Single Equality Scheme Action Plan – (Latest Update Jan 30th 2012)

 The RNIB College Loughborough is committed to removing barriers to
  inclusion and success no matter how unintentional
 This document sits within the context of Human Relations (HR) policies
  that are produced by RNIB corporately. Many issues of equal
  opportunities such as the right to have your application pack in Braille is
  covered already by these corporate-wide policies. Therefore,
  operational actions such as these are not included.
 Many equality actions have already been completed under previous
  action plans for GED, DED and the Race Duty.
 The following action plan has been endorsed by the Principal and Chair
  of Governors.

Objectives for improvements and associated action points 2010 –
2013

    This action plan continues the work the RNIB College has already
     achieved under the action plans previously in place to proactively
     improve race relations, and gender and disability equality. The
     previous Disability Equality Duty Action Plan has been completed.
     However the College’s commitment to improvement for disabled
     people has not. This action plan contains new actions and activities
     for this group of people. The Gender Equality Duty Action Plan has
     been completed apart from 2 actions, which have been transferred to
     this action plan. Access to both the Gender and Disability Action
     Plans (now replaced by this action plan) are available via the
     College’s Intranet and Internet sites (www.rnibcollege.ac.uk). The
     Race Relations Action Plan contained on-going actions and the
     College has been careful to ensure all actions have been transferred
     to this Action Plan. If you require this Action Plan in any other format
     then please contact Norma Curtis, Quality Improvement Manager on
     01509 631269 or e-mail her on ncurtis@rnibcollege.ac.uk

As this is a Single Equality Action Plan covering all strands of equality it
could mean that the previous emphasis on race, gender and disability
would be lost. To avoid this, each action is identified by which group it will
mainly affect. Groups for the following strands are identified:




                                                                                 1
       Age
       Disability
       Gender Reassignment
       Pregnancy/Maternity/paternity
       Race
       Religion or belief (including non-belief)
       Sex
       Sexual Orientation

The plan shows after each action which main aim of the General Duty it is
focused upon, ie

     Eliminating discrimination
     Promoting equality
     Fostering relationships between people in protected characteristic
      groups

Abbreviations used in this action plan:

APP Assistant Principal Programmes
QIM Quality Improvement manager
SA Senior Administrator
MDM Marketing and Development Manager
MAO Marketing Admissions officer
APF Assistant Principal Finance
EPE Employment Placement Executive



–




                                                                            2
Single Equality Action Plan. The first four objectives are those issues specifically raised by learners
when they were consulted at a Learner Conference for the six specialist colleges in the East Midlands
Region on 24 March 2010

A = Age D = Disability G = Gender including gender reassignment and pregnancy/maternity/paternity; R = Race;
RB = Religion/Belief; S = Sexuality;

Objective 1 – Responding to the learners – Learners would like more access to the Internet – they feel
because they are learners at a residential college they may not have enough access (Eliminating
discrimination)

No    Actions                    Deadline   A    D   G     R    RB S      Update                  Responsibility
1.1   Head of Care with          Jan 2012        X                                                HoC
      Safeguarding Committee
      to investigate safe use of
      the Internet sites such as
      MSN, Facebook, etc and
      gambling sites with a
      view to adding advice
      and guidance to the
      Safeguarding Policy.
      Learners wish to retain
      the right to communicate
      with friends through these
      sites. Head of Care and
      Safeguarding Committee
      to consider the use of
      gambling sites by


                                                                                                           3
No    Actions                        Deadline   A   D   G   R   RB S    Update   Responsibility
      learners, methods of
      blocking access to these
      sites, rights of individuals
      to these sites, etc.

      Amended Safeguarding
      Policy to be published
      and advice given to staff
      and learners.
1.2   Head of Care and               Jan 2012       X                            HoC and Res
      Residential Team to risk                                                   Team
      assess learners for their
      ability to access Internet
      sites safely including the
      access to gambling sites.
      Formal risk assessment
      documents to sit in the
      Care Plan area.
1.3   Head of Care and Team          Jan 2012   X   X   X   X   X   X            HoC
      to write with learners a
      ‘contract’ for using
      Facebook, Beebo, etc




                                                                                         4
No    Actions                       Deadline    A   D   G   R   RB S    Update   Responsibility
1.4   Head of Care to liaise        Jan 2012    X   X   X   X   X  X             HoC
      with Principal about
      updating disciplinary
      policies and use of
      computer policies to
      include misuse of Internet
      sites such as Facebook
      as indicated by actions
      taken above
1.5   Head of Care to ensure        June 2012 X     X   X   X   X   X            HoC
      communication about the
      above procedures are
      shared with learners and
      parents/carers
      appropriately through the
      learner and parent
      handbook and care
      planning
1.6   Head of Care to present       January     X   X   X   X   X   X            HoC
      this e-safety aspect of the   2012
      Colleges policy to Quality
      Improvement manager
      who will share with other
      specialist colleges
1.7   Internet safety to be used    September       X                            APP
      as the basis for a project    2009
      during Induction week.

                                                                                         5
No    Actions                   Deadline   A   D   G   R   RB S    Update                 Responsibility
      Learners have asked for
      advice on which sites are
      available to them and
      which are not. They
      would like to know how to
      take responsibility for
      their actions on the
      Internet. They would like
      to know which contact
      poses a risk and which
      does not.
1.8   Learners to be instructed December   X   X   X   X   X   X   Principal has asked IT APP in liaison
      how to add ‘privacy       2011                               Team leader to         with Principal
      settings’ to Facebook                                        investigate this.
      accounts                                                     There have been
                                                                   recent concerns that
                                                                   Facebook updates
                                                                   privacy settings
                                                                   without permission of
                                                                   the user
1.9   Learners to have         December    X   X   X   X   X   X   Included in PSHE       APP
      included within their    2011                                sessions
      education the risks of
      gambling and its
      addictive nature




                                                                                                    6
No Actions                       Deadline   A   D   G   R    RB S     Update                Responsibility
1.10 Learners would like to      Jan 2012   X   X   X   X    X  X                           HoC in liaison
     know which areas of the                                                                with APP
     Internet are blocked and
     why – list to be
     developed by
     Safeguarding Committee
1.11 Head of Care with           Jan 2012   X   X   X   X    X   X                          HoC
     Safeguarding Committee
     to review Bullying and
     Harassment policy to
     ensure it includes advice
     and guidance re bullying
     by mobile phone and or
     other electronic means of
     communication.

Objective 2 – Responding to the learners – Learners would like to know more about bullying and
harassment (Fostering relationships)

No   Actions                     Deadline   A   D   G   R    RB S     Update                Responsibility




                                                                                                    7
No     Actions                      Deadline   A   D   G   R   RB S    Update                   Responsibility
2.1   Learners would like           December                           Bullying and              APP
      provision to understand       2011                               harassment and
      the extent and nature of                                         principles of respect
      bullying and harassment.                                         are included in PSHE
      They would like explicit                                         sessions
      provision about how to
      deal with it if it should                X   X   X   X   X   X
      happen to them. They
      would like to know how
      not to bully other people
      or harass them. They
      would like workshops to
      explore these areas.
2.2   Learners would like           Jan 2012                           e-safety lessons are      APP
      lessons on text bullying –                                       included on the
      how not to do it and how                 X   X   X   X   X   X   curriculum for all in-
      to deal with it if it happens                                    house learners
      to them
2.3   Learners would like an        June                               Learners can contact     APP
      anonymous way of letting 2012                                    Senior Administrator for QIM
      people know if they are                                          an ‘independent ear’ –
      being bullied by mobile                  X   X   X   X   X   X   specific advice re
      phone                                                            mobile phones to be
                                                                       discussed at next
                                                                       EODWG




                                                                                                        8
Objective 3 – Responding to the Learners - Learners would like to be as health aware and diet aware as
people without disabilities (Advancing equality)

No    Actions                    Deadline A   D    G    R     RB   S    Update                 Responsibility
3.1   Learners would like to     March                                                          APP/HoC
      have their own Slimming    2012
      World Club or Weight                    X
      watchers Club

3.2   Learners would like more   March                                                          APP/HoC
      nutritional information    2012
      about the food they are                 X
      eating




                                                                                                         9
No     Actions                      Deadline A   D   G   R   RB   S   Update                 Responsibility
3.3   Learners would like to        March                             Alcohol and drug        APP
      know more about drinking      2012                              misuse and abuse is
      alcohol or getting involved                                     included in the PSHE
      with drugs. They want                                           curriculum
      more explicit information
      and information about how
      to drink in moderation,
      what is moderation, what
      happens to your body if                    X
      you over drink. Learners
      would like to talk to ex-
      drug users and ex-
      alcoholics to hear personal
      testimony about how to
      overcome these addictions
      or avoid them in the first
      place.
3.4   Learners would like           March                             Healthy living is         APP
      healthy living sessions       2012         X                    incorporated in Lifestyle
                                                                      and sports curriculum




                                                                                                      10
Objective 4 – Responding to learners – Learners at the RNIB College felt the Relationship Policy is good
and is working – they appreciate equal access to relationships along with their mainstream peers. They
would like the following added to the approach (Eliminating discrimination, advancing equality)

No    Actions                      Deadline A    D     G     R    RB S       Update                   Responsibility
4.1   Learners would like sex      Jan 2012                                                           APP
      education to be
      personalised. APP to
                                                 X                     X
      investigate 1-1 support
      with PL Education and PL
      Skills and liaise with HoC
4.2   Learners have suggested      Jan 2012                                                           HoC
      that final year learners
      should live in mixed flats
                                                 X                     X
      in preparation for
      University – HoC to
      investigate
4.3   Links will be maintained     On-going                                                           HoC
      with Loughborough                                                                               APP
      University’s Lesbian, Gay,                 X                     X
      Bisexual and Transgender
      Group


