and
                                                                 C. Facilitate HL7                              2/28/2011 8:00
                      Universal                                  implementation. standards adoption and
                                                                 C. Facilitate HL7                              6/14/2010 8:00
                      Universal                                  implementation.
                                                                 A. Lead the development of global               2/2/2010 8:00
                      - Choose One -                             technical and functional health informatics    3/30/2009 8:00
                      - Choose One -                                                                            5/14/2007 8:00
                      - Choose One -                                                                            1/29/2007 8:00
                      - Choose One -                                                                            5/23/2005 8:00
                      - Choose One -                                                                             5/2/2005 8:00
                        Notes below)
Other (specify in Misc. Universal                                A. Lead the development of global              5/18/2011 8:00
N/A                   Universal                                  technicalof the above health informatics
                                                                 G. None and functional                          2/8/2011 8:00
                      Universal                                  A. Lead the development of global              1/20/2010 8:00
                      - Choose One -                             technical and functional health informatics   12/11/2009 8:00
                      - Choose One -                                                                             2/2/2009 8:00
                      - Choose One -                                                                            12/8/2009 8:00
N/A                   Universal                                    B. Streamline the HL7 standards                 3/4/2011 8:00
                      - Choose One -                               development process., C. Facilitate HL7        5/17/2010 8:00
                      Universal                                    B. Streamline the HL7 standards                11/2/2010 8:00
                      - Choose One -                               development process.                          10/16/2009 8:00
                      Universal                                                                                   1/23/2009 8:00
                      - Choose One -                                                                               9/8/2008 8:00
                      - Choose One -                                                                              1/25/2005 8:00
                      - Choose One -                                                                              1/28/2008 8:00
                      - Choose One -                                                                              1/28/2008 8:00
IHE                   Universal                                    B. Streamline the HL7 standards                 8/9/2011 8:00
Other (specify in Misc. Universal
                        Notes below)                               development process., D. of global
                                                                   A. Lead the development Define an              6/28/2011 8:00
Other (specify in Misc. Realm Specific - Enter U.S. or name of HL7 technical and functional health informatics
                        Notes below)           "U.S."              Affiliate below
                                                                   A. Lead the development of global              6/28/2011 8:00
                      Universal                                    technical and functional health informatics
                                                                   A. Lead the development of global               2/3/2011 8:00
                      Universal                                    technical and functional health informatics
                                                                   A. Lead the development of global              6/14/2010 8:00
                      Universal                                    technical and functional health informatics
                                                                   A. Lead the development of global              3/23/2010 8:00
                      Universal                                    technical and functional health informatics
                                                                   A. Lead the development of global              1/18/2010 8:00
                      Universal                                    technical and functional health informatics
                                                                   A. Lead the development of global              1/19/2010 8:00
                      - Choose One -                               technical and functional health informatics    1/18/2010 8:00
                      Universal                                                                                   1/18/2010 8:00
IHE                   Universal                                    A. Lead the development of global               8/9/2011 8:00
                      Universal                                    technical and functional health informatics
                                                                   A. Lead the development of global              5/17/2010 8:00
                      - Choose One -                               technical and functional health informatics    11/2/2009 8:00
                      - Choose One -                                                                              11/2/2009 8:00
                      - Choose One -                                                                              11/2/2009 8:00
                      - Choose One -                                                                              11/2/2009 8:00
                      - Choose One -                                                                              8/19/2009 8:00
                      Universal                                                                                  11/13/2008 8:00
                      - Choose One -                                                                               9/8/2008 9:00
                      - Choose One -                                                                              1/24/2007 8:00
                      Universal                                                                                   5/22/2006 8:00
                                             "U.S."
                      Realm Specific - Enter USA or name of HL7 Affiliate below                                   11/5/2007 8:00
                      - Choose One -                                                                              9/25/2006 8:00
                      Universal                                                                                   9/25/2006 8:00
                      - Choose One -                                                                              9/25/2006 8:00
