					        Southern Railway
          Presents to
Hon’ble MR, CRB and Members of
         Railway Board




    Safety Performance
        Trend of Consequential Accidents
                       2006- 2007- 2008- 2009- 2010- 2010-11          2011-12
        Type            07    08    09    10    11   (upto Oct.)      (upto Oct.)

Collision                0     0      1      1        0         0         1

Fire in trains           0     1      0      0        0         0         0

UMLC accidents          11     6      5      1        3         2         3
Derailments              4     4      3      3        3         3         1
Miscellaneous            1     1      0      0        0         0         0

Total                   16     12     9      5        6         5         5
Accidents per
million train kms.     0.264 0.195 0.141 0.077 0.088          0.127    0.111
SR
Accidents per
million train kms             0.22   0.20   0.17     0.15
IR
                                                                                    2

                 Corporate Safety Plan Target-2013        -   0.17
 Cause wise Analysis of Consequential Accidents:
      Brief Cause                  06-07       07-08       08-09      09-10        10-11        10-11       2011-12
                                                                                              (Upto Oct.)   (upto Oct.)

Negligence of Road
                                     11           6           5           1           3            2            3
users
Failure of other than
                                      0           3           1           0           0            0            0
Railway Staff
Equipment Failure                     2           0           0           0           3            3            1*
Natural calamity                      0           1           0           0           0            0            0
Running over
                                      0           1           2           1           0            0            0
obstruction
Sabotage                              0           0           0           0           0            0            0
Failure of Railway
                                      3           1           1           3           0            0            0
Staff
Under investigation                   0           0           0           0           0            0            1
           Total                     16          12           9          5            6            5            5
*Derailment of last two bogies of T.No.12521 Exp. between Attipattu & Ennore on 09.06.11 due to rail fracture
                    Trend of Indicative Accidents
                             2006 – 2007 – 2008 – 2009 – 2010 – 2011-12
          Type
                               07     08     09     10     11   (upto Oct.)


Averted Collision              1       1       0      0         0     0

Signal Passing at Danger       2       3       3      2         0     1*

Breach of Block rules          2       1       0      0         1     0
                     Total     5       5       3      2         1     1


*On 08.05.11 Driver of Track Machine passed UP Home signal at
Chettiyappatti at “ON”




                                                                              4
     Cause wise analysis of Other Train Accidents
                                2006- 2007- 2008- 2009- 2010- 2010-11 2011-12
   Type
                                 07    08    09    10    11   (upto Oct.) (upto Oct.)

Fire in
              Mechl. failure      1      1      1      0       0       0        0
trains
UMLC          Negligence of
               road user          5      5      8      4       5       5        6
accidents
              Equipment
              failure(Engg.)      1      -      2      2       3       -        1
              Equipment
              failure (Mech.)     2      1      3      1       3       3        1
              Track twist/
Derail-       level variation     -      -      1       -      -       -        -
ments         Combination
              (Mech.&Engg.)       3      3      2      3       1       -        -
              Failure of
              Railway Staff       6      7      -      1       -       -        1

              Others              -      -      1       -      1       -        -

      Total                      18     17      18     11     13       8        9
                                                                                        5
         Cause wise analysis of Yard Accidents
                                                         2008-09    2011-12
S. No.      Dept.               Brief Cause
                                                        to 2010-11 (upto Oct.)
                     Track twist/cross level variation      21          3
                     Sinkage of track due to rain           14          3
                     Rail fracture                           2
  1      Engineering Perished wooden sleeper                 4
                     Material failure                        1
                     Variation of track parameter            2
                     Miscellaneous                           2          2
                                              Sub-Total     46          8
                     Spring broken                           3
                     Wagon/wheel defect                      6
                     Heavy oscillation                       1
         Mechanical Buffer interlocking                      2
  2
                     Breakage of coupling                    1
                     Defective hand brake                    2
                     Poor brake power                        1          1
                     Crane                                   1
                                              Sub-Total     17          1        6
        Cause wise analysis of Yard Accidents … Contd.
                                                           2008-09
                                                                     2011-12
S. No.       Dept.               Brief Cause                 to
                                                                     (upto Oct.)
                                                           2010-11
                     Mounting over commercial rubbish        10
                     Mounting over foreign body               3
    3     Commercial Infringement of parcel                   1
                     Hitting of parcel trolley                1
                                               Sub-Total     15
                     Over speed                               4
                     Passing disc at ON                       7          2
                     Failure to control loco                  4
                     Improper shunting                        4          2
          Running    Backed over trailed through point        1
    4
          Staff      Backed without permission                1
                     Sudden application of brake              2
                     Shunter slept due to overworking         1
                     Miscellaneous                            6
                                               Sub-Total     30
          Mech. &
5                    Combination                             9                     7
          Engg.
Cause wise analysis of Yard Accidents Contd …

                                                    2008-09
S.No.      Dept.              Brief Cause              to     2011-12
                                                              (upto Oct.)
                                                    2010-11
                     Non-securing of facing point     13
                     Hand signal not shown            14          3
  6     Traffic      Wrong movement given by SM         1
                     Removal of skid                    1
                     Miscellaneous                      5         2
                                          Sub-Total   34          5
  7     Electrical   Loco brake failure               1
        Running
  8     Staff &      Combination                      3           2
        Traffic

                     Other than Railway staff         3          1
                                       Grand Total   158         21

                                                                            8
     Main concerns of this Railway on Safety

1. Rail Failure
With the increase in axle load and the trailing load in addition to the enhanced
maximum permissible speed on the Indian Railways, it is essential to have
minimum standard of track with 60 kg rails and 68 or 71 kg rails for A and B
routes on Indian Railways.
Suitable modifications to the toilets (CDT) of passenger coaches to be carried
out at the earliest to prevent corrosion to the rail and rolling stock.
Allocation for track renewal and achieved track renewal.

                Budget Grant for           Gross
                                                             Track renewal done
     Year        track renewal          expenditure
                                                            in CTR units (In Kms.)
                 (Rs. In crores)       (Rs. In crores)
  2008-09             260.8                335.10                      218.60
  2009-10             296.7                265.40                      199.30
  2010-11             250.0                227.80                      155.40
  2011-12             250.0                250.00                      108.50

     Budget allocation for track renewal has been reduced over years
                                                                                     9
    Main concerns of this Railway on Safety
2. Human Failure
 With the increase in speed, it is essential for the Loco Pilot to have advance
indication about the aspects of the signals ahead. Therefore, cab signalling
should be available for Loco Pilot for at least 5 kms. ahead to pre-warn the
aspects of the stop signals ahead. In the event of the train crew ignoring these
aspects of the pre-warned signals, it should be possible for the train to
accentuate the braking based on the aspects of the signals.
3. Coach/Wagon Detachment
 Stationary automatic temperature sensors may be installed at all important/
select locations to detect hot axles on both passenger and goods stock.