Objective 5 - Support for religious beliefs (The following actions were specifically raised by learners from
Black Minority Ethnic (BME) Groups at a Focus Group on 3 March 2010. The Focus Group was held by a
member of staff from a BME group) (Promoting equality)

                                                                                                               11
No    Actions                   Deadline A   D   G   R   RB S   Update                  Responsibility
4.4   Investigate if learners   Completed                       Faith and Reflection    QIM
      would like a prayer room                                  room set up ready for
      at the main College site                                  September 2011.
      (previously learners have
      been canvassed and
      stated they were happy
      to use their own en-suite
                                                         X
      facilities and the faith
      room at Loughborough
      College) Update:
      learners said they would
      appreciate a prayer and
      this has been instigated
      in G7
4.5   Parents/carers of         Dec 2011                        Action complete. A MDM
      younger learners to be                                    leaflet about the
      given information about                                   different support the
      how the College supports                           X
      learners’ religious needs
                                                                College is
      prior to enrolment                                        distributed to
                                                                potential learners




                                                                                                12
No    Actions                      Deadline A     D   G   R   RB S     Update                  Responsibility
4.6   Learners requested an        April 2010                          It was decided that the QIM
      impartial person to report   Completed                           Senior Administrator    SA
      concerns to                                                      would become an
                                              X   X   X   X   X   X    alternative point of
                                                                       contact for learners
                                                                       and this will be
                                                                       advertised.

  The following objectives have been designed to address those issues identified when a gap analysis
  was undertaken of the guidance from LSC: Equality and Diversity in Self-Assessment (Annex D)
  published in October 2009 and a similar gap analysis of the Ofsted Common Inspection Framework.
  Also any issues from previous actions plans under the Disability Equality Duty and the Gender
  Equality Duty and Race Relations Action Plan are subsumed here.

Objective 6: Ensure equal opportunities is central to the college’s mission, planning and continuous
improvement cycle (Eliminating discrimination, advancing equality and fostering relationships)

No    Actions                      Deadline   A   D   G   R   RS S     Update                 Responsibility
5.1   Ensure there is an equal     On-going                            Yes and on-going –     QIM
      opportunities aim                                                Ofsted found the
      contained in the strategic                                       approach to equal
                                              X   X   X   X   X   X
      plan each time is                                                opps to be
      reviewed                                                         Outstanding in
                                                                       November 2011




                                                                                                       13
No    Actions                     Deadline    A   D   G   R   RS S    Update                 Responsibility
5.2   Maintain an Equal           On-going                            Yes – and on-going –   QIM
      Opportunities and                                               good representation    SA
      Diversity Working Group                                         now with a Governor
      – to be held 3 times a                                          rep too.
      year with representatives
      from all College teams,
                                              X   X   X   X   X   X
      Loughborough College,
      Chaplaincy, Charnwood
      Human Rights and
      Equalities and
      representatives of
      learners
5.3   Ensure a Governor           Completed                           Link Governor          Principal
      representative is                                               appointed
      appointed as a link from                X   X   X   X   X   X
      the EODWG to the
      Governors




                                                                                                         14
No    Actions                   Deadline A     D       G       R   RS S    Update                Responsibility
5.4   All teams to evaluate     November                                   Update: Needs to be   CMT
      their approach to equal   each year                                  taken to next CMT     (monitored by
      opportunities and                                                    meeting will be       QIM)
      diversity in curriculum                                              updated in December
      reviews and self-
      assessment reports.
                                           X   X       X       X   X   X
      Teams to receive
      sufficient challenge to
      improve from their Line
      Managers under this
      heading




Objective 6 – Policies and Procedures are analysed for equality (impact assessed) in line with statutory
requirements (Eliminating discrimination, advancing equality and fostering relationships)

No    Actions                     Deadline A       D       G   R   RB S     Update               Responsibility




                                                                                                         15
No    Actions                        Deadline A     D   G   R   RB S    Update                  Responsibility
6.1   All policies and procedures    On-going                                                   CMT
      are regularly reviewed and                                                                Control sheet
      are impact assessed in line                                                               monitored by
                                                X   X   X   X   X   X
      with the Single Equality Act                                                              MAO
      and previous Duties (DED
      and GED)
6.2   The Marketing and              Dec                                A catalogue and         MDM
      Development Manager to         2011                               reminder system is in
      conduct a review of the                                           place. Reminders to
      Intranet and with the MIS                                         managers about out
      Officer to devise a                       X   X   X   X   X   X   of date policies will
      cataloguing system plus                                           commence in
      reminder system when                                              January
      reviews and impact
      assessments are due
6.3   The Marketing and              On-going                                                   QIM
      Admissions Officer to                                                                     MAO
                                                X   X   X   X   X   X
      maintain a complete record
      of impact assessments




                                                                                                        16
No    Actions                        Deadline A   D   G   R    RB S      Update                Responsibility
6.4   An analysis to be conducted On-going
      for each protected
      characteristic against the
      policies/protocols/procedures
      in place to determine which
      policies/protocols/procedures
      have the potential to
      discriminate the most for that
      particular characteristic –
      check emerging themes –
      task equality champions to
      conduct this initial analysis


Objective 7 – To ensure the buildings are compliant with Disability Discrimination Act and the Special
Educational Needs and Disability Act (SENDA) (Eliminating discrimination)

No    Actions                   Deadline   A      G   D    R    RB S     Update                Responsibility
7.1   Access to buildings to    On-going                                                       APF
      be kept under review
      using the DDA/SENDA
      monitoring spreadsheet
                                                      X
      which monitors work
      being undertaken at the
      College main site and
      the Stan Bell Centre



                                                                                                         17
No    Actions                    Deadline   A   G   D   R   RB S   Update   Responsibility
7.2   Assistant Principal        January
      Finance to discuss the     2012
      requirements of the
      above Acts with the
      Asst Principal
                                                    X
      Programmes with a
      regard to work
      placement and learners
      placed at Loughborough
      College
7.3   The Asst Principal         On-going                                   APP
      Programmes to ensure
      the Extended
      Curriculum Programme
      Leader (a specialist
      qualified rehabilitation
      officer) maintains her                        X
      overview and links with
      Loughborough College
      to advise and guide
      when new buildings or
      internal works are
      considered.




                                                                                    18
No    Actions                       Deadline    A   G   D   R   RB S   Update                Responsibility
7.4   The Asst Principal            January                                                  APP
      Programmes to discuss         2012
      the requirements of the
      Act with regard to
      extended curriculum                               X
      activities and
      individually decide on a
      course of action should
      a venue not comply.
7.5   All activities on the         September                          Confirmed – all       APP
      extended curriculum           2011                               activities are risk
      and study within                                                 assessed
      Loughborough College
                                                        X
      and its external
      trips/visits/etc to be risk
      assessed including
      access




                                                                                                     19
Objective 8 – Embed equality and diversity into teaching and learning (Eliminating discrimination,
advancing equality and fostering relationships)
No Actions                      Deadline   A       D    G R      RB S      Update              Responsibility
8.1 All single equality         December                                                       QIM
     strands included in        2010
     observations for
     teachers, trainers,
     learning assistants and
     key workers (gender;
     ethnicity or race;
     disability; sexual
     orientation; age; religion
     (belief or non-belief);
     transgender;
     pregnancy, maternity
                                           X       X    X   X    X    X
     and paternity; socio-
     economic, and
     marriage/civil
     partnerships

      Observation forms to
       be updated
      QIM to promote this
       approach to other
       observers
     Observation reports to
     comment



                                                                                                      20
No    Actions                  Deadline   A   D   G   R   RB S    Update   Responsibility
8.2   Equality and diversity   Jan 2012                                    APP
      on the agenda at each
      management and
      curriculum team
      meeting across the
      college                             X   X   X   X   X   X

       Template agenda to
         be produced
      Minuted (even if no
      issues arise)
8.3   College themes           Ongoing                                     QIM
      continue to be
      embedded into
      curriculum throughout
      the year
                                          X   X   X   X   X   X
       First term: local
        community
       Second term: wider
        community
       Third term:
        celebration




                                                                                   21
No    Actions                  Deadline    A   D   G   R   RB S    Update                 Responsibility
8.4   Equality and diversity   Jan 2012                                                   APP
      discussed in tutorials

       Tutorial template to
         include prompt                    X   X   X   X   X   X
         questions re equality
         and diversity
      Tutors to report any
      areas of concern to QIM
8.5   Continue to evaluate     June 2011                           The curriculum is      APP
      the curriculum to ensure and on-                             evaluated in the
      the individual needs of  going                               spring term and
      learners are met and                                         part of that
      the potential for                                            evaluation is to
      learners to meet a                                           ensure that it
      positive outcome are                                         continues to meet
      maximised                                                    the needs of all
                                           X   X   X   X   X   X
                                                                   learners. At this
                                                                   evaluation we take
                                                                   into account the
                                                                   needs of the
                                                                   learners that are
                                                                   likely to be joining
                                                                   us the following
                                                                   September




                                                                                                  22
No    Actions                    Deadline    A   D   G   R   RB S    Update               Responsibility
8.5   When learners make         September                           Tutors ensure that APP
      their initial curriculum   2011                                learners are
      choices personal tutors                                        making appropriate
      will challenge any                                             curriculum choices.
      stereotypical approach                                         All learners are
      by learners or other                                           encouraged to try
      staff (which may be                    X   X   X   X   X   X   all curriculum
      detrimental to the                                             options in the first
      learner). Staff                                                half-term. This
      development for                                                ensures that they
      teaching staff to be                                           do not only pick
      focused on transition                                          stereotypical
      issues in 2010-2011.                                           options.
8.6   QIM to investigate with    September                           QIM e-mailed Prog QIM
      Programme Leaders          2011                                Leader on 6.9.11 to
      Education, Skills and                                          commence audit
      Extended Curriculum
                                             X   X   X   X   X   X
      how equality and
      diversity is embedded in
      the provision – audit of
      schemes of work




