naga resume by HC120809095355

VIEWS: 31 PAGES: 6

									                            NAGARAJAN JAYARAMAN
                          6055, 184A –Street, Surrey, BC, V3S7P7
                                  Mobile: 1-778-242-2577
                             Email: nagarajan_j@hotmail.com


I have diversified vast professional experience in the construction industry. Have managed and
worked with complex competitive challenge projects and have implemented them successfully with
efficiency and quality. Have

      Expertise in Project Manger,
      Expertise in Checker,
      Expertise in Project cost estimation,
      Expertise in Negotiations for projects at various levels,
      Expertise in design of steel / concrete structure
      Expertise in consultant of buildings
      Expertise in industrial & residential steel buildings in accordance with AISC
      3 Years in Malaysia (high rise building, shopping complex) and Brunei. Designed as per
       AISC / BS code
      6 Years of exclusive experience on US jobs (steel structure) as Manager
      13 months of experience in Canada for oil sands project and
      One year experience in project management (QATAR)

Objective:
       Seeking a position in competitive construction projects where I could prove my expertise
and vast experience gained in this area.


EDUCATIONAL QUALIFICATION

      Bachelor of Engineering (Civil) Bharathiar University (T.N) passed in 1993 in first class
              P.S.G College of Technology, Coimbatore

Skills and Strengths:
             Efficient Management and Leadership ability
             Effective budgeting and cost management of projects
             Expertise with latest tools and techniques
             Efficient planning and coordination of activities
             Effective quality checking of final deliveries
             Well versed with the usage of computer and Microsoft office tools, Internet and
                email
             Software Knowledge - STAAD-111, Tekla Structure, Strucad, Autocad
             Excellent Time Management to finish the work scheduled on Time
             Quick Learning , Excellent Memory
             Knows how to get things done from the subordinates
             Go-getter Attitude




                                                                                        Page 1 of 6
PROFESSIONAL EXPERIENCE:



                                                                  (JULY 2009 to TILL NOW)

Employer: TDS INDUSTRIAL SERVICES Ltd – Surrey – CANADA

                                                              As Project Coordinator / checker

PROJECT DETAILS
Dow Chemical Poly Train 3 - Location: Fort Saskatchewan, Alberta
Fabricator Supreme Steel Ltd - Saskatchewan, Alberta
Checking the drawing and coordinating with the Jacob's Engineering - Calgary, AB for
clarification.

                                                                  (MAY 2008 to JUNE 2009)

Employer: Detailed Design Drafting Services Ltd – Surrey – CANADA

                                                                    As Project Manager / checker

PROJECT DETAILS
Oil Sands - Alberta - Suncor Energy Inc Calgary, Alberta Canada
Fabricator      Wayward Steel Fabricators
Tonnage         13000
Schedule        19 Months



Checking the drawing and coordinating with the Jacob's Engineering - Calgary, AB for
clarification.
ROYAL VICTORIA HOSPITAL Ontario, Canada - RVH Phase 1 Expansion Project -1100T




                                                                                     Page 2 of 6
                                                                  (JULY 2007 to APRIL 2008)

Employer: QATAR DESIGN CONSORTIUM – DOHA –QATAR
(ARCHITECTS, ENGINEERS, PROJECT MANAGERS & CONSULTANTS)

                     As Project coordinator / Structural Engineer in PROJECT MANAGEMENT

       Formulation of Alternative Concept and sketches, preparing Design Philosophy based on
        Architectural Drawings, Clients Requirement, site conditions, and local regulations.
       Conduct on-site inspection and check the quality of work, materials and equipment of the
        contractors. Check if the materials and any portion of work conform to the drawings and
        specifications.
       Coordinating with other team members & preparing Additional Structural Design
       Guiding team of draughtsman for preparation of drawings
       Checking the design and drawings
       Checking structural specifications before handing over
       Checking coordination with Architectural and services drawings
       Coordinating with other team members within Project Management department
       Checking Bill of Quantities
       Awareness of QDC policy and adhere to process procedures applicable to the department
       Awareness of the significant aspects and Environment management Programmes in QDC

PROJECTS:
   1. JASSIM TOWER AT OLD SALATA ROAD – 14 STOREY BUILDING
   2. DUHAN HOUSING PROJECT – PHASE VI
   3. DEVELOPMENT OF UMM AL GEHAB FARM
   4. DIWAN AL-AMIRI CAR PARK & UTILITY BUILDING




                                                                  (Jan 2002 to June 2007)

Employer           : Cistron Infotek –Chennai
                                                                                     As MANAGER,
                           USA OFFICE: Cistron Technologies Inc.

                            508 Finley Avenue North Wilkesboro NC 28659 – USA
                            www.cistrontechnologies.com
Completely responsible for technical as well as the entire Chennai office administration

Work Profile :
    Studying the drawings
    Preparing the drawing office schedule to complete the project in time
    Identifying the draughts person & checkers based on the drawing counts and the delivery
       schedule
    Organizing Kick-off Meeting to explain the nature of the job and to decide the strategy for
       handling the project.
                                                                                   Page 3 of 6
       Allocating the jobs for the detailers & the checkers
       Preparation of Standards like Connection Details, Sample Drawings, etc. according to the
        Clients’ requirements, by which uniformity can be achieved in the final drawings prepared
        by various editors.
       Adherence to codes, AISC
       Clarifying the queries to the detailers & the checkers
       Raising queries and seeking clarification from Clients
       Correspondence with the clients
       Proposing better options to the Clients
       Final Checking / Reviewing of drawings before releasing the final drawings
       Responsible for Maintaining the Schedule

