Consultation on the Use of Licence Exempt Spectrum For Provision
Document Sample


Annette Henley
Private Business Systems Unit
Radiocommunications Agency
0207 211 0181
Institution of Mechanical Engineers, 20th June 2002
SMAG 01/19 1
5GHz Consultation Process
• Final Stage consultation document and draft
Interface Requirement for 5GHz band were
published on RA website in mid-December 2001
asking for comments.
• Final Stage consultation document contained 4
proposals.
• Closing date for comments, 15 February 2002.
SMAG 01/19 2
Proposal 1
–Make all 3 Bands licence exempt
–All equipment must meet requirements
of appropriate IR .
SMAG 01/19 3
Proposal 2
Band A (5150 - 5350MHz)
• all devices will be nomadic/mobile.
• All devices should comply to ERC Decision
99(23) and IR 2006.
• Indoor Use only. Max EIRP 200mW
Band B (5470 - 5725 MHz)
• all devices will be nomadic/mobile. Max
EIRP 1W
• All devices should comply to ERC Decision
99(23) and IR 2006.
SMAG 01/19 4
– Band C (5725 - 5875 MHz)
• All equipment should comply with IR2006.
Max EIRP of 2W.
• All Devices Fixed.
• IR 2030 with maximum EIRP of 25 mW will
still apply.
SMAG 01/19 5
Proposal 3
– Band C ideal candidate to implement a database
showing the locations and other technical
parameters of stations deployed in this band.
– RA to ensure that site information is made
publicly available.
– The identities of operators would not form part
of the publicly available material.
SMAG 01/19 6
Proposal 4
For RLANs without DFS/TPC as standard an
interim proposal was made
• Maximum EIRP of 50mW without TPC as
standard
• Maximum EIRP of 200mW with TPC only
as standard
• Indoor use only in the band 5150-5250 MHz.
• This proposal to be reviewed at future date.
SMAG 01/19 7
Summary of Responses
• 28 Responses were received.
• Non-confidential replies published on RA website.
• Majority of negative replies focused on mainly
two issues
– Use of band C for higher power Fixed services
(Proposal 2)
– Interim proposals for band A (proposal 4)
SMAG 01/19 8
Interim Solution
• IR 2006 to be rewritten without Band C proposals.
Band C requires further sharing studies before it
can be released
• To contain the following conditions.
– Band A (5150 - 5350MHz)
• all devices will be nomadic/mobile.
• All devices should comply to ERC Decision
99(23) and IR 2006.
• Indoor Use only. Max EIRP 200mW
SMAG 01/19 9
– Band B (5470 - 5725 MHz)
• all devices will be nomadic/mobile.
Max EIRP 1W
• All devices should comply to ERC
Decision 99(23) and IR 2006.
SMAG 01/19 10
Reality (as of June 2002)
• To open the market quickly IR 2006 to contain the
following interim conditions.
– Band A (5150 - 5350MHz)
• all devices will be nomadic/mobile.
• Indoor Use only.
• Max EIRP 60mW without TPC
• Max EIRP 120mW with TPC (3dB
mitigation)
• Random Channel Selection Mechanism to
cover all Band A. 01/19
SMAG 11
Regulatory Process
• New IR 2006 to go for EU notification (3 month
process)
• Minister submissions to be done in parallel
– To decide whether to allow provision of public
services in 5GHz
– To contain redrafted licence exemption SI
– To contain Regulatory Impact Assessment for 5
GHz
• Lay Regulations in Parliament by end Sept
SMAG 01/19 12