                                                                                                 23
No    Actions                    Deadline    A   D   G   R   RB S    Update                Responsibility
8.7   Investigate the            December                            Completed             QIM with APP
      appropriateness of the     2011                                Dedicated
      curriculum for the adult                                       Transition Team in
      learners, ie is it                                             place and Adult
      promoting and raising                          x               Programme Co-
      aspirations for people                                         ordinator. 6 weeks
      with disabilities?                                             into programme
                                                                     surveys taking
                                                                     place
8.8   Appreciation of            Commenced                                                 APP
      linguistics to be
      included in curriculum
      linked to curriculum                                   x
      theme ie Chinese
      writing

8.9   EPE to provide             September                           Sept 2011 –           APP with EPE
      information to learners    2011                                included in Work
      about how to raise                                             Experience Packs
      issues re equal                        X   X   X   X   X   X   for adult learners.
      opportunities and
      diversity should there                                         Included in packs
      be one on placement                                            for YPLA learners




                                                                                                   24
No Actions                      Deadline    A   D   G   R   RB S    Update                 Responsibility
8.10 Promotion of health and    On-going                            Health and well-       APP
     well-being to be                                               being is included in
     embedded within the                                            all appropriate
     curriculum in                                                  areas of the
                                            X   X   X   X   X   X
     appropriate areas such                                         curriculum
     as Independent Living
     Skills, Sport and
     Tutorials
8.11 Ensure learners know       Jan 2012                                                   APP
     where they can go for                                                                 HoC
     emotional support
                                            X   X   X   X   X   X
     including tutors, key
     workers and external
     advocacy arrangements
8.12 Relationships Policy       Commenced                                                  HoC
     supports the formation
     of adult relationships –
                                                X               X
     learners are given
     sufficient support to
     understand this policy
8.13 Learners to be given       On-going                                                   HoC/
     support to access                                                                     Tutors
     external support from
     the Lesbian, Bi-Sexual,                                    X
     Gay and Transgender
     Group from the Student
     Union

                                                                                                    25
No Actions                       Deadline   A   D   G   R   RB S    Update          Responsibility
8.14 Conduct an audit into       Jan 2012                           Not completed   APP
     the diversity of cooking,
     diet and nutrition
     information provided to                X   X   X   X   X   X
     learners through
     Independent Living
     Skills
8.15 Audit of teaching           Jan 2012                           Not completed   APP
     materials for sensitivity
     to and promotion of                    X   X   X   X   X   X
     equal opportunities and
     diversity
8.16 To ascertain the level      Jan 2012                                           App
     and appropriateness of                                                         HoC
     current transition advice
     learners are given
     about services available                   X
     after College such as
     further education,
     training, housing,
     benefits, etc.
8.17 Maintain destination        On-going                                           EPE
     data for one year at
     least (plans to extend                 X   X   X   X   X   X
     this to two).




                                                                                            26
Objective 9 – Embed equality and diversity into the extended curriculum (eliminating discrimination,
advancing equality and fostering relationships)

No    Actions                Deadline    A      D     G   R    RB S      Update               Responsibility
9.1    Extended curriculum Ongoing                                                           APP
         to follow the
         philosophy of Every
         Child Matters, ie to
         promote health,
         safety, enjoy and
         achieve, positive
         contribution and
         economic well-being.
       Extended curriculum
         to reflect the themes           X      X     X   X    X    X
         running through the
         College curriculum
      Extended curriculum to
      reflect the make-up of
      the learner community
      (ie male/female
      balance, activities for
      people from different
      cultural communities,
      etc)




                                                                                                       27
No    Actions                    Deadline   A   D   G   R   RB S    Update   Responsibility
9.2   Extended Curriculum    June 2012                                       APP
      Co-ordinator to
      consider 3 projects to
      ensure learners make a
      positive contribution:

       to the College
       to the peer review
        colleges
       Local community.
                                            X   X   X   X   X   X
      Extended curriculum
      co-ordinator or
      representative to attend
      the Equal Opportunities
      and Diversity Working
      Group meetings to
      present the projects,
      monitor the impact of
      the projects and decide
      follow up needed.




                                                                                     28
No    Actions                 Deadline    A   D   G   R   RB S    Update                   Responsibility
9.3   Analyse participation in Jan 2012                           Attendance at            APP
      the extended curriculum                                     activities is reported
      analysed by all strands                                     in the Curriculum
      of the SES                                                  Review. Some
                                                                  concerns are
       to be reported in the                                     emerging around the
          Extended Curriculum             X   X   X   X   X   X   participation of some
          Review including                                        groups. These have
          Quality Improvement                                     been addressed in
          Plan                                                    the QIP
      data to be reported in
      the Self-Assessment
      Report
9.4   Maintain and extend the November                            Student Committee        APP
      influence of the Student and                                elections have taken
      Committee to input and annually                             place
                                          X   X   X   X   X   X
      help develop the
      extended curriculum




                                                                                                   29
No    Actions                     Deadline    A   D   G   R   RB S    Update                Responsibility
9.5   Extended Curriculum         Ongoing                                                   APP
      Co-ordinator to monitor
      and challenge external
      facilities who
      discriminate against
      RNIB College learners
                                                  X
      Where appropriate ECC
      to liaise with QIM re:
      training and staff
      development of staff in
      external locations
9.6   QIM to monitor annually     September                           QIM e-mailed PL for   QIM
      with Programme Leader       2011                                details on 6.9.11
      for Ext Curr how
      equality and diversity is                       X
      planned and embedded
      in the Ext Curr
      programme
9.7   Investigate with Ext        September                           Adult learners now  APP
      Curr Co-ordinator how       2011                                have a bespoke
      adult learners can have                                         Extended Curriculum
      targeted extended                                               programme
                                              X   X   X   X   X   X
      curriculum opportunities
      using creative methods,
      ie links to local
      associations

                                                                                                    30
No    Actions                   Deadline    A   D   G   R   RB S   Update               Responsibility
9.8   The Extended              September                          Out door activities    APP
      Curriculum to promote     2011                               are promoted in the
      access to fresh air and                                      activity programme.
      outside activities                                           Newly appointed
                                                                   sports trainer has
                                                                   time allocated to
                                                                   promote sport in the
                                                                   Extended
                                                X
                                                                   Curriculum. The
                                                                   college acts as a hub
                                                                   for blind football but
                                                                   learners of all
                                                                   disabilities, both
                                                                   male and female can
                                                                   join in the training
                                                                   sessions
9.9   A calendar of important On-going                                                    APP
      holy days and festivals
      is displayed in the
      College. Ext Curr PL to
      ensure an appropriate                                    X
      number are publicised
      and celebrated through
      the extended curriculum




                                                                                                31
No    Actions                     Deadline    A   D   G   R   RB S    Update                 Responsibility
9.10 Some same-sex                September                                                  APP
     extended curr activities     2012
     to be piloted to see if it
     promotes attendance
                                                      X
     by under-represented
     groups, eg goal ball for
     females only

9.11 Staff to ensure that all     September                           There is a Varied         PLEC
     activities are available     2011                                Extended Curriculum
     to all learners –                                                activity programme
     Communication with                                               that is inclusive for all
     parents/careers to offer                                         learners.
     help and advice for                                              Regular information
     those parents who                                                is sent to learners
     would find the cost of                                           and parents/carers
     some activities                                                  prior to
     prohibitive. Unless the                  X   X   X   X   X   X   commencement on
     activity has been                                                programme and
     specifically designed to                                         through daily diaries.
     engage a particular                                              Letter sent by
     cohort of learners. eg                                           Principal/APP
     goal ball for females                                            finance to
     only.                                                            parents/carers of day
                                                                      learners to advise of
                                                                      costs for support
                                                                      needs.

                                                                                                       32
Objective 10 - Ensure the College learner body remains diverse and proportionate to that of the local
community (NB the College recruits nationally) (Eliminating discrimination)

No     Actions                       Deadline   A   D   G    R   RB S     Update                 Responsibility
10.1   To positively promote the     On-going                             Action embedded        MDM
       quality of life for all                                            and ongoing            APP
       learners by our actions,
       the images we use,                       X   X   X    X   X    X
       challenging stereotypes
       and discriminatory
       behaviour
10.2   Monitor all potential         February                             Action embedded        MDM
       learners (enquirers and       2010                                 and ongoing –
       visitors) by each strand of              X   X   X    X   X    X   potential issues are
       the SES (already                                                   raised in the E&D
       monitored by six strands)                                          meetings
10.3   Monitor applications by       February                             As above               MDM
       each strand of the SES        2010       X   X   X    X   X    X

10.4   Analyse the make up of        February                             As above               MDM
       the learner body by each      2010
                                                X   X   X    X   X    X
       area of the SES




                                                                                                         33
No     Actions                    Deadline    A   D   G   R   RB S    Update                  Responsibility
10.5   Proactively target any     February                            Action complete         MDM
       areas of concern from 3.1, 2010
       3.2 and 3.3 and redress                X   X   X   X   X   X
       any inequalities

10.6   Ensure all marketing        December                           A local community       MDM
       material is distributed     2011                               strand to the
       within local community                                         marketing plan has
       groups                                                         been developed. A
        local community                                              number of
          marketing plan                                              community groups
                                            X     X   X   X   X   X
          produced listing all                                        already receive our
          local groups within East                                    information
          Midlands region                                             including disability,
                                                                      faith and carer
                                                                      groups

10.7   Include language             Ongoing                           Action embedded         MDM
       transcription and print
                                                                  X
       translation options on all
       marketing materials
10.8   Impact assess all            Ongoing                           Action embedded         MDM
       marketing materials and
       practices on the strands               X   X   X   X   X   X
       of the SES




                                                                                                      34
No     Actions                        Deadline A     D   G   R   RB S    Update                  Responsibility
10.9   Benchmark above                November                           Project to              MDM
       statistics with a college or   2011                               benchmark
       colleges from the Peer                                            statistics with PRD
                                                 X   X   X   X   X   X
       Review and Development                                            colleges in
       Group College                                                     progress.

