DNYANESHWAR V by KLNS4Q

VIEWS: 2 PAGES: 4

									                            DNYANESHWAR V. GAVHANE

   Current Address :                                              Permanent Address :
   Sunder Rachana, B1- Wing , Flat No-6                           Dr. Rajendra Prasad Marg.
   Anandnagar, Opp. Santosh Hall,                                 At Post :- Barshi - 413401
   Sinhagad Road, Pune ;-411051                                   Dist;- Solapur
   Maharashtra                                                    Maharashtra,

   India Cell - 091-20-24345699     Res. Tel – +91 9923755006

   E-MAIL:- gavhane1@ gmail.com


                                 INSTRUMENTATION ENGINEER

       PROFESSIONAL OBJECTIVE

   A position in Engineering (Design Instrumentation & Control) department of the company and
   providing an opportunity to make a strong contribution to organizational goal through continued
   development of professional skills. I intend to secure a challenging position in the Instrumentation
   field by working as a key player in challenging and creative environment and keeping up with the
   latest technology.

       FUTURE CONCEPT OF PERSONNEL INTEREST

         To make a successful career in Engineering – Instrumentation & Control system.
         Taking new opportunities of doing a work in best organizations for maximum output.
         Sophisticated Instrumentation & control system for better reliability and productivity with
          minimal losses.
         Learn as many as possible to develop multi-skill profession.
         Continual development of professional skills.

       TOTAL YEAR OF INDUSTRIAL EXPERIENCE: 21 YEARS.
            Engineering firm – 16 years ( Design – Instrumentation & Control )
            Details:-Design Engineering – Instrumentation & Control in MNC Consultancy – 6 years
            Design Engineering – Instrumentation & Control in EPC / LSTK Engg. Firm– 10 years
            Process plant – Maintenance - 5years.


KEY AREA OF EXPERIENCE
Academic Achievements
       Oil & Gas Plant – Terminal Automation ( IOCL Petroleum Depot )
       Refinery Project – PTA ( Purified Terephthalic Acid) - ( IOCL Refinery Panipat )
       Iron and Steel Plant – Coal Dust Injection plant for Blast Furnace( SAIL & TATA Steel )
       Petrochemical Plant – Chloromethane Plant
       Chemical Plant – Carbon black plant & Plastic Compounding Plant

   KEY AREA OF EXPERIENCE
    SPECIALIZED EXPERIENCE

       Basic / Extended Engineering Package
       Control System ( DCS/ PLC / ESD )- Design Engineering and Procurement
       Instrumentation Detailed Engineering and Procurement
       Inspection and Factory Acceptance Test
       Man-hour Estimation & Cost Estimation
       Testing and Commissioning
       Plant Maintenance – Instrumentation & Automation
    Developing Checklists / Procedures
    SKILLS DEVELOPED
    Worked with Process & Technology Licensor - BMH Claudius Peters , Germany,
    Worked with Process & Technology Licensor – Hualu Engineering & technology, China.
    Worked with PMC – Project Development India Ltd. ( PDIL )- India
    Worked with PMC – Centre for Engineering & Technology.- (SAIL) , India
    Worked with PMC – Engineer India Ltd .( EIL ).- India
    Standard Familiar with – IEC,API,BS, ISA
    Foreign Language - English
    JOB PROFILE & RESPONSIBILITIES
    Supervisor / Lead Engineer, Instruments – Monitoring and approving all the Instrumentation
     engineering activities of the project. Leading & motivating team for completion of project
     deliverables & milestones as per schedule.
    Ensuring that the Company Quality standards are followed. Interfacing with Licensor, PMC,
     Client, Vendors and other disciplines to ensure seamless engineering.
    Design, engineering & procurement of Instrumentation, Plant Control Systems (DCS, PLC,
     Fieldbus) and critical items like Safeguarding/Shutdown system, Process Analysers, Weighing
     systems, Fire & gas detection system etc. Handled various activities like – Preparation of
     Specification Technical Bid Analysis and Installation Tender, Generation of Control room
     layouts, Instrument layouts, Junction Box Schedule, IO Schedule, Sizing Calculations, Loop
     drawings, Logic drawings Hook-ups & Erection bulk MTO etc.
    CAREER SUMMARY
    Company: - EMCO DOHA - QATAR.
    Position : - PROJECT ENGINEER – DESIGN ENGINEERING & COMMISSIONING –
                 DESIGN INSTRUMENTATION & CONTROL FOR QATAR FOUNDATION
                (LEAD ENGINEER FOR QATAR FOUNDATION PROJECTS AND EXPANSIONS).
    Period   :- FROM MONTH JAN. TO TILL DATE.