                      Universal                                                                                   9/25/2006 8:00
IHE                   Universal                                    A. Lead the development of global               8/9/2011 8:00
N/A                   Universal                                    technical and functional health informatics
                                                                   A. Lead the development of global              1/24/2011 8:00
                      Universal                                    D. Define an functional and internally
                                                                   technical andoverarchinghealth informatics     12/6/2010 8:00
                      - Choose One -                               consistent interoperability framework.         3/22/2010 8:00
                      Universal                                    A. Lead the development of global              1/21/2010 8:00
                      - Choose One -                               technical and functional health informatics   10/16/2009 8:00
                      - Choose One -                                                                              1/15/2009 8:00
- Choose One -                                                                                9/17/2008 8:00
- Choose One -                                                                                9/28/2008 8:00
- Choose One -                                                                                5/20/2004 8:00
                       "U.S."              Affiliate below
Realm Specific - Enter U.S. or name of HL7 A. Lead the development of global                  2/10/2011 8:00
- Choose One -                             technical and functional health informatics         6/8/2010 8:00
Universal                                  C. Facilitate HL7 standards adoption and           10/8/2010 8:00
- Choose One -                             implementation.                                     6/3/2010 8:00
- Choose One -                                                                                 6/3/2010 8:00
Universal                                  A. Lead the development of global                   6/1/2010 8:00
Universal                                  technical and functional health informatics
                                           A. Lead the development of global                   6/1/2010 8:00
Universal                                  technical and functional health informatics
                                           A. Lead the development of global                   6/1/2010 8:00
- Choose One -                             technical and functional health informatics        5/17/2010 8:00
Universal                                  A. Lead the development of global                  4/30/2010 8:00
Universal                                  technicalof the above health informatics
                                           G. None and functional                             4/13/2010 8:00
Universal                                  A. Lead the development of global                  3/23/2010 8:00
- Choose One -                           technical
                     HL7 Netherlands and HL7 UK and functional health informatics             5/20/2008 8:00
Universal                                  A. Lead the development of global                   5/3/2004 8:00
- Choose One -                             technical and functional health informatics        5/14/2007 8:00
Universal                                                                                     9/25/2006 8:00
- Choose One -                                                                                9/25/2006 8:00
Universal                                  G. None of the above                              10/10/2010 8:00
Universal                                  G. None of the above                              10/10/2010 8:00
- Choose One -                                                                                1/28/2010 8:00
                       "U.S."
Realm Specific - Enter USA or name of HL7 Affiliate below                                     5/18/2009 8:00
                       "U.S." or name of HL7 Affiliate below                                    9/8/2008 8:00
Realm Specific - Enter ISO,CEN Normative Standard for Regulatory Reporting of Human Pharmaceuticals
- Choose One -                                                                                9/28/2009 8:00
Universal                                  A. Lead the development of global                  1/21/2010 8:00
- Choose One -                             technical and functional health informatics        9/28/2009 8:00
- Choose One -                                                                                9/28/2009 8:00
- Choose One -                                                                                5/21/2009 8:00
- Choose One -                                                                                9/25/2006 8:00
- Choose One -                                                                                9/25/2006 8:00
- Choose One -                                                                                9/25/2006 8:00
- Choose One -                                                                                9/25/2006 8:00
- Choose One -                                                                                9/25/2006 8:00
- Choose One -                                                                                9/25/2006 8:00
- Choose One -                                                                                9/25/2006 8:00
- Choose One -                                                                                9/25/2006 8:00
- Choose One -                                                                                9/25/2006 8:00
- Choose One -                                                                                9/25/2006 8:00
- Choose One -                                                                                9/25/2006 8:00
- Choose One -                                                                                9/25/2006 8:00
      - Choose One -                                                                             5/14/2007 8:00
N/A   Universal                                   A. Lead the development of global              6/28/2011 8:00
      Universal                                   technical and functional health informatics
                                                  A. Lead the development of global              6/22/2010 8:00
      Universal                                   technical and functional health informatics
                                                  C. Facilitate HL7 standards adoption and        3/5/2010 8:00
      - Choose One -                              implementation.                               11/13/2009 8:00
      - Choose One -                                                                            11/13/2009 8:00
      - Choose One -                                                                            11/13/2009 8:00
      - Choose One -                                                                            11/13/2009 8:00