10.10 Collection of data to be        December                           Health                  SA
      broadened to include all        2011                               questionnaire e         QIM
      strands of equality:                                               sent out only 25%
                                      And on-                            return rate. Will
           Gender                    going                              send annually.
           Ethnicity or Race                                            Head Office now
           Disability                                                   sending data for
           Sexual Orientation                                           gender, ethnicity,
           Age                                                          disability, age after
           Religion, belief or                                          each job
                                                 X   X   X   X   X   X   appointment. This
            non-belief
           Transgender                                                  is an on-going area
            (gender identify)                                            of development
           Pregnancy,
            maternity and
            paternity
              Socio-economic
              Marriage/Civil
                Partnerships



                                                                                                         35
36
Objective 11 - Profile of the College staff reflects that of the learners (Eliminating discrimination,
advancing equality)

No     Actions                           Deadline    A   D    G   R    RB S     Update              Responsibility
11.1    Analyse each team               November                               Not completed       QIM
           separately by the strands     2011                                   yet. 25% return
           of the SES including                                                 for questionnaire
           management and                                                       re protected
           governors                                 X   X    X   X    X    X   characteristics –
       Develop specific impact                                                  new deadline of
       measures with appropriate                                                November 2012
       teams to focus improvement                                               suggested
       in their diversity profile
11.2   Senior Administrator to talk to   June 2010                              Emails sent to      SA
       HR Corporate RNIB – to            and on-                                SSR to chase this
       obtain monthly anonymous          going                                  up. Also had
       stats – to ask they are able or               X   X    X   X    X    X   conversation will
       would be able to maintain                                                SSR around this
       data against the 10 strands of                                           subject. Waiting
       equality                                                                 for response
11.3   Compare the staff statistics to   November                               Completed and in    QIM
       that of the Charnwood             2011                                   SAR
       census, Loughborough
                                                     X   X    X   X    X    X
       College and another local
       (national) specialist college




                                                                                                            37
No     Actions                              Deadline   A   D   G   R   RB S    Update   Responsibility
11.4   Ensure all opportunities for         On-going                                    SA
       recruitment reflect fair
       procedures including the
       communication of all job
       vacancies to the local
       community network via the
       Chair of Charnwood Human
       Rights and Equalities.

       Advertisements for jobs to                      X   X   X   X   X   X
       proactively encourage
       applications from all, ie
       attention paid to eliminating
       indirect discrimination in
       language eg ‘mature’,
       ‘experienced’, ‘lively’, ‘bright’,
       ‘must have a driving licence’




                                                                                                38
No     Actions                          Deadline   A   D   G   R   RB S    Update      Responsibility
11.5   Review to be undertaken of       December                           Completed   Principal
       how learners are involved        2010
       with the recruitment process –
       guidance to be issued
       regarding how we will
       consistently involve learners
       in inputting to job
       descriptions, person
       specifications, interview
       questions and direct
       involvement during interview.
       For example, learners to be                 X   X   X   X   X   X
       involved with tours of college
       and/or micro-teaches.
       Applicants to be aware that
       learners will be asked for their
       opinion about applicants.
       This information to be given
       to applicants as a separate
       sheet. Principal to discuss
       with team leaders to ensure
       agreement is reached about
       this approach.




                                                                                               39
No     Actions                         Deadline     A   D   G   R   RB S    Update   Responsibility
11.6   Monitor application - interview On-going                                      QIM/SA
       - offer process for all vacant
       positions to ensure no
                                                    X   X   X   X   X   X
       discrimination is taking place
       within particular teams


11.7   Monitor appraisals and            On-going                                    QIM/SA
       progression of staff to ensure
       equality of opportunity for all              X   X   X   X   X   X
       staff. To be monitored by
       team leaders.




                                                                                              40
No     Actions                          Deadline   A   D   G   R   RB S    Update              Responsibility
11.8   Offer advice and guidance to     November                           Update: Has not     QIM/SA
       any senior member of staff       2011                               occurred as of yet.
       investigating any grievance                                         Governors on
       and disciplinary issues from a                                      29/11/11 given
       perspective of equality                                             additional training
       against the SES strands                                             about how to bring
                                                                           sufficient
                                                                           challenge to the
                                                                           SMT re equal
                                                                           opps and
                                                   X   X   X   X   X   X   diversity, eg
                                                                           analysing learners
                                                                           who are not
                                                                           offered places at
                                                                           the College – this
                                                                           will have raised
                                                                           their awareness re
                                                                           staffing issues too
                                                                           as best practice
                                                                           information was
                                                                           shared with them




                                                                                                      41
No     Actions                         Deadline    A   D   G   R   RB S    Update   Responsibility
11.9   Investigate with staff if, in   June                                         QIM
       addition to the RNIB staff      20122
       forum, staff in minority groups
       would benefit from the
                                                   X   X   X   X   X   X
       support of a network group
       with other staff members from
       that same minority category.

11.10 Investigate if we are able to    June 2012                                    HoC
      target recruitment to specific
      groups, ie an open day for
      people from local BME
                                                                       X
      groups to have a look at the
      residential provision at the
      College with a view to
      applying as staff
11.11 Recruit a volunteer to sit on    September                                    QIM
      the EODWG – positively           2012                                         SA
                                                   X   X   X   X   X   X
      action applications from the
      BME community




                                                                                            42
No    Actions                        Deadline A         D   G   R   RB S    Update               Responsibility
11.12 Senior Administrator currently September                              At all full Governor SA
      provides data to the EODWG 2011                                       meetings a report QIM
      meeting about staff                                                   is produced by the
      appointments which includes                                           SA to give
      promotions. This data to be                                           Governors a list of
                                               X        X   X   X   X   X
      taken forward by the link                                             new
      Governor to Governor                                                  appointments,
      meetings                                                              promotions and
                                                                            leavers since the
                                                                            last meeting.
11.13 Conduct a gender, race and        June 2012                                                QIM
      disability pay gap analysis by                X   X   X           X                        APF
      pay bands
11.14 SMT to investigate the            March                               Discussed several Principal
      appropriateness and               2012                                times by CMT.
      desirability of positive action                                       Successful
      for male recruitment at the                                           approaches
      College                                               X               trialled in
                                                                            residential team
                                                                            being applied
                                                                            elsewhere (e.g. to
                                                                            LAs)




                                                                                                          43
No    Actions                          Deadline    A   D   G   R   RB S    Update             Responsibility
11.15 Investigate the                  March                                                  APF
      appropriateness of CRB           2012                                                   SA
      checks where previous
      names are required. Add
      information to the application
                                                           X
      pack for transgender people
      to telephone the CRB on
      0151 676 1452 to discuss this
      matter in confidence or email
      CRBSensitive@crb.gsi.gov.uk
11.16 Publicise RNIB’s approach to     June 2012                                              APF
      retirement age more clearly to               X                                          SA
      staff
11.17 Steps taken to attract more      June 2012                           Currently 50% of   Principal
      female applicants to senior                                          CMT and most
      roles where there is an                                              team leader
      imbalance.                                                           positions female.
                                                                           Last 3 team
                                                                           leader positions
                                                   X   X   X   X   X   X
                                                                           appointed were 2
                                                                           female (incl. 1
                                                                           BME) and one
                                                                           BME male, which
                                                                           is a broad gender
                                                                           and ethnic spread.




                                                                                                          44
No    Actions                          Deadline A       D   G    R   RB S     Update              Responsibility
11.18 Succession strategy plans to     June 2012                                                  Principal
      be drawn up to include
      reference to equal                          X     X   X    X   X    X
      opportunities, positive action
      and aims/vision




Objective 12 - Profile of College Governors reflects that of the learner body in terms of ethnicity
(Eliminating discrimination, advancing equality)




                                                                                                          45
No Actions                    Deadline A   D   G   R   RB S    Update      Responsibility
12.1 Analyse the profile of   December                         Completed   Principal
     the College Governing    2011
     Body in order to
                                      X    X   X   X   X   X
     compare it to that of
     staff and learners

12.2 Conduct a Governor       December                         Completed   Principal
     recruitment campaign to 2010
     ensure Governors
                                       X   X   X   X   X   X
     reflect the learner body
     – maintain statistics




                                                                                       46
No Actions                         Deadline   A   D   G   R   RB S    Update   Responsibility
12.3 All new Governors             Ongoing                                     Principal
     receive equality and
     diversity training, as                                                    SA to maintain
     part of induction and                                                     data
     this will be refreshed
     every 3 years. The aim
     of the training will be for
     Governors to have the
                                              X   X   X   X   X   X
     requisite amount of
     knowledge to bring
     sufficient challenge to
     the Management Team
     of the College on
     equality and diversity
     issues.