    Company: - UNILEVER SRI LANKA LTD. – COLOMBO – SRI LANKA
    Position : - EXECUTIVE (PROJECT) – DESIGN ENGINEERING & COMMISSIONING –
                 DESIGN INSTRUMENTATION & CONTROL (AUTOMATION)
    Period : - FROM MONTH SEPETEMBER TO DECEMBER 2010.

    Company: - AKER POWERGAS PVT. LTD.
    Position : - PRINCIPAL ENGINEER – INSTRUMENTS
    Period   :- FROM AUGUST 2004 TO AUGUST 2010 (06 YEARS)

   Responsibility includes various following Basic and Detail Engineering activities Instrumentation
  and Control required for successful Erection, Installation Commissioning and subsequent operation
  of various projects.
 Preparation of work instruction, Approved Vendor list, Instrument Design Basis, Design Basis for
  Package Instrumentation.
 Preparation of Enquiry / order specification for various Field instruments, PLC/DCS, Control
  panels.
 Technical Bid evaluation of offers for various instruments and Valves.
 Vendor drawing review and approval of various instrument items, expediting and inspection.
 Sizing calculation for Control Valves, Orifice plate, Safety Valves.
 Preparation / Checking of various installation documents like hook ups , loop diagrams, Loop
diagram , level sketches, Instrument Layouts, Control room Layout , Installation Tender & Bill of
material, Review PDMS.
 Cost estimation and man-hour estimate for various projects.
 Planning and co-ordination with Projects / other disciplines and vendor for timely execution of
engineering activities.
 Worked as a Lead Engineer & task force member for various projects.
   Company: - CONTROL PRINT INDIA LTD. , PUNE
   Position : - SENIOR SERVICE ENGINEER
   Period   :- FROM OCTOBER 2000 TO AUGUST 2004 ( 3 YEARS & 8 MONTHS )

Handled & Involved Design Automation, selection of Instrument / sensors              Field Servicing,
Demonstration, Installation, Commissioning, of Automation of sophisticated machines. Trainings to
Personnel spare parts management, Failure Analysis, Troubleshooting, Calibration, Diagnose Fault, and
Annual Maintenance Contracts.

   Company : - TRF LTD. ( A TATA ENTERPRISES ) , JAMSHEDPUR
   Position : - SENIOR ENGINEER – PROJECTS
   Period     :- FROM OCTOBER 1996 TO 2000( 3 YEARS & 10 MONTHS )
   Involved in Supervision & preparation Basic & Detail Engineering for EPC / LSTK project Process &
    Bulk (Coal) material handling plant.
   Handled projects Coal Dust Injection Plant for Blast Furnace.

   Company: - TARU LALVANI ENGINEERING PVT. LTD. , PUNE
   Position : - ENGINEER – PROJECTS
   Period    :- FROM SEPTEMBER 1994 TO SEPTEMBER 1996 ( 2 YEARS )
   Involved in Supervision & preparation Basic & Detail Engineering for LSTK project Terminal
    automation.
   Handled projects - Automatic Tank Lorry Filling system for Petroleum Depot Terminal.

   Company: - TASTY BITE EATABLES LTD. ( FMCG – FOOD PROCESS PLANT ) PUNE
   Position : - MAINTENANCE ENGINEER
   Period     :- FROM JULY 1989 TO AUGUST 1994 ( 5 YEARS & 1 MONTH )
   Involved in preparation & Implements Preventative Maintenance Schedule / failure analysis /
    replacement / trouble shooting, calibration diagnoses fault/ Installation for Machineries Equipment,
    Instrumentation & Control Panel / Expansion for plant. Review, Checking, Handling team of technician
    & maintenance personnel. Approval Design Engineering Consultant, EPC, Contractor.
   Understanding project, expansion requirement & conceptualization. Detail Engineering of the project
    with safety aspects.