4. Fire in trains
 Fire resistant electrical cables may be used for wiring inside the coaches.
 Provision of fire retardant curtains and upholstery is to be extended to non-
   AC coaches also.
 At present, fire extinguishers of traditional type are being kept in AC coaches.
   They may be replaced with “fire extinguishing balls” which become operative
   automatically when they come in contact with fire. The cost benefit analysis
   may be studied.
                                                                                     10
      Action taken to prevent/control accidents
  1. Engineering
        Year                  2010-11                       2011-12
     Type of rails   52 kg rails   60 kg rails    52 kg rails       60 kg rails
       Board’s
                      90 kms.       70 kms.       . 143 kms           63 kms
        target

      Achieved       184 kms.      81.76 kms     56.02 kms.        41.23 kms.
                                                 (upto Oct.2011)   (upto Oct.2011).



 Ultrasonic flaw detection of rails and weld to identify internal defects
Ultrasonic flaw detection of rails and welds carried out is 7377 kms. against
the pro rata target of 6417 Track kms. upto Oct. 2011.

Protection of Alumino-Thermic welds with joggled fish plates in vulnerable
locations .
34,371 defective welds and old welds located in sharp curves, high banks
and major bridge approaches have been protected with joggled fish plates
and the fitting defects found in 5491 Nos. of joggled fish plates have been
rectified.
                                                                                      11
     Action taken to prevent/control accidents

De-stressing of welded track
       Target for the year : 1200 km.
       Achieved upto Oct.11 : 474.53 km.

Renewal of old/corroded/defective rails
      Wheel burnt/corroded – Scope            : 34 km.
                       Done upto Oct.11       : 8.5 km.

Prompt repairs are taken up once RF/WF is detected after emergency
repairs and protection by Keymen/Mate.
Intensive training given.

2. Mechanical
Thermo hunters are provided at all major points to detect hot axles.
Speed gun is procured to detect overspeeding of trains.
4-wheeler oil tank wagons were withdrawn from 01.05.2011.
VCD provided in 182 Diesel locos and balance 79 locos will be
provided.                                                               12
     Action taken to prevent/control accidents

3. S&T
 Total No. of block stations : 511
 BPAC provided at 196 stations as against the qualified 428 stations.
 Track circuiting completed at all BG stations.
Data loggers have been provided at 427 stations.
Colour light signalling provided at all stations except 13 stations (KMD,
VRQ, MMH, MY, LP, PGN, EL, MTNL, NNY, VLY, AAY, KAY & MTP) which are
also under progress.
 LED signals provided at 246 stations.

4. Electrical
 Fast Track Simulator courses were conducted and 493 LPs underwent
training.
Screened LP(Goods) to work coaching trains during emergency.
VCD has been provided in 36 locos (WAP4 – 19 & WAG7 – 17) and 250
VCDs are procured for providing in AC locos.
Fuel cell breathalyzers are under procurement.


                                                                             13
       Action taken to prevent/control accidents
5. Security
CCTV cameras have been installed at 8 stations on Southern Railway and
further installation of additional14 cameras are under progress.

6.   Unmanned Level Crossings

                                                                              2011-12
 Description of work            2007-08   2008-09   2009-10   2010-11
                                                                        Target   Achieved
 Manning of unmanned
                                  21        30        31        15       60             14
 LCs
 Provision of Limited Use
                                  9         10        12        15       12             0
 Subway
 Construction of
                                  6         15        10        18       29             4
 ROB/RUB
 Closing of LCs                   15        15        21        17       50             88
 Interlocking                     32        31        22        78       37             16
 Provision of lifting barrier     20        15        6         4        14             10




                                                                                             14
    Action taken to prevent/control accidents
7. Safety Drives, Seminars, Audits & Checks

       S.No.    Description                   Quantity
           I    Safety Drives (Board level)     12
                Safety Drives (Zonal level)     13
          II    Safety Audits (Inter Rly.)       1
                Safety Audits (Internal)         5
          III   Safety Seminars (By HQ)          1
                Safety Seminars (By Divn.)      983
         IV     Ambush checks at LC gates       212




                                                         15
       Assistance required from Railway Board

1. Sufficient and timely allocation of funds for meeting the expenses on
   maintenance and replacement of assets.
2. More No. of WILD (Wheel Impact Load Detector) may be installed on
   all important/select locations.
3. In view of heavier axle load freight trains overaged and arch bridges
   built to BGML, RBG & MBG may be reviewed and rebuilt to suit
   HMLS stock.
4. Centralized Traffic Control (CTC) may be introduced to ensure
   correct setting of points and route for the operation of the train to
   eliminate the errors caused by human elements.
5. Train Actuated Warning Device (TAWD) in all unmanned LCs may be
   installed in all electrified sections.
6. Dual cab to be provided in all the newly designed locos.
7. Cab signalling system to be introduced.


                                                                           16
Thank You

            17
Details of Consequential Accidents 2011-12

Tiruchchirappalli Division :

  • Unmanned LC accident on 04.04.11 at 14.12hrs
  • T.No.LQ10 and a Tata Indica car
  • UM LC No. 46 at km 41/300-400 between Neyveli
    and Uttangalmangalam stations
  • TVUs -1407 of 03/2009
  • Casualty - 3, Grievous 1
  • Not sanctioned for manning
  • Fault of Road user
Details of Consequential Accidents 2011-12
  Chennai Division :
    • On 09.06.11 @ 01.30hrs.
    • Derailment of SLR98750 T.No.12521
      (Barauni – Ernakulam (Rapti sagar) Exp.
    • Between Attipattu and Ennore stations
    • (Route A)
    • Equipment Failure – Rail Fracture
    • Casualty – NIL
    • RDSO conclusion:-The multi fractures of rail
      at four locations may be attributable to the
      combined effect of severe localized
      corrosion at liner seating areas and some
      unusual impact forces coming on the rail due
      to passing of rail vehicles.
Details of Consequential Accidents 2011-12