12.4 One College Governor          January                                     Principal
     to act as an equal            2010
     opportunities link
     between the Governing
                                              X   X   X   X   X   X
     Body and the Equalities
     and Diversity Working
     Group (see above)




                                                                                           47
No Actions                   Deadline     A      D       G       R       RB S    Update              Responsibility
12.5 College Governor        January                                                                 QIM
     invited to attend each  2010
     Equal Opportunities and
     Diversity Working                    X      X       X       X       X   X
     Group meeting (see
     above)

12.6 Governors to feedback      January                                          Completed. Occurs   Principal
     from their link meetings   2012                                             at Board meetings
     at each Governor
     meeting – thus raising
                                          X      X       X       X       X   X
     any issues of concern
     regarding equality or
     diversity



Objective 13 - Maintain the College's excellent record on minimising the achievement gap for learners
from all categories of the SES (Eliminating discrimination)

No Actions                      Deadline   A         D       G       R   RB S     Update             Responsibility
13.1 Learner complaints         Commencing                                                           MIO
     analysed by the strands    November
     of the SES and any         2010
                                           X         X       X       X   X   X
     areas of concern then
     proactively dealt with



                                                                                                                 48
No Actions                       Deadline    A   D   G   R   RB S    Update                 Responsibility
13.2 Include equality and        February                                                   QIM
     diversity in all focus      2010
     group and survey
     questions, including
                                             X   X   X   X   X   X
     anti-bullying discussion
     and how to make a
     complaint

13.3 Analyse achievement         November                            Data is collated,      MIO
     statistics by all strands   each year                           analysed and
     of the SES on a yearly                                          published 3 times
     basis                                                           per year for the
                                                                     meetings.
                                             X   X   X   X   X   X
                                                                     Graphs are used
                                                                     for trends to be
                                                                     highlighted along
                                                                     with other areas for
                                                                     concern.




                                                                                                    49
No Actions                       Deadline    A   D   G   R   RB S    Update                 Responsibility
13.4 Analyse progression         November                            Data is collated,      MIO
     statistics by all strands   each year                           analysed and
     of the SES on a yearly                                          published 3 times
     basis                                                           per year for the
                                                                     meetings.
                                             X   X   X   X   X   X
                                                                     Graphs are used
                                                                     for trends to be
                                                                     highlighted along
                                                                     with other areas for
                                                                     concern.

13.5 Analyse outcomes,           November                            Data is collated,      MIO
     employment and/or           each year                           analysed and
     Further                                                         published 3 times
     Education/Higher                                                per year for the
     Education including                                             meetings.
     those learners who
                                                 X
     move into semi-                                                 Graphs are used
     independent living or a                                         for trends to be
     care setting.                                                   highlighted along
                                                                     with other areas for
                                                                     concern.




                                                                                                    50
Objective 14 - RNIB College plays a key part in the local community (advancing equality and fostering
relationships)


Please turn to next page




                                                                                                        51
No Actions                       Deadline A   D   G   R   RB S    Update               Responsibility
14.1 All in-house College        September                        All in-house college APP
     learners complete a         2010                             learners undertake
     work placement as part                                       work placements.
     of their programme
                                                                  Employers attend
      Ensure all employers                                       training at the
        providing work                                            college
        placements for
        college learners have
        access to the
        College’s Single
        Equality Scheme
      Equality and                      X    X   X   X   X   X
        Diversity audit to be
        conducted as part of
        the health and safety
        assessment before a
        learner begins a work
        placement
     Sight loss training and
     other disability training
     offered to all employers
     providing work
     placements for College
     learners




                                                                                               52
No Actions                       Deadline   A   D   G   R   RB S    Update             Responsibility
14.2 Teaching team includes Jan 2012                                                   APP
     activities that benefit the
     local community.
     Teaching team identify                 X   X   X   X   X   X
     at least 3 formal
     activities per year

14.3 Positive contribution to    November                           Embedded           QIM
     community is evaluated      2011                               throughout
     in appropriate teams'                                          appropriate SARs
                                            X   X   X   X   X   X
     Curriculum Reviews and
     Self Assessment
     Reports.
14.4 Learner representatives     March                                                 QIM
     from the College            2010
     participate in activities
     held jointly with other                X   X   X   X   X   X
     colleges in the Peer
     Review and
     Development Group.




                                                                                               53
14.5 Local community groups or          December                 Leicester Council of Faiths      QIM
     representatives to be invited      2011                     Equality and Diversity Officer
     as external speakers to share                               opened the Faith and
     and celebrate diversity with the   And on-                  Reflection Room alongside
     learners – QIM to discuss with     going                    the Chaplain – Dec 2011
     associate Governor
                                                                 Rep from Loughborough
                                                                 University’s LGBT group
                                                                 supported staff training on 18
                                                                 Jan 2012


                                                                 Tommy Godwin (cycling
                                                   X X X X X X
                                                                 Olympian athlete 1948)
                                                                 celebrated 500 days to go to
                                                                 the Olympics with learners (ie
                                                                 age




                                                                                                        54
14.5 Local community groups or          December                   Leicester Council of Faiths      QIM
cont representatives to be invited      2011                       Equality and Diversity Officer
     as external speakers to share                                 opened the Faith and
     and celebrate diversity with the   And on-                    Reflection Room alongside
     learners – QIM to discuss with     going                      the Chaplain – Dec 2011 (ie
     associate Governor                                            religion/belief)

                                                               Rep from Loughborough
                                                               University’s LGBT group
                                                               supported staff training on 18
                                                               Jan 2012 (ie sexual
                                                   X X X X X X
                                                               orientation)

                                                                   Blind football player will be
                                                                   presenting certs in summer
                                                                   term (ie disability)




                                                                                                          55
14.5 Local community groups or          December                 FA blind soccability session    QIM
cont representatives to be invited      2011                     work with all learners – so is
     as external speakers to share                               raising awareness of disability
     and celebrate diversity with the   And on-                  in sport (ie disability)
     learners – QIM to discuss with     going
     associate Governor                                          Leics Youth and Teenage
                                                                 Pregnancy Partnership
                                                                 services running a Secret
                                                                 Shopper project with learners
                                                                 – re having their say about
                                                                 health services.
                                                   X X X X X X




                                                                                                       56
14.5 Local community groups or          December                                                 QIM
cont representatives to be invited      2011
     as external speakers to share
     and celebrate diversity with the   And on-
     learners – QIM to discuss with     going
     associate Governor
                                                    X X X X X X




14.6 SMT to consider ways in which September                    2 meetings held of              Principal
     our learners could contribute to 2011                      Loughborough in Focus
     neighbourhood and town                                     Group with governor, RNIB
     vision.                                                    and Borough Council
                                                                representation. We will be
                                                    X X X X X X
                                                                working with the Town Hall in
                                                                the Autumn Term and
                                                                producing ceramic tiles for the
                                                                Railway Station in the new
                                                                year.
14.7 Learners draw up ‘rules for        Induction                                               HoC
     how to live with neighbours        each year
     during induction – this to be                  X X X X X X
     included in the induction
     ‘Golden Rules’ activity


                                                                                                       57
14.8 Support the training of more     December                       Completed                      APF
     staff to drive the mini-buses to 2011                                                          QIM
                                                     X
     enable further access to local                                                                 HoC
     community activities                                                                           APP
14.9 Learners appreciate the          June 2012                                                     APP
     chance to act as ambassadors
     within the community for
     disability. Extended
     Curriculum Programme Leader
                                                     X
     and Executive Placement
     Officer to investigate
     opportunities for this – 2
     opportunities per year to be
     identified

Objective 15 - College staff are equipped with the skills and knowledge to tackle discrimination,
harassment and any other activities with the potentiality to create barriers to achievement for all staff
and learners (Eliminating discrimination, advancing equality and fostering relationships)

No     Actions                     Deadline       A D G R RB S Update                        Responsibility
15.1   All new RNIB College        Ongoing                     Update April 2012             QIM
       staff to receive equality                               New induction
       and diversity awareness                                 process introduced –
       raising as part of                         X X X X X  X 3 opportunities per
       induction                                               year – equal opps is
                                                               one of the main
                                                               presentations.



                                                                                                            58
No     Actions                     Deadline    A D G R RB S Update                   Responsibility
15.2   For those staff who         September                Update April 2012:       QIM
       cannot attend a live        2012                     On-line PowerPoint
       induction an in-house                                presentation available
       DVD will be produced                                 to staff for equal opps.
       with learners to be given               X X X X X  X Learners concentrated
       to staff                                             this year on
                                                            safeguarding DVD
                                                            and fire evacuation
                                                            procedures
15.3   Quality Improvement         On-going                                          QIM
       Manager and Senior                                                            SA
       Administrator to attend
       regular training to keep
       up-to-date with legislative             X X X X X      X
       requirements. QIM and
       SA to share best practice
       with other specialist
       colleges
15.4   All staff to refresh        Ongoing                                           QIM
       equality and diversity
       training every 3 years.
       Basic training to be
       referred to as Phase 1                  X X X X X      X
       Training – with follow-on
       training referred to as
       ‘Phase 2’.



                                                                                                 59
No     Actions                      Deadline      A D G R RB S Update                   Responsibility
15.5   RNIB College staff to        3 times per                                         APP
       deliver training on          year
       disabilities to
       Loughborough College
       staff at least 3 times per
                                                    X
       year. Individualised
       training to be offered to
       course teams by the
       RNIB Tutor based at
       Loughborough College
15.6   RNIB College to liaise       On-going                    April 2012 update:        QIM
       with Loughborough                                        Successful meetings
       College regarding equal                                  being held, eg April
       opportunities and learner                                2012 meeting re
       voice.                                                   integration of RNIB
                                                                learners at Lough Coll
           QIM to attend                                       resulting in training for
            Loughborough                                        staff, provision of
            College’s equal                       X X X X X   X learning buddies, etc
            opportunities                                       – see separate actin
            meetings whenever                                   plan
            possible
           Reciprocal
            attendance by
            Loughborough
            College on RNIB
            EODWG meetings

                                                                                                    60
No     Actions                     Deadline     A D G R RB S Update                 Responsibility
       Learning Partnership
       Feedback Group (focus
       group for RNIB learners
       studying at Lou Coll) to
       be held once per year in
       Spring Term to be
       attended by QIM and
       Assistant Principal
       Performance and
       Standards at
       Loughborough College
15.7   Staff conditions and        March 2012                 Not updated yet as     QIM
       aspects of service are                                 RNIB corporately       APF
       discussed between                                      undertaking review of
       employee and team                                      working conditions
       leader to identify any                                 through staff forum –
       potential areas of                                     will await outcomes of
       discrimination, ie hours of              X X X X X   X this before proceeding
       work, working                                          April 2012 QIM
       methodology, assistive
       equipment and any other
       consideration. This
       aspect to be added to the
       staff appraisal procedure.