    PERSONAL DETAILS

   Educational Qualification : 1) Diploma In Industrial Electronics
                                   MS Board of Technical Examination, Mumbai
                                   Year of Passing: - June 1989

                                2) Degree in Instrumentation Engineering
                                   College – Institute of Studies in Technology, Pune
                                   Year of Passing: - June 2008

     Date of Birth              : 11th September 1969

     Nationality                : Indian

     Languages Known            : English, Hindi, and Marathi

     Marital Status             : Married

     Present Salary             : 4000 USD per month + Accommodation + after 6 month air
                                Ticket for India & 15 days paid leave

     Passport No                 : F 8453987

     Date of Issue               : 23rd June, 2006

     Date of Expiry              : 22nd June, 2016
    PROJECT HANDLED & COMPLITED

   Year -2010 – Name of client – Viergo Fuels Ltd Saltend Hull, UK (Join venture between BP
    British Sugar and DuPont) Name of Project - Ethanol Process plant, Process Licensor Praj
    Industries Ltd. Capacity of Plant - 3, 20,000 TPA. Areas of responsibility – Supervisor - for
    Cable Schedule, MTO, Tender, Package study, Review PDMS, Instrument Layout,
   Year 2009 – Name of client – Akzo Noble Coating India Ltd. Banglore (India), Name of Project –
    Coil coating Facility Plant, Capacity of Plant – 11,000 of coils & extrusion product per Annum
    Responsibility – Supervisor – Entire Design Instrumentation & Control system.
   Year – 2007-2008 – Name of client – DSM Engineering Plastic Pvt. Ltd. – Pune (India), Capacity
    of Plant -90,000 TPM as a Lead Engineer- Cost estimation, Cost control & Detail Engineering (
    Phase I & II ) – Instrumentation and Control , Site Support.
   Year 2008 – Name of client – Thai Carbon Black Company Ltd. Angthong,(Thailand) Name of
    Project – Expansion of Line # 6 of Carbon black plant, Capacity of Plant Expansion to 270 TPD,
    as a Lead Engineer – Detail Engineering - Instrumentation and Control system
   Year -2006 -2007 – Name of client – Gujarat Flurochemicals Ltd. – Dahej (India) Name of
    Project - Chloromethane Plant , Capacity of Plant- 125 TPD, Process Licensor- Hualu
    Engineering Technology Company Ltd. – China as a Lead Engineer – Detail Engineering
   Year 2005 - 2006 – Cabot India Ltd. – Pelletizer Dryer Module for Carbon black plant. Capacity
    of Plant – Expansion to 47000 TPA Areas of responsibility – Preparation of datasheets for field
    instruments, Instrument Layouts, Detail Engineering Supervision.
   Year 2004-2005 – Name of client – Indian oil Corporation Ltd - Panipat Refinary, Name of
    Project - Purified Terephthalic Acid (PTA), Process Licensor:- DuPont, Capacity of Plant –
    5,53,000 TPA, PMC- Engineer India Ltd. ( EIL) Areas of responsibility–Engg.& Site Supervision
   Year 2000 -2004 – FMCG Packaging & Printing Machines Automation ( Videojet ) supplier
    Control Print India Ltd. Pune, Areas of responsibility :- Engineering Design, Erection, Installation
    Testing & Commissioning, AMC – Annual Maintenance Contract, Field servicing, Diagnose fault,
    troubleshooting, Calibration, Demonstration
   Year 1998- 2000 – Name of client: - Steel Authority of India Ltd. (SAIL) – for Bokaro Steel Plant,
    Bokaro & Name of client: - Steel Authority of India Ltd (SAIL) – Bhilai Steel Plant, Bhilai. (Year-
    1998 – 1999) Name of Project – Coal Dust Injection for Blast Furnace, Process Licensor – BMH
    Claudius Peters AG Schanzenstra Be 40 Buxtehude. Germany PMC– Centre for Engineering &
    technology (CET) As a Lead Engineer, Detail Engineering – Instrumentation & Control, and
    Erection , Installation Testing and Commissioning Supervision.
   Year 1997- 1998 – Name of client: - Steel Authority of India Ltd. (SAIL) – Raurkela steel Plant.
    Raurkela & Name of client: - National Thermal Power Corporation Ltd. (NTPC) –Ramagundam
    Thermal Power station – Khamam (A.P.) Name of Project – Coal Handing plant Areas of
    responsibility– Preparation of Detail Engineering documents – Instrumentation & PLC
   Year 1994-1996 Name of Client - Indian oil Corporation Ltd, (IOCL) –Petroleum Depot Terminal-
    Pakani-Solapur, Loni-Pune Name of Project – Automatic Tank Lorry Filling System for gantry
    (Terminal Automation) – LSTK, PMC – Project Development India Ltd. ( PDIL )- India
   Year 1989- 1994– Food Processing Plant of M/s Tasty Bite Eatables Ltd - Pune as Maintenance
    Engineer-Areas of responsibility: - preparation & Implements Preventative Maintenance,
    Expansion for plant. Review, Approval of Engineering submitted by LSTK, EPC, Consultants,
    Contractor




                                                                            D. V. GAVHANE

								
To top