To automate by HC12073008143

VIEWS: 42 PAGES: 4

									Soovam Dutta

Biographical Summary (1/2 page)

Soovam Dutta (Soovam) is associated with Tata Consultancy Services for the last 13 years. He has Project
Management experience of 6 years and has been successfully delivering large TCS projects during this period.
He is currently Project Manager for Integrated Offender Case Management System (IOCMS) for the PA Dept. of
Corrections project.
In his previous roles, Soovam was involved in the delivery of multiple projects in the domain of e-Governance,
Manufacturing, Transportation. During his tenure with TCSL he has worked in multiple roles of Developer,
Module Lead, Technical Architect, Business Analyst & Project Manager and having a rich experience of SDLC.
He has worked on projects with varying technology and frameworks.
Soovam is also having experience of multi-cultural client interaction during his multiple assignments at USA,
Japan and United Kingdom.
Soovam joined TCSL in 1996. He holds a Bachelor of Technology in Computer Science & Engineering from the
North Eastern Regional Institute of Science and Technology, Itanagar, India.


=====================================================================================
Education & Certifications
                 Bachelor of Technology (Computer Science & Engineering)
                 Certified Quality Analyst from QAI, Florida, US


Technical Proficiencies
          Operating Systems                      MS Windows Server 2003, 2008
                                                 UNIX on RS6000 (AIX 5.1L, AIX 4.x)
                                                 MS-DOS
          Languages/APPLICAtion                  Database - MS SQL Server 2005, Oracle 9i/8i
          Server/Database                        UI Technologies - ASP.NET
                                                 Frameworks - .NET 3.5
                                                 Languages - XML, VB.NET 9.0, C, Pro*C, SQL*Plus, PL/SQL, UNIX Shell
                                                  Scripting
                                                 Report Development – Cristal Reports
          Special Software                       UML Modeler - Rational Rose XDE Modeler
                                                 ER Modeler - Embarcadero ER Studio 7.0,
                                                 Configuration Management - TFS, VSS, ClearCase
                                                 IDE - VSTS 2008
                                                 Project Management Tools (MS Project, Excel Power Point, Word)

Work Experience (up to last 5 years)
          Project Name                   Integrated Offender Case Management System (IOCMS)
          Client Name                    Commonwealth of Pennsylvania
          Project Role                   Project Manager
          Start Date and End Date        01-April-2009 to Till Date
          Location                       TCS Product Delivery Center, Noida-III, India
          Project Participation          1 FTE
          Brief Description of Project
          The Product: OMS product is aimed for Department of Corrections and Board of Probation and Parole for various States
Soovam Dutta
Page 2 of 4


                           in the US. The current legacy software systems that are not integrated at the process, program, data, or
                           architecture levels and have limited data interfaces with external as well as internal sub-systems.
                           Consequently, the department’s business and information processes include paper based processing and
                           redundant, manual data entry.
         OMS is targeted to be implemented as an integrated system that will leverage inter-agency and intra-agency business
         process and data standardization, workflow capabilities, and data flow to create an electronic virtual case file for every
         offender. Apart from the primary stakeholders, the Office of Victim Advocate and the Sexual Offender Assessment Board
         are also benefited from this product.
         The Product objective for this initiative is not only to meet the IT challenges but also attain a state of excellence in
         performing the day-to-day processes. Potential benefits of the product implementation include:
                 Increased ability to enforce standardized business processes across and between the DOC and Board of Probation
                  and Parole;
                 Increased ability to make sound management decisions;
                 Increased ability to match offender needs with available resources;
                 Processing of electronic case files in lieu of paper files;
                 Elimination of redundant data entry;
                 Increased ability to maintain compliance with changing government and industry standards;
                 Increased reliance on automated workflow to facilitate approval processes and case reviews;
                 Increased access to information and timeliness of information, to include the use of mobile computing for Board of
                  Probation and Parole field supervision operations and other applications where appropriate;
                 Agencies will have a user friendly, reliable, scalable, secure, consistent and web-based integrated system.
         OMS is a web based system developed on .NET & MS SQL Server technology stack (ASP.NET, VB.NET, MS SQL Server
         and SQL Server Reporting)
         Scope of OMS includes OLTP (On Line Transaction Processing) and Data warehouse implementation. Functional scope
         definition of the product constitutes of following business processes cutting across DOC, Board of Probation and Parole,
         Office of Victim Advocate and the Sexual Offender Assessment Board agencies:
            Reception & Commitment                                         Sentence / Time Accounting
                Offender Classification                                 Offender Identification
                Facility Checks & Offender Count                        Discipline/Appeals/Grievance/ Incident Reporting
                Transfer/Movements/Transportation/Housing               Security Threat Group (STG) Affiliations
                 Assignment
                Offender Searches / Drug Testing                        Offender Health Record
                Offender Accounts Payable / Receivable                  Offender Work Tracking / Assignment / Payroll
                External Contacts                                       Re-entry / Release
                Interface to OVA and SOAB                               Revocation and Recommit
                Parole Decision                                         PBPP Supervision
                ISC Service                                             Special Program Management
                Commissary                                              Work Release Program
                Unit Management                                         Facility Management
         Responsibilities
                Project Management (Primary)
                Cost and Schedule Management
                Risk Assessment and Management
                Review of Project deliverables
                Deliverable Quality Management
                Coaching & Mentoring of Team
                Coordinating at multiple levels such as Product Manager, Technical Team, Development Team and Onsite Project
                 Manager for issues resolution and knowledge sharing