                                                                                                61
No     Actions                    Deadline       A D G R RB S Update               Responsibility
15.8   Continue to impact         Ongoing                     Analyses of equality QIM
       assess all new college                                 as impact assessment
       policies, procedures and                               is now termed -
       practices as they are                                  continues
       produced for the                          X X X X X  X
       potentiality to
       discriminate under the
       SES (see above)

15.9   Investigate the process    September                      April 2012 update –      QIM
       for applying to become     2012 (date                     not completed yet –
       an Investor in Diversity   changed from                   so date moved to
                                  March 2012)                    September 2012 –
        Investigate current                                     written to peer review
         standards                                               colleagues to see if
        Find out contact                                        they have this award
         details for local                                       and if it was a useful
                                                 X X X X X     X process QIM
         assessor
        Form a working group
         to meet standards if
         standards are
         considered
         appropriate
        Apply for assessment




                                                                                                62
No    Actions                   Deadline    A D G R RB S Update                 Responsibility
15.10 Ensure contractors and    Ongoing                                         APF
      subcontractors working
      on the College premises
      are familiar with the                 X X X X X   X
      Colleges commitment to
      equality and diversity

15.11 Head of Care and Quality September                  Confidentiality        HoC
      Improvement Manager to 2011                         statement has been     QIM
      develop a one-page A4                               updated with
      sheet detailing the                                 safeguarding
      College’s equal opps,                               information 6.9.11.
                                            X X X X X   X
      health and safety and                               Updates to induction
      safeguarding key points                             means that equals
      to be given to all staff,                           opps info available. H
      volunteers and bank staff                           & S covered at
                                                          inductions by APF
15.12 Investigate with the      September                 Completed              QIM
      EODWG the possibility of 2010
      appointing equality
      champions from the staff
      and learner population.
                                            X X X X X   X
      Ie people to whom others
      can raise issues in
      confidence who might not
      necessarily raise them in
      other ways.

                                                                                            63
No    Actions                  Deadline       A D G R RB S Update                   Responsibility
15.13 QIM to conduct an        October 2011                Training offered to      QIM
      investigation with the                               Carillion engineers not APF
      APF about training and                               yet able to take this up
      /or standards                                        but offer still open.
      requirements for sub-                                Risk assessment in
      contractors. This will                               place for non CRB'd
      include analysis of                                  adults accessing the
      safeguarding                                         College site which
      requirements                                         refers to our main
                                                           contractors being
                                                           CRB'd. We would
                                                           then accompany other
                                                           contractors on site
                                                           and/or only allow them
                                              X X X X X  X in non student areas
                                                           (ie. segregate). Under
                                                           our reception
                                                           procedures for the
                                                           College and SBC no
                                                           contractors are
                                                           allowed into our
                                                           buildings without a
                                                           conversation with our
                                                           premises staff.




                                                                                                64
No    Actions                      Deadline       A D G R RB S Update                    Responsibility
15.14 QIM to conduct an            October 2011                Oct 2011 Disability       QIM
      investigation with the                                   handbook given to         HoC
      HoC about the equality                                   agency staff. Follow
                                                  X X X X X  X
      training for bank staff to                               up e-mail sent
      ensure the safeguarding                                  14.10.11 about
      procedures.                                              equality training pack
15.15 QIM to work with             October 2011                Equality Opportunities    QIM
      Employment Placement                                     Policy collated for all   EPE
      Executive to ensure she                                  employers supporting
      maintains a central                                      learners on
      record of those                                          placement. No
      employers who have                                       employers to date are
      their own equality                                       without their own
      policies and those for                                   policy.
      whom we have had to                         X X X X X  X
      supply a copy of our
      policy. The latter to be
      invited to equal opps
      training or given a copy
      of the College produced
      DVD and the A4
      information sheet
      identified above




                                                                                                     65
No    Actions                   Deadline       A D G R RB S Update                        Responsibility
15.16 EPE to give employers     October 2011                Discussed with QIM,           APP
      the Treating Learners                                 yet to be                     EPE
      with Respect and Ethos                   X X X X X  X implemented. Work
      and Values statement                                  Experience paperwork
                                                            needs to be changed.
15.17 EPE to conduct a           June 2011                  This has been put on          APP
      questionnaire with                                    the Agenda for the            EPE
      employers – to include a                              next Employer Focus
      question regarding equal                              Group Meeting and at
      opportunities, ie ‘Did you                            the next Employers
      have enough support to                                Networking meeting.
      understand the needs of
      learners before they                       X
      came on placement’ and
      ‘Were you given access
      to the College’s equal
      opportunities policy and
      did you understand the
      College’s approach to
      this’.
15.18 Training to continue to be On-going                      Handbook has been          EPE
      offered to employers                                     distributed – this is an   QIM
      regarding disability                                     on-going action
                                                 X
      awareness and
      successfully working with
      people with disabilities



                                                                                                      66
No    Actions                      Deadline       A D G R RB S Update                        Responsibility
15.19 LSIS resources focusing      January 2012                Some investigations           QIM
      on equal opportunities                                   made – e-mails sent
      and diversity to be          New deadline                to appropriate
      investigated for use in      of June 2012                contacts for on-line
                                                  X X X X X  X
      the College                                              learning resources –
                                                               current resources put
                                                               on staff development
                                                               area of database
15.20 Member of staff to be        January 2012                                              APP
      trained to offer advice on
                                                    X
      benefits

15.21 Ensure relevant staff        On-going                        Has not emerged as a      QIM
      have hearing impairment                                      learner issue this year
      training                                      X              (2012) but will keep as
                                                                   on-going action, QIM
                                                                   April 2012
15.22 Ensure teachers and LAs      September                       QIM consulted with        APF
      are able to activate loop    2011                            APF – APF arranging       QIM
                                                    X
      system in Conference                                         test with member of
      Room                                                         staff 6.9.11
15.23 SaLT to be trained as an     September                       Completed                 QIM
      enhanced trainer of          2011
                                                    X
      Makaton




                                                                                                         67
No    Actions                    Deadline    A D G R RB S Update                    Responsibility
15.24 SaLT to run Makaton        On-going                 SaLT is running           APP
      courses within the                                  bespoke training and      QIM
      college and residences                              embedding within          SaLT
                                                          areas. Useful
                                                          phrases/words
                                               X
                                                          distributed to teams
                                                          via memory sticks.
                                                          Regular Makaton DVD
                                                          played on loop in
                                                          reception.
15.25 SaLT to devise Makaton     September                QIM wrote to PL for       APP
      badges for staff who can   2011                     reply on 6.9.11           SaLT
                                               X
      be ‘champions’ for this                                                       QIM
      communication language
15.26 SaLT to maintain           September                   Completed –            APP
      updates to staff via       2011                        Makapedia also now     SaLT
      weekly links to Makaton                                on line – commonly-
      sign language on the                     X             used words available
      Intranet                                               for all staff on
                                                             individual memory
                                                             sticks




                                                                                                68
No    Actions                      Deadline     A D G R RB S Update                        Responsibility
15.27 SaLT to train reception      Commencing                All staff will receive        APP
      staff in the use of          September                 specific Makaton              SA
      Makaton, Bell Bar staff      2011                      training relevant to          SaLT
      and residential staff                                  their roles across            QIM
                                                             college. E.g. Makaton
                                                  X          5-a-day initiative,
                                                             Learn to sign week,
                                                             attendance at regular
                                                             team meetings,
                                                             delivery of basic
                                                             Makaton signs to CMT
15.28 Lesson plans to contain      On-going                                                APP
      individualised targets for
      learners based on base-                     X     X
      line assessments and
      language levels
15.29 Ensure all staff and         On-going                      Action complete,          MDM
      students are aware of                                      presentation at staff
      translation and                                            meeting, information
      interpretation                                             delivered to front line
      arrangements. Also                                         staff and wider
                                                        X
      raise awareness of                                         communications to all
      ‘language line’. Monitor                                   other staff.
      use of translation and
      interpretation services
      and report to EODWG



                                                                                                       69
Objective 16 - to maintain an inclusive environment and facilities (Eliminating discrimination)

No     Actions                        Deadline    A D G R RB S Update                       Responsibility




                                                                                                        70
No     Actions                           Deadline   A D G R RB S Update                Responsibility
16.1   QIM to investigate the benefits   March                   No direct benefit for QIM
       of becoming a member of the       2012                    us – we have good SA
       National Council for Faiths and                           contact with the
       Beliefs in FE                                             Leicestershire Faith
                                                                 Council – their
                                                                 Equalities Officer
                                                                 attended the
                                                                 opening of the
                                                                 Faith Room.
                                                                 Learners in
                                                                 November 2011
                                                                 and April 2012
                                                                 testified as to the
                                                          X      usefulness of the
                                                                 Faith and
                                                                 Reflection Room –
                                                                 plus testified the
                                                                 same to Ofsted in
                                                                 November 2011.
                                                                 One learner from
                                                                 Lou Coll who uses
                                                                 the building also
                                                                 using the room and
                                                                 has told our
                                                                 learners how
                                                                 welcoming and
                                                                 useful it is.