Thiruvananthapuram Division
  • 06.08.11 @ 21.10hrs
  • Unmanned LC No.45 @Km 121/800-700
  • T.No.16604 Thiruvananthapuram – Mangalore
    (Maveli) Exp. and a Mini lorry
  • Between Ochira-Karunagappalli stations.
  • TVUs 5452 of 11/2009
  • Infrastructure ready – waiting for man power
  • Fault of Road user
Details of Consequential Accidents 2011-12



Chennai Division (Under CRS Enquiry)

  • 13.09.11 at 21.25 hrs
  • Rear collision of T. No. MEMU 66017
  • (Chennai Beach -Vellore) on 56007
    (Arakkonam – Katpadi Jn. Passr.)
  • In rear of Semi Automatic Gate Stop Signal No 744
  • Casualty – 11; Grievous-23; Simple-66
    Details of Consequential Accidents 2011-12


Madurai Division

•   21.09.11 @ 14.18hrs
•   Unmanned LC No.325 @Km 453/400-500
•   T.No. OMS Special and a Maruti Swift car
•   Between Ambaturai and kodaikkanal Road stations.
•   TVUs 7302 of 05/2011
•   Manned
•   Fault of Road user
•   Killed:- Two


                                                       22
Details of Consequential Accidents 2010-11

   Tiruvananthapuram Division :

     •   On 20.04.10 @ 15.03 hrs.
     •   Derailment of CGV AFK/N Goods
     •   Between Pudukkad and Irinjalakuda stations
     •   (Route B)
     •   Equipment Failure – Rail Fracture
     •   Casualty - NIL




                                                      23
Details of Consequential Accidents 2010-11


Salem Division :

  • Unmanned LC accident on 04.06.10 at 17.00 hrs
  • T.No.3A Special and a Mini bus
  • UM LC No. 6 at km 12/800-900 between
    Coimbatore North and Karamadai stations
  • TVUs – 960 of 06/2010
  • Casualty - 5, Grievous 4
  • Fault of Road user
  • Not manned
                                                    24
Details of Consequential Accidents 2010-11


Tiruvananthapuram Division :

  • Unmanned LC accident on 08.08.10 at 10.45 hrs
  • T.No. 6041 Exp. and a Tata Indica car
  • UM LC No. 45 at Km.42/800-900 between
    Sherthala and Mararikulam stations
  • TVUs – 6194 of 03/2010
  • Casualty – 4
  • Manned
  • Fault of Road user
                                                    25
Details of Consequential Accidents 2010-11

   Madurai Division :

     •   On 30.08.10 @ 01.06 hrs.
     •   Derailment of 2790 Exp.
     •   Between Satur and Tulukkapatti stations
     •   (Route D)
     •   Equipment Failure – Rail Fracture
     •   Casualty – NIL
     •   RDSO conclusion:-failure of rail in fatigue
         mode from foot may be attributable to severe
         localized corrosion at liner seating area.
         Severe localized corrosion had resulted in
         thinning of rail foot & ultimately breakage of
         rail.                                            26
Details of Consequential Accidents 2010-11

   Tiruchchirappalli Division :

     •   On 10.10.10 @ 02.15 hrs.
     •   Derailment of 2631 Exp.
     •   Between Lalgudi and Valadi stations
     •   (Route B)
     •   Equipment Failure – Rail Fracture
     •   Casualty – NIL
     •   RDSO conclusion:-The sudden fracture of
         rail from edge of rail foot from the liner
         seating location may be attributable to
         severe localized corrosion at liner seating
         location.
                                                       27
Details of Consequential Accidents 2010-11


Chennai Division :

  • Unmanned LC accident on 27.01.11 at 00.35 hrs
  • T.No. 6177 Exp. and a lorry
  • UM LC No. 100 at km 132/26-28 between
    Tindivanam and Mailam stations
  • TVUs – 2860 of 03/2010
  • Casualty – 1
  • Manned
  • Fault of Road user
                                                    28
   Details of Indicative Accidents 2011-12

Madurai Division :

  • Signal Passing at Danger on 08.05.11 at 13.23
    hrs.
  • T.No. Track Machine
  • Driver of Track Machine passed Up Home signal
    at Chettiyapatti station at Danger..




                                                    29
   Details of Indicative Accidents 2010-11


Palakkad Division :

  • Breach of Block Rule on 17.11.10 at 15.00 hrs
  • T.No. 2602 Exp.
  • LP has observed that the point No.55 & 56 at
    Payyanur station are not set in favour of Road 2.
  • Duty SM failed to ensure the correct setting of
    points through point indication on the panel.