         Project Name                        Property Tax Management System (PTMS)
         Client Name                         Orange County, CA, USA
         Project Role                        Project Manager
         Start Date and End Date             Aug 2008 to Mar 2009
Soovam Dutta
Page 3 of 4


         Location                            Orange County, CA, USA
         Project Participation               1 FTE
         Brief Description of Project
         The vision of a Property Tax Management System (PTMS) for the Orange County Treasurer - Tax Collector is to provide
         Orange County’s Treasurer-Tax Collector’s Office with the tools and means to enhance and improve administration of the
         Orange County Property Tax programs. The new PTMS will be developed with optimal processes and modern information
         technology that will improve operations and services for the Orange County taxpayers.

         TATA Consultancy Services (TCS) will develop an integrated web-based n-tier solution. The objective of this solution is to
         develop a web application for Orange County having both internal and external facing users, which will replace the existing
         Legacy system.
         Responsibilities
              Project Management (Primary)
              Cost and Schedule Management
              Risk Assessment and Management
              Deliverable Quality Management
              Requirement Analysis
              Requirements Modeling

         Project Name                          JCMS Web Solution
         Client Name                           Pennsylvania Juvenile Court Judges’ Commission
         Project Role                          Project Manager
         Start Date and End Date               Feb 2006 to Jul 2008
         Location                              Shippensburg, PA, USA
         Project Participation                 1 FTE
         Brief Description of Project
         Juvenile Court Judges’ Commission (JCJC) is responsible for advising Juvenile courts concerning the proper care and
         maintenance of delinquent children; establishing standards for judicial procedures; collecting, compiling and publishing
         juvenile court statistics.
         The objective of this solution is to develop an intranet web application (JCMS Web application) for JCJC and county users.
         The application will store all the Juvenile information, Case Details, Charges, Victims, and Disposition etc. JCMS Web will
         enable the juvenile probation officers to track juveniles, monitor compliance with conditions of supervision and maintain
         juvenile specific information. It should provide the reporting of juvenile court dispositions to JCJC and PA State Police
         Central Repository.
         Responsibilities
              Project Management (Primary)
              Cost and Schedule Management
              Risk Assessment and Management
              Deliverable Quality Management
              Requirement Analysis
              Requirements Modeling

         Project Name                       Tech Line System
         Client Name                        American Honda Motors
         Project Role                       Project Manager
         Start Date and End Date            May 2005 to Feb 2006
         Location                           Torrance, California
         Project Participation              1 FTE
         Brief Description of Project
         This project focuses on redeveloping the American Honda Motors Automobile Technical Support system for Dealers which
         was based on a heavily customized Vantive application to a Microsoft Web Based Solution built using .NET technology.
         Apart from managing the Knowledge Base and assisting easy fixing of Dealer problems, this project also had modules to
         manage Work Orders at the Honda Shop, Manage the Test Vehicles for the Shop and managing Workload and Workflow
         for various users.
         Responsibilities
              Project Management (Primary)
Soovam Dutta
Page 4 of 4


              Cost and Schedule Management
              Risk Assessment and Management
              Deliverable Quality Management
              Requirement Analysis
              Requirements Modeling
              Design

          Project Name                        e-Application
          Client Name                         Shinsei Bank, Ltd.,
          Project Role                        Project Manager
          Start Date and End Date             August 2004 to till April 2005
          Location                            Meguro, Tokyo
          Project Participation               1 FTE
          Brief Description of Project
          This was a Corporate Credit Management project. The focus of the project was :
               To automate, as far as possible, the creation of the Credit Approval Package (CAP) documents
               Create a paperless flow of documents around various groups
               Electronic approvals for documents & CAP
          Responsibilities
              Meeting Users to collect the requirements
              Preparing Project Plan
              Managing Project as per Plan
              Reporting on progress against plan to the management
              Identifying the project risks and planning for contingency and mitigation



Visa Details (if Immigrant)
          Type of Visa                        L1A

          Visa Expiration Date                5-Mar-2011
          Formal Sponsor

								
To top