                                                                                                   71
No     Actions                         Deadline     A D G R RB S Update                        Responsibility
16.2   Review RNIB College’s           October                   Not reviewed – e-             QIM
       Accessibility Statement         2011                      mail sent to APF –            SA
                                                      X
                                                                 is this still a
                                                                 requirement
16.3   Continue rigorous monitoring of Ongoing                                                 APF
                                                      X
       the DDA/SENDA action plan
16.4   Survey learners and staff with  April 2012                   Update: April 2012         Principal/MDM
       disabilities regarding                                       Added to staff
       environmental and assistive                                  survey for summer
       technology to see if there are                               2012
       any unintentional barriers to
       access.
                                                                    New equipment
                                                                    purchased for staff
                                                                    Humanware
                                                      X             myReader2’s

                                                                    Learners asked
                                                                    about equipment at
                                                                    each survey

                                                                    2 larger screen monitors
                                                                    are now in U40 plus a 2
                                                                    Humanware myReader2s
                                                                    were purchased – a sort
                                                                    of sophisticated CCTV




                                                                                                           72
No     Actions                           Deadline    A D G R RB S Update         Responsibility
16.5   Provide learners on Work          Ongoing                                 Principal
       Placement with the assistive
       technology required in order to
                                                       X
       be successful (where
       appropriate).

16.6   Each year conduct an audit of     June each                   Happening   Principal/APF
       potential learners' needs to      year
                                                       X
       ensure environment and
       equipment are available
16.7   Investigate potential learners'   June each                               APP/HoC
       needs and advise appropriate      year
       college teams about any issues
                                                     X X X X X   X
       that require anticipatory
       planning

16.8   Each June hold a case            June each                                APP/HoC
       conference for appropriate staff year
       about the needs of learners                X X X X X      X
       joining the College in
       September
16.9   Residential Team to be part of Ongoing                                    HoC
       the Assessment Team                        X X X X X      X




                                                                                                 73
No    Actions                             Deadline  A D G R RB S Update               Responsibility
16.10 Equal opportunities data to         March                  April 2012 Update QIM
      include the routine analysis of     2011                   from QIM:            MIS Officer
      Viewpoints (feedback                                       Viewpoints had
      database) – currently reviewed                             been disbanded
      against equality strands – this                            due to the
      to be enhanced to include                                  introduction of
      analysis against cohort of                                 Databridge –
      learning difficulty – to ensure all                        however event
      learners have access to                       X X X X X  X logging not
      feedback. Analysis to include                              capturing all events
      socio-economic factors.                                    so Viewpoints
                                                                 reintroduced in
                                                                 April 2012. MIS
                                                                 Officer has been
                                                                 asked to update
                                                                 Viewpoints to
                                                                 enable this analysis
16.11 Conduct an investigation with       June 2010                                   QIM
      learners to ascertain if they are                                               SA
      still happy to use
      Loughborough College’s faith                             X
      room (update March 2010 –
      prayer room instigated at the
      RNIB College March 2010)
16.12 Offer rest facilities to those      On-going                                     College
      learners or staff who are                                    X                   Programme
      pregnant                                                                         Leaders

                                                                                                   74
No    Actions                           Deadline A D G R RB S Update              Responsibility
16.13 EODWG to conduct an audit of      June 2012             Update April 2012 QIM
      the faith requirements of staff                         from QIM: Health
      and learners                                            and Well-Being
                                                              questionnaire has
                                                              been sent out on
                                                              several occasions
                                                              to encourage better
                                                              recording of data.
                                                              This includes
                                                              questions about
                                                       X
                                                              faith requirements.
                                                              Staff involved with
                                                              the Faith and
                                                              Reflection Room
                                                              and enabled to
                                                              bring in artefacts,
                                                              books, products to
                                                              support religious,
                                                              faith, belief
                                                              observance




                                                                                              75
No    Actions                            Deadline A D G R RB S Update                Responsibility
16.14 Equal opps forms are kept by       June 2010             Raised with           Senior
      Head Office and are not                                  corporate HR.         Administrator
      revealed to the College.           To be                 Information on age,
      Therefore, the Senior              conducted             gender, ethnic
      Administrator to gather            termly                origin and disability
      statistics regularly about:                              now shared with
                                                               College. Corporate
          Religion, faith, and belief                         view is it is not
           or non-belief                                       feasible to record
          Age                                                 other
          Disability                              X X X X X X characteristics.
          Marital status
          Ethnicity
          Sexual Orientation
          Transgender
          Gender
          Maternity/paternity

      Socio-economic factors will be
      gathered via postcode
16.15 Freedom of information and         Dec 2011                     QIM took to CMT   QIM
      access to information by                                        on 20 Jan 2012    CMT
      learners to be reviewed by                    X X X X X     X
      CMT




                                                                                                 76
No    Actions                            Deadline    A D G R RB S Update               Responsibility
16.16 Staff to have access to all        On-going                 Available on iSite   SMT
      corporate RNIB policies such
      as family-friendly working,
      maternity, paternity etc. Each
      member of staff who raises a                   X X X X X     X
      query to be treated individually
      according to the corporate and
      local policies plus reference to
      best practice will be made.
16.17 Maintain an equal opportunities    March                                         QIM
      and diversity notice board –       2011                                          SA
      one half dedicated to promoting
      the term’s equal opportunities
      theme – the other half
                                                     X X X X X     X
      dedicated to contact
      information, helplines, etc.
      This information to be included
      on the Intranet and included in
      the learner handbook
16.18 Investigation of accidents to      June 2012                                     APF
      see if there is any correlation
      between different groups under                 X X X X X     X
      the equality strands and
      accidents




                                                                                                   77
No    Actions                           Deadline A D G R RB S Update               Responsibility
16.19 Conduct a postcode analysis to June 2012                Work in progress.    APP
      see if learners with disabilities                       Postcodes have       SA
      from poorer backgrounds are                             been sent for        MDM
      not able to access College – if                         analysis with RNIB
      areas of concern are found                    X         HO, initally
      these will be action planned                            revealed no such
                                                              bias, second round
                                                              of data sent for
                                                              analysis
16.20 To prefer to work with            June 2012                                  APF
      employers (work placements)                                                  APP
      and sub-contractor                          X X X X X X
      organisations who we know to
      be ‘fair’ employers
16.21 To issue to sub-contractors an Immediate                                     APF
      equal opportunities statement
                                                  X X X X X X
      when they first gain a contract
      with the College
16.22 Cultural audit to be undertaken June 2012                                    HoC
      of the Residences by external
      consultant. If successful and                     X X
      impactful audit to be widened
      to include main college site




                                                                                               78
No    Actions                           Deadline A D G R RB S Update   Responsibility
16.23 Equal opportunities risk          December                       HoC
      assessments to be undertaken      2012
      in line with all other risk
      assessments (ie an individual
      learner could be ‘more
      vulnerable’ to discrimination
      than another and more                        X X X X X   X
      vulnerable in different sets of
      circumstances, ie a female
      learner with a disability being
      placed with an employer who
      has 0% of disabled staff in
      post)
16.24 Bullying and harassment policy    Jan 2012                       HoC
      to be reviewed to see if
      information about homophobic,
      biphobic and transphobic
      bullying and harassment is
      recognised, understood and                       X       X
      action planned. This will
      include clear procedures for
      raising concerns about issues
      relating to sexual orientation
      and gender identity




                                                                                   79
No    Actions                               Deadline A D G R RB S Update   Responsibility
16.25 To review personal, social,           June 2012                      APP
      health education scheme of
      work to understand if
                                                        X       X
      information on sexual
      orientation and gender identity
      including legislation is identified
16.26 CMT to consider which senior          June 2011                      CMT
      manager should lead on
      developing the College’s                                             completed
                                                        X       X
      understanding around sexual
      orientation and gender identity
      equality
16.27 QIM and SA to undertake self-         June 2011                      QIM
      study about sexual orientation                                       SA
      and gender identify with a view
      to raising awareness of
      governors and senior                                      X
      managers first, followed by
      general staff training
      particularly for tutors and key
      workers




                                                                                       80
No    Actions                          Deadline A D G R RB S Update                  Responsibility
16.28 Information about how to         June 2012             Completed               SA
      contact support groups for
      lesbian, gay and bisexual                               Chair of Lough Uni
      groups is clearly given to                              Student and the
      learners on the information                             separate Staff
                                                            X
      board and in preferred access                           LGBT Group now
      media                                                   involved with the
                                                              College. Staff
                                                              member involved
                                                              with staff training.
16.29 Seek to support people to        On-going                                      QIM
      worship and express their        – see                                         HoC
      religious and other beliefs      actions                                       APP
      freely but without imposing      above
      their views on others:

          Maintain close links with
           University Chaplaincy                        X
           (QIM and HoC)
          Ensure support is
           available for learners to
           attend places of
           workshop (HoC)
          Events to be held to
           celebrate faith and holy
           days (QIM and APP)


                                                                                                 81
No    Actions                         Deadline   A D G R RB S Update                     Responsibility
          Appropriate displays to
           be made by learners to
           celebrate various events
           and to promote mutual
           understanding and
           respect for others
      Maintain the College’s
      approach to 3 curriculum
      themes per year

Objective 17 - Communication within the RNIB College will meet accessibility standards (Eliminating
discrimination)

No Actions                       Deadline A D G R RB S Update                            Responsibility
17.1 MDM will conduct a          Jan 2012              Action complete. All              MDM
     review of internal and                            publications are approved
     external communication to                         and signed off for
     analyse how the college is                        accessibility by RNIB’s
     meeting RNIB                                      publishing team. The
     accessibility standards                X          website has See it Right
      Gaps established will                           accreditation for
        be addressed via a                             accessibility
        training plan devised by
        MDM




                                                                                                      82
17.2 RNIB college electronic     Ongoing                              See it Right is in place and   MDM
     media such as website will                                       has been superseded by
     continue to achieve 'See it                                      Surf Right, audit has been
                                                    X
     Right' status                                                    completed and gaps
                                                                      identified are being
                                                                      resolved.
17.3 College welcome notice       February                            Publishing are able to         MDM
     on outside of building to    2012                                produce this signage.
     be in community                                                  Agreement from CMT
     languages and Makaton                          X      X          required as to the location
     signs                                                            and prominence of the
                                                                      signage before progress
                                                                      can be made.