OTHER IMPORTANT ACTIVITIES:
    Ensuring co-ordination between the team members
    Job counseling to the team members to help them realize their errors and rectifying the
       same.
    Personal counseling to cheer them up
    Do Performance Appraisal for the team members
    Fixing Key Result Area for the members
    Keep on motivating the members to realize their potentials and improve themselves
    Explain the team members to work in a realistic way keeping in view the fabrication,
       erection and safety factors
STEEL DETAILING JOBS DONE:
Major client:
BERLIN STEEL, Lynchburg Steel Corp, Southern Steel’s, American Steel, Inc, Century Steel

For US Projects as per AISC:
 Hospital Building
 Multi-Storied Residential buildings
 School Building
 Library
 Stadium
 Churches, etc.
List of projects
      New Safeway Stores # 1689, Herndon, Virginia
      Umass (1300T under erection), Drexel (700 T)
         Regional center of Arts (400 T), Sheraton (700Tt)
      ECCI – Eastern Carolina Cardicular Institute (1000T)
      Joint Battle Center SJFNQ Building, Suffolk, Virginia
      St. Rose of Lima Parish, Gathers burg, Maryland
      The Old Guard Vehicle Maintenance Facility, Port Myer, Virginia
      Weapons Dynamics Center, Washington, DC
      Williamsburg Presbyterian Church, Williamsburg, Virginia
      West County RE Center, Chantilly, Virginia
      Renaissance Center III - Retail / Office Shell Building - Durham, North Carolina
      Block-10 Town Center, Newport News, Virginia




                                                                                          Page 4 of 6
                                                                        (May 1999 to Dec 2001)

Employer           : S Kumara Subramani Engineer & Builder –Pondicherry
                                                                  As, Construction Manager
Work Profile:
• Responsible for the overall construction of projects and ensured that the contract and
regulations documents of projects are as per standards and do not violate any government or legal
regulations.
• Project Budget analysis and cost analysis of all the projects given to him and scheduled all tasks
and activities without foregoing quality to keep the budget and cost under control.
• Managed and supervised a team of members working in various constructions projects in the
organization.
• Conducting periodical site visits, efficient planning and coordination of activities
Projects :
         Construction of Residential Building for TVS Sundram Fasteners Ltd at Korkadu And two
commercial building complex in Pondicherry.


Worked as a Civil / structural Engineer, Estimator and project coordinator for 6 years

I was exposed to wide range of Analysis, Design of Steel & RCC Buildings Co-ordination with
Client Technical appraisal and planning / Monitoring of Project, establishments and updating of
cost data bank of project Developing management information systems, compilation &generation of
report Cost Estimation & Cost Control activities of project


                                                                           (July 1998 to April 1999)

Employer        :Baharuddin & Associates Consulting Engineers - Brunei
                                     Civil & Structural ,Oil & gas Consultants

                                                               As              :Structural Engineer
Worked as a structural engineer under the supervision of Principal Structural Engineer. During my
tenure with this firm I was exposed to wide range of projects and was given greater responsibility as
time grew.



Projects involved
    1. Brunei internatioanl Airport – Brunei in association with WS Atkins
            Role played : detail design for extension of Brunei international Airport and coordination
            with client, technical appraisal and planning/ monitoring of project in association with
            WS Atkins.
                                                                           August 1996 to June1998

Employer        :Perunding EC Sepakat Sdn Bhd - Malaysia
                                    Consulting Civil & Structural Engineers
                                                 As                : Civil / Structural Engineer


                                                                                         Page 5 of 6
Worked as a structural engineer under the supervision of Principal Structural Engineer. During my
tenure with this firm I was exposed to wide range of projects and was given greater responsibility as
time grew.
Projects involved
1.      Kuching Riverine Resort – Kuching (Condominium & commercial complex- High Rise
Building RB Development SDN BHD)
Role Played :Detail design , pile cap design , load calculation for piling and coordination with client,
Technical appraisal and planning / Monitoring of project.
2.      Sibu Tower view –SIBU( Comercial complex –high rise building PELTIA Tower view)
3       Masja Building – Kuching (Office complex – 12 storey building)
        Sports & recreational park – sibu.
4.      Sibu indoor stadium (capacity 3500 spectators J.K.R Sarawak)
5.      Sibu outdoor stadium (Capacity 1700 Spectators J.K.R Sarawak)

                                                                            May 1995 to August 1996

Employer :MAC Civil Engineers Ltd. –Madras Consultant & Construction Company
                                                                  As                      : Engineer
Projects involved
MAC-CWT Distriparks Ltd Singapore – Madras Container Freight Station
Role played : Analysis , design of Steel & RCC buildings coordination with the client technical
appraisal and planning / monitoring of project , est ablishments and updating of cost data bank of
project developing management information syaytems , compilation and generation of report cost
estimation and cost control activities of project.

                                                                              April 1993 to May 1995

Employer                  :C.R.Narayana Rao -Madras Architects, Engineers & Planners
                                                                            As     : Engineer
Projects involved
            1. S.R.F Ltd – dipping machine plant
            2. India Cements Ltd.
            3. Raymond’s Synthetics Ltd. Allahabad Polyster Plant
            4. D.C.M Hyundai Ltd. – container freight station

Role played : Analysis , design of steel & rcc buildings coordination with client technical appraisal
and planning / monitoring of project.




                                                                                           Page 6 of 6

								
To top