N/A   Universal                                   C. Facilitate HL7 standards adoption and       3/11/2011 8:00
      - Choose One -                              implementation., E. Ensure broad and           2/14/2011 8:00
      - Choose One -                              G. None of the above                           2/14/2011 8:00
      - Choose One -                                                                              2/4/2011 8:00
      - Choose One -                                                                              2/4/2011 8:00
      Universal                                   B. Streamline the HL7 standards                6/11/2010 8:00
      - Choose One -                              development process.                           9/11/2009 8:00
      - Choose One -                                                                             9/11/2009 8:00
      - Choose One -                                                                             9/11/2009 8:00
      - Choose One -                                                                             9/11/2009 8:00
      - Choose One -                                                                             9/11/2009 8:00
IHE   Universal                                   A. Lead the development of global               6/6/2011 8:00
      Realm Specific - Enter U.S. or name of HL7 technical and functional health informatics
                             "U.S."              Affiliate below
                                                 C. Facilitate HL7 standards adoption and        1/25/2011 8:00
                                                 C. Facilitate HL7 E. Ensure broad and
      Realm Specific - Enter U.S. or name of HL7 implementation.,standards adoption and
                             "U.S."              Affiliate below                                 1/21/2011 8:00
      - Choose One -                              implementation., E. Ensure broad and            1/9/2009 8:00
      - Choose One -                                                                             1/26/2009 8:00
      - Choose One -                                                                             1/23/2009 8:00
      - Choose One -                                                                             9/23/2008 9:00
      Universal                                   A. Lead the development of global              12/1/2010 8:00
      - Choose One -                              technical and functional health informatics     9/1/2006 8:00
      - Choose One -                                                                             5/19/2011 8:00
N/A   Universal                                   A. Lead the development of global               1/1/2010 8:00
      - Choose One -                              technical and functional health informatics    2/26/2010 8:00
      - Choose One -                                                                             2/26/2010 8:00
      - Choose One -                                                                             2/26/2010 8:00
      - Choose One -                                                                             2/26/2010 8:00
      - Choose One -                                                                             2/26/2010 8:00
      - Choose One -                                                                             10/8/2010 8:00
      - Choose One -                                                                            11/10/2010 8:00
      - Choose One -                                                                             10/3/2011 8:00
      - Choose One -                                                                              2/1/2011 8:00
      - Choose One -                                                                              2/1/2011 8:00
      - Choose One -                                                                              8/1/2012 8:00
      - Choose One -                                                                              2/1/2012 8:00
                      - Choose One -                             A. Lead the development of global              9/11/2009 8:00
N/A                   Universal                                  technicalof the above health informatics
                                                                 G. None and functional                         9/11/2009 8:00
                      - Choose One -                                                                            9/11/2009 8:00
                      - Choose One -                                                                             9/8/2008 8:00
                      - Choose One -                             A. Lead the development of global              2/23/2010 8:00
                      - Choose One -                             technical and functional health informatics    1/30/2008 8:00
                      - Choose One -                                                                            9/24/2007 8:00
                      - Choose One -                                                                            5/14/2007 8:00
                      - Choose One -                                                                            9/23/2009 8:00
                      Universal                                  A. Lead the development of global              3/15/2010 8:00
                      - Choose One -                             technical and functional health informatics    9/21/2009 8:00
                      - Choose One -                                                                            1/28/2008 8:00
                      - Choose One -                                                                            1/29/2008 8:00
N/A                   Universal                                  A. Lead the development of global               6/6/2011 8:00
                      Universal                                  technical and functional health informatics
                                                                 C. Facilitate HL7 standards adoption and       3/23/2010 8:00
                      - Choose One -                             implementation.                                5/30/2005 8:00
                      - Choose One -                                                                            5/14/2007 8:00
N/A                   - Choose One -                             A. Lead the development of global              7/22/2011 8:00
N/A                   Universal                                  technical and functional health informatics
                                                                 C. Facilitate HL7 standards adoption and       6/23/2011 8:00
Other (specify in Misc. Realm Specific - Enter U.S. or name of HL7 implementation.
                        Notes below)           "U.S."              Affiliate below
                                                                   A. Lead the development of global            2/24/2011 8:00
                      Universal                                  B. Streamline functional health informatics
                                                                 technical and the HL7 standards               12/28/2010 8:00
IHE                   Realm Specific - Enter U.S. or name of HL7 development process.
                                             "U.S."              Affiliate below