Objective 18 Work with Peer Review and Development Group to ensure all colleges are graded at least
Good by Ofsted by 2011 (advancing equality)

No Actions                                              Deadline     A D G R RS S Update Responsibility
18.1 Discuss ways of comparing data and                 September                        QIM
     statistics with peer colleges on 10 equality       2010         X X X X X X
     strands
18.2 Compare approach to equal opportunities            March 2010                                   QIM
     with all colleges and with one college in                                                       SA
                                                                     X X X X X         X
     particular who are graded as outstanding in
     this area.




                                                                                                           83
Objective 19 To promote learner voice and parent/carer voice (advancing equality)

No     Actions                        Deadline A D G R RS S Update                     Responsibility
19.1   Learners to maintain the       On-going                                         APP
       successful Student
                                                 X X X X X   X
       Committee – see above

19.2   Monitoring of a                On-going                 Update April 2012 – on- QIM
       comprehensive learner                                   going. Ofsted inspectors MAO
       involvement strategy                                    in November 2011 found
                                                 X X X X X   X equal opps to be
                                                               outstanding and for
                                                               learner voice to be
                                                               having a real impact
19.3   Learners to be represented     On-going                 Learners are             CMT
       on key college committees                               represented on
       including Governors, equal                X X X X X   X governors, equal
       opportunities, health and                               opportunities and health
       safety, etc                                             and safety committees
19.4   Learners to be represented     On-going                                          PL Education
       on curriculum groups:                     X X X X X   X                          PL Skills
       Education and Skills
19.5   Learners to meet with          On-going                                         QIM
       others from the 6 specialist
       colleges in the region                    X X X X X   X
       biennially




                                                                                                       84
No     Actions                         Deadline A D G R RS S Update                       Responsibility
19.6   Learner involvement with        On-going
       staff recruitment detailed in            X X X X X X
       actions above
19.7   To hold regular focus           On-going                 Update April 2012:         QIM
       groups and surveys –                                     Learner groups held in     MAO
       exploring and piloting new                               communication ability
       ways to ensure access to                                 levels. Full involvement
       all learner groups.                        X X X X X   X of SaLT in this
                                                                programme. Effective
                                                                programme has led to
                                                                major improvements in
                                                                satisfaction rates in 2012
19.8   Outcomes of Framework           Every                                               QIM
       for Excellence survey are       Survey     X X X X X   X
       action planned
19.9   Parent survey to be             February                 Action complete. Latest   MDM
       reviewed – with particular      2012                     parents survey resulted
       reference to accessibility                               in 80% response rate
       requirements of parents
                                                    X   X
       particularly for those for
       whom English is a second
       language




                                                                                                      85
No    Actions                        Deadline A D G R RS S Update      Responsibility
19.10 Audit of communication         June                  Completed   MDM
      with parents to be             2010
      undertaken – number of
      times and when we
      communicate with parents
      and how. This to be done
      with a view to rationalising
      communication and                      X X X X X    X
      publicising a yearly
      communication schedule
      so parents are clearer
      about what communication
      they can expect and who
      can help, advise or guide
      them about various issues.




                                                                                   86
No    Actions                          Deadline A D G R RS S Update                    Responsibility
19.11 Investigate new ways of          June                  Action complete. All      MDM
      communicating with               2012                  parents asked for the
      parents, not just in                                   preferred method of
      translated form for those                              contact as part of the
      parents/carers who have                                parent’s survey. Options
      English as a second                                    include telephone, email,
      language but for those                      X   X      text, diaries. Community
      parents not literate in their                          marketing plan in place
      first or second language, ie                           to over outreach work
      direct phone contact, local
      mosque, local language
      radio programmes, social
      services and GP practices
19.12 Advice to parents about the      June                       April 2012 update:          APP
      costs of further training, the   2012                       Parent survey in 2012
      availability of student loans                               shows a big increase in
      etc to encourage aspiration                  X              parent satisfaction about
      in those parents/carers who                                 ‘what next’
      see the cost of this as
      prohibitive
19.13 Review with learners how         June                       Completed                   APP
      much involvement they            2011
      wish their parents/carers to                 X
      have with their individual
      case reviews




                                                                                                    87
No    Actions                       Deadline A D G R RS S Update                         Responsibility
19.14 Investigate with learners      June                                                QIM
      from different cultural       2012                                                 SA
      groups what the attitudes
      towards disability are and                 X       X X
      how this affects their
      retention, achievement and
      progression paths
19.15 Learners to influence         June                                                 MDD
      marketing literature –        2012
      working in a focus group
      way with the MDM to
                                               X X X X X           X
      establish why they like to
      learn at the RNIB College
      and how to approach other
      learners who might benefit
19.16 Respond to parent             Dec 2011                           Completed         Principal
      comments in 2011 to have
      more progress information
      about their son or daughter

Objective 20: Gather the views and experiences of those staff and learners from those groups that are
now protected characteristics, ie transgender, pregnancy etc. (Eliminating discrimination)


No   Actions                   Deadline    A         D   G     R       RB S   Update          Responsibility




                                                                                                        88
1   To invite staff from these June           QIM
    groups to attend a focus 2012
    group to discuss their
    views and issues. If the
    invitation is not                 X   X
    successful the college
    will run an anonymous
    feedback week using talk
    back




                                                    89
The following objective has been transferred from the College’s previous Gender Equality Duty Action
Plan (to see the Gender Equality Scheme and Action Plan which has now been completed please look at
the College’s Intranet/internet site at www.rnibcollege.ac.uk)

Objective 21: To improve the number of males employed in learning assistant and care roles
(Eliminating discrimination, advancing equality)

No Actions                                          Deadline A D G R RB S Update Responsibility
1  To establish current gender split and compare    Jan 2012                     APF
   to a peer college or published data and set                   X
   SMART targets for improvement
2  Action plan changes, ie review job description   April                               APF
                                                                 X
   and person specification for above roles         2012
3  Implement changes and review results             June                                APF
                                                                 X
                                                    2012




                                                                                                   90
Objective 22: Emphasise to the Residential Training Unit (funding body for adults) the unintentional
gender bias of their current funding criteria for people with caring responsibilities (on the whole female)
– this objective will be reviewed when new funding arrangements come into place during 2011
(Eliminating discrimination)

No Actions                                               Deadline A D G R RB S Update Responsibility
1  Investigate statistics of females with disabilities   Jan 2012                     APP
                                                                      X
   into work to the RTU


Objective 23: Raise staff awareness re working conditions and facilities (Eliminating discrimination)


Please turn to next page




                                                                                                          91
No Actions                    Deadline A D G R RB S Update                             Responsibility
1  Investigation of           June                  AD reported that - RNIB            CMT
   maternity pay – is         2012                  included a question in their staff
   RNIB in line with other                          survey relating to benefits.
   major employers?                                 RNIB were committed to
                                                    reviewing benefits in the light of
    RNIB                                            the answer - essentially they
    Weeks 1 & 2 Full pay                            were saying that there was only
    Weeks 3 – 6 90% of                              so much money available for
    full pay                                        benefits and they wanted to see
    Weeks 7 – 39 the                                which benefits staff valued the
    lower of either the                             most highly
    standard rate of
    £123.06, or 90 per cent                               Question also raised at Staff
    of your average gross                    X            Forum September 2011
    weekly earnings.

    Leicester City Council
    6 weeks full pay
    12 weeks at 50% plus
    SMP
    21 weeks at SMP

    Loughborough
    University
    18 weeks full pay
    21 weeks SMP

                                                                                                   92
    Review by CMT
    needed

Objective 24: Premises and facilities at the RNIB College will promote equality (advancing equality)

No Actions                                              Deadline A D G R RB S Update Responsibility
1  Introduce condom machines in female                  Dec                          APF
   lavatories – or – ensure ease of access for all      2012     X X X X X  X
   learners
2  Nappy changing table in designated unisex            June                              APF
                                                                     X
   area                                                 2012
3  Facilities for staff going through life change, ie   June                              APF
   menopause or gender reassignment to be               2012
   publicised to staff for example access to                         X    X    X
   suitable and appropriate facilities, eg rest room,
   shower, iced water




                                                                                                       93

						
Related docs
Other docs by HC120727135350
Tim Hardy
Views: 1  |  Downloads: 0
quartet manual
Views: 16  |  Downloads: 0
No Slide Title
Views: 2  |  Downloads: 0
Park Exercise
Views: 3  |  Downloads: 0
Summer Fling Day Sheets 2008
Views: 8  |  Downloads: 0
custom blend form 1
Views: 2  |  Downloads: 0
Northeast, Southeast, Midwest, or West�
Views: 8  |  Downloads: 0
PowerPoint Presentation
Views: 1  |  Downloads: 0
BLM Leg 3
Views: 1  |  Downloads: 0