                                                        30
        Details of Other Train Accidents 2011-12
                                 Section/                                  Type of
S.No.       Date        Divn.                  T.No.        Casualty                                    Cause
                                 Location                                  Accident
        01-05-11@        SA     UAM-MTP. 5637 UAM-MTP
 1                                                             Nil       Derailment    Spring Bro\ken
        16.20 Hrs.,                       Dn Pass
           11-05-11                                                      Unmanned LC
 2                      MDU     ABI-KQN     56709 Pass         Nil                     Negligence of the road vehicle driver
         18.24 Hrs.,                                                     accident
                                MAS-GDR
          13.05.11                          66039 NLR-MAS                Unmanned LC
 3                      MAS      Between                       Nil                     Negligence of the road vehicle driver
         11.50 Hrs.,                        Pass                         accident
                                DVR-PEL
           22.05.11                                                      Unmanned LC
 4                      TVC     HAD-CHPD Tower Car             Nil                     Negligence of the road vehicle driver
          15.30 Hrs.,                                                    accident
           25.05.11                         56838 SA-VRI                 Unmanned LC
 5                       SA     CHSM-PRV                       Nil                     Negligence of the road vehicle driver
          11.30 hrs                         Pass                         accident
           13.07.11      SA     MKSP-VRI
                                            56838 SA-VRI                 Unmanned LC
 6            at                                               Nil                     Negligence of the road vehicle driver
                                            Pass                         accident
          12.35 Hrs,
                                CAPE-NCJ
          11.09.11
                                            12790 CAPE-
 7                      TVC Kanniyakum                                   Derailment    Non removal of Safety Chain
                                            RMM Exp
         at 22.00 Hrs
                                 ari.                          Nil
         21.10.2011 Chenn     Chennai
                        ai.   Egmore-
              at                            66045 MLMR-VM                Unmanned LC
 8                          Villupuram. /                   One Killed                 Negligence of the road vehicle driver
                                            MEMU                         accident
          12.05 Hrs.,        Ollakkur-
                            Tindivanam
           27.10.11    MAS Korukkupet-
 9                          Veysarpadi      CKN Goods          Nil       Derailment    Cross level variaton
        at 00.15 Hrs.,
                                                                                                                               31
         Details of Other Train Accidents 2010-11
                                  Section/                                     Type of
S.No.        Date        Divn.                       T.No.     Casualty                                      Cause
                                  Location                                     Accident
        19.04.10         TVC      NCJ-TEN     6340 NCJ-CSTM                 Unmanned LC
 1                                                             Killed : 1                 Negligence of the road vehicle driver
        @08.00 hrs.                           Exp.                          accident
           05.06.10 at                                                      Unmanned LC
 2                       TVC      KTYM-KYJ    343 Passr.       Injury : 1                 Negligence of the road vehicle driver
            14.35 hrs.                                                      accident
           06.06.10 at                                                      Unmanned LC
 3                       TVC      TVC-NCJ     VAPM/WHN Goods      Nil                     Negligence of the road vehicle driver
            13.10 hrs.                                                      accident
           10.06.10 at            Kadambur-                                 Unmanned LC
 4                       MDU                   MULE            Injury : 1                 Negligence of the road vehicle driver
            15.45 hrs.            Maniyachi                                 accident
           21.08.10 at            Pallipuram-                               Unmanned LC
 5                       PGT                   FIE Goods          Nil                     Negligence of the road vehicle driver
            21.35 hrs              Pattambi                                 accident
           26.08.10 at   MAS     Vaniiyambadi-
 6                                             IPN/OT             Nil       Derailment    Wagon defect.
            05.20 hrs.           Kettandapatti
           14.09.10 at
 7                       TVC      ERS-SRR     CHZ/BTPN                      Derailment    Head stock wagon broken
            08.45 hrs.                                            Nil
           29.09.10 at   MAS      MTL-TML
            04.05 hrs.                                                      Unmanned LC
 8                                            6702 Exp.           Nil.                    Negligence of the road vehicle driver
                                                                            accident

          08.12.10 at    MAS       Doraivari-
 9         10.55 hrs.            chattram-Poli- TNPM/OTE          Nil       Derailment    Working out of the shackle pin cotter.
                                 reddipalayam
          21.12.10 at    TVC          AWY
 10.                                            FIE goods         Nil       Derailment    Excessive twist.
           02.55 hrs
          05.01.11 at    MAS          AJJ
 11.                                          N/Gale goods        Nil       Derailment    Excessive cross level variation
           17.10 hrs.
          05.03.11 at    TVC          IPL
 12.                                          IPN/Spl.            Nil       Derailment    Track was not settled properly.
           05.10 hrs.
          19.03.11 at    MAS        MLPM
 13.                                          SSPS Goods          Nil       Derailment    Worn out stock rail.                     32
           16.25 hrs.
  Vacancies in Safety Categories and Action Plan
           2011-12 (As on 01.10.2011)
Category   Vacancy                           Action Plan
SMs                  • Indent placed:255.
                     • GDCE-80
            509      •Undergoing training:228
                     •Selection initiated for 100.
Guards
            188      •  Selection initiated for 19.
                     •Indent placed for 71.
LPs/ALPs             •Indent placed : 485
                     •GDCE :159
            425      • Undergoing Trg:298




                                                           33
   Vacancies in Safety Categories and Action Plan
            2011-12 (As on 01.10.2011)
 Category      Vacancy                   Action Plan



                         • Indent placed:3437
Gangman         4319     .




Other Safety             • Indents placed for 379 vacancies
Category        2181     • 51 are under training
Vacancies                • Selection initiated for 200



                                                              34
Manning of Unmanned LCs in last five years
and during 2011-12 - Division wise


Division   2006-07 2007-08 2008-09 2009-10 2010-11 2011-12
                                                   Upto Oct.)
                                                                Total
 MAS          -       6        6       2        1        5       20
  SA         11       2       10       3        3        -       29
 PGT         1        1        -       2        1        1       6
 TVC         14       4        3       5        4        5       35
  TPJ        14       4        8       12       6        -       44
 MDU         9        4        3       7        -        3       26
 Total       49      21       30       31      15       14      160



                                                                        35
Details of Level Crossings Interlocked done – Year wise


                                                             Scope for
    Division 2006-07 2007-08 2008-09 2009-10 2010-11 Total
                                                              2011-12
     MAS          5       2       3       2       0     12      16
      SA          0       9       7       2      20     38      10
     PGT         17       7       5       4       3     36      3
     TVC         35       7       2       2       9     55      55
     MDU          7       6      11       3      14     41      19
     TPJ          8       1      3        9      32     53       2
     Total       72      32      31      22      78    235     105


             So far achieved upto Oct. 2011 : 16 LCs interlocked.



                                                                         36
 MANNING OF LEVEL CROSSINGS IN THE LAST
       FIVE YEARS & DURING 2011-12

STATE        2006-07   2007-08   2008-09   2009-10   2010-11   2011-12   TOTAL

Tamil Nadu     39        16        24        23        10        4        116


Kerala         10        3         3         4         4         2        26


Karnataka       -         -         -        1          -        1         2

Andhra
                -        2         3         2          -        1         8
Pradesh

Puducherry      -         -         -        1         1          -        2

TOTAL          49        21        30        31        15        8        154



                                                                                 37
   Safety related works upto Sep. 2011 (in Kms.)

                                         Achieved
       Engineering       Sanctioned
                                        (upto Sept.)