                                                                 A. Lead the development of global             12/13/2010 8:00
                      Universal                                  technical and functional health informatics
                                                                 C. Facilitate HL7 standards adoption and       11/3/2010 8:00
                      Realm Specific - Enter U.S. or name of HL7 implementation.
                                             "U.S."              Affiliate below
                                                                 A. Lead the development of global              6/14/2010 8:00
                      - Choose One -                             technical and functional health informatics    10/1/2009 8:00
                      - Choose One -                                                                            10/1/2009 8:00
                                             "U.S."
                      Realm Specific - Enter USA or name of HL7 Affiliate below                                 10/1/2009 8:00
                                             "U.S."
                      Realm Specific - Enter USA or name of HL7 Affiliate below                                 5/18/2009 8:00
                      - Choose One -                                                                             6/4/2009 8:00
                      - Choose One -                                                                             4/2/2009 8:00
                      - Choose One -                                                                            2/26/2009 8:00
                      Universal                                                                                  9/8/2008 8:00
N/A                                          "U.S."             Affiliate below
                      Realm Specific - Enter USA or name of HL7 C. Facilitate HL7 standards adoption and        5/15/2008 9:00
                      - Choose One -                             implementation.                                1/28/2008 8:00
                      Universal                                                                                 1/28/2008 8:00
                      - Choose One -                                                                            5/14/2007 8:00
                      - Choose One -                                                                            9/25/2006 8:00
                      Universal                                  A. Lead the development of global              8/12/2011 8:00
N/A                   Universal                                  technical and the HL7 standards
                                                                 B. Streamline functional health informatics     3/7/2011 8:00
Other (specify in Misc. Universal
                        Notes below)                             development process.
                                                                 A. Lead the development of global               3/7/2011 8:00
N/A                   Universal                                  technical and functional health informatics
                                                                 A. Lead the development of global              2/21/2011 8:00
N/A                   Universal                                  technical and functional health informatics
                                                                 A. Lead the development of global              2/14/2011 8:00
                                                                 technical and functional health informatics
                      Universal        A. Lead the development of global              8/18/2010 8:00
                      Universal        technical and functional health informatics
                                       A. Lead the development of global              7/27/2010 8:00
                      - Choose One -   technicalof the above health informatics
                                       G. None and functional                         2/16/2010 8:00
                      - Choose One -   A. Lead the development of global              3/23/2009 8:00
                      - Choose One -   technical and functional health informatics   12/23/2009 8:00
                      - Choose One -                                                   3/6/2009 8:00
IHE                   Universal        B. Streamline the HL7 standards                1/30/2006 8:00
                      - Choose One -   development process., C. Facilitate HL7        9/16/2011 8:00
                      - Choose One -                                                  9/16/2011 8:00
                      - Choose One -                                                  9/16/2011 8:00
                      - Choose One -                                                  9/16/2011 8:00
                      - Choose One -   B. Streamline the HL7 standards                 2/8/2011 8:00
                      Universal        development the HL7 standards HL7
                                       B. Streamline process., C. Facilitate          6/25/2010 8:00
                      Universal        development process.
                                       A. Lead the development of global               5/7/2010 8:00
Other (specify in Misc. Universal
                        Notes below)   B. Streamline functional health informatics
                                       technical and the HL7 standards                 9/9/2011 8:00
Other (specify in Misc. Universal
                        Notes below)   development process., C. Facilitate HL7
                                       C. Facilitate HL7 standards adoption and        2/8/2011 8:00
                      Universal        implementation.
                                       A. Lead the development of global              3/12/2010 8:00
                      Universal        technical and functional health informatics
                                       A. Lead the development of global              2/24/2010 8:00
                      - Choose One -   technical and functional health informatics    1/13/2012 8:00
                      Universal                                                       5/18/2009 8:00
                        Notes below)
Other (specify in Misc. Universal      C. Facilitate HL7 standards adoption and       5/11/2009 8:00
                      - Choose One -   implementation.                                5/18/2009 8:00
                        Notes below)
Other (specify in Misc. Universal      C. Facilitate HL7 standards adoption and       5/18/2009 8:00
                      Universal        implementation. HL7 standards
                                       B. Streamline the                              5/11/2009 8:00
                      - Choose One -   development process., C. Facilitate HL7        1/15/2005 8:00
                      - Choose One -                                                   6/2/2008 8:00
                      - Choose One -                                                   4/8/2008 8:00
Next Milestone MM/DD/YYYY
        7/29/2007
        9/15/2011
        9/15/2010
        9/15/2011
        9/15/2011
        9/15/2011
        1/15/2012
        9/15/2011
        4/30/2007
       11/30/2005
       12/31/2005
       12/31/2005
        5/15/2008