CTR                        59.63           25.61

TRR                        88.34           73.24

TSR                         9.4            4.68

Turnout renewal             130             91

Deep screening              400           184.503

USFD                       11000           6326

                                                       38
       Safety related works upto Sep. 2011 (in Kms.)
                                                          Achieved
S&T                                         Sanctioned
                                                         (upto Sept.)
Replacement of over aged signalling gears      22             9

Track circuits                                 115           45
Panel interlocking                             38            11
Data logger                                    38            37
BPAC                                           48            26
LED provision for signals                      74            55

Replacement of worn out point machines         162           85

Replacement of old relays                      485           349

                                                                        39
    Equipment Failures
                   2010-11 up to     2011-12 up to
                     October           October       Target for
   Category                                                               Index
                  No. of            No. of            31.03.13
                            Index            Index
                  cases             cases
                                                                    Defects per billion
Track defects     166       4.65     179     4.82      4.23             GTKMs
Diesel loco                                                             Incidents per
                   57       4.57     68      4.93      4.74       million diesel loco kms.
failure
                                                                       Incidents per
AC loco failure    35       1.63     32      1.37      3.40       million elec. loco kms.
Wagon                                                                 Incidents per
                   16       0.44     18      0.48      4.25           billion GTKMs
detachments
Poor Brake                                                              Incidents per
                    0         -       0        -       0.15        billion GTKMs (Gds)
Power
                                                                       Incidents per
Train parting      17       1.26     10      0.67      0.60       Billion GTKMs (Gds)
Coach                                                                 Incidents per
                    2       0.05      3      0.08      0.24           billion GTKMs
detachments
                                                                       Incidents per
OHE failure         5       2.65      5      2.65      2.01           1000 electrified
                                                                         track kms.
                                                                       Incidents per
Signal failure    3296      0.89    3040     0.79      5.28                ZISTUs         40
      Equipment Failures up to October 2010   vis-à-vis October 2011


         Item
                            2010-11            2011-12        Variation
                        (till 31 October) (till 31 October)

Rail fracture                  72                 89            +23%
Weld failure                   94                 90           - 4%
Diesel loco failure            57                 68            +19%
AC loco failure                35                 32            - 8%

Wagon Detachment               16                 18            +12%

Poor Brake power               0                   0              0
Train parting                  17                 10            - 41%

Coach detachments              2                   3            +50%

OHE failure                    5                   5             0%
Signal failure               3296                3040           - 8%      41
      MONITORING OF LOCO PILOTS
 Effective use of Simulators( 3 shifts-Avadi and Golden
  Rock)

 Counselling of crews by LIs

 Intensive Inspection by Officers and Supervisors of
 Ambush checks (Apr.-Aug. ‘11 - Day :355, Night : 85)

 Adequate monitoring of newly promoted, > 55 years of
  age & non-metric LPs.

 Motivation of LPs/ALPs – Posting of Welfare Inspectors
  to redress the grievances
 Improvement to the condition of running rooms.
 RC/PME due : Nil.                                        42
                        List of Alcoholic Loco Pilots
CHENNAI DIVISION
   1.    Sri. Venugopal Nair, LP/Goods         Kept under monitoring – found
   2.    Sri. S.K. Asokan, Motorman/AJJ
   3.    Sri. K.N. Madhu, Motorman/MAS
                                               working normal

PALGHAT DIVISION
   1.    Sri. S. J. George, LP Mail/SRR       Sent and attended de-addiction
   2.    Sri. B. Radhakrishnan, LP/Pass/SRR
                                              camp

THIRUVANANTHAPURAM DIVISION
    1.   Sri. A. Balachandran, ALP/QLN        Sent and attended de-addiction
    2.   Sri. Rajendran, LP/Shunting/NCJ
                                              camp

TIRUCHCHIRAPPALLAI DIVISION
   1.    Sri.M. Ravindran, LP/Pass/TPJ
   2.    Sri.J. Danson, ALP/Pass/TPJ
   3.    Sri. S. Kannan, LP/Goods/TPJ
   4.    Sri. T. Rajamurthy, ALP/VM
   5.    Sri. P. Sekar, LP/Goods/VM           Classified under ‘C’ category and
   6.    Sri. V. Lazarus, LP/Goods/VM         are being closely monitored.
   7.    Sri. T. Chinnadurai, LP/Shg/VM
   8.    Sri. M. Soundarajan, LP/G/VM
   9.    Sri. C. Manivasagam, LP/Pass/VM
   10.   Sri. L. Stephenson, ALP/VM
   11.   Sri. V. Ramachandran, LP/Goods/VM
                                                                                  43
SALEM & MADURAI DIVISION                        - NIL
Ten Hour position
Ten-hour implementation in the Railway is around 93%.
 The performance for the last 4 year is as follows
                          Total trips with in   % of trips within 10   % of trips
             Total No.   10hrs from S/on to
   Year                                          hrs (from S/on to     over 14
              of Trips          S/Off)                 S/Off)           hours
  2007-08      82374           78248                   95.0               0.7
  2008-09      85739           81431                   95.0               0.5
  2009-10      85367           79661                   93.3               0.6
  2010-11      79975           75368                   94.2               0.6
                 2011-12 performance from April - October
April 2011     6665             6205                   93.1               0.4
 May 2011      6794             6315                   93.0               0.6
June 2011      6549             6098                   93.1               0.6
 July 2011     7254             6766                   93.3               0.5
 Aug 2011      7449             6944                   93.2               0.5
 Sep. 2011     7057             6573                   93.1               0.6
 Oct. 2011     6794             6257                   92.1               0.6       44
      Sections identified as critical (10 Hrs. )
              in Southern Railway.
                                   Average %age for
Division      Critical sections
                                   last Five months
MAS        TVT-RU                        90.5
           TVT-VM                        81.3
SA         JTJ-ED                        90.3
PGT        PGT-ED                        85.5
           PGT-ERM                       77.4
MDU        MDU-ED                        90.0
TPJ        TPGY-KIKP-TPGY                91.6


                                                      45
        Safety Audit 2011 – Upto October



• Two Inter Railway Audits by Southern Railway in South Central
  Railway in Guntakal and Vijayawada Divisions

• Two Inter Railway Audits by South Western Railway in
  Southern Railway in Tiruchchirappalli and Madurai Divisions.

•Six Intra Railway Safety Audits in Palakkad, Salem,
  Thiruvananthapuram, Madurai Tiruchchirappalli and
ChennaiDivisions.