         8/5/2011
       12/31/2011
       12/15/2011
        9/30/2011
        6/30/2011




        9/15/2011
        1/15/2011
        1/15/2011
        9/15/2012
        9/15/2010
        9/15/2011
        3/24/2013
        9/30/2008
        5/15/2011
        9/15/2011
        1/15/2010
        9/15/2011
        9/15/2011
        9/15/2011
        9/15/2011
        9/15/2011
        9/15/2010
        9/15/2010
        9/15/2011
        9/15/2011
9/15/2010
1/15/2011
9/15/2011
1/15/2011
9/15/2011
9/15/2011
9/15/2010
1/15/2010
12/7/2011
9/15/2011
9/15/2011
9/15/2010
1/15/2011
 7/6/2012
 2/4/2012
9/15/2010
1/15/2011
5/15/2010
9/15/2011
5/15/2011
5/15/2011
9/15/2011
1/15/2012
1/15/2012
1/15/2012
9/15/2011


9/15/2011
5/15/2011
9/15/2011
9/15/2011
1/15/2011
9/15/2011
1/15/2011
9/15/2010
5/15/2010
9/15/2010
9/15/2011
5/15/2010
5/15/2009
9/15/2011
9/30/2010
9/15/2010
7/31/2011
9/15/2012
5/15/2012
1/15/2012
9/15/2011
9/15/2011
5/15/2011
9/15/2011


9/15/2010
1/15/2012
9/15/2011
9/15/2011
9/15/2011
9/15/2010
1/15/2012
9/15/2011
9/15/2010
9/15/2010
9/15/2011
9/15/2011
9/15/2011
9/15/2011
1/15/2012
1/15/2010
9/15/2011
9/15/2011
9/15/2011
9/15/2010
1/15/2011
1/15/2011
5/15/2011
9/15/2010
5/15/2010
5/15/2011
9/15/2011
9/15/2011
5/15/2011
9/15/2010
1/15/2011
 1/15/2012
 5/15/2011
 5/15/2011
 9/15/2012
 1/15/2010
 9/15/2011
 9/14/2009
12/31/2008
 9/15/2011
 9/15/2011
 9/15/2011
 9/15/2011
 9/15/2011
 9/15/2010
 1/15/2011
 9/15/2011
 9/15/2011


 1/15/2013
 9/15/2011
 9/15/2011
 9/15/2010
 1/15/2013
 1/15/2013
 1/15/2014
 9/15/2011
 9/15/2012
 9/15/2010
 9/15/2010
 9/15/2011
 1/15/2011
 9/15/2010
 1/15/2011
 1/15/2011
 1/15/2012
 9/15/2011
 5/15/2011
 9/15/2011
 9/15/2011
 9/15/2011
 9/15/2010
 9/15/2013
9/15/2011
9/15/2011
9/15/2011
9/15/2011
9/15/2010
1/15/2011
9/15/2010
9/15/2010
1/15/2011
9/15/2011
9/15/2010
9/15/2011
9/15/2011
9/15/2011
9/15/2011
9/15/2011
5/23/2011
 6/9/2012
5/23/2011
5/23/2011
1/15/2012
9/15/2011
1/15/2011
9/15/2010
1/15/2011
5/15/2010
5/15/2010
5/15/2010
1/15/2010
9/15/2011
5/15/2011
1/15/2011


5/15/2012
9/15/2011
5/15/2011
9/15/2010


1/15/2010
5/15/2011
5/15/2011
5/15/2011
9/15/2011
8/31/2011
9/15/2010
5/15/2010
1/15/2012
5/15/2011
1/15/2012
9/15/2012
5/15/2011
9/15/2011
9/15/2011
9/15/2011
9/15/2011
9/15/2011
9/15/2011
9/15/2011
9/15/2011
9/15/2011
1/15/2012
1/15/2012
5/15/2011
9/15/2011
5/15/2010


5/15/2011
1/15/2012
9/15/2011
9/15/2011
5/15/2013
9/15/2011
1/12/2011
9/15/2010
9/14/2011
9/15/2010
9/15/2010
 1/8/2012
5/15/2011
1/15/2012
5/15/2011
5/15/2011
9/15/2012
5/15/2012
 5/18/2012
 9/15/2011
 5/15/2011
 5/15/2011
 5/15/2011
 9/15/2012
  9/9/2013
 1/15/2011
 9/15/2011
 9/15/2011
 9/15/2010
 1/15/2010
 1/15/2010
 9/15/2012
 1/15/2011
 1/15/2011
 1/15/2011
 1/15/2012
 9/15/2012
 9/15/2011
 5/15/2011
 9/15/2011
 5/15/2011
  2/5/2013
  9/3/2012
 7/23/2012
 6/22/2012
12/17/2011
 3/10/2012
 9/15/2009
 9/15/2010
  4/2/2011
  3/1/2013
 4/17/2012
10/19/2012


  1/2/2012
 9/15/2011
 5/15/2011
 5/15/2011
 5/15/2011
 5/15/2011
 9/15/2010
 1/15/2011
 5/16/2011
 9/15/2010
 1/15/2010
 1/15/2010
 9/15/2011
 9/15/2011
 9/15/2011
 9/15/2011
 9/15/2011
 9/13/2011
 9/15/2010
  1/9/2011
 1/15/2012
 9/15/2011
 1/15/2011
 5/15/2011
 1/15/2012
 5/15/2010
 1/15/2012
 1/15/2011
 1/15/2012
 9/15/2010
 5/14/2009
10/28/2011
 8/30/2008

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:0
posted:8/10/2012
language:
pages:128