                                                                 46
                   Calendar Safety Drive 2011-12


Sl.
                 Theme of the drive              Ordered by   From – to
No.
      Calendar Drive

1     Safety at non-interlocked LCs               April 11    16th to 25th

2     Worksite protection                         May 11      16th to 25th
      Prevention of SPAD – Road learning,
3     proper rest, running room maintenance,      June 11     16th to 25th
      etc.
4     Working of trains during signal failures    July 11     16th to 25th
      Rail fracture/weld failure – liner seat
5                                                August 11    16th to 25th
      corrosion
6     Disaster Management                         Sep. 11     16th to 25th
      Carriage of inflammable articles
7                                                  Oct.11     16th to 25th
                                                                             47
  Special Safety Drive 2011-12 (Ordered by RLY. BOARD, GM/AGM & CSO)
Sl.
    Theme of the drive                                    Ordered by       From – to
No.
                                                                       07.04.11 –
 1    Safety at Unmanned Level Crossings.                   CSO
                                                                       21.04.11
      Auditing of fire safety systems in pantry cars &                 18.04.11 –
 2                                                           RB
      power cars.                                                      27.04.11
      Working of VCDs, Validity of BPC and Checking                    07.05.11 –
 3                                                           RB
      of Speed in order to prevent Collisions                          16.05.11
                                                                       07.05.11 –
 4    Survey all emergency cross overs                       RB
                                                                       16.05.11
      Ensure the safe backing of rakes on the dead                     12.05.11 –
 5                                                          CSO
      end plat form                                                    26.05.11
      Safety at UMLC (International Level Crossing                     09.06.11 –
 6                                                           RB
      Awareness Day)                                                   15.06.11
                                                                       11.06.11 –
 7    “Trees falling on the tracks” due to wind storms.      RB
                                                                       25.06.11
      Safety with specific emphasis at Manned Level                    07.07.11 –
 8                                                          CSO
      Crossings”.                                                      21.07.11
                                                                       21.07.11 –
 9    Safety at Unmanned Level Crossings                     RB
                                                                       04.08.11
                                                                       22.08.11-
10.   Safety at interlocked level crossings                 CSO
                                                                       05.09.11
      Attaching of Locomotives for Passenger trains
                                                                       07.09.11-
11.   at Originating/ Junction Stations and while           CSO                        48
                                                                       21.09.11
      performing shunting of coaching trains
                    Special Safety Drive 2011-12 (Ordered
                    by RLY. BOARD, GM/AGM & CSO)-
                    Contd
Sl. No. Theme of the drive                                   Ordered by   From – to
        To prevent cases of fire in Pantry Car,
                                                                          01.10.11-
  12    passenger coaches and diesel fueling                    RB
                                                                          30.1011
        installations
        Ambush check on LPs following prescribed rules
                                                                          07.10.11-
  13    while passing Automatic signal at ‘ON’ and keeping     CSO
                                                                          06.11.11
        mobile phones in switched off /silent mode on run.
        Strict adherence of G&SR to avoid accidents                       10.10.11-
  14                                                            RB
        due to Hot Axle                                                   09.11.11




                                                                                      49
NO.OF INSPECTIONS CONDUCTED BY SAFETY BRANCH FOR
               APRIL-SEPTEMBER 2011

                                  DAY       NIGHT
       FOOTPLATE
                                  587        304

       BRAKEVAN                   536        216

         STATION                  1163       380

    LEVEL CROSSING                2188       550
         LOBBY                    212         91

     RUNNING ROOM                 264         86

        AMBUSH                    518        106

          TOTAL                   5460       1733

      GRAND TOTAL                                   50
 MAN OF THE MONTH AWARD GIVEN DURING 2011 TO IMPROVE
  SAFETY CONSCIOUSNESS AMONG THE OPEN LINE STAFF
                      SM                               1
                      GK                               2
                      Loco Pilots                      9
                      Asst. Loco Pilots                1
                      SCP                              1
                      Pointsman                        1
                      SSE/C&W                          1
                      TOTAL                           16
            Prevention of potential accidents due to alertness of Staff
                                                                  TXR
                                                    GK’s
                                     LP found                  detection
Detection                                        alertness
              LP experienced Heavy     LC in                       of
   of                                               when                   Total
                       jerk            open                    Crack on
Hot axle                                         Vehicle hit
                                     condition                   bogie
                                                   the LC
                                                                bolster
   4                    7               3            1            1         16
                                                                                   51
RC due for Safety Categories as on 30.9.2011

 Category                              No. of Dues
 TI / SMs /YMs                              6
 Pointsman / Gatemen / Shtg. Jamedar       30
 Guards                                    13
 Inspectors/P Way & Bridge                 41
 Trackmen                                 320
 Trackmen/Engg. Gate Keeper               635
 Inspector/ S&T                            1
 ESM/MSM                                   9
 Inspector/C&W                             15
 C&W Fitter                                81

                                                     52
              ART/ARME position in Southern Railway
                                          Class Crane     Type of
  Divn      Location of ART       Gauge                                  Location of ARMV
                                          of ART Capacity Crane
          Basin Bridge (BBQ)      BG        B         -       -      Chennai Central (SPART)
  MAS
          Jolarpettai (JTJ)       BG        B         -       -      Jolarpettai (JTJ)
          Tondiarpet (TNP)        BG        A      140 T    Diesel   -
          Madurai (MDU)           BG        A       140 T   Diesel   Madurai (MDU) BG
  MDU
          Tirunelveli (TEN)       BG        B         -       -      -
          Shoranur (SRR)          BG        B                        Shoranur (SRR) SPART
  PGT
          Mangalore (MAQ)         BG        B         -       -      Mangalore (MAQ)
   SA     Erode (ED)              BG        A      140 T    Diesel   Erode (ED)
          Trivandrum (TVC)        BG        B         -       -      Trivandrum (TVC)
  TVC                                       A*
          Ernakulam (ERM)         BG               140 T      -      Ernakulam (ERS)

          Tiruchirappalli (TPJ)   BG       A       140 T      -      Tiruchirappalli (TPJ) BG
          Villupuram (VM)         BG        B         -       -      Villupuram (VM) BG
  TPJ
          Thiruvarur                                                 Thiruvarur
                                  MG        A       35 T    Steam
          (TVR)                                                      (TVR)
Total    ‘A’ Class ART-5; ‘B’Class ART-7; SPART-2; ARME-8   MG ART ‘A’ Class-1;MG ARME-1
                                                                                                53
No. of Divisions : 6

                                    Total  Electrified Route km
        Division     BG     MG
                                  Route km 25KV Incl.2.2KV

Chennai              698    133     831       685       685

Salem                711    63      774       335       335

Palakkad             497    81      578        99       102

Thiruvananthapuram   625     0      625       452       546

Tiruchchirappalli    778    223     1001      226       267

Madurai              896    398     1294       90       265

Total                4205   898     5103     1890       2197

                                                                  54
Total No. of Stations - 770
Block Stations               511 (Junction Stations : 36)
Halt Stations                147
Flag Stations                100
Block Hut/Cabin              12
  Category        A1     A    B       C       D       E      F   Total
                  6     32    20      71      77     378 142      726
Total Route kms (BG)         4203 Total Track kms (BG)      5889 kms

Total Route kms (MG)         898    Total Track kms (MG)    899 kms
                                    Electrified Track kms
Electrified Route kms (BG)   1890                           4321 kms
                                    (BG)

                                                                         55
 Total No. of Originating Trains 1358
     (including all weekly & Bi weekly trains)

A.    Mail/Exp        BG      386 (224 – Daily Average)
                         MG   2
B. Passenger          BG      272 + 125 EMU Passenger. Trains
                         MG   14
C.     Suburban               441   & MRTS 134

 Total No. of Coaches        BG 5176
 Total No. of Wagons         BG 8091 + 410 Departmental wagons
                              15.842 MT (till Aug.)
 Loading (2011-12)
                              (Average 3.16 MT per month)

                                                                  56
No of Electric Locos - 348
No. of Electric Loco Sheds       Arakkonam, Erode & Royapuram
                                 BG:382; MG:15;
No. of Diesel Locos
                                 Steam 8 (X Class Locos)
                            4 (Erode, Golden Rock,
No. of Diesel Loco Sheds BG
                            Ernakulam, & Tondiarpet)
                             MG 01 (Coonoor)
BRIDGES
A.   Important                   36
B.   Major                       952
C.   Minor                       15010


                                                                57
Level Crossings :

                             Non-       Total
Division   Interlocked                          Unmanned   Total
                         interlocked   Manned
 MAS          227            29         256        55      311

  SA          150            73         223       134      357

  PGT         155            22         177        35      212

  TVC         185           120         305       119      424

  TPJ         199           202         401       367      768

 MDU          245           179         424       417      841

 TOTAL        1161          625         1786      1127     2913



                                                                   58
Level Crossings & Accident Details


                                            No. of Level Crossings
                              Manned                                  Unmanned
Div.
                              No. of Accidents                           No. of Accidents           Total
        No. of                                         No.of
        Gates    06-07   07-08 08-09 09-10 10-11 11-12 Gates 06-07 07-08 08-09 09-10 10-11 11-12

MAS     256       0       0       0     0        0   0   55     1    1       0     0        1   0   311

 SA     223       0       0       0     0        0   0   134    1    1       1     0        1   0   357

PGT     177       0       0       0     0        0   0   35     0    0       0     0        0   0   212

TVC     305       0       0       0     0        0   0   119    3    2       1     0        1   1   424

TPJ     401       0       0       0     0        0   0   367    0    0       1     0        0   1   768

MDU     424       0       0       0     0        0   0   417    6    2       2     1        0   1   841

Total   1786      0       0       0     0        0   0   1127   11   6       5     1        3   3   2913

                                                                                                          59
                         Yard Accidents – Details 2011–12
                                                                Type of
S.                                               Section/
        Date       Time      Gauge   Divn.                      derailed    Casualty                     Cause
No.                                              Location
                                                                 stock
1     02.04.11   22.25 Hrs    BG     MAS KOKG                 Loco            Nil      Track defect subject to Loco reading.
                                             Sand hump of
2     13.04.11       -        BG      SA     Road 3 of PALM Loco + BCN        Nil      Case is under investigation.
                                             Station.
                                                                                       Mounting over the ballast in BG
3     03-05-11   17.15Hrs     BG      SA     SA Yard.         Loco            Nil
                                                                                       siding.
                                                                                       Non-observance of shunting rules by
4     03-05-11   22.22Hrs     BG     TVC     TRVL Siding.     BCN             Nil
                                                                                       shunting staff & crew.
5     08-05-11   03.15Hrs     BG     TVC     NCJ              Coach           Nil      50% Brake power in the rake.
                                                                                       LP/Shunting had ignored the Shunt
6     16-05-11   21.15 Hrs    BG     TVC     ERS              Loco            Nil
                                                                                       Signal No. 35 at ERS yard.
7     23.05.11   09.10 Hrs    BG     MAS BBQ                  Coach           Nil      track defective and Low joints
8     06.06.11   11.30 Hrs    BG     TVC     QLN              Tower Car       Nil      Trailed through
                                                              Loco & Bost
9     08.06.11   13.30 Hrs    BG     MAS KOKG                                 Nil      PFC: Split in the point.
                                                              Loads
                                                                                       (1) Conveying wrong signal by
                                                                                       Points Man/SM without reversing
10    11.6.2011 04.08 Hrs     BG     TVC     Ollur (OLR)      Loco & BCN      Nil      trap No.3.
                                                                                       2) Non-Observation of correct setting
                                                                                       of Trap No.3 by LP.
                                                                                       No points man was available in the
                                             Nagercoil Jn.,
11    19.07.11   08.50 Hrs    BG     TVC                      Coach           Nil      rear of the formation and no piped
                                             Road-10
                                                                                       vehicle was available..
                                                                                       PFC:Low Joint due to sinkage of
12    21.07.11   13.30 Hrs    BG     TVC     KCVL             Loco            Nil                                          60
                                                                                       track.
                 Yard Accidents – Details 2011–12 Contd. . .
                                                               Type of
S.                                                Section/
       Date        Time      Gauge   Divn.                     derailed      Casualty                    Cause
No.                                               Location
                                                                stock

13    13-08-11 19.30 Hrs      BG     MAS BBQ Yard.           Loco              Nil      Low Joint due to sinkage of track.

                                                        Ey Rake of                      Split in the manually operated point
14    19.08.11   21.35 Hrs    BG     TPJ     VM                                Nil
                                                        56866                           No. 208.
                                         Thiruvananthap Ey Rake of
15    1-9-2011 08.15 Hrs      BG     TVC                                       Nil      Split gauge
                                         uram Central. 16345
                                                        Loco No
16    07.09.11   05.40 Hrs    BG     TVC KLMR                                  Nil      Improper handling by LP/PGT
                                                        27906
                                                                                        Not-setting of PT No.28 for the
                                                              MULE                      movement which has resulted in trail
                                             Tiruachichirapp
17    06-10-11 01.10 Hrs      BG     TPJ                      13302/13308/     Nil      through and backing of the MULE over
                                             alli Goods Yard.
                                                              KYN                       trailed through the Point No.22 has
                                                                                        resulted in derailment.
                                                                                        Point taking two routes due to Point
                                                             Loco No
18    04.10.11   17.40 Hrs    BG     MAS TNPM                                  Nil      No.8B not locked in the facing
                                                             27776 WAG7
                                                                                        direction.
                                                                                        Point taking two routes due to Point
                                                             Loco No
                                                                                        No.8B not locked in the facing
19    04.10.11   21.40 Hrs    BG     MAS TNPM                31084 WAG9        Nil
                                                                                        direction. No light in the trap indicator
                                                             / AQ
                                                                                        and shunt disc.
                                             Chennai         Loco No.
20    10.10.11   22.20 Hrs    BG     MAS                                       Nil      Trail through track.
                                             Central.        17266 WDM2

21    30-10-11 08.22 Hrs      BG     TPJ     TPGY            TBM-CGL/N         Nil      Sinkage of track
                                                                                                                               61
       Action Taken to avoid Yard Derailments

MAS Yard
• All the age old wooden sleeper layouts has been replaced with PSC fan
  shaped layouts in MAS yard thereby ensuring safety.
• Deep screening of track for a length of 4.5 km. completed from 01.04.2011
  upto 31.10.11.
• Bridge No.7R (distressed bridge) which was causing cross level variation
  due to holes in the trough resulting in derailments have been rebuilt and
  commissioned in Sep.2011.
• Deep screening has been planned for 20 PSC layouts. TDC : 31.03.2012.
• TRR done upto 31.10.2011 in platform line with 90 UTS rail for a length of
  800 m.
• Scattered PSC sleeper renewal from 01.04.11 upto 31.10.11 – 351 Nos.
  done to strengthen the track.

                                                                               62
       Action Taken to avoid Yard Derailments

BBQ coaching yard
   • 25 Nos. of PSC layouts inserted in place of aged wooden layouts upto
     31.10.11.
   • Strengthening of pit line in NL 5 & 6, PL 3 & 5 to a length of 2.2 km.
     completed upto 31.10.11.
   • Complete track renewal completed in the year 2011-12 in Down 7.
   • Strengthening of pit line to a length of 2 km. – tender called.
   • Elimination of aged wooden sleeper in pit line approaches – 581 Nos.
     work in progress. TDC : 31.12.2011.
SO Yard
   • The overburden/spilling of cement on track is being cleared regularly.
   • Contract agencies have been advised to be careful while unloading and
     stocking of cement bags.

                                                                              63
      Action Taken to avoid Yard Derailments

TNPM Yard
  • 5 km. Through Sleeper Renewal (PSC secondary) done to ensure
    gauge in yard upto 31.10.11.
  • Drainage network arrangement done in 2010-11 for a length of 1.2 km.
    to avoid derailment due to water stagnation and sinking.
  • Out of 195 Nos. of wooden layouts, 55 sets sanctioned for renewal and
    agency under finalization for 40 Nos. upto 31.10.11.
PTMS Yard
  • Periodical cleaning of ballast above rail level in ballast depot siding is
    being ensured.
ED Yard
  • Shunters and Shunting staff have been counselled to strictly adhere to
    standing instructions while performing shunting.
IPN Yard
  • 4-wheeler oil tanks which were causing majority of derailments have
    been grounded and thereby reducing derailments.
                                                                                 64
            Action Taken for Yard Derailments
TVC, NCJ & ERS Yards in TVC Division
    • Most of the derailments were due to passing shunt disc and wrong
      movement.
    • Shunters and Shunting staff have been counselled to strictly adhere
      to standing instructions while performing shunting.

Derailments in Sidings
PLMD
    • FCI authorities have been advised to follow stipulated rules for
        shunting.
VRI
    • Contract loading staff have been advised to keep the track free of
       obstruction before clearing empties.
VLU
     • NLC authorities have been advised to clear the overburden coal after
       loading is completed before making movement.                           65
         Action Taken for Yard Derailments


Derailments due to Other reasons
   •   Non-securing of point with cotter.
   •   Trail through without ensuring point setting.
   •   Taking two routes without ensuring facing point setting.
   •   Rolling back of wagon.
   •   Overshooting dead end.

Action taken
   • Staff counselled suitably to adhere to existing instructions to
     avoid such cases in future.


                                                                       66
LOOKING AHEAD . . .
                           Summing up priorities for 2011-12

 • Intensify Ambush Checks to check alertness of Running Staff
 • Progressive Elimination of UMLCs
   * closure     *ROB/RUB        * Manning & *LUS
 • Interlocking of manned LCs
 • Checking alertness of Gatemen at night
 • Effective Track Patrolling / USFD testing in vulnerable locations
 • Meaningful Rolling in Examination of through stock
 • Discourage unsafe working / maintenances practices
 • Up grading quality of training.




                                                                       67
              ENQUIRY PENDING



Rear collision of T. No. MEMU 60017 on T. No. 56007
between Chitteri and Melpakkam in Chennai Division.
Under CRS enquiry. Preliminary report has been issued by
CRS/SBC.




                                                           68
PROVISION OF DATA LOGGERS IN SOUTHERN RAILWAY

Total No. of block stations              :       511

Total No. of stations eligible for
 provision of data loggers                :       443

Stations provided with data loggers      :       411
      Balance stations 32 includes IBH,
      IBS and stations closed due to
      gauge conversion.

Total No. of stations networked and working:     397

Networking under progress                    :     9

Stand alone stations                         :     5
                                                        69
                     WDM2 WDM3A WDM3D WDG3A   WDP3A   WDG4 WDP 4 Total



Total No. of locos    76   44    45    74      14      4      4   261


Total No. of locos
                      48   15    42    69       0      4      4   182
 fitted with VCD


 Balance to be
                      28   29     3     5      14      0      0    79
   provided




                                                                     70
    SHED        WAP4 / WAM4 / WAP1          WAG7 / WAG5


                 Total     VCD fitted     Total    VCD fitted
ED (161)
                  92           19          71           17
AJJ (142)
                  45                       76
RPM (45)
                  70
Total
                  207          19         147           17
        %
                         9%                       11%
   36 Locos have been fitted with VCD and procurement has
been made for 316 locos are to be completed this year